Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9104009EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND NEI Electric Power Engineering Inc. DATED: May 18, 2009 Work Order Number: n M tr 3 O Purchase Order Number: Project Title: Bid 7011 Commencement Date: 7/23/2010 Completion Date: 8/13/2010 Maximum Fee: (time and reimbursable direct costs):$4,000.00 Project Description: Review of CSU Engines Lab Interconnection Submittal Scope of Services: See attached proposal dated July 20, 2010 Acceptance -)�vt User Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a. conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. Professional By: �t Date: R�L.3/ / The attached forms consisting of one (1) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is stdwopsa rev 07/08 hereby given. City of Fort Collins By: James B. O'Neill II, CPPO, FNIGP Director of Purchasing and Risk Management (over $60,000.00) Date: P.O Box 1265 •Arvada, CO 80001 c Phone (303) 431-7895 • Fax (303) 431-1836 electric power engineering www.neiengineering.com Sa/q/0000/ • �.Z./Z/D-9302.-. July 20, 2010 City of Fort Collins Attn: Bob Micek, P.E. Electric System Engineering Manager 215 N. Mason St., 2nd Floor Fort Collins, Colorado 80524 Ph: (970) 416-2724 Fax: (970) 221-6619 bmicekca>fcgov.com Ref: CSU Engines Lab Review Dear Mr. Micek: Thank you for the opportunity to provide you with a professional engineering services cost estimate for review of the plans and other documents for the CSU Engines laboratory and providing recloser settings for the proposed recloser. The estimated cost of this work is $4,000.00. Work included is: • Checking submitted documents for compliance with Fort Collins Interconnection standards. • Reviewing proposed grounding • Checking loss of sensitivity of utility feeder and switchgear fuse • Suggesting frequency and voltage trip settings for the recloser • CT Ratio and over current setting for the recloser If approved, I anticipate beginning this work August 2, 2010 and delivering my results to you by August 6, 2010. Very truly yours, ;go h Keith Malmedal Ph.D. P.E. P.Eng President