Loading...
HomeMy WebLinkAboutWORK ORDER - PURCHASE ORDER - 9103981 WORK ORDERWORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Southwestern Painting DATED: August 1, 2008 Work Order Number: OP-436585 Purchase Order Number: Project Title: Senior Center miscellaneous painting during August shut down. Commencement Date: 08-02-1 Completion Date: 08-07-10 Maximum Fee: (time and reimbursable direct costs): $6,059.0 Project Description: Paint walls at the Senior Center per proposal from Southwest Painting Scope of Services: See proposal from Southwest Painting. Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of consisting of (___) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Service ProMider* ' By. • 1 Date: (6 City of Fort Collins: Submitted By:_Bruce Byrne Project Manager Date: 08-02-10 Approved by: 07/21/2010 21:25 FAX 1@001 SOUTHWESTERN PAINTING P.O. Box 1400 Brighton, do., 80601 (3)655-0153 (7)300-2121 To: City of Fort Collins 300 LaPorte Ave. Fort Collins, Co. Attn: Jared H. PROPOSAL Project: Interior misc. painting, Senior Center, 1200 Raintree St, To Include: scrape, sand, caulk, spot prime as needed and one - coat finish, to all walls, ceilings, doors, door frames, window frames and handrails. Area 1. Paint railings going downstairs. Labor: Journeymen hrs. 2 x $24.00 pr. hr. $48.00 Estimated Material: $24.00 Sub total $72.00 Area 2. Tull area downstairs near locker rooms touch-up. Labor: Journeymen hrs. 2 x $24.00 pr. hr. $48.00 Estimated Material: $24.00 Sub total $72.00 Area 3. Gym wall touch-up between storage dancing. Labor: Journeymen hrs. 3 x $24.00 pr. hr. $72.00 Estimated Material: $35.00 Sub total $107.00 Area 4. Lifeguard office walls. Labor: Journeymen hrs: 6 x $24.00 pr. hr. $144.00 Estimated Material: $48.00 Sub total $192.00 Area 5. Paint gym entry, stairwell, and exit door -frames. Labor: Journeymen hrs: 14 x $24.00 pr. hr. $336.00 Estimated Material; $48.00 Sub total $384.00 Area 6. Spot prime and touch-up mens--womens locker rooms, 3 x 3 water damage, epoxy paint. Labor: Journeymen hrs: 12 x $24.00 pr. hr. $288.00 Estimated Material; $105.00 Sub total $393.00 Area 7. Activity rooms two and three touoh--up walls,doors frames. Labor: Journeymen hrs: 6 x $24.00 pr. hr. •$144.00 Estimated Material: $80.00 Sub total $224.00 41qqq 07/21/2010 21:25 FAX [a 002 SOUTHWESTERN FAINTING F.O. BOX 1400 Brighton, Co., 80601 (3)655-0153 (7)300-2121 Area 8. Swimming pool area, four blocks up touch-up, ductwork touch-up, paint second to last door and frame eastwall. Labor: Journeymen hrs. 16 x $24.00 pr. hr. $384.00 Estimated Material: $151.00 Sub total $535.00 Area 9. Track area, eastwall, westside window sills, northaide corner to second window westside four blocks -up corner to door, halfwall northaide to break, touch-up. Labor: Journeymen hrs. 22 x $24.00 pr. hr. $528.00 Estimated Material: $120.00 Sub total $648.00 Area 10. Touch-up all railings, north of reception. Labor: Journeymen hrs. 2 x $24.00 pr. hr. $48.00 Estimated Material. $24.00 Sub total $72.00 Area 11. Complete painting of walls north side. Labor: Journeymen hrs. 56 x $24.00 pr. hr. $1,344.00 Estimated Material: $384.00 Sub total $1,728.00 krea 12. Faint hallway door frames and two doors, north side hallway. Labor: Journeymen hrs. 20 x $24.00 pr. hr. $480.00 Estimated Material: $72.00 Sub total $552.00 Area 13. Paint main doors, door frames and windows, north side entry. Labor: Journeymen hrs. 20 x $24.00 pr. hr. $480.00 Estimated Material: $48(00 Sub total 528.00 Area 14. Paint all walls vending area hallways. Labor: Journeymen hrs. 4 x $24.00 pr. hr. $96.00 Estimated Material: $24.00 Sub total $120.00 Area 15. Billards room, paint telephone and boardwall. Labor: Journeymen hrs. 4 x $24.00 pr. hr. $96.00 Estimated Material: $24.00 Sub total $120.00 Area 16. Billards room, paint west wall. Labor: Journeymen hrs. 4 x $24.00 pr. hr. $96.00 Estimated Material: $24.00 Sub total $120.00 Area 17. Confrence room, paint quilted wall & Touch-up east wall. Labor: Journeymen hrs. 7 x $24.00 pr. hr. $168.00 Estimated Material: $24.00 Sub total $192.00