HomeMy WebLinkAboutWORK ORDER - RFP - P1107 GEOTECHNICAL TESTING SERVICE (24)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and CTL Thompson, Inc. DATED: July 27, 2010 Work Order Number: 03-400901802-10 Project Title: College Harmony Intersection Project (CHIP) Commencement Dater July 27, 2010 Completion Date: September 30, 2010 Maximum Fee: (time and reimbursable direct costs): not to exceed $28,476 Project Description: QC/QA testing Scope of Services: Perform work per attached quote dated July 19, 2010. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service Provider Date: —2�--i Approved By: Purchasing Agent over $60,000 q /0-� q -� 3 The attached forms consisting of three (3) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins ig By: Fr L. i -f, Date: -7 ^ Z --7 _ 1 C-) July 19, 2010 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Mark Laken, PE Project Manager Subject: Fee Estimate for Construction Observation and Materials Testing Services College Avenue/Harmony Road Intersection Improvements Intersection of College Avenue and Harmony Road Fort Collins, Colorado Fee Estimate No. FC 10-0247 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for Construction Observation and Materials Testing services for the College Avenue/Harmony Road Intersection Improvements project located at the intersection of College Avenue and Harmony Road in Fort Collins, Colorado. We understand testing for this project should be performed in accordance with City of Fort Collins standards and specifications as well as CDOT specifications. We reviewed the plans prepared by Interwest Consulting Group dated February 23, 2010 in preparation of our proposal. We understand that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing may be required for roadway subgrade, sidewalk subgrade, curb and gutter subgrade, aggregate base course, and utility trench backfill. We estimate a total of 25 site visits will be necessary. Engineering Technician 25 days x 2 hrs/day x $57/hr $2,850.00 Standard Proctor 3 tests x $83/ea $249.00 Atterberg Limits 3 tests x $62/ea $186.00 Gradation 3 tests x $72/ea $216.00 Subtotal: $3,501.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 Concrete Testing: Concrete testing will be required for the pavement, medians, ramps, sidewalk, and curb and gutter. We estimate 85 concrete tests consisting of 5 cylinders each will be necessary. We further estimate that additional technician time will be necessary to test the percent air content on approximately two extra trucks for each day of concrete placement. Concrete Cylinders 85 tests x $166/test $14,110.00 Additional Concrete Cylinders 85 tests x $9/test $765.00 Additional Technician Time 85 hours x $52/hour $4,420.00 Subtotal: $19,295.00 Asphalt Testing: Compaction testing will be required during asphalt placement on Harmony Road. We estimate the project will require 8 days of asphalt compaction testing and 8 laboratory samples. Engineering Technician 8 days x 8 hrs/day x $57/hr $3,648.00 Lab Density (Rice) 8 tests x $88 /ea $704.00 AC Content/Gradation 8 tests x $166/ea $1,328.00 Subtotal: $5,680.00 TOTAL ESTIMATED FEE: $28,476.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Heather Grubb Field Department Manager CITY OF FORT COLLINS COLLEGE AVENUElHARMONY ROAD INTERSECTION IMPROVEMENTS CTL I T FEE ESTIMATE NO. FC-10-0247