HomeMy WebLinkAboutRESPONSE - BID - 7133 WEED CUTTING AND RUBBISH REMOVALCity of
Fort Collins
/0" �PurChasingg
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid 7133: Weed Cutting and Rubbish Removal
OPENING DATE: 3:00 P.M. (Our Clock) April 13, 2010
Financial Services
Purchasing Division
215 N. Mason St. 2n0 Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov. com/purchasing
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
CHANGE:
The following will be paid to contractors on an hourly or negotiated cost with the
City Representative. The City may ask contractors for pricing for a project and
the low responsive responsible price would be awarded the work. Work must be
completed in a complete and professional manner.
Scope of work for Dilapidated Fences & Dirt Yards Ordinances:
Repair, replace or remove sections of fences that are found in violation of Code
Sec. 20-32 by the City of Fort Collins Code Compliance Inspectors. Must use
compatible/comparable materials to the original fence for all repairs. Bring dirt
yards into compliance with Code Sec. 20-31 by performing work as instructed by
Compliance Inspectors by coving dirt area of yard with some form of ground
cover (e.g. seed, sod, gravel, mulch, plants, etc.).
Hourly Rate: $ 35 AW—
2. Traffic control for Road Shoulder mowing will be the responsibility of the
contractor.
Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777
with any questions regarding this addendum.
RECEIPT" OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
where renewal is a way of life
BID SCHEDULE
7133 Weed Cutting and Rubbish Removal
We hereby enter our pricing for the City of Fort Collins' requirements to cut and remove weeds and rubbish
in accordance with Section 20 - 45 of the Code and Ordinance of the City of Fort Collins. All pieces of
equipment shall be priced separately, listing make, model, year, horsepower, size, and cost per hour. Also,
a combined price shall be given for minimum equipment required in each category. Contractor may bid on
one or all categories. Category II and III require a digital camera and all weed mowing and rubbish removal
must have a digital photo taken prior to the weed mowing and rubbish removal. The disk with the pictures
should be turned it with the invoice. Failure to do so may result in the contractor not being paid. Camera
malfunction will be taken into consideration.
Section 1. Extra Heavy Rubbish Removal
Minimum equipment required: please check (4) equipment you have
t' Loader
Tandem dump truck with a 10 yard minimum box.
EQUIPMENT
YEAR
MODEL
CU. YDS. HP
$/HR.
eA clog
492
Box/BUCKET
PA//i�br f%i T .300
IWq
10
G mr,
r
512
Combined minimum price for fork/bucket loader and tractor......... $ a-5per hour.
Minimum price for dump truck: .................................$ f $per hour.
FIRM NAME 49%,�j 1,4�tiGt$G/ Dte �� C-
4
Section 2. Heavy Rubbish Removal
Minimum equipment required: Please Check N) equipment you have
V I-ork or bucket loader
Tractor with sufficient capacity, defined as the industry standard for the P.T.O. horse power
needed for the loader, to perform the work.
L-5:yard minimum capacity dump truck
✓Digital Camera
EQUIPMENT
YEAR
MODEL
CU. YDS.
HP
$/HR
CAT
�Z
Box/BUCKET
ear
�
Ab y leaf%A�rcr�
'®D
r5-75"
'7 5"
91
14 42/ tti
11-Iq
,Or -
Combined minimum price for fork/bucket loader and tractor ......... $,; per hour.
Minimum price for dump truck: ................................................ $-YLper hour.
FIRM NAME A -In
�i
Section 3. WEED MOWING AND RUBBISH REMOVAL
The minimum equipment required is: please check equipment you have
IZFive-foot rotary mower
✓Tractor with sufficient capacity, defined as the industry standard for the P.T.O. horse power
needed for the make and model of mower;
fiHand tools
:/High back pickup truck
and operated weed cutter
_
hree-foot walk behind mower.
1/List a three-foot walk behind grooming mower, if available.
✓Digital Camera
Equipment Year Model HP Width $/Hr.
h]jk.Z &A,1d
Ford I7v F7,or&d
4 ; x17AI
9v5gUAt1A,v,4
y5-O
roigry 'Ov"/i
Combined minimum price for tractor and mower ........................ $__!�/� per hour.
FIRM NAME ZILM ) 4t1a15c" �,vG
0
C1
Section 4. Road Shoulder Mowing
Approximately 100 lane miles of road shoulders to be mowed, three or more times a summer, depending
upon climate conditions. From past experience a mile to a mile and a half can be mowed in an hour.
Includes weed whipping around poles, signs, etc. Must avoid mowing major arterials during rush hour, from
7-9am, and 4-6pm. Major arterials are streets like Prospect, Drake, Lemay, Timberline, Horsetooth, Taft,
Shields, etc. This restriction does not apply to weekends.
Minimum equipment required: please (�) check equipment you have
9'or larger mower capable of mowing road shoulders
Tractor with sufficient capacity, defined as the industry standard for the P.T.O. horse power
j,/eeded for the make and model of the mower.
