Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7127 COLLEGE HARMONY INTERSECTION IMPROVEMENTS FEDERAL AID PROJECT NO. STU M455-077 (6)College / Harmony Intersection Project CHIP PRE -BID CONFERENCE April 2, 2010 2:00 P.M. 215 N. Mason Street. Community Room City of Fort Collins Engineering Dept. Capital Improvements Program INTRODUCTIONS • Engineering: — Capital Projects Program: o Rick Richter - Program Manager 221-6798 o Dean Klingner — Project Manager 218-4962 o Mark Laken - Project Engineer 222-3546 o Craig Farver - Construction Inspector 222-0854 • Purchasing: — John Stephen -Purchasing Agent 221-6777 • Traffic — Syl Mireles Traffic Eng. Tech 221-6815 • Consultant Engineers: — Bob Almirall — Senior Project Manager 970-674-3300 — Mike Oberlander — Project Designer 970-674-3300 HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: • SUPERINTENDENTS: o The General Contractor SHALL employ a full time Superintendent whose sole responsibility isto monitor and coordinate all facets of the worms LIQUIDATED DAMAGES: o SUBSTANIAL COMPLETION: o The contractor will need to meet substantial completion requirements within 112 days of construction start date. Substantial completion shall be defined as the completion of all earthwork, asphalt placement, concrete items, utility installations, landscaping and any other pertinent items as required for this project. If the Contractor goes past the 112 calendar days for substantial completion, damages in the amount of Five Thousand Dollars ($5,063.00) for each calendar day will be assessed. o FINAL ACCEPTANCE: Final acceptance must be met by August 14, 2009. Liquidated damages in the amount of One Thousand Dollars ($i,000.00) per calendar day will be charged if this schedule has not been met. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: • CONSTRUCTION HOURS: o Standard Hours of Operation ■ 7:00 A.M. thru 6:00 P.M. - Monday thru Friday. ■ Given the scope of the proposed improvements, the City will permit extended working hours —Extended Hours requests must be made in writing HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: • PROJECT MEETINGS: o Once a week at the construction trailer located on site, time to be determined. o PROGRESS AND SCHEDULE REVISIONS: o Schedules shall be updated weekly. The Contractor may be required to submit additional schedules depending on the progress of the project. • HAUL ROUTES: o Arterial and Collector streets only. Contractor will not be allowed to use residential streets to access the site with trucks hauling materials. HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: • SITE CLEAN-UP: o The construction work shall be kept and accomplished in a neat, clean and orderly fashion. o Tracking pads and street sweeping will need to be used in order to minimize tracking and meet EPA storm water quality requirements. o Dust control will be required. Notes on College- Harmony Intersection CMAQ Federal Aid Project • Change Orders will follow CDOT procedures • Federal Aid = Davis Bacon Wages and Wage