ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Financial Services
Purchasing Division
215 N. Mason St. 2"d Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov. com/purchasing
Description of RFP 7076: Poudre Trail Rehabilitation — Junction and ELS
OPENING DATE: 3:00 P.M. (Our Clock) October 6, 2009
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
CLARIFICATIONS:
1. For this project, what taxes as a contractor are we responsible for implementing into
our bid, including State sales and RTD taxes, as well as local use, head, sales,
material, and equipment taxes?
Answer. The City of Fort Collins is tax exempt.
2. For this project, what Permits at the state and local level will be required for the
contractor to obtain? What costs will be associated with these Permits?
Answer. A Floodplain Use Permit from the City is required for this project and it will
be obtained prior to construction. The fee and permit will not be the Contractor's
responsibility to obtain. All other State and local permits, if any, are the responsibility
of the Contractor.
3. What, if any, utility conflicts will be foreseen on this job? If there are conflicts, what
agency and utility work will need to be completed before work is to begin?
Answer. Utility locates are the responsibility of the Contractor. Utility conflicts are
not anticipated. Any utility conflicts identified during construction will be assessed on
a case by case basis.
4. This being a Fall project, adverse weather is inevitable, winter protection is
anticipated. Stain and discoloration will result in using winter protection, who will be
responsible or how will the problems be address?
Answer. The project is expected to give Notice to Proceed shortly after bid opening
with allowable number of days for completion identified in the bid docs. Bid
accordingly.
3.2. In accordance with Section 8-160 of the Code of the City of Fort Collins
in determining whether a bidder is responsible, the following shall be
considered: (1) The ability, capacity and skill of the bidder to perform
the contract or provide the services required, (2) whether the bidder can
perform the contract or provide the service promptly and within the time
specified without delay or interference, (3) the character, integrity,
reputation, judgment, experience and efficiency of the bidder, (4) the
quality of the bidder's performance of previous contracts or services,
(5) the previous and existing compliance by the bidder with laws and
ordinances relating to the contract or service, (6) the sufficiency of
the financial resources and ability of the bidder to perform the contract
or provide the service, (7) the quality, availability and adaptability of
the materials and services to the particular use required, (8) the
ability of the bidder to provide future maintenance and service for the
use of the subject of the contract, and (9) any other circumstances which
will affect the bidder's performance of the contract.-
3.3. Each Bidder may be required to show that he has handled former Work
so that no just claims are pending against such Work. No Bid will be
accepted from a Bidder who is engaged on any other Work which would
impair his ability to perform or finance this Work.
3.4 No Bidder shall be in default on the performance of any other
contract with the City or in the payment of any taxes, licenses or other
monies due to the City.
4.0 EXAMINATION OF CONTRACT DOCUMENTS AND SITE
4.1. It is the responsibility of each Bidder, before submitting a Bid,
to (a) examine the Contract Documents 'thoroughly, (b) visit the site to
familiarize himself with local conditions that may in any manner affect
cost, progress or performance of the Work, (c) familiarize himself with
federal, state and local laws, ordinances, rules and regulations that may
in any manner affect cost, progress or performance of the Work, (d) study
and carefully correlate Bidder's observations with the Contract
Documents, and (e) notify Engineer of all conflicts, errors or
discrepancies in the Contract Documents.
4.2. Reference is made to the Supplementary Conditions for
identification of: Subsurface and Physical Conditions SC-4.2.
4.3. The submission of a Bid will constitute an incontrovertible
representation by Bidder that Bidder has complied with every requirement
of this Article 4, that without exception the Bid is premised upon
performing and furnishing the Work required by the Contract Documents and
such means, methods, techniques, sequences or procedures of construction
as may be indicated in or required by, the Contract Documents, and that
the Contract Documents are sufficient in scope and detail to indicate and
convey understanding of all terms and conditions for performance and
furnishing of the Work.
Rev10/20/07 Section 00100 Page 2
sum finally detennined to be due, then CONTRACTOR
may, upon seven days' written notice to OWNER and
)NIGINEER, and provided OWNER or ENGINEER do not
remedy such suspension or failure within that time,
terminate the Agreement and recover from OWNER
payment on the same terms as provided in paragraph 15.4,
In lieu of terminating the Agreement and without prejudice
to any other right or remedy, if UNGLNEER has failed to
act on an Application for Payment within thirty days after it
is submitted. or OWNER has failed for thirty days to pay
CONTRACTOR any sum finally determined to be due,
CONTRACTOR may upon seven days written notice to
OWNER and ENGINEER stop the Work until payment of
all such amounts due CONTRACTOR, including interest
thereon. The provisions of this paragraph 15.5 are not
intended to preclude COirfRAc*roR from making claim
under Articles 11 and 12 for an increase in Contract Price
or Contract Times or otherwise for csTwnscs or damage
directly attributable to CONTRACTOR'sstopping Work as
permitted by this paragraph.
ARTICLE: 16—DISPUTE: RF_SOLUriON
If and to the extent that OWNER and CONTRACTOR
have agreed on the method and procedure for resolving
disputes between them that may arise under this
Agreement, such dispute resolution method and procedure,
if any, shall be as set forth in kxhibit GC -A, "Dispute
Resolution Agreement", to be attached hereto and made a
part hereof. If no such agreement on the method and
procedure for resolving such disputes has been reached,
and suhjcct to the provisions of paragraphs 9.10, 9.11 and
9,12, OWNER and CONTRACTOR may exercise such
rights or remedies as either may otherwise have under the
Contract Documents or by Laws or Regulations in respect
of any dispute.
ARTICLE 17—;♦ MELLANEOUS
Giving Notice:
17.1. Whenever any provision of the Contract
Documents requires the giving of written notice, it will be
deemed to have been validly given if delivered in person to
the individual or to a member of the firm- or to an officer of
the corporation for whom it is intended, or if delivered at or
sent by registered or certified mail, postage prepaid, to the
last business address known to the giver of the notice.
17.2. Computation of Tinte:
17.2.L When any period of time is referred to in the
Contract Documents by days, it will be computed to
exclude the first and include the last day of such
period. If the last day of any such period falls on a
Saturday or Sunday or on a day made a legal holiday
by the law of the applicable jurisdiction, such day will
he omitted from the computation.
EXI)COENERAL COMMONS 1910-5 (1990 Edition)
a! CITY OF FORT COLLI NS DSODIIICA-rIONS (RL--V 4P-0(J0}
17.2.2. A calendar day of twenty-four hours measured
from midnight to the next midnight will constitute a
day.
Notice of (Taint:
17.3. Should OWNER or CONTRACTOR suffer injury
or damage to person or property because of any error,
omission or act of the other party or of any of the other
party's employees or agents or others for whose. acts the
other party is legally liable, claim will be made in wTiting
to the other party within a reasonable time of the first
observance of such injury or damage. The provisions of
this paragraph 17.3 shall not be construed as a substitute
for or a waiver of the provisions of any applicable statute
of limitations or repose.Cumulative Remedies:
17,4. 'fhe duties and obligations imposed by these
General Conditions and the rights and remedies available
hereunder to the patties hereto, and, in particular but
without limitation, the warranties, guarantees and
obligations imposed upon CONTRACTOR by
paragraphs 6.12, 6.16, 630, 6.31, 6.32, 13.1, 13.12, 13.14,
14.3 and 15.2 and all of the rights and remedies available
to OWNER. and F.NGINFER thereunder, are in addition
to, and are not to be construed in any way as a limitation
of, any rights and remedies available to any or all of them
which are otherwise imposed or available by Laws or
Regulations by special warranty or guarantee or by other
provisions of the Contract Documents, and the provisions
of this paragraph will be as effective as if repeated
specifically in the Contract Documents in connection with
each particular duty, obligation, right and remedy to which
they apply
Professional fees and Court Costv Included:
17.5. Whenever reference is made to "claims, costs,
losses and damages", it shall include in each case, but not
be limited to, all fees and charges of engineers, architects,
attorneys and other professionals and all court or
arbitration or other dispute resolution costs.
