Loading...
HomeMy WebLinkAboutPrebid - BID - 7138 DOWNTOWN ALLEY ENHANCEMENTS (2)Downtown Alley Enhancements Pre -Bid Meeting and Walk Through April 27, 2010; 2 pm Agenda I. Introductions II. Procedural Items — John Stephen, City of Fort Collins Purchasing 1. Sign -in sheet; mandatory pre -bid meeting 2. Bid Opening: May 11, 2010 at 3:00 pm; Purchasing Department 3. Ensure bid addendums are documented/received 4. Bid Bond — 5% 5. Sealed bid with separate qualifications a. Qualifications listed in Section 01010 (review) 6. Provide list of unit prices in addition to lump sum bid 7. Last day for questions: May 4, 2010 end of business a. Direct all procurement questions to John Stephen b. Direct all plan and specification questions to Keith Meyer III. Contract Times 1. Substantial Completion — 85 calendar days 2. Liquidated Damages - $1,300 per day 3. Final Completion — 14 calendar days from Substantial 4. Liquidated Damages - $300 per day IV. Warranty — 2 year V. Plan set scale (24x36 and 12x18) Presentation Handout: VI. Project Locations and Scope of Work VII. Staging, Demolition, Access and Traffic Control Vill. Utility Relocation Coordination IX. Business Owner and Tenant Access and Coordination X. Temporary Facilities XI. Permits XII. Technical Specifications XIII. Site Walk Through 4/26/2010 Project Locations &Scope of Work 0 0 OO ld Fire House Alley (OO FA) • Scope of work: Utility relocation, storm drainage, newpower a:. ungahon foundations is c ncretepavement unit paver si e furnisliigs, fencing, landscaping. R'o" rfCotljns� dite-A-c-b- rl'-Lq—c I a-�j Montezuma Fuller Alley vimv = I k*— Ell x i Iri,,rySlai,g: DDA dittift -of" ffiffidda a 1 4/26/2010 Old Fire House Alley TAiN wFZL— --=--n— =:= ZZ PrimarVStaging: Mike Jensen fp -Qr,fCoIhns dfteSe 9.9 dd a' ........ Montezuma Fuller Alley A 4 IF Demolition Areas dites-c-d- n s' FL dda Old Fire House Alley Demolition Areas 9!— Now- 0- Qty.1 ditesco -,�,,cdlns 'G.L;q d d a 4/26/2010 Access and Traffic Control • MFA Access — Primary from Remington — Secondary from alley entry points • OO FA Access — Primary from alley entry points ••Seeondaryxfrpm WalnutF�ia L-ot 10, (T,-uesday ""'�"' Morning) • Traffic Control Plans shown are schematic for bidding purposes only Fort Collins d0fte - 1 ����� Critical to"success.of project — Maintain Service to businesses. — Coordinate outages and downtime (min. 48 hrs) • Three week schedule, door hangers, visits Fort ColUns ditesco -� ! dda Business and Tenant Coordination • Refer to Section 01010 — Accommodate multiple deliveries on mulriple days — Allow access across construction zone • Business employees; Business delivery primary access • Tenants — Provide for trash and recycling service throughout construction duration; include removal of ex�stmg .dumpsters — Provide for grease trap service and removal — Recognize residential nature of areas of work Noise level for tenants Working hours: 8 am to 6 pm; 7 am to 9 am deliveries Get Collins dINSCO � !09 dda 3 4/26/2010 Temporary Facilities • Power and Water • Toilets • Fencing (peruneter 6-foot chain link) - C•ombination locked • Trash and recychng containers Phdne,' cl other services Fortcolllns ditesce - 1.0 d d a FOr�tfl`S NOW 11 dda Note spare parts/materials — Irrigation service taps by City —'Site Furnishings • No substitutions to specified products dItCSCO �rt`in r !O dda 4 4/26/2010 - Lighting: 72 hour operational test'14 day performance test; night test - 5% spare parts/extra materials (ballasts) —cnyf--- - —, Fort Cothns dit '- - �- 11 dda Site Walk Through • Start at north end of OO ld Firehouse Alley ditesco ^-ems aEdda 5