Reporting Requirements z — Weekly Payroll Submittals to City Staff — UDBE Goals = 8% of contract amount — On -Job Training Goals = 0 hours • CDOT Materials Requirements • CDOT Form Submittals College Harmony Intersection Project UDBE Requirements • Underutilized Disadvantaged Business Enterprise (UDBE) Goal is 8% of Total Contract • If UDBE goal is met, submit CDOT Form 715 • If UDBE Goal is not met — Submit CDOT Form 718 — 3 Copies of Good Faith Effort documentation needs to be supplied to the City of Fort Collins by 4:30 PM on the next business day following Bid Opening. — Good Faith Effort includes all correspondences and supporting. documentation that was amassed in effort to meet the UDBA project goal. College Harmony Intersection Project UDBE Requirements • For UDBE Questions contact: — CDOT EEO Office at: (303) 757-9303 • CDOT maintains a DBE contractor list at: — http://www.dot.state.co.us/EEO/DBEProgramPage. htm — The list is updated monthly. Erosion Control - SWMP • Contractor will obtain and maintain the SWMP from the Colorado Dept of Public Health and Environment (CDPHE) • Erosion Control is broken into several measurable pay items. • The Erosion Control Plans provided are not the SWMP. However, plan quantities were calculated from the Erosion Control Plan. • Erosion Control Supervisor is an hourly pay item. • The Erosion Control Supervisor will meet with the Project Engineer and Contract Superintendent at least every 7 days and within 24 hours of storm/snowmelt events. r_Ielm] AOI.111LTA IkOUTI Bid Tab quantities do not equal plan quantities. Use the quantities in the plans. A revised bid tab was posted on Wednesday, March 28, 2G10. Highlights from Specifications SECTION 202 REMOVALS 201-00000 Clearing and Grubbing SECTION 202 - REMOVALS 202-00019 - Removal of Inlet 202-00035 - Removal of Pipe SECTION 202 - REMOVALS 202-00200 - Removal of Sidewalk 202-00203 - Removal of Curb and Gutter SECTION 202 - REMOVALS 202-00210 - Removal of Concrete Pavement SECTION 202 - REMOVALS 202-00211 - Removal of Median Cover SECTION 202 - REMOVALS 202-00220 - Removal of Asphalt Mat SECTION 202 - REMOVALS 202-00226 — Removal of Asphalt Mat (Special) SECTION 202 - REMOVALS 202-00240 — Removal of Asphalt Mat (Planing) SECTION 202 - REMOVALS 202-00900 - Removal of Concrete Footing (Signal Pole Base - Top 36") SECTION 203 - EARTHWORK • 203-00010 - Unclassified Excavation (Complete,in Place) • 203-00100 -Muck Excavation • 203-01596 - Potholing With Surveying and Stationing of U/G Utilities ATTENDANCE • Please be sure to register BID OPENING — When: April 16, 2010 @ 3:00 P.M. — Where: 215 North Mason Street (2"d Floor) CHIP BASE MAP mg SECTION 207 - TOPSOIL • 207-00205 Topsoil • 207-00210 Stockpile Topsoil • 207-00405 Topsoil (Special) SECTION 208 - EROSION CONTROL • 208-00003 Erosion Log (Wattle) (18 Inch) • 208-00020 Silt Fence • 208-00045 Concrete Washout Structure • 208-00050 Storm Drain Inlet Protection • 208-00070 Stabilized Construction Entrance 0 208-00205 Erosion Control Supervisor SECTION 209 - WATERING 209-00100 Watering (Landscaping) o All disturbed irrigated vegetation o To be done May thru October o Will need to be measured SECTION 210 - RESET STRUCTURES 210-00001 — Reset Structure (Monument Sign) — Work By Others SECTION 210 - RESET STRUCTURES 210-00002 - Reset Structure (Brick Bollards) 210-00003 — Reset Existing Irrigation Bag flow Preventer SECTION 210 - RESET STRUCTURES 210-00004 — Adjust Existing Irrigation Backflow Preventer 210-00050 — Reset Fire Hydrant SECTION 210 - RESET STRUCTURES 210-00051 — Adjust Fire Hydrant 210-00065 — Reset Monument SECTION 210 - RESET STRUCTURES 210-04010 — Adjust Manhole SECTION 210 - RESET STRUCTURES 210-04015 — Modify Manhole SECTION 210 - RESET STRUCTURES 210-04050 — Adjust Valve Box SECTION 210 - RESET STRUCTURES 210-04060 — Adjust Water Meter SECTION 212 - SEEDING • 212-00050 Sod SECTION 304 - AGGREGATE BASE COURSE • 304-06000 Aggregate Base Course (Class 6) SECTION 403 - HOT MIX ASPHALT • 403-00001 Hot Mix Asphalt (Temporary) (11") • 403-00720 Hot Mix Asphalt (Patching) (Asphalt) (6") • 403-32821 Hot Mix Asphalt (Grading SG) (100) (PG 58-28) (4" Depth) • 403-33851 Hot Mix Asphalt (Grading S) (100) (PG 64-28) (2" Depth) • 403-33852 Hot Mix Asphalt (Grading S) (100) (PG 64-28) (3" Depth) SECTION 412 - PORTLAND CEMENT CONCRETE PAVEMENT • 412-00801 Concrete Pavement (8 Inch) (Special -Driveway) • 412-01100 Concrete Pavement (11 Inch) • 412-01101 Concrete Pavement (11 Inch) (Special -Crosswalk) • 412-01102 Concrete Pavement (11 Inch) (Special -Raised Crosswalk) • 412-01120 Concrete Pavement (11 Inch) (Fast Track) (24 Hour) • 412-01061 Concrete Pavement (11 inch) (Fast Track) (48 Hour) SECTION 412-- PORTLAND CEMENT CONCRETE PAVEMENT • Pavement is tied to curb with dowel bars • Curb and Gutter that is tied to Concrete Pavement will have the same thickness as the Pavement Section per CDOT M-Standard 609-01 • Pavement joints use preformed compression seals at all contraction joints — See detail in CDOT Standard Special Provisions • Tining will be to CDOT Standards on College Avenue — mechanical, longitudinal tining as specified in Section 412 of CDOT Standard Specifications. • Tining on Harmony Road will be determined at the pre -construction meeting based on discussions with the awarded contractor. SECTION 412 — PORTLAND CEMENT CONCRETE PAVEMENT *SwC­th P4 Nr tmnwrsa sawetl canYaUbn pc�t T/� br wtgd krptitlnN aav+oction pnt SECTION 420 and 506 — GEOTEXTILES • 420-00500 Geotextile (Paving) — Used on overlay of College Avenue • 506-01020 Geogrid Reinforcement — Used to stabilize subgrade in muck excavation areas SECTION 603 - CULVERTS AND PIPES • 603-01155 15 Inch Reinforced Concrete Pipe (Complete In Place) • 603-01185 18 Inch Reinforced Concrete Pipe (Complete In Place) • 603-01245 24 Inch Reinforced Concrete Pipe (Complete In Place) SECTION 604 - MANHOLES, INLETS AND METER VAULTS • 604-16050 Inlet Type 16 (Single) (Special) • 604-16505 Inlet Type 16 (Double) (5 Foot) • 604-19315 Inlet Type R L 15 (15 Foot) • 604-30010 Manhole Slab Base (4' Diameter) (10 Foot) • 604-30015 Manhole Slab Base (5' Diameter) (15 Foot) • 604-XXXX Snout Structure IMPORTANT CONTRACT DATES: • AWARD CONTRACT o Bid Opening April 16, 2010 at 3:00 PM o Award dependant on CDOT concuranace to award — typically 5 to 7 business days after bid opening • PARTNERING SESSION — Force Account Item — meeting arranged by Contractor — Agenda is a collaboration with City Staff • PRE -CONSTRUCTION MEETING o Mandatory Meeting Prior to Start of Construction o Date to be determined after contract is awarded • CONSTRUCTION START DATE o Approximately May 2, 2010 o Calendar Day Contract • SUBTANTIAL COMPLETION -112 Calendar days • FINAL COMPLETION - 14 Days after Substantial Completion CONTRACT DOCUMENTS FOR BID # 7127: • PLAN SHEETS — Prepared by Interwest Consulting Group — Sheets 1 thru 116 • SPECIFICATION BOOK — Prepared by City of Fort Collins Engineering • PAVEMENT DESIGN — Prepared by CTL Thompson • ADDEDNDUM #1 — Revised Bid Tab SECTION 605 - SUBSURFACE DRAINS 605-00004 4 Inch Non -Perforated Pipe Underdrain 605-00040 4" Perforated Pipe Underdrain SECTION 608 - SIDEWALKS AND BIKEWAYS • 608-00005 Concrete Sidewalk (Special -Thickened Edge) • 608-00350 Concrete Sidewalk (Colored) • 608-00006 Concrete Sidewalk (6 Inch) • 608-00010 Concrete Curb Ramp • 608-10010 Sidewalk Drain SECTION 608 - SIDEWALKS AND BIKEWAYS ts-,;�j FOR SUBMITTAL 'f L � +IT M C1� •11 M4 f 1, E QV 1 •• { SECTION 609 - CURB AND GUTTER • 609-21010 Curb and Gutter Type 2 (Section I-B) • 609-21011 Curb and Gutter Type 2 (Section I-B) (Modified) • 609-21020 Curb and Gutter Type 2 (Section II-B) • 609-21011 Curb and Gutter Type 2 (Section I-M) • No Type 4 Curb and Gutter m SECTION 610 - MEDIAN COVER MATERIAL • 610-00010 Median Cover Material (Decorative) SECTION 613 - LIGHTING • 613-00200 2 Inch Electrical Conduit 613-00201 2,,Inch Electrical Conduit -Irrigation Sleeve 613-00300 3 Inch Electrical Conduit SECTION 620 - FIELD FACILITIES -00002 Field Office (Class 2) -00020 Sanitary Facility SECTION 622 - REST AREAS AND BUILDINGS Bollard VETaL [.ULL' RD MPY SECTION 626 - MOBILIZATION • 626-00000 Mobilization • 626-01000 Public Information Services - Contractor will establish a Public Information Manager • Maintain communication with area businesses and residents • Work with City Staff to update the City hosted Project Website - Contractor will establish a Public Information Office • Maintain a phone line and answering service with project information SECTION 627 - PAVEMENT MARKING • 627-00025 4 Inch Pavement Marking Tape (Removable) SECTION 630 - CONSTRUCTION ZONE TRAFFIC CONTROL • 630-00000 Flagging • 630-00012 Traffic Control Management • 630-80000 Construction Traffic Control Devices • 630-80341 Construction Traffic Sign (Panel Size A) • 630-80342 Construction Traffic Sign (Panel Size B) SECTION 630 - CONSTRUCTION ZONE TRAFFIC CONTROL • 630-80359 Portable Message Sign Panel • 630-80370 Concrete Barrier (Temporary) • 630-86800 Traffic Signal (Temporary) — College and Harmony Intersection • 630-86801 Traffic