I T6. The laws of the State of Qglondo apply to tlul
eement. Reference to two pertinent Colorado statutes
are as follows;
17.6.1. Colorado Revised Statutes (CRS 5-17-101).
require that Colorado labor be employed to perform
the Work to the extent of not less than SO percent
(80%) of each tape or class of labor in the several
classifimtions of skilled and common labor emplove.d
on the Project. Colorado labor means any person who
is a bona fide resident of the State of Colorado at the
time of emplovment,without discrimination as to race,
color, creed, age, religion or sex.
11.6.2. if a claim is filed, OWNER is required by
law ((sRS 3&26-107) to withhold from. all payments to
CONTRACTOR sufficient funds to insure the
gym ent of all claims for labor, materials, team hire,
sustenance, provisions, provender, or other supplies
used or consumed by CONCRAC.I'OR or his
33
EJCUCGENERAL CONDHIONS 1910-4 (1990 Edition)
34 edC17TOFFORTCOLLINSAIOUIFICATIONS(REV,IPOto)
(This page left blank intentionally.)
EJCDC GENERAL CONDrn ON5 I `) i0 Y o 99i) Eclilionj 3$
a! CITY 01;. FORT COLLINS NODIFICA'CIONS tREV 9Q000)
iG EICUC GEN-MA . CONDITIONS 1910-8 (1990 Edition)
tc/ CITY OF FORT COLLINS MODIFICATIONS tREV,IP0001
EXHIBIT CC -A to General Conditions
of the Construction Contract Between
OWNER and CONTRACTOR
DISPUTE RESOLMO\ AGREEMENT
OWNER and CONTRACTOR hereby agree that
article 16 of the General Conditions of the Construction
Contract between OWNER and CONTRACTOR is
amended to include the following.epreement of the parties:
16.1. All claims, disputes and other matters in
question between OWNER and CONTRACTOR arising
out of or relating to the Contract Documents or the breach
thereof (except for claims which have been waived by the
making or acceptance of final payment as provided by -
paragraph 14.15) will be decided by arbitration in
accordance with the Construction Industry Arbitration
Rules of the American Arbitration Association then
obtaining. subject to the limitations of the Article 16. This
agreement so to arbitrate and any other agreement or
consent to arbitrate entered into in accordance herewith as
provided in this Article 16 will be specifically enforceable
under the prevailing law of any court having jurisdiction.
16.2. No demand for arbitration of any claim, dispute
or other matter that is required to be referred to
E"`i '(311NEER initially for decision in accordance with
paragraph 9.11 will Ix: made until the earlier of (a) the date
on which ENGINEER has rendered a written decision or
(b) the thirty-first day after the parties have presented their
evidence to INGINEER if a written decision has not been
rendered by ENGINEER before that (Lite. No demand for
arbitration of any such claim, dispute or other matter will
be made later than thirty days after the state on which
ENGINEER has rendered a written decision in respect
thereof in accordance with paragraph 9.I1-, and the failure
to demand arbitration within said thirty days period will
result in ENG -ERs decision being final and binding
upon OWNER and CONTRACTOR_ If BNGWEER
renders a decision after arbitration proceedings have been
initiated, such decision may be entered as evidence but will
not supersede the arbitration proceedings, except where the
decision is acceptable to the parties concerned. No demand
for arbitration of any written decision of L'i`iGINEE-R
rendered in accordance with paragraph 9.10 will be made
later than ten days after the party making such demand has
delivered written notice of intention to appeal as provided
in paragraph 9.10.
16.3. Notice of the demand for arbitration will be
filed in writing with the other party to the Agreement and
with the American Arbitration Association and a copy will
be sent to ENGINEER for information The demand for
arbitration will be made within the thirty -day or ten-day
period specified in paragraph 162 as applicable, and in all
other cases within a reasonable time after the claim, dispute
or other matter in question has arisen, and in no event shall
imy such demand be made after the elate when institution of
legal or equitable proceedings based on such claim, dispute
or other matter in question would he barred by the
applicable statute of limitations.
EXIX; GENERAL CONDITIONS 1910.3 (1990 Edition)
%d CITY OF FORT COLLINS MODIFICATIONS (REV 9199)
16.4. Except as provided in paragraph 16.5 below,
no arbitration arising out of or relating to the Contract
Documents shall include by consolidation, joinder or in any
other manner any other person or entity (including
ENGUEER. ENGNEER's Consultant and the officers,
directors, agents, employees or consultants of any of them)
who is not a party to this contract unless:
16.4.1. the inclusion of such other person or entity is
necessary if complete relief is to be afforded among
those who are already parties to the arbitration, and
16.4.2. such other person or entity is substantially
involved in a question of law or fact which is common
to those who are already parties to the arbitration and
which will arise in such proceeding% and
16.4.3, the written consent of the other person or
entity sought to be included and of OWNER and
CONTRACTOR has been obtained for such inclusion,
which consent shall make specific reference to this
pamgmph; but no such consent shall constitute consent
to arbitration of any dispute not specifically described
in such consent or to arbitration with any party not
specitcally identified in such consent.
16.5. Notwithstanding paragraph 16.4, if a claim,
dispute or other matter in question between OWNER and
CONTRACTOR involves the Work of a Subcontractor,
either OWNER or CONTRACTOR may join such
Subcontractor as a party to the arbitration between OWNER
and CONTRACTOR hereunder. CONTRACTOR shall
include in all subcontracts required by paragraph 6:11 a
specific provision whereby the Subcontractor consents to
being joined in an arbitration between OWNER and
CONTRACTOR involving the Work of such
Subcontractor. Nothing in this paragraph 16.5 nor in the
provision of such subcontract consenting to joinder shall
create any claim, right or cause of action in favor of
Subcontractor and against OWNER, ENGINEER or
ENGINEER's Consultants that does riot otherwise exist.
16.6. The award rendered bv. the arbitrators will be
final, judgment may he entered upon it in any court having
jurisdiction thereof, and it will not be subject to
modification or appeal.
16.7. OWNER and CONTRACTOR agree that they
shall first submit any and all unsettled claims,
counterclaims, disputes and other matters in question
between them arising out of or relating to the Contract
Documents or the breach thereof ("disputes"). to mediation
by the American Arbitration Association under the
Construction industry Mediation Rules of the American
.Arbitration Association prior to either of them initiating
against the other a demand for arbitration pursuant to
paragraphs 16.1 through 16.6, unless delay in initiating
arbitration would irrevocably prejudice one of the parties.
The respective thirty and ten day time limits within which
to file a demand for arbitration as provided in paragraphs
162 and 16.3 above shall be suspended with respect to a
dispute submitted to mediation within those same
applicable time lunits and shall remain suspended until ten
days after the termination of the mediation. The mediator
of any dispute submitted to mediation under this Agreement
shall not serve as arbitrator of such dispute unless otherwise
agreed.
QC -Al
FRW, GFNERAI. CONDITIONS 1910-3 (1990 F.,6tim)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9194)
GC -Al
SE
SECTION 00800
SUPPLEMENTARY CONDITIONS
SECTION 00800
SUPPLEMENTARY CONDITIONS
Conditions of the Contract
These Supplementary Conditions amend or supplement the General Conditions of
the Construction Contract (EJCDC General Conditions 1910-8, 1990 edition with
City of Fort Collins modifications) and other provisions of the Contract
Documents as indicated below.
SC-5.4.8 Limits of Liability
A. Add the following language at the end of paragraph 5.4.8.
The limits of liability for the insurance required by the paragraph
numbers of the General Conditions listed below are as follows:
5.4.1 and 5.4.2
Coverage A - Statutory Limits
Coverage B - $100,000/$100,000/$500,000
5.4.3 and 5.4.5 Commercial General Liability policy will have limits of
$1,000,000 combined single limits (CSL). This policy will include
coverage for Explosion, Collapse, and Underground coverage unless waived
by the Owner.
