Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 7069 DECONSTRUCTION OR MOVING OF 2448 SQ FT HOUSEDeJohn Housemoving Inc. September 22, 2009 Re: RFP 7069 Addendum No.(23 received Main level of building shall be moved in it's entirety; garage included. Lower level windows, doors, trim, heating system and water heater shall be deconstructed and reused. Work shall be completed within 90 days of acceptance. Receiving site to be determined. DeJohn will pay the City of Ft. Collins $100.00 W21V _[,1 P.O. Box 5218 • Greeley, Colorado 80631 • (970) 352-1391