Signal (Temporary) — College and Mason Intersection FORCE ACCOUNT • 700-70010 F/A Minor Contract Revisions • 700-70011 F/A Partnering • 700-70014 F/A Incentive • 700-70016 F/A Fuel Cost Adjustment • 700-70019 F/A Asphalt Cement Cost Adjustment • 700-70022 F/A OJT Colorado Training Program • 700-70380 F/A Erosion Control ADDENDUM #1 • An Addendum for the project was posted online on Wednesday, March 31, 2010 to clarify discreprencies between the plan quantities and the bidtab quantities. It contained a revised bid tab. • An additional Addendum will be posted on April 9, 2010 and it will also include a revised Bid Tabs. The revised bid tab will remove the item 210-0001 - Reset Structure (Monument Sign). ADDENDUM #2 • A second Addendum will be posted on April 9, 2010. — There will be a revised bid tab that removes Item 210-0001 — Reset Structure (Monument Sign). — The Addendum will clarify Item 202-00220 Removal of Asphalt Mat to include all full depth asphalt removal up to 10" in depth. — The Addendum will include a specification for Item 202-00900 Removal of Concrete Footing (Signal Pole Base) — Concrete Color Specification revised to remove Davis Color "Tile Red" and add Davis Color "Kahlua" to colored crosswalks — Concrete Color Specification revised to remove Davis Color "Tile Red" and add Davis Color "San Diego Buff" to colored sidewalks — And it will address any other questions that are submitted to the City prior to bid opening. Thanks For Attending! • Any Questions or concerns can be addressed to: - Mark Laken • Office: (970) 221-6605 • Cell: (970) 222-3546 • Email: mlaken fcaov.com - Craig Farver • Office: (970) 221-6605 • Cell: (970) 222-0854 • Email: cfarver _fcgov.com i 1 I rs to--------------------- HARMO"ROAD I 1111 I 01 PHASE 2 NOTES: m 2. FULL MOVEMENT SIGNAL AT MASON/COLLEGE. 4. DO NOT BUILD EAST PORKCHOP ISLAND (AREA USED IN PHS 3). I 11 � I I 1 I I I I I I i r___ n a - i �Ppp REG�ST Oo:.Qp�JL Of34288i i �SS�GNAL•E�G\ 70 0 70 140 SCALE: 1 " = 140' I ! i -J II E II 1 IIII IIII 1 I __________________________!i _________________ _____ .___________________------------------------ _______ __ � --------- 4 i I II i iil� � II 111 I I L— 1 h I I �------ FOR SUBMITTAL i PLMERDRE NOT FOR CONSTRUCTION IYT°•-••. GGR9GLTIRG GROUT Computer File Information Index of Revisions Cltyof pT As Constructed CONSTRUCTION PHASING PLAN Project No. Code Creation Date: 4/22/090 Initials: MPO F!rt Collins / Last Modification Date: 2 23 10 Initials: MPO f� No Revisions: PHASE 2 STU M455-077 Full Path: 1420 2nd Street 6 36 281 North College Avenue Greeley, CO 80631 Revised: Designer. M. OBERLANDER Drowin File Name: 104601202FOR—PHASING.dw Fort Collins. CO 80522 Phone: (970) 350-2126 Detailer. J. LOFiON Phone: (970) 221-6605 FAX: (970) 350-2198 Void: Sheet Number 101 Acad Ver. 2007 Scale: 1:140 Units: ENGLISH FAX: 970 221-6378 Region 4 PJG I Sheet Subset: PHASING Subset Sheet: 2 of 4 uuunnnllllllllllll I _ -- I ( -- �P�0• REG�ST 1 -- - r------- o �PPUL �•�� v F%p••;�� " I U • O 34288: -10 I I � •,• • �G/ 41 I �SS'ONAL •��G\ I I I 0 I l I '• r I ' 70 0 70 140 e! SCALE: 1" = 140' b1 `-----f----------- -__ �— Q ' ------ — --- — — ---------- — —' .