5.4.6The Comprehensive Automobile Liability Insurance policy will have
limits of $1,000,000 combined single limits (CSL).
5.4.9This policy will include completed operations coverage/product
liability coverage with limits of $1,000,000 combined single limits
(CSL) .
Rev10/20/07 Section 00800 Page 1
SECTION 00900
ADDENDA, MODIFICATIONS AND PAYMENT
00950Contract Change Order
00960Application for Payment
Rev 10/20/07
SECTION 00950
CHANGE ORDER NO.
PROJECT TITLE:
CONTRACTOR:
PROJECT NUMBER:
DESCRIPTION:
1. Reason for change:
2. Description of Change:
3. Change in Contract Cost
4. Change in Contract Time:
ORIGINAL CONTRACT COST $ .00
TOTAL APPROVED CHANGE ORDER 0.00
TOTAL PENDING CHANGE ORDER 0.00
TOTAL THIS CHANGE ORDER 0.00
TOTAL % OF THIS CHANGE ORDER
TOTAL C.O.% OF ORIGNINAL CONTRACT
ADJUSTED CONTRACT COST $ 0.00
(Assuming all change orders approved)
ACCEPTED BY: DATE:
Contractor's Representative
ACCEPTED BY: DATE:
Project Manager
REVIEWED BY: DATE:
Title:
APPROVED BY: DATE:
Title:
APPROVED BY: DATE:
Purchasing Agent over $30,000
cc: City Clerk Contractor
Project File Architect
Engineer Purchasing
Rev10/20/07 .Section 00950 Page 1
5.0 INTERPRETATIONS AND ADDENDA.
5.1. All questions about the meaning or intent of the Bidding Documents are to
be submitted in writing to the Engineer and the OWNER. Interpretation or
clarifications considered necessary in response to such questions will be
issued only by Addenda. Questions received less than seven days prior to
the date for opening of the Bids may not be answered. Only questions
answered by formal written Addenda will be binding. Oral and other
interpretations or clarifications will be without legal effect.
5.2. All questions concerning the scope of this project should be
directed to the Engineer. Questions regarding submittal of bids should
be directed to the City of Fort Collins' Purchasing Division.
5.3. Addenda may also be issued to modify the Bidding Documents as
deemed advisable by OWNER or Engineer.
5.4. Addenda will be mailed or delivered to all parties recorded by the
OWNER as having received the Bidding documents.
6.0 BID SECURITY
6.1. Each Bid must be accompanied by Bid Security made payable to OWNER
in the amount stated in the Invitation to Bid. The required security
must be in the form of a certified or bank cashier's check payable to
OWNER or a Bid Bond on the form enclosed herewith. The Bid Bond must be
executed by a surety meeting the requirements of the General Conditions
for surety bonds.
6.2. The Bid Security of the successful Bidder will -be retained until
such Bidder has executed the Agreement and furnished the required
contract security, whereupon Bid Security will be returned. If the
successful Bidder fails to execute and deliver the Agreement and furnish
the required contract security within 15 days of the Notice of Award,
OWNER may annul the Notice of Award and the Bid Security of that Bidder
will be forfeited. The Bid Security of other Bidders whom OWNER believes
to have reasonable chance receiving the award may be retained by OWNER
until the earlier of the seventh day after the effective date of the
Agreement or the thirty-first day after the Bid Opening, whereupon Bid
Security furnished by such Bidders will be returned. Bid Security with
Bids which are not competitive will be returned within seven days after
the Bid opening.
7.0 CONTRACT TIME.
The number of days within which, or the date by which the Work is to be
substantially complete and also completed and ready for Final Payment
(the Contract Times) are set forth in the Agreement.
8.0 LIQUIDATED DAMAGES.
Provisions for liquidated damages are set forth in the Agreement.
Rev10/20/07 Section 00100 Page 3
IT
0
w
0
ƒ
ofwooaf
eezzw
20zz2
=zz�=
z2ELij cz
Ig
\/%E§
g IL }i�2
a -<I CL
k
A
z
3:
0
0
\
ƒ
0
0
S
k
R
k
R
k
q
�
\
\
.
m
J
�
)
}
c
I
\
0
\ ®
\
7
.
-�
yo'0M
\K
J«2a
CA
<
®�-<
< , _
\
k�
a2<.,&
�k0:3
2
°
\°
L) /
0 2 d
]
§�
\=
22 :3
� R
° a
. L)
'b z
0
E 2
' &a
0z
o§
/eu<u
k
0
�
<
F-
w
c
w 0
z 0
w \
7
0
\k
P:
\
m �
�/
2
0±
a.
\\
)k
'
/
\
//
z
i k
/\
<
o£
0
\\
S
)
k
0 A
7
§
cu L
¥f
.
S cr
/
�2
k
2
<
§
F- _
}k
/
0
z \
°
&
00
3
2
o m
2
0 k ©
° of
E0
< }
%\
&
§
0
�
t
�j�
Mz
k
q
z
L)
e
3
m [
k
w
0
m
m
04
0
m
0
\
0
/
§
m
c
a) �
m
It a> =
a a m
O
N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
W a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
b466E6646464b4E464696f3,b469b4b46969V3.b4b4b464b4b464646464646409,69,b469
Q O (0 O
a H W F-
N O
O
L 6 N 'C
N
F- a
O O O O O O O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ebp' "64E9V-?b'ib}64b46464b46464E9V3 V?646:1604b464696969696g69636969696969
N Q
Y CL
L E a)
�0 0o 0
�0000000000000000000000000000000000
0000000000000000000000000000000000
a
p o O C) C) C) C) C) C) C) C) C) C) C) C> C) C) C) C) O O O O CD O C) C) C) CD 0 0 CD 6 66
E646969696g6%b4b4Eflk'v%`b4b4b4b4EA646961*64696969d4EAb4b463e%Q%64b469,
a> o_
Z
Y > •O
O
F-1-�Uaa
CJ
QZ
UW
0000000000000000000000000000000000
J 2
3 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 O O O O O O O O O O O O O O O O O
a Q
E 6,�669669 �W,������66R � � � � � � b04 � ul �� � � 60�T 60%���b�466R�
¢a
Q
am
Y
CCL
L C y C
O�
�UH
C7
�0000000000000000000000000000000000
�O000000000000000000000000000000000
0000000000000000000000o000000000000
E6R<f)646%b4Q3,Q), fib4E9,b404b464d46969646969696R69b4va69b46969b4b4696969
Q
m
�C U
L
na
N
C
D
U
Z'
C
O
co
O
Q
d
U
c
O
n
U
�
Z
O
(n
a)
Fa-
0
U
�
L
a)
E
E
M�
W
Z
R
c
V L
0 a m
M 70 O O O O O O O O O O O 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0 0 0 0 0 0 0 0 0 0 0
w N O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O O
C7 L 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
a m lM v>v>v>v>e>e3e>v>e>e>e>e>e>e>e>69.6FY s).�c�v3�E»E»e»e9,ocrQ9,&% ��rctres36sreA
y
O
'0^ LL L
VJ r a
C
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
0
0
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
e�69 ---e3rtre3ears3cs,ead�vac�eae3cs1e,vad3E»E»vaE»e),6gw, %V:),V,e�e�e3E»e�
0
0
Q
d
Y E
w�CUF-0 C7
Q �00000000000000000000000000000000000
Oo000000000000000000000000000000000
a o00000000000000oo000000000000000000o
a E
br' u-Q`v>v>v>v "ul' 6,"v>v>v>v>v>to,U3.6-,v)-v>v3v3v),el, vrv>cflv,v.,v3,v)�
o
O a��� Q
w a 0 -0
zE>.2
o
C)aa C7
U�00000000000000000000000000000000000
J a) :3
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0
0
a 000000000000000000000000oo0000000000
a Ee>v>v>v>v>e>v>v>v>v>v>e>u4v>v3cfleav1'vav>v3v3vJ,E»v3v3v>vae,vav-Q-,vavav3
Q E
0
Y �
ch
> F- O
0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Cl 0 0 0
C 0 0 0 Co 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
:3 0 0 0 0 0 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
C) v> v> v> v> v> v> v> v> v> v> v> v> v> v> v> v> v> v> e> 6-3-e> e> e> e> b9 v} e> 6 % e> e> v> v> v> v> v>'
Q !i
'= U
"L
�a
w
0
O
N W J
Q
O c m o
W
o U f'
( -iw
Z Q�
r m O a
L
a�
m Z
M
CD
0
000000000000000000000000000000000 0
000000000000000000000000000000000 �
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
000000000000000000000000000000000
