Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 6045 ASPHALT SUPPLY (4)EXHIBIT "All WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Connell Resources, Inc...,._.:....... Dated: 5/20/2010 Work Order Number: Purchase Order Number: c:y Project Title: ;,BMX Grnding for Trck;design... Commencement Date: 4/9/2010 Completion Date: 5/31/2010 _ Maximum Fee: (time & reimbursable direct costs): l $23,18-7.0.5.. Project Description: Scope to include time and materials for grading oftiack fur track designer, l2" rcp and storm drains, 6" aggregate access drive, construction debris removal, additional safety fencing, trenching for electric line, drain pits in track. Scope of Services: Terms and rates for the City's current contract bid with Connell Resources to apply for this work. Work to comply with City, State, and Federal regulations. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terns of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control.' - Service Provider By - ,Date: CC: Purchasing ®VINAN The attached forms consisting of two Ll page(s) are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. City of Fort Collins :By: Date: Director of Purchasing and Risk Management if over $60,000 Connell Resources, Inc. 7785 Highland Meadows Pkwy, #100 Fort Collins, CO 80528 Phone: (970) 223-3151 Fax: (970)223-3191 Estimator: Roland Tremble QUOTATION Submitted To: City Of Fort Collins - Park Planning Address: 215 North Mason Street Fort Collins, CO 80521 Contact: Kathleen Benedict Phone: 970-221-6360 Fax: 970-221-6586 Date: 4/2/2010 Bid Title SE Community Park BMX Track New Work Order Items Bid Number: Project Location: SE Community Park Project City, State: Fort Collins, CO Engineer/Architect: Interwest Consulting Group We offer for your consideration the following Quotation which, if accepted, shall constitute a contract between us. Item # Item Description Estimated Quantity Unit Unit Price Total Price Time And Material Work 900 Time And Material 4/26/10 1.00 LS $1,581.50 $1,581.50 901 Time And Material 4/27/10 1.00 LS $3,461.25 $3,461.25 902 Time And Material 4/28/10 1.00 LS $4,365.00 $4,365.00 903 Time And Material 5/3/10 1.00 LS $2,965.00 $2,965.00 905 Time And Material 5/4/10 1.00 LS $3,560.00 $3,560.00 Total Price for above Time And Material Work Items: $15,932.75 Unit Price Work Items 02-102 12" RCP FES 2.00 EACH $308.65 $617.30 02-101 12" RCP Storm Drain 24.00 LF $30.50 $732.00 47-100 6" Agg Base Drive Area 50.00 SY $13.50 $675.00 22-100 Remove Building Haul To Dump 1.00 EACH $2,200.00 $2,200.00 22-150 Install Orange Safety Fence Around Edora Park 720.00 LF $1.25 $900.00 23-200 Trench For Electric Line 20" Deep 600.00 LF $2.00 $1,200.00 23-300 Install Drain Pits, Concrete Pipe And Gravel 3.00 EACH $310.00 $930.00 Total Price for above Unit Price Work Items Items: $7,254.30 Total Bid Price: $23,187.05 Notes: • Pricing is based upon all New work required to cmplete the work at the South East Community Park, and all time and material work completed so far. SE Community Park BMX Track New Work Order Items Page 1 of 2