7' mower with a 7' wing is desirable, and will be given preference on the wider stretches of road
shoulder.
✓' Hand operated 20 hp power weed cutter.
Safety Equipment:
The tractor must be equipped with safety placards: "Caution", etc., and working flashers as well as
reflectors. The mower must be equipped safety guards or chain guards to prevent rocks and debris from
flying out from under the mower. Personnel working on or near the road including the road shoulder or
right-of-way must wear a Class III reflective safety vest and hard hats at all times. Personnel must wear
eye and ear protection during weed whipping. City will provide traffic control for work on all major roads.
Litter control on some major arterials will be required, as well as special cleanup instructions on Harmony/1-
25 interchange to prevent blockage of the irrigation siphon. Contractor must have irrigation experience so
they can operate the irrigation system at the intersection.
Tractor\Whip
Year
Model
Width
$/Hr.
OA1;
Net:.,.&- �,�d
fic-
5 �T
CO
hll� UyArvA
WZe
AC
s.�
e7fo 7
we-ld &Z4
NP
caf_
Combined minimum price
for tractor and
mower ........................
$ -'
3.5 per
hour.
Minimum price for weed whip ................................................ $� per hour.
FIRM NAME /9t in 4144idsC-Z , r11,1 C
7
Section 5. Stormwater Detention Basins and Drainage Channels Mowing
Approximately 14 Detention Basins and 28 Drainage Channels to be mowed 4-6 times a season,
depending on weather (growing) conditions. Debris pick-up and removal (tree limbs, wind blown debris,
misc. abandoned debris, etc.) may be required in the spring prior to mowing to avoid equipment damage
and/or for the aesthetics of the area. Debris disposal will be billed for man-hours, hauling and landfill fees.
The minimum equipment required is: please check N) equipment you have
_✓. ive-foot or larger rotary mower
✓Tractor with sufficient capacity, defined as the industry standard for the P.T.O. horse
power needed for the make and model of mower;
Hand tools
High back pickup truck
cf/ Hand operated weed cutter
vl Three-foot walk behind mower.
List a three-foot walk behind grooming mower, if available.
% Digital Camera
Equipment
Year
Model
HP
Width
$/Hr.
Ve 1e)114,d
Aga
X6'-9
-7Sr
to '
.,W
��6A i.Aovg 14 ; 1�P "94--so 00
of
�Cf-
Combined minimum price for tractor and mower ........................ $ per hour.
FIRM NAME A:F In
Are you a Corporation, Partnership, DBA, LLC, or PC
SIGNATURE.
ADDRESS f C/ $ q Q F, 4 9 V
PHONE/FAX # CP, )1' gV - 53% J-?q,,7 ICA- -*
LIST OF PROPOSED SUBCONTRACTORS AND SUPPLIERS
NAME OF INDIVIDUAL OR COMPANY WORK TO BE PERFORMED AND/OR
GOODS OR MATERIALS SUPPLIED
�r�1c7�oy, lyi>`h
NOTE: Only Subcontractors, Suppliers and Material suppliers listed above will be allowed to work on
the City's Weed and Rubbish Abatement Program under your contract. Any additions or deletions must
have prior approval from the City.
I certify no Subcontractors, Suppliers or Material suppliers will be used by my firm in the performance of
this contract, therefore, Lien Waivers will not be supplied with billing forms.
Authorized Signature
5
Title
IRM NAME
14
Health Act, all regulations issued there under and all state laws and regulations enacted and adopted
pursuant thereto.
The Contractor also agrees to require that all persons operating motorized equipment possess a valid
drivers' license and that it will comply with Title 8, Article 12, C.R.S., the Colorado Youth Employment
Opportunity Act of 1971.
The Contractor agrees to pay all state and federal social security, unemployment insurance and other
taxes, assessments or contributions due and payable to the State of Colorado and/or the United States
in connection with the work to be performed under this Contract, and the Contractor shall hold the City
harmless from any liability on account of any such taxes or assessments.
NO CONFLICT WITH THIRD PARTIES
The Contractor agrees that no conflicts between the Contractor or its employees and any third party
who owns or exercises control over the work site or adjacent property shall occur.
WAIVER FOR WORKMEN'S COMPENSATION INSURANCE COVERAGE
WHILE ENGAGED IN WEED AND RUBBISH REMOVAL OPERATIONS FOR
THE CITY OF FORT COLLINS, COLORADO
The Contractor shall indemnify and hold harmless the City of Fort Collins, Colorado and its agents,
officers and employees from and against all claims, damages, losses and expenses, including
attorneys' fees, arising out of or resulting from the performance of the work.
It is expressly understood Workmen's Compensation Insurance is not required due to the nature of your
performance, i.e., driving trucks, never leaving the cab area of such trucks or for the following reasons:
while performing your duties as described in all Specifications and Contract Documents.
Dated this day of 2010.
TYPED OR PRINTED NAME OF CONTRACTOR OR FIRM
By:
Authorized Signature
Notary Public
My commission expires
13