6361+613� 60*6fle1). 61:�r»eflv9.6%v,v3e»E»<»V),vava6»v3v3e»v.�v>v)-6-1E»v3v3E»v3v3
v
LL c
Oa o
IT c .6
LJJ M U
= tQ
Q L
aCL
0HQ
0
0
0
v�
a
m a
N o
5 t a� .s��
0
0
0
a
(D
> a
a) O
U CO) 'c
0
0
O
U
J cO
LU O U
H 2 > —
Q c N
2}.OdQ
C) LY
Q
02
U) U
c
O
'c
U
N
0
U -0 J
O E H
c = O
Z
a)
a)Z
IzT
O
rti
a
0
rn
0
0
s~
O
JJ
U
O
En
TABLE OF CONTENTS
TECHNICAL SPECIFICATIONS
DIVISION 1 GENERAL REOUIREMENTS
Section 01000
Project Summary
Section 01100
Summary of Work
Section 01160
Site Conditions
Section 01290
Measurement and Payment
Section 01300
Coordination and Project Meetings
Section 0 13 10
Construction Schedules
Section 01330
Shop Drawings, Product Data and Samples
Section 01340
Survey Data
Section 01450
Quality Control and Testing
Section 01500
Temporary Controls
Section 01510
Temporary Utilities
Section 01570
Traffic Control
Section 01600
Material and Equipment
Section 01700
Contract Close -Out
Section 01800
Definition of Bid Items
DIVISION 2 SITEWORK
Section 02050
Section 02100
Section 02200
Section 02221
Section 02720
Section 02750
Section 02900
APPENDIX
Sheet A-1
Sheet A-2
Sheet A-3
SCHEDULE OF DRAWINGS
Demolition
Mobilization
Earthwork and Grading
Trenching, Backfilling and Compacting
Aggregate Base Course
Portland Cement Concrete Paving
Site Re -vegetation
Junction — Trail Detour Exhibit
Junction — Trail Detour Exhibit
ELC — Trail Detour Exhibit
Sheet 1 Junction - Cover Sheet & Vicinity Map
Sheet(s) 2-4 Junction — Trail Plan & Profile
Sheet(s) 5 - 6 Junction — Cross Sections
Sheet(s) 7 Junction — Details
Sheet 1
Sheet(s) 2-3
Sheet(s) 4
Sheet(s) 5
City of Fort Collins
Park Planning and Development
ELC — Cover Sheet & Vicinity Map
ELC — Trail Plan & Profile
ELC — Cross Sections
ELC — Details
Table of Contents
DIVISION 1
SECTION 01000 —PROJECT SUMMARY
PART 1 - GENERAL
1.01 Scope
A. This section contains general requirements that are applicable to this project.
1.02 Description of Work
A. The Contractor shall provide all labor, materials and equipment necessary to perform the work items
indentified in the bid schedule.
1.03 City Furnished Materials
A. None.
1.04 Conditions of Work
A. Qualifications for Bidding: The Contractor must meet minimum qualifications as a condition for
bidding the Work. In addition to any other stated requirements the Contractor must be an established
single company for five (5) or more years. The Contractor must list a minimum of three (3) projects
similar in scope and size, as well as provide the contact information for each of the referenced projects.
Referenced project work shall specifically include construction of concrete paving and excavation
work within a regulated floodplain, sub -grade stabilization, and general work in a river corridor
environment. Providing contact information that is inaccurate or incomplete will disqualify the
referenced project and may disqualify the bid from award. Please provide the following:
Project Name:
Owner:
Timeline of Construction thru completion:
Project Contact for Construction Reference:
B. Area of Work: The Contractor shall confine his operations to the immediate work area. Material
storage shall be confined to areas shown on the Drawings or designated by the City.
C. Regulations: The Contractor shall comply with all applicable Federal, State, and local regulations
pertaining to safety, traffic control, fire prevention, erosion control and environmental protection.
D. Working Hours: The Contractor's working hours shall be between 7:00 a.m. and 5:00 p.m., with no
work on weekends or Federal holidays, unless otherwise approved by the City.
E. Material Storage: The Contractor's material and equipment storage site shall be limited to the area of
the project site. The area shall be kept orderly and free of litter.
1.05 Project Cleanup
A. The Contractor is responsible to maintain the construction site in a clean and orderly condition from the
start of the project to completion. Daily cleanups are required.
1. The City may require Contractor to perform cleanup within 100 feet of the progress of the work
and perform cleanup of the site daily prior to work stoppage.
B. Store volatile wastes in covered containers and dispose off -site.
1. Provide on -site covered containers for the collection of waste materials, debris and rubbish.
City of Fort Collins SECTION 01000 — PROJECT SUMMARY
Park Planning & Development Division Page 1 of 4
2. Neatly store construction materials, such as concrete forms, when not in use.
C. Wastes shall not be buried or burned on the site or disposed of into storm drains, sanitary sewers,
streams or waterways.
D. At project completion the Contractor shall remove all equipment, materials, and debris from the site
including toilets and dumpsters. Areas around work sites shall be cleaned with dirt and grass surfaces
raked clean of any slag from the Contractor's operations. Broom clean exterior paved surfaces.
Remaining dirt and fill material shall be removed, or may be scattered, with the approval of the City.
1.06 Trash Removal.
A. All non -salvageable items and trash shall be hauled off the site and disposed of in accordance with
applicable state and local regulations. Items shall be transported in tarp -covered or closed vehicles.
Any materials dropped or blown off vehicles shall be picked up immediately by Contractor.
1.07 Verification of Dimensions
A. The Contractor shall he responsible for the coordination and proper relation of the work. He shall field
verify all dimensions and advise the City of any discrepancies prior to proceeding with that phase of
the work.
1.08 Fire Hydrants
A. Fire Hydrant Connections: City's permission is required for connection to fire hydrants. Only
compatible adapters shall be utilized for hydrant connections. A gate valve shall be provided and
installed by the Contractor between the hydrant and supply hoses to control flow. Connection shall
include backflow protection. Temporary connections to fire hydrants shall he disconnected at the end
of each working day. No quick closing valves such as plug or butterfly valves will he used.
1.09 Outages
A. Utility outages necessitated by the work shall be requested in writing at least fifteen (15) working days
prior to the proposed outage. The request shall be directed to the City and shall stipulate the specific
utility system(s) and circuits to be affected, the location of the work, the time at which the shutdown
will occur, and the duration of the outage for each system. Outages shall be kept to a minimum both in
number and in duration. Where multiple outages are required, as many outages as can be accurately
scheduled shall he submitted as a group.
1.10 Fill Material
A. Excess fill material, including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be
hauled off the site and disposed of in accordance with applicable State and local regulations.
B. Additional fill material, if required, shall be hauled to the site from off the site as a necessary part of
the work. Material composition shall be subject to the requirements of the specifications.