` I I I - --- ------ --- - _ - ------ ' _ * HARMOMYROAD I '- i --- ----------------- 1 PHA9E l COMSTRUC770MAREA - - - - c' --- -- --- - --- I�_________��________________. -------------- 1 '' x ,I I III I ��- PHAS�------- E 1 NOTES: __= j � � ;; �,-----.I I m 1. REMOVE ALL MEDIAN IN COLLEGE FOR CROSSOVERS, I I I _ r n I 3. FULL MOVEMENT SIGNAL AT MASON/COLLEGE. ,>F' ' 4. HARMONY/COLLEGE RUNS WITH SIGNAL. 5. DO NOT BUILD EAST PORKCHOP ISLAND (AREA USED IN PHS 3). —�_- � 4 I I I 'Iil 4------ \ -- /__ I I h I, �I l I ♦— I I I � I �' ------ F O R SUBMITTAL PALMERDR/VE ---- NOT FOR CONSTRUCTION NT•RA•.T CONBULTINp GROUP Computer File Information Index of Revisions City of As Constructed creation Date: 4/22/09 Initials:MPO Fort Collins pT CONSTRUCTION PHASING PLAN Project No./Code Last Modification Date: 2 23 10 Initials: MPO`/�� ` No Revisions: PHASE 1 STU M455-077 Full Path: 1420 2nd Street Di M. OBERLANDER 281 North College Avenue Greeley, CO 80631 Revised Designer 16136 Dmwin File Name: 104601202FOR-PHASING.dw Fort Collins, CO 80522 Phone: (970) 350-2126 Detailer. J. LOFfON Acad Ver. 2007 Scale: 1:140 Un'rts:ENGLISH Phone: (970) 221-6605 FAX: (970) 350-2198 Void; Sheet Number 100 FAX: 970 221-6378 Ton 4 PJG Sheet Subset PHASING Subset Sheet: 1 of 4 SUMMARY OF WORK College Harmony Intersection Improvements: • 27,000 SY of Asphalt and Concrete Removal • 7,000 SY of Dirt Work • Storm Water System Upgrades • 7,500 TONS of Aggregate Base • 12,500 SY of Concrete Paving (11 inch thick) • 3,000 TONS of Hot Mix Asphalt. • 7500 Lineal Feet of Curb and Gutter • 2000 SY of Concrete Sidewalk • Temporary Signals and Traffic Control SUMMARY OF WORK • Survey — Provided by City of Fort Collins — Engineering Department Survey Staff — 48 hour written request for survey • Testing — Provided by City of Fort Collins — Thru contract with CTL Thompson — Contractor will setup testing as required ,I • IIIIIIII1111111111111111„ �P'00 REG/S -- -- i 34288 ►� 1 �SS/ONAL •��G\ ' I I 0 i j r 1 70 0 70 140 SCALE: 1'= 140' ---- ----------- --- ------------- __________----- ______ �---=-----------__—____— v PHASES COAFSMLIC77ONAREA _-_ --------------- 1 11 1 1 I L1 I II I Ll I I I I o x IF ' �;-TTTTTTITFTTTT(-T11TIi �- x --4H PHASE 3 NOTES: ----- + m 1. FULL MOVEMENT SIGNAL AT MASON/COLLEGE. III I I 2. SIGNAL AT HARMONY/COLLEGE FOR EAST LEG TURNS. NO SOUTHBOUND LEFTS TO HARMONY ALLOWED. 3. CLOSE THROUGH MOVEMENTS AT MASON/HARMONY. II 4. HARMONY/MASON RUNS WITH NO SIGNAL. 5. INSTALL ALL HARMONY/COLLEGE SIGNALS. 6. INSTALL COLLEGE MEDIANS AND ALL PORKCHOP ISLANDS. II I I I I -- f j I I I f� 1 f PALMERDR/VE FOR SUBMITTAL ----- NOT FOR CONSTRUCTION ••°•.