HomeMy WebLinkAboutAddenda - RFP - 7105 CNG FUELING STATION ADDITIONFinancial Services
Purchasing Division
215 N. Mason St. 2"d Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov. com/purchasing
ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of RFP 7105: CNG Fueling Facility Addition
OPENING DATE: 2:30 P.M. (Our Clock) February 16, 2010
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
CHANGE:
The opening date has been changed to February 16, 2010.
CLARIFICATIONS:
Clarification of Drawing Al, concerning the CNG enclosure:
The additional compressor(s) can be placed in the area labeled Hythane, since
Hythane will not be installed.
Added storage tanks may be placed beside the existing tanks (noted on the
drawing as Storage Vessels in Stacked Arrangement).
Any available space in the enclosure can be used for the added compressor(s)
and storage tanks, based on the requirements of components being provided, as
long as there is sufficient room around the equipment for maintenance and
repair.
Please contact James R. Hume, CPPO, Senior Buyer at (970) 221-6776 with any
questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
where renewal is a way of life