1.11 Parking
A. Parking of the Contractor's vehicles shall be restricted to an area designated by the City.
1.12 Telephone
A. Business Telephone: At the beginning of construction, the Contractor shall provide the City with a
telephone number at which the Contractor or his representative may be contacted at any time during
regular working hours. The Contractor shall also provide a phone number for after -duty hours contact.
City of Fort Collins SECTION 01000 — PROJECT SUMMARY
Park Planning & Development Division Page 2 of 4
1.13 Sanitary Provisions
A. The Contractor shall provide temporary toilets for the use of construction personnel. Location, type,
proposed maintenance, etc., shall be approved by the City prior to placing toilets. Temporary toilets
shall be removed at the completion of construction and the adjacent area restored to the condition
existing prior to the start of construction or as indicated on the plans.
1.14 Pollution Abatement
A. Transporting materials to or from the site shall be accomplished in a manner preventing materials or
particles from becoming airborne. Earth materials shall be covered, wetted or otherwise protected.
Gravel, sand and concrete shall be contained within vehicles to prevent spillage.
B. Prevent the deposit of dirt, mud or debris on improved streets and roads, and remove all should such
deposition occur.
C. Burning of any material on site is prohibited.
D. Stream beds, lakes, drainage ways, sanitary and storm sewers, etc., shall not be polluted by fuels, oils,
bitumen, acids, or other harmful materials. Surface drainage from the construction site, which contains
harmful amounts of sediment, shall not be allowed to drain onto adjacent areas. All grading shall be
accomplished to allow sedimentation to settle out prior to flowing onto adjacent areas.
E. Flushing of concrete trucks is allowed only at the project site or the designated contractor storage area,
with the responsibility of conirol and cleanup resting with the Contractor.
F. Toxic, corrosive and flammable materials for construction other than specified shall not be used
without prior approval of the City of Fort Collins. When approved, disposal of these materials or their
containers will be off site and conform to state and federal regulations.
1.15 Protection of Property
A. Initiate, maintain and supervise necessary protection to prevent damage, injury or loss to:
1. The Work and materials and equipment to be incorporated in the project, whether in storage on or
off the site: and
2. Property at the site or adjacent thereto, including fences, patios, driveways, sidewalks, pavement,
trees, shrubs, lawns, walks, structures, utilities and underground facilities not designated for
removal, relocation or replacement in the course of construction.
B. Maintain, protect, and support existing utilities and other appurtenances against damage by shoring,
bracing, or other means.
C. Do not stockpile excavated material against existing appurtenances.
1.16 Survey Requirements
A. Contractor shall be responsible for construction staking necessary for proper and accurate completion
of the work covered by this contract. The Contractor shall provide experienced instrument personnel,
competent assistants, and such instruments, tools, stakes, and other materials required to complete the
survey, layout, and measurement Work. Survey work shall be performed under the direction of a
licensed professional surveyor in the State of Colorado. In addition, Contractor shall furnish, without
charge, competent personnel and such tools, stakes, and other materials as Engineer may require in
checking survey, layout, and measurement Work performed by the Contractor.
B. All work shall be performed to the lines, grades, and elevations shown on the Drawings. When
construction occurs within the following areas, corresponding tolerances are required. The installation
will be acceptable to the Owner when these tolerances are met, with respect to the lines and grades. If
the tolerances are not met, the Contractor shall be responsible for performing OWNER approved
modifications to the facilities to bring the project components into tolerances.
City of Fort Collins SECTION 01000 — PROJECT SUMMARY
Park Planning & Development Division Page 3 of 4
Description:
Max. Permissible Deviation from Alignment
and Elevation shown on Drawings:
Horizontal location of concrete trail
+/- 0.10 feet*
Horizontal location of all walls & components
N/A
Vertical elevation of concrete trail finished grade
0.00 feet to (405 feet)
Vertical elevation of all Walls & Components
N/A
Vertical elevation of other trail cross-section
grading
0.00 feet to (405 feet)
Vertical elevation of site grading, bank restoration,
and bank protection
N/A
Steel Pilings alignment and height
N/A
* Unless trail is field located by Owner
C. Contractor shall remove and reconstruct Work that is improperly located. Horizontal and vertical
alignments shall be checked regularly as the Work progresses. Contractor shall report results to the
Engineer.
D. If the construction survey uncovers any discrepancies, the Contractor shall notify the Engineer, in
writing, prior to construction proceeding. If the Contractor proceeds with work that includes apparent
discrepancies without resolution by the Engineer, he assumes full responsibility for any subsequent
necessary modifications.
E. The Contractor must provide stamped sets of as -built drawings, per the contract, for approved
verification. The as-builts must be stamped by a licensed professional surveyor in the State of
Colorado.
1.17 Construction Superintendent
A. The construction superintendent shall beat the job site anytime work is being accomplished by any of
the trades per General Conditions including, but not limited to, Article 6.
PART 2 - MATERIALS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
PART 4 - MEASUREMENT & PAYMENT (Not Applicable)
END OF SECTION
City of Fort Collins SECTION 01000 - PROJECT SUMMARY
Park Planning & Development Division Page 4 of 4
DIVISION 1
SECTION 01100 - SUMMARY OF WORK
PART 1 - GENERAL
1.01 Description of Work
A. The City of Fort Collins Poudre Trail rehabilitation includes erosion control, demolition of existing
asphalt trail, minor earthwork, traffic control, new 10' wide colored concrete trail, landscape
restoration, hydro -seeding for any areas disturbed by construction and surveying.
B. Protection and Restoration.
1. Replace to equal or better conditions all items removed and replaced or damaged during
construction. Restore all areas disturbed to match surrounding surface conditions.
1.02 Notices to Private Owners and Authorities
A. Notify private owners of adjacent property, utilities, affected governmental agencies, and school
district when execution of the work may affect them.
B. Give notification 48 hours in advance to enable affected persons to provide for their needs when it is
necessary to temporarily deny access or services.
C. Contact utilities at least 48 hours prior to excavating near underground utilities.
D. Contact all agencies at least 72 hours prior to start of construction. Notify all agencies of the proposed
scope of work schedule and any items that would affect their daily operation.
E. Several names and telephone numbers of potentially affected agencies and utilities in the area are listed
below for Contractor's convenience. This may not be a comprehensive listing of agencies.
Water - City of Fort Collins,.Colorado 221-6681
Storm Sewer - City of Fort Collins, Colorado 221-6605
Sanitary Sewer - City of Fort Collins, Colorado 221-6681
Electrical - City of Fort Collins, Colorado 482-5922, 221-8553
Gas - Public Service Company of Colorado 482-5922, 221-8553
Telephone - QWest Communications 484-0300, 226-6310
Roads - City of Ft. Collins, Colorado 221-6815
Cable Television — AT&T Cable Services 493-7400
Utility Locates - One -call System 1-800-922-1987
Safety - Occupational Safety and Health Administration (OSHA) 844-3061
Fire - Poudre Fire Authority Non -Emergency 221-6581/ Emergency 911
Police - City of Fort Collins Police Department Non -Emergency 221-6550 / Emergency 911
Larimer County Sheriffs Department - Non -Emergency 221-7177
Postmaster - United States Postal Service 482-2837
Ambulance - Poudre Valley Hospital Non -Emergency 484-1227 / Emergency 911
Public Transportation — `TransFort' 221-6620
Traffic Control - Traffic Engineering 221-6815
City of Fort Collins SECTION 01100 — SUMMARY OF WORK
Park Planning & Development Division Page 1 of 2
9.0 SUBSTITUTE ("OR EQUAL") MATERIAL AND EQUIPMENT
The Contract, if awarded, will be on the basis of material and equipment
described on the Drawings or specified in the Specifications without
consideration of possible substitute or "or equal" items. Whenever it is
indicated on the Drawings or specified in the Specifications that a
substitute or "or equal" item of material or equipment may be furnished
or used by CONTRACTOR if acceptable to Engineer, application for such
acceptance will not be considered by Engineer until after the "effective
date of the Agreement". The procedure for submittal of any such
application by CONTRACTOR and consideration by Engineer is set forth in
the General Conditions which may be supplemented in the General
Requirements.
