HomeMy WebLinkAboutCORRESPONDENCE - BID - 7069 DECONSTRUCTION OR MOVING OF 2448 SQ FT HOUSEDeJohn Housemoving Inc.
September 22, 2009
Re: RFP 7069
Addendum No.(23 received
Main level of building shall be moved in it's entirety; garage
included. Lower level windows, doors, trim, heating system and
water heater shall be deconstructed and reused. Work shall be
completed within 90 days of acceptance. Receiving site to be
determined.
DeJohn will pay the City of Ft. Collins $100.00
W21V
_[,1
P.O. Box 5218 • Greeley, Colorado 80631 • (970) 352-1391