HomeMy WebLinkAbout113170 MWH AMERICAS INC - PURCHASE ORDER - 9104044 (2)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND MWH DATED: July 26, 2010 Work Order Number: M-WRF-2010-07 Purchase Order Number: Project Title: Mulberry WRF Communications, Security, and Commissioning Commencement Date: July 26, 2010 Completion Date: April 1, 2011 Maximum Fee: (time and reimbursable direct costs), $193,223 Project Description: To provide design and engineering services during construction for the completion of the Mulberry Water Reclamation Facility Improvements, including additional construction support; security design and coordination; communications and network support; additional start-up, pre - commissioning, and commissioning services; and odor testing and documentation. Scope of Services: See attached Exhibit "B" Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached Exhibit "B" consisting of five (5) pages, plus figures and tables, is hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. cc: Purchasing Professional MWA Vice President Date: 9/24 110 City of Fort Collins Submitte y: Link Mueller Proj ct Manager Date: 2 Zb Reviewed By: Kevin'Gertig , Water Re ruos ces &- Treatment Operations Manager Date: 'T - 2"1- 10 By: Jano lis, Utilities , Executive Director games d By: O'N' , Pur hasigg & Risk Mgt � v EXHIBIT "B" WORK ORDER NO. M-WRF-2010-07 MULBERRY WRF COMMUNICATIONS, SECURITY, & COMMISSIONING DESIGN AND CONSTRUCTION MANAGEMENT SERVICES SCOPE OF SERVICES PROJECT SCHEDULE • Contract Commencement Date: July 26, 2010 • Contract Completion Date: April 1, 2011 FEE ESTIMATE • Fees shall be on a time and reimbursable direct cost basis with a not -to -exceed limit • See Table B-1: Rate Schedule • See Table B-2: Fee Estimate • Not -To -Exceed Amount = $193,223 SCOPE OF SERVICES This scope of work submitted to Fort Collins Utilities (FCU) by MWH Americas, Inc. (MWH) covers the design and engineering services during construction for the completion of the Mulberry Water Reclamation Facility Improvements, including additional construction support; security design and coordination; communications and network support; additional startup, pre -commissioning, and commissioning services; and odor testing and documentation required for the completion of the Mulberry WRF Improvements Project. The scope includes: Task 1 - Construction Support Objective: Provide civil, architectural, structural, mechanical, HVAC, electrical and instrumentation support during the construction process. Task 1.1 Construction -related meetings Activities 1.1.1 Conduct Arc -Flash coordination meetings with City Staff and Light & Power 1.1.2 Meet with Contractor and HVAC representatives to coordinate issues related to the geothermal HVAC system 1.1.3 Coordinate with the Contractor,. City staff, and Turblex to resolve issues relating to submittal process 1.1.4 Provide one representative to attend 2 — two day performance and functional tests in Springfield, MO. MWH Exhibit B: Page 1 of 3 July 26, 2010 Task 1.2 Design -related Services Activities 1.2.1 Re -design MWRF odor control resulting from lessons learned from DWRF odor control project 1.2.2 Structural evaluation of submittals and modifications presented by Contractor, including: • Final Clarifier fitting • Tank Covers • Scrubber reinforced concrete supports • General Pipe Supports • Miscellaneous BREW building structural issues 1.2.3 Provide an additional week of support services to cover installation related issues for each discipline. 