HomeMy WebLinkAboutPrebid - BID - 7138 DOWNTOWN ALLEY ENHANCEMENTS (2)Downtown Alley Enhancements
Pre -Bid Meeting and Walk Through
April 27, 2010; 2 pm
Agenda
I. Introductions
II. Procedural Items — John Stephen, City of Fort Collins Purchasing
1. Sign -in sheet; mandatory pre -bid meeting
2. Bid Opening: May 11, 2010 at 3:00 pm; Purchasing Department
3. Ensure bid addendums are documented/received
4. Bid Bond — 5%
5. Sealed bid with separate qualifications
a. Qualifications listed in Section 01010 (review)
6. Provide list of unit prices in addition to lump sum bid
7. Last day for questions: May 4, 2010 end of business
a. Direct all procurement questions to John Stephen
b. Direct all plan and specification questions to Keith Meyer
III. Contract Times
1. Substantial Completion — 85 calendar days
2. Liquidated Damages - $1,300 per day
3. Final Completion — 14 calendar days from Substantial
4. Liquidated Damages - $300 per day
IV. Warranty — 2 year
V. Plan set scale (24x36 and 12x18)
Presentation Handout:
VI. Project Locations and Scope of Work
VII. Staging, Demolition, Access and Traffic Control
Vill. Utility Relocation Coordination
IX. Business Owner and Tenant Access and Coordination
X. Temporary Facilities
XI. Permits
XII. Technical Specifications
XIII. Site Walk Through
4/26/2010
Project Locations &Scope of Work
0
0 OO ld Fire House Alley (OO FA)
• Scope of work:
Utility relocation, storm drainage, newpower
a:. ungahon foundations is c ncretepavement
unit paver si e furnisliigs, fencing, landscaping.
R'o" rfCotljns�
dite-A-c-b- rl'-Lq—c I a-�j
Montezuma Fuller Alley
vimv = I
k*—
Ell
x i
Iri,,rySlai,g:
DDA
dittift
-of"
ffiffidda
a
1
4/26/2010
Old Fire House Alley
TAiN wFZL— --=--n—
=:=
ZZ
PrimarVStaging:
Mike Jensen
fp
-Qr,fCoIhns
dfteSe 9.9 dd a'
........ Montezuma Fuller Alley
A
4 IF
Demolition Areas
dites-c-d- n s' FL dda
Old Fire House Alley
Demolition Areas
9!—
Now-
0-
Qty.1
ditesco -,�,,cdlns 'G.L;q d d a
4/26/2010
Access and Traffic Control
• MFA Access
— Primary from Remington
— Secondary from alley entry points
• OO FA Access
— Primary from alley entry points
••Seeondaryxfrpm WalnutF�ia L-ot 10, (T,-uesday ""'�"'
Morning)
• Traffic Control Plans shown are schematic for
bidding purposes only
Fort Collins
d0fte - 1 �����
Critical to"success.of project
— Maintain Service to businesses.
— Coordinate outages and downtime (min. 48 hrs)
• Three week schedule, door hangers, visits
Fort ColUns
ditesco -� ! dda
Business and Tenant Coordination
• Refer to Section 01010
— Accommodate multiple deliveries on mulriple days
— Allow access across construction zone
• Business employees; Business delivery primary access
• Tenants
— Provide for trash and recycling service throughout
construction duration; include removal of ex�stmg
.dumpsters
— Provide for grease trap service and removal
— Recognize residential nature of areas of work
Noise level for tenants
Working hours: 8 am to 6 pm; 7 am to 9 am deliveries
Get Collins
dINSCO � !09 dda
3
4/26/2010
Temporary Facilities
• Power and Water
• Toilets
• Fencing (peruneter 6-foot chain link)
- C•ombination locked
• Trash and recychng containers
Phdne,' cl other services
Fortcolllns
ditesce - 1.0 d d a
FOr�tfl`S
NOW 11 dda
Note spare parts/materials
— Irrigation service taps by City
—'Site Furnishings
• No substitutions to specified products
dItCSCO �rt`in
r
!O dda
4
4/26/2010
- Lighting: 72 hour operational test'14 day
performance test; night test
- 5% spare parts/extra materials (ballasts)
—cnyf--- - —,
Fort Cothns
dit '- - �- 11 dda
Site Walk Through
• Start at north end of OO ld Firehouse Alley
ditesco ^-ems aEdda