10.0 SUBCONTRACTORS, SUPPLIERS AND OTHERS
10.1. Each Bidder shall submit at the Bid opening to OWNER a list of
principal subcontractors he proposes to use in the Work. Refer to
Section 00430 contained within these Documents.
10.2. If OWNER or Engineer after due investigation has reasonable
objection to any proposed Subcontractor, either may, before the Notice of
Award is given, request the apparent successful Bidder to submit an
acceptable substitute without an increase in Bid price. If the apparent
successful Bidder declines to make any substitution, OWNER may award the
contract to the next lowest responsive and responsible Bidder that
proposes to use acceptable subcontractors. Subcontractors, suppliers,
other persons or organization listed and to whom OWNER or Engineer does
not make written objection prior to the giving of the Notice of Award
will be deemed acceptable to OWNER and ENGINEER subject to revocation of
such acceptance after the effective date of the Agreement as provided in
the General Conditions.
10.3. CONTRACTOR shall not be required to employ any subcontractor,
supplier or other persons or organizations against whom he has reasonable
objection. The use of subcontractors listed by the Bidder and accepted
by OWNER prior to the Notice of Award will be required in the performance
of the Work.
11.0 BID FORM.
11.1. A copy of the Bid Form is bound in the Contract Documents which
may be retained by the Bidder. A separate unbound copy is enclosed for
submission with the Bid.
Rev 10/20/07 Section 00100 Page 4
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END,OF SECTION
City of Fort Collins SECTION 01100 —SUMMARY OF WORK
Park Planning & Development Division Page 2 of 2
DIVISION 1
SECTION 01160 — SITE CONDITIONS
PART 1 - SITE INVESTIGATIONS AND REPRESENTATION
1.01 General Investigations
A. The Contractor acknowledges that he has satisfied himself as to the nature and location of the work, the
general and local conditions, particularly those bearing upon access to the site; handling, storage, and
disposal of materials; availability of water, electricity and roads; uncertainties of weather, or similar
physical conditions at the site; the conformation and conditions of the ground; the equipment and
facilities needed preliminary to and during the execution of the work; and all other matters which can
in any way affect the work or the cost thereof under this Contract.
1.02 Soil Conditions
A. The Contractor further acknowledges that he has satisfied himself as to the character, quality and
quantity of surface and subsurface materials to be encountered from his inspection of the site and from
reviewing any available records of exploratory work furnished by the Owner or included in these
Documents. Failure by the Contractor to acquaint himself with the physical conditions of the site and
all the available information will not relieve him from responsibility for properly estimating the
difficulty or cost of successfully performing the work.
1.03 Contractor Representation
A. The Contractor warrants that as a result of his examination and investigation of all the aforesaid data
that he can perform the work in a good and workmanlike manner and to the satisfaction of the Owner.
The Owner assumes no responsibility for any representations made by any of its officers or agents
during or prior to the execution of this Contract unless; (1) such representations are expressly stated in
the Contract, and (2) the Contract expressly provides that the responsibility therefore is assumed by the
Owner.
PART 2 - INFORMATION ON SITE CONDITIONS
2.01 General
Any information obtained by the Engineer regarding site conditions, subsurface information,
groundwater elevations, existing construction of site facilities, and similar data will be available for
inspection, as applicable, at the office of the Engineer upon request. Such information is offered as
supplementary information only. Neither the Engineer nor the Owner assumes any responsibility for
the completeness or interpretation of such supplementary information.
A. Differing Subsurface Conditions:
1. In the event that the subsurface or latent physical conditions are found materially different from
those indicated in these Documents, and differing materially from those ordinarily encountered and
generally recognized as inherent in the character of work covered in these Contract Documents,
the Contractor shall promptly, and before such conditions are disturbed, notify the Owner in
writing of such changed conditions.
2. The Engineer will investigate such conditions promptly and following this investigation, the
Contractor shall proceed with the work, unless otherwise instructed by the Engineer. If the
Engineer finds that such conditions do so materially differ and cause an increase or decrease in the
cost of or in the time required for performing the work, the Engineer will recommend to the Owner
the amount of adjustment in cost and time he considers reasonable. The Owner will make the final
decision on all Change Orders to the Contract regarding any adjustment in cost or time for
completion.
City of Fort Collins SECTION 01160 — SITE CONDITIONS
Park Planning & Development Division Page 1 of 3
B. Underground Utilities:
1. Known utilities and structures adjacent to or encountered in the work are shown on the Drawings.
The locations shown are taken from existing records and the best information available from
existing utility plans, however, it is expected that there may be some discrepancies and omissions
in the locations and quantities of utilities and structures shown. Those shown are for the
convenience of the Contractor only, and no responsibility is assumed by either the Owner or the
Engineer for their accuracy or completeness.
PART 3 - CONTRACTOR'S RESPONSIBILITY FOR UTILITY PROPERTIES AND SERVICE
3.01 General
A. Where the Contractor's operations could cause damage or inconvenience to railway, telegraph,
telephone, television, oil, gas, electricity, water, sewer, or irrigation systems, the operations shall be
suspended until all arrangements necessary for the protection of these utilities and services have been
made by the Contractor.
B. Notify all utility offices which are affected by the construction operation at least 48 hours in advance.
Under no circumstances expose any utility without first obtaining permission from the appropriate
agency. Once permission has been granted, locate, expose, and provide temporary support for all
existing underground utilities.
C. The Contractor shall protect all utility poles from damage. If interference of power poles, telephone
poles, guy wires, or anchors is encountered, notify the Owner's Representative and the appropriate
utility company at least 48 hours in advance of construction operations to permit the necessary
arrangements for protection or relocation of the interfering structure.
D. The Contractor shall be solely and directly responsible to the Owner and operators of such properties
for any damage, injury, expense, loss, inconvenience, delay, suits, actions, or claims of any character
brought because of any injuries or damage which may result from the construction operations under
this Contract.
E. Neither the Owner nor its officers or agents shall be responsible to the Contractor for damages as a
result of the Contractor's failure to protect utilities encountered in the work.
F. If the Contractor while performing the Contract discovers utility facilities not identified in the
Drawings or Specifications, he shall immediately notify the Owners and the utility in writing.
G. In the event of interruption to domestic water, sewer, storm drain, or other utility services as a result of
accidental breakage due to construction operations, promptly notify the proper authority. Cooperate
with said authority in the restoration of service as promptly as possible and bear all costs of repair. In
no case shall interruption of any water or utility service be allowed to exist outside working hours
unless prior approval is granted.
H. The Contractor shall replace, at his own expense, any and all other existing utilities or structures
removed or damaged during construction, unless otherwise provided for in these Contract Documents
or ordered by the Engineer.
3.02 Interfering Structures
A. Take necessary precautions to prevent damage to existing structures whether on the surface,
aboveground, or underground. An attempt has been made to show major structures on the Drawings.
The completeness and accuracy cannot be guaranteed, and it is presented simply as a guide to avoid
known possible difficulties.
City of Fort Collins SECTION 01160 — SITE CONDITIONS
Park Planning & Development Division Page 2 of 3
3.03 Field Relocation
A. During the progress of construction, it is expected that minor relocations of the work will be necessary.
Such relocations shall be made only by direction of the Owner's Representative. If existing structures
are encountered that prevent the construction, and that are not properly shown on the Drawings, notify
the Owner's Representative before continuing with the construction in order that the Owner's
Representative may make such field revision as necessary to avoid conflict with the existing structures.