°•t °°N•°Lr'•° °a°°° Computer File Information Index of Revisions City of pT As Constructed CONSTRUCTION PHASING PLAN Project No. Code Creation Date: 4/22/090 Initials: MPO Fort Collins / Last Modification Date: 2 23 10 Initials: MPO ��� No Revisions: PHASE 3 STU M455-077 1420 2nd Street 16136 Full Path: Designer. M. OBERLANDER 281 North College Avenue Greeley, CO 80631 Revised: Fort Collins, CO 80522 Phone: 970 350-2126 Drawin File Name: 104601202FOR—PHASING.dw ( ) Detailer. J. LOFTON Phone: (970) 221-6605 FAX: (970) 350-2198 Void: Sheet Number 102 Acad Ver. 2007 Scale: 1:140 Units: ENGLISH FAX: 970 221-6378 ion 4 PJG Sheet Subset: PHASING Subset Sheet: 3 of 4 4CONSMUC"ON. I PHASE 4 NOTES: I 1. OPEN ALL LANES OF COLLEGE. 2. OPEN HARMONY AND COLLEGE INTERSECTION. 3. REMOVE TEMP SIGNAL FROM MASON/COLLEGE. 4. LIMIT THROUGH MOVEMENTS OF MASON AT HARMONY. 5. NARROW HARMONY TO 1 LANE EACH WAY FROM MASON TO RAILROAD. 6. MOVE LANES TO CONSTRUCT WEST BLOCK OF PROJECT AND WEST HALF OF MASON INTERSECTION. Gom uter file intormation Creation Date: 4/22/090 Initials: MPO Last Modification Date: 2 23 10 Initials: MPO Full Path: Drawinq File Name: 104601202FOR—PHASING.dw Acad Ver. 2007 Scale: 1:140 Units: ENGLISH Index of Revisions i TI: I 1 l i i i t I Ifl L______ III 1 I I ------------ II I I I City of For! Collins / ""Z_ 281 North College Avenue Fort Collins, CO 80522 Phone: (970) 221-6605 FAX: (970) 221-6378 4 II II 11 - �11 �O cY»r�srii+;rz�WC ��' I I � I I II I 1 !1 ( !I I� I I j II I I I l 11 I III I I I I;i 4------ I I I 111 � 1 I � I � I I I I ,I I I � I ~_ t< � L_ II II II I Ailln I OT 1420 2nd Street Greeley, CO 80631 Phone: (970) 350-2126 FAX: (970) 350-2198 Rion 4 PJG4 PJG As Constructed No Revisions: Revised: Void: P"0p REG/S T UFO• �P �L .��.•..��0 34288� -0 of ON ON 70 70 O 70 140 SCALE: 1 " = 140' CONSTRUCTION PHASING PLAN Project No./Code PHASE 4 STU M455-077 Designer. M.OBERLANDER 16136 Detailer. J. LOFTON Sheet Subset: PHASING Subset Sheet: 4 of 4 Sheet Number 103 \ � r \ r \ r i NOTES: 1. SIDEWALK LIMITS, HANDICAP RAMPS AND PEDESTRIAN REFUGE ISLANDS DESIGNATED SHALL BE: DAVIS COLOR 'SAN DIEGO BUFF' (1.5 LBS. OF 5237 PER 1 CU.FT. OF TYPE 1-II CEMENT). ��DAVIS SSWALKS AND TABLE TOP (ELEVATED) CROSSWALKS IN THE COLLEGE/HARMONY INTERSECTION SHALL BE: COLOR 'KAHLUA' (4 LBS OF 667 PER 1 CU.FT. OF TYPE I -II CEMENT) 3. REFUGE SHALL BE GRADED TO SLOPE TO STREET AT 1% MIN AND 3% MAX WITH 2% MAX CROSS SLOPE. ZrMLIMITS OF COLORED CONCRETE (SEE NOTE 1) 5028. 5028.61 5028.18 R=31 R=31 FOR SUBMITTAL NOT FOR CONSTRUCTION TABLE TOP (ELEVATED) CROSSWALK 5028.01 5027.97 FL (SEE NOTE 2) FL/TBC 5028.47 TBC TYPE 2 (SECTION IB) C&G o (OUTFLOW) �O CURB TRANSITION 5 ira ♦TYPE 2o nl�/ MA � � . ��� ���,..•���e�e''�e°e�-► •.eeeeeee< e�►eee�eeoeeaeeoe�eee . - : ♦� a .:.iee.� eeoeo. eo �eooeseeooeeeeeeeoeo s+ • :•, ��� . • ••,•.� °i° �li°e°i°o°e°�°e°o°i°o°e°o°e°o°i°e°�°o°e°000i°�` • :. • :.. .�; ��• ooee�►o, eooss�000eoeooeoeeeoo. ��o . °� e°o°e°i°o°er►e°e°e°e°see°o°e°e!'i°A°��e°o°�,�ile�e!�!�°,' ��•,�e�'e� �e��►�e�e�e.►�eoeve�oeo_o_�e_ee_e_ose_s_�.