WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
NEI Electric Power Engineering Inc.
DATED: May 18, 2009
Work Order Number: n M tr 3 O
Purchase Order Number:
Project Title: Bid 7011
Commencement Date: 7/23/2010
Completion Date: 8/13/2010
Maximum Fee: (time and reimbursable direct costs):$4,000.00
Project Description: Review of CSU Engines Lab Interconnection Submittal
Scope of Services: See attached proposal dated July 20, 2010
Acceptance -)�vt
User
Professional agrees to perform the services
identified above and on the attached forms
in accordance with the terms and conditions
contained herein and in the Professional
Services Agreement between the parties. In
the event of a. conflict between or ambiguity
in the terms of the Professional Services
Agreement and this work order (including
the attached forms) the Professional
Services Agreement shall control.
Professional
By: �t
Date: R�L.3/ /
The attached forms consisting of one (1)
pages are hereby accepted and
incorporated herein, by
this reference, and Notice to Proceed is
stdwopsa rev 07/08
hereby given.
City of Fort Collins
By:
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing and Risk
Management
(over $60,000.00)
Date:
P.O Box 1265 •Arvada, CO 80001
c Phone (303) 431-7895 • Fax (303) 431-1836
electric power engineering www.neiengineering.com
Sa/q/0000/ • �.Z./Z/D-9302.-.
July 20, 2010
City of Fort Collins
Attn: Bob Micek, P.E.
Electric System Engineering Manager
215 N. Mason St., 2nd Floor
Fort Collins, Colorado 80524
Ph: (970) 416-2724
Fax: (970) 221-6619
bmicekca>fcgov.com
Ref: CSU Engines Lab Review
Dear Mr. Micek:
Thank you for the opportunity to provide you with a professional engineering
services cost estimate for review of the plans and other documents for the
CSU Engines laboratory and providing recloser settings for the proposed
recloser.
The estimated cost of this work is $4,000.00. Work included is:
• Checking submitted documents for compliance with Fort Collins
Interconnection standards.
• Reviewing proposed grounding
• Checking loss of sensitivity of utility feeder and switchgear fuse
• Suggesting frequency and voltage trip settings for the recloser
• CT Ratio and over current setting for the recloser
If approved, I anticipate beginning this work August 2, 2010 and delivering
my results to you by August 6, 2010.
Very truly yours,
;go h
Keith Malmedal Ph.D. P.E. P.Eng
President