If the Contractor shall fail to so notify the Owner's Representative when an existing structure is
encountered, and shall proceed with the construction despite the interference, he shall do so at his own
risk.
3.04 Easements
A. Easements will be obtained by the Owner where portions of the work are located on public or private
property. Easements will provide for the use of the property for construction purposes to the extent
indicated within the easement agreements. Copies of these easements and permits are available upon
request to the Owner. It shall be the Contractor's responsibility to determine the adequacy of the
easement obtained in every case and to abide by all requirements and provisions of the easement. The
Contractor shall confine his construction operations to within the easement limits or make special
arrangements with the property owners or appropriate public agency for the additional area required.
Any damage to property, either inside or outside the limits of the easements provided by the Owner,
shall be the responsibility of the Contractor as specified herein. The Contractor shall remove, protect,
and replace all fences or other items encountered on public or private property. Before final payment
will be authorized by the Owner's Representative, the Contractor will be required to furnish the Owner
with written releases from property owners or public agencies where side agreements or special
easements have been made by the Contractor or where the Contractor's operations, for any reason, have
not been kept within the construction right-of-way obtained by the Owner.
B. It is anticipated that the required easements and permits will be obtained before construction is started.
However, should the procurement of any easement or permit be delayed, the Contractor shall schedule
and perform the work around these areas until such a time as the easement or permit has been secured.
3.05 Land Monuments
A. The Contractor shall notify the Owner's Representative of any existing Federal, State, Town, County,
and private land monuments encountered. Private monuments shall be preserved, or replaced by a
licensed surveyor at the Contractor's expense. When Government monuments are encountered, the
Contractor shall notify the Owner's Representative at least two (2) weeks in advance of the proposed
construction in order that the Owner's Representative will have ample opportunity to notify the proper
authority and reference these monuments for later replacement.
END OF SECTION
City of Fort Collins SECTION 01160 — SITE CONDITIONS
Park Planning & Development Division Page 3 of 3
DIVISION 1
SECTION 01290 - MEASUREMENT AND PAYMENT
IL\:��iQei�►1=1 71�
1.01 Description
A. This section covers the methods employed in determining the payment due for work completed under
this contract.
B. The bid price should cover all work required by this contract based upon the quantities outlined in the
bid form.
C. Where actual quantities differ from those outlined in the bid form; unit prices as stipulated in the bid
form shall be utilized to compute payment.
D. Where unit prices are not set forth on specific work, that work shall be considered a subsidiary
obligation of the Contractor.
E. Quantities given in the bid form are estimates for the purpose of evaluating bids consequently some
difference may arise in actual and bid quantities.
1.02 Lump Sum Prices
A. Where lump sum (LS) prices are given for an item in the bid schedule or for items added during
construction by change order, the price will include all materials, labor, overhead and any other cost
incurred to complete the construction of the item in accordance with the plans and specifications.
B. All unit prices for each item shall include its pro rata share of profits, taxes, and overhead, and are for
the items installed in place, maintained and guaranteed. Including these factors, unit prices must
accurately reflect actual costs. Unit prices are to be valid for the life of the contract.
PART 2 - PRODUCTS (Not Used)
PART 3 - EXECUTION (Not Used)
END OF SECTION
City of Fort Collins SECTION 01290 — MEASUREMENT AND PAYMENT
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01300 — COORDINATION AND PROJECT MEETINGS
PART 1 - GENERAL
1.01 General
A. In order to provide for an orderly progression of work, all parties involved in the construction will meet
at various times during the project to discuss pertinent items regarding the work.
B. Coordinate operations under contract in a manner that will facilitate progress of the Work.
C. Conform to the requirements of public utilities and concerned public agencies in respect to the timing
and manner of performance of operations that affect the service of such utilities, agencies, or public
safety.
1.02 Conferences
A. The pre -construction conference will be held at a time to be determined by the Owner, after the
awarding of the Contract and prior to the issuance of the Notice to Proceed. The meeting will involve
the Owner, the Engineer, the Contractor, subcontractors and representatives of utilities and other
properties that will be directly affected by the work. The Contractor will have a complete construction
schedule ready for review at the time of the pre -construction conference.
B. Hold conferences for coordination of the Work when necessary.
C. The City may hold coordination conferences to be attended by all involved when Contractor's
operations affects, or is affected by, the work of others.
1.03 Progress Meetings
A. Contractor and the City shall schedule and hold regular progress meetings at least weekly and at other
times as requested by the City or required by the progress of the Work.
B. Attendance shall include:
1. Contractor and Superintendent
2. Owners Representative
3. Landscape Architect
4. Others as may be requested by contractor, Landscape Architect or Owner
C. Minimum Agenda shall include:
1. Review of work progress since last meeting
2. Identification and discussion of problems affecting progress
3. Review of any pending change orders
4. Revisions of Construction Schedule as appropriate
1.04 Job Site Administration
A. Contract administration and construction observation services will be provided by the Owner. The
Owner will make decisions regarding changes in the work and adjustments in contract quantities and/or
unit prices.
END OF SECTION
City of Fort Collins SECTION 01300 —COORDINATION AND PROJECT MEETINGS
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01310 - CONSTRUCTION SCHEDULES
PART 1 - GENERAL
1.01 General
A. It is the intent of the Owner to begin construction as soon as possible after the opening of the bid. The
signing of the contract and issuance of a Notice to Proceed will be completed promptly to accomplish
that objective. The Notice to Proceed will authorize the Contractor to begin project administration and
construction work on the site. Construction work shall not begin on site prior to the pre -construction
conference.
B. The Contractor shall complete all work, including cleanup of the site by "Substantial Completion' date,
specified in the Agreement, subject to the "Liquidated Damages" provision described under
"Instructions to Bidders."
C. Delays during project contract period outside control of the Contractor are subject to time extension
consideration but not financial compensation unless such delay is significant enough to reasonably
require Owner initiated work suspension (demobilization) as determined in the field by the Owner at
the time of occurrence. See Paragraph 1.04 for requirements for modifying the Contract Time due to
weather delays.
D. Contractor shall plan and schedule his own work effort (personnel, equipment and material) to
complete the project satisfactorily within the project time limits. Such schedule shall be in general
conformance with the schedule submitted at the pre -construction conference. This includes the
requirement that the Contractor conduct his operations to enable a shift of work effort from one part of
the project to another to reasonably accommodate unexpected delays, and to conduct his daily
operations so as to not create a public nuisance including but not limited to access or traffic
obstruction, dust and mud generation, work outside of construction limits, noise, unsatisfactory cleanup
or site restoration, unacceptable equipment/materials staging, flooding, etc. No work is to begin at the
site until City's acceptance of the Construction Schedule.
E. Contractor shall prepare and submit a Critical Path Method (CPM) schedule. The schedule shall show
all work completed within the contract time and shall cover the time from the date of Notice to Proceed
to the completion date. Contractor shall use Microsoft Project 2000 or approved equivalent to develop
and manage the CPM schedule.
F. Schedule shall include milestones that demonstrate the Contractor's approach to completing the project
within project time limits. Milestones shall be of sufficient number to indicate regular progress of
work and shall identify major components of the work. Milestones are subject to Owner approval prior
to work beginning at the site. If Contractor fails to meet a milestone, contractor shall submit an
updated schedule subject to Owner approval and demonstrate how the remaining milestones will be
met. The Owner may order work shut down or suspended for nonconformance with the approved
schedule (See Paragraph G. below)
G. Milestones (minimum required items)
H. The Contractor may voluntarily shut down or suspend work due to conditions beyond his control
provided a minimum of 24 hours notice is provided to the Owner together with the reasons for subject
suspension of work. The Contractor shall leave the project conditions in such a way so as not to cause
a public nuisance or a threat to public safety. Neither remobilization costs nor additional time will be
allowed for such suspension unless agreed to in writing in advance.