� • :. - - . • C&G (INFLOW) CONSULTING GROUP )uter File Information Index of Revisions City0f As Constructed PLAN SHEET Project No./Code Creation D. •• • Wlins r= No Revisions: PEDESTRIAN RAMP DETAILS -Lost ModificoVion r. • Initials: JDL I„ 281 North College Avenue Greeley. CO 80631 Fort Collins. CO 80522 Phone: (970) 350-2126 r—Drowing File Name: 104601-202FOR—DET—Plan.dwg •• • • ' Incentive / Disincentive Contract • 2 Incentive / Disincentives on the Project • Milestone #1: Completion of short duration closure of Harmony Road between Mason Street and College Avenue labeled "Phase 3" • Substantial Completion • See Special Provisions "Commencement and Completion of Work" Short Duration Harmony.Road Closure Incentive / Disincentive • Goal is to close Harmony Road for 30. calendar days for construction activities • Incentive of $10,000 per day for early completion capped at $70,000. • No cap on Disincentive • Clock starts when closure is setup and ends when Harmony Road is reopened with the curb and pavement installed as shown in the shaded area of phase 3 on the phasing plan Phase 3 Closure Detail J 777. ` F LL EVE' T I L T C iLC- T n-. ,T LL.E 1N n IH V Wl C E•T 1 f . 1 H N •. ITI I -L ?. I`.'>T:LL sLL H-FVnVr+::y�'.E 51:ti 4S IvT:11 f[LLE[E `/Cll='.5 :r; _'=LL :•nl%.[Nll: I`L>':05. � �� �'�, Substantial Completion Incentive / Disincentive • 112 Day for Substantial Completion • $5000/Dayfor early completion capped at $45,000 • No maximum disincentive PROJECT PHASING OVERVIEW • Brief review of project as shown in the construction phase sheets • Phasing Plans are not absolute. The City is open to Contractor's ideas and proposals on closures. • However, College Avenue needs to maintain 2 lanes of northbound and 2 lanes of southbound traffic at all times. Proposed Phasing Plan - Phase 1 �e 7 — — — _. _ Y E C"EI-T C C T LL[E i-aC '"jIj II L L -E ENE v fE h 0 {K, E- Lh L ='�:E •Li li is 1 a n/ iLLE s _ v_T . a T ._.... ... .lF ' i�•!- _:EJ M1 M. 1 .I . ° FOR SUBMMAL ry':� IIFY�II• i NOT FOR CONSTRUCTION - - `• ccwhu:'.+C CONSTRUCTION PHASING PUN PWSE �rv�•c� nc./coe• �Iw Proposed Phasing Plan - Phase 2 E tr 1 E 1 '.LEE=TN -TIF - L !"LL v ..E\ET I' { T GUE.E I EL:L-E%'�,L: -f .1 .>.• •:::T :.. L'I E-,1 v�.:..Hr F.l--`.� �: E- j'LE V. •H.:.j 1, °' -- - FOR SUBMITTAL `. II hj�IP 1 NOTFOROONSTRUCMM m.F.d CONSTRUCTON PHASING PUN Ro�K�+_/�• Proposed Phasing Plan - Phase 3 -.MEL- E }I I I t HFLL I. -T H `y`RlrUX + ;R:/c-LLT IZ i =L =T H E f^ E .TIE. T.��v> T'.. M3 LOT T: N , I. T{L -I H ::aILU- 1 +4 E E I ' r• 1•_'•T{l Lc:nNE;E VE:l CL ti,,s - I`I STRRUC on FNOT FOR GONNsY - - CONSTRUCTION RMSING IIAN PINS, P•a•u X,.Kom �� eT.�.mv, Proposed Phasing Plan - Phase 4 _ -1 i kr i I i it _�— - :c, .. - = — — _ 1 F CCL=E -ILE I � r E' N E f lE E II R! I ii ir_ I 0, �L G-1 H— EUE'T F T H N= 1 L 'E E H F 'S T ! 'C 0 ..'. .T 1- .I I1p; FOR SUBMITTAL NOT FOR CONSTRUCTION CONSTRUCHAUN PHdSCTIONPSING P o++*T -/ate Traffic Control • Traffic Control — Responsibility of Contractor — Major Road Closures — Phase Changes — 1 week advance notice for public outreach — Anticipated Flagger Quantities — Weekly Progress Meeting — See specific Traffic Control Plan criteria in Section " O" page 77 of Project Special Provisions