1.2.4. Amend the current construction drawing set to incorporate as -built information related to the following sub -systems: • Irrigation system — yard piping, valves, control information, pumps, and instrumentation • MWRF Landscaping plan • HVAC modifications to the Operations Building in support of MIS installation Task 2 — Security Support Task 2.1 Physical S Physical Activities 2.1.1 Provide design details for automated gate at west entrance to MWRF 2.1.2 Provide design details for a grating over MWRF outfall to prevent intruders from entering the site Task 2.2 Security System Coordination Activities 2.2.1 Assist project staff in coordinating with electrical contractor and outside vendors on electrical and control issues related to the following systems: • Site Security Camera System & Network • Door Security System • Motion Detection Intruder System MWH Exhibit B: Page 2 of 3 July 26, 2010 Task 2.3 Security System Documentation Activities 2.3.1 Utilizing information provided by the contractors as -built the. security systems on existing electrical drawings Task 3 — Communication and Network Support Task 3.1 Communications and Network Support Activities 3.1.1 Coordinate with City's MIS group on network and communications issues 3.1.2 Document as -built conditions for network fiber and'copper wire installations Task 4 — Start-up, Pre -Commissioning, and Commissioning Services Task 4.1 Startup Manuals Activities 4.1.1 Provide technical review and assistance for the development of Startup and Commissioning Manuals Task 4.2 Plant Equipment Startup, Activities 4.2.1 Provide technical assistance and advice to contractor and manufacturer's representatives during startup of equipment components 4.2.2 Witness test startup of major equipment. Attendance at equipment startups to be coordinated with Owner. 4.2.3 Provide Commissioning assistance during final plant commissioning events. Task 5 — MWRF Odor Documentation Task 5.1 Odor Testine Activities 5.1.1 Assist Owner is determining number and location of test site to be monitored for odors prior to plant startup 5.1.2 Assist Owner in performing the sampling operations and coordinating odor sample delivery and testing 5.1.3 Provide similar assistance for post -startup testing once plant operation has stabilized. The scope will be completed by the team under direction of MWH. It includes electrical and instrumentation and control work from Carollo Engineers. MWH Exhibit B: Page 3 of 3 July 26, 2010 MWH TABLE B-1 WORK ORDER NO. M-WRF-2010-07 2010 MWH RATE SCHEDULE Personnel Classification Hourly Rate ($/hr) Principal Professional $195 Supervising Professional $155 Senior Professional $135 Professional $105 Associate Professional $85 Supervising Designer $130 Senior Designer $100. Designer $90 i Senior Administrator $90 Administrative Assistant $80 Receptionist $60 Rates for Other Direct Charaes Other Direct Charges Associated Project Costs $9.50/labor hour Mileage Current Federal Rate CAD Computer Usage $18.00/hour ODC and Carollo Markup 15% Table B-1: Page 1 of 1 July 26, 2010 i M m 'namom �nrmmrn mMmrn Nr mm mm m�mom omomc> NN d _M O o Nr _ �n OH d •--tC mo t� �MC1N o am �c O d min mH om NC6� m d d N N ~ N Y N M Q� f r d m ' d m d m O m m w Yf Odat m O mm O Om0 m O m N N ^�Nr m 9 EN ' m H3 wwwwwwwww wwww ww Nwwww t wNO mm m� an d P Ndom �— .- � mn M i � � i i � � Nd N t a m Min a N o w w w w w w O O N am0 O W N N N w w w w w w w w ... w N w . w w w w m a V O N O N O N 0 o v w wwwwwww wwww ww wwwww ww w `m m L Q N w w w w w w w w N w w w N w N w w w w O 3 Jw O O m N tmfm O CJ NN' O O m m O O O N N O O m N ip N O d O 1 O O m m thM OI f m O H w w w w w w N w w w N w w w w N w o$c ��om��ydo 0000 00 ��ono � J L J � L O O O O � H C cyL Ear m o 0 0 0 0 v ¢aw O � L y9 w m m o 0 o m ¢ m O C L 0 m O w Cf m O O m x N b O � N G J Y tit � O Q Yf m m O �yD Q ry vy f�f N Q N N m _ a`p 'o w x o •t a t0 6 q N C L N yy o 00 O p C c � • C O'�O t N ry N p N u Z N O O O c C G Q N U O O U ao U oc_ I 0 c o m m 0 0 m Y o o f U o U A o yz- D m�Up irn vccml o 17 , a¢ -U- E ' E E Ac vlm o c c c�m� v� 222 a '3 ww E`' >> cE E~ In H a 7KF N N m m E U M C w w �� m ¢ f 'C O�ry N N O; V SSA an d N d O N C 1- O O lV O NI O V O Q Y-