I. The Owner or Engineer may order work shut down or suspended for such nonconformance issues as
unsafe conditions, nonconformance with schedule, cause of public nuisance, unnecessary private
property disturbance, materials and labor unsuited to the task, nonconformance to technical
specifications, failure to comply with permits, etc. The Owner or Engineer will give a written warning
to the Contractor with a specified deadline during which time the Contractor shall remedy the cause(s)
described on the warning. Failure to do so shall justify the Owner or Engineer to order work shutdown
City of Fort Collins — Soft Gold Park SECTION 01310 — CONSTRUCTION SCHEDULES
Park Planning & Development Division Page 1 of 4
or suspended. Such shutdown will not be compensated by cost reimbursement or time schedule
adjustment.
J. Failure to promptly execute the approved schedule in the judgment of the Owner will result in a written
warning submitted to the Contractor explaining the specific compliance needed. Failure of the
Contractor to remedy the noted items may be considered a breach of contract possibly leading to work
shutdown for cause or contract termination.
1.02 Format and Submissions
A. Prepare Construction and Procurement schedules in a graphic format suitable for displaying schedule
and actual progress.
B. Submit two copies of each schedule to owner for review. Owner will return one copy to contractor with
revisions suggested or necessary for coordination of the Work with the needs of Owner or others.
1.03 Progress Revisions
A. A schedule update shall be submitted to the Owner at each weekly progress meeting that will reflect
work performed in the previous week and the upcoming two-(2) weeks. Schedule updates shall not
change any Contract times.
B. A complete schedule update shall be submitted with each application for progress payment.
C. Show changes occurring since previous submission.
1. Actual progress of each item to date.
2. Revised projections of progress and completion.
D. Provide a narrative report as needed to define:
1. Anticipated problems, recommended actions, and their effects on the schedule.
2. The effect of changes on schedules of other work.
1.04 Modifications to Time of Completion in the Approved Schedule
A. The date of beginning and the times for completion of the work are essential conditions of the Contract
Documents and the work embraced shall be commenced on a date specified in the Notice to Proceed.
The Contractor will proceed with the work at such rate of progress to ensure full completion within the
contract time. It is expressly understood and agreed, by and between the Contractor and the Owner
that the contract time for the completion of the work described herein is a reasonable time, taking into
consideration the climatic and other factors prevailing in the locality of the work.
Every effort shall be made by the Contractor to complete the project within the "Contract Time" shown
in the proposal. The "Contract Time" anticipates a "Normal" weather and climate condition in and
around the vicinity of the Project site during the times of year that the construction will be carried out.
Extensions of time based upon weather conditions shall be granted only if the Contractor demonstrates
clearly that such conditions were "unusually severe," would not have been reasonably anticipated, and
that such conditions adversely affected the Contractor's work and thus required additional time to
complete the work.
B. The following specifies the procedure for the determination of time extensions for unusually severe
weather. The listing below defines the anticipated number of calendar days lost to adverse weather for
each month and is based upon National Oceanic and Atmospheric Administration (NOAA) or similar
data for the geographic location of the project.
City of Fort Collins — Soft Gold Park SECTION 01310 — CONSTRUCTION SCHEDULES
Park Planning & Development Division Page 2 of 4
Monthly Anticipated Calendar Days Lost to Adverse Weather Conditions
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
(7) (4) (4) (4) (6) (3) (4) (2) (3) (3) (2) (5)
The above schedule of anticipated adverse weather will constitute the base line for monthly (or portion
thereof) weather time evaluations. Upon acknowledgment of the Notice to Proceed and continuing
throughout the contract on a monthly basis, actual adverse weather days and the impact of adverse
weather days that delay the work will be recorded on a day-to-day basis. It is assumed that the work
will be carried out Mondays through Fridays (holidays excluded) unless an approved construction
schedule or written authorization from the Owner indicates otherwise. The number of days of delayed
work due to adverse weather or the impact thereof will then be compared to the monthly adverse
weather schedule above.
An actual adverse weather day must prevent work for 50 percent or more of the Contractor's workday,
delay work critical to the timely completion of the project, and be documented by the Contractor. The
City Representative observing the construction shall determine on a daily basis whether or not work
can proceed or if work is delayed due to adverse weather or the effects thereof. The Contractor shall
notify the Construction Coordinator in writing of any disagreement as to whether or not work can
proceed on a given date, within 2 calendar days of that date. The Owner will use the above written
notification in determining the number of working days for which work was delayed during each
month.
C. At the end of each month, if the number of working days for which work was delayed due to adverse
weather exceeds that shown in the above schedule, a Change Order will be executed which increases
the Contract Time. The number of workdays delayed due to adverse weather or the impact thereof will
then be converted to Calendar Days based on the contract completion day and date. This conversion
assumes a 5-day work week, Mondays through Fridays, holidays excepted; should the Contractor have
authorization to work weekends and/or holidays, then the method of conversion of workdays to
calendar days would take this into consideration. The contract time period will then be increased by the
number of calendar days calculated above and a new contract completion day and date will be set.
D. The Contractor's schedule must reflect the above -anticipated adverse weather delays on all weather -
dependent activities.
E. While extensions of time shall be granted for "unusually severe" weather or climate conditions, the
Owner shall make no monetary compensation for any. costs to the Contractor arising out of such delays.
The Contractor shall comply with the portions of the Contract Documents relating to his project
schedule and amendments thereto which result from the "unusually severe" weather condition.
F. Breakdowns in equipment or lack of performance by the Contractor will not be considered justification
for an extension of time. Liquidated damages will be assessed as delineated elsewhere.
G. The Contractor shall not be charged with liquidated damages or any excess cost when the delay in
completion of the work is due to the following, and the Contractor has promptly given written notice of
such delay to the Owner or Engineer.
To any preference, priority, or allocation order duly issued by the Owner.
To unforeseeable causes beyond the control and without the fault or negligence of the Contractor,
including but not restricted to, acts of God, or of the public enemy, acts of the Owner, acts of
another Contractor in the performance of a contract with the Owner, fires, floods, epidemics,
quarantine restrictions, strikes, freight embargoes, and abnormal and unforeseeable weather as
provided above; and
To any delays of Subcontractors occasioned by any of the causes specified in paragraphs 1 and 2,
above.
City of Fort Collins — Soft Gold Park SECTION 01310 — CONSTRUCTION SCHEDULES
Park Planning & Development Division . Page 3 of 4
1.05 City's Responsibility
A. City's review is only for the purpose of checking conformity with the Contract Documents and
assisting Contractor in coordinating the Work with the needs of the Project.
B. It is not to be construed as relieving Contractor from any responsibility to determine the means,
methods, techniques, sequences, and procedures of construction as provided in the General Conditions.
PART 2 - MATERIALS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
PART 4 - MEASUREMENT & PAYMENT (Not Applicable)
END OF SECTION
City of Fort Collins — Soft Gold Park SECTION 01310 — CONSTRUCTION SCHEDULES
Park Planning & Development Division Page 4 of 4
11.2. Bid Forms must be complete in ink or typed. All lump sum prices
on the form must be stated in words and numerals; in case of conflict,
words will take precedence. Unit prices shall govern over extensions of
SUMS.
11.3. Bids by corporations must be executed in the corporate name by the
president or a vice-president (or other appropriate officer accompanied
by evidence of authority to sign) and the corporate seal shall be affixed
and attested by the secretary or an assistant secretary. The corporate
address and state of incorporation shall be shown below the corporate
name.
11.4. Bids by partnerships must be executed in the partnership name and
signed by a partner, his title must appear under his signature and the
official address of the partnership must be shown below the -signature.
11.5. Bids by joint venture shall be signed by each participant in the
joint venture or by an authorized agent of each participant. The full
name of each person or company interested in the Bid shall be listed on
the Bid Form'.
11.6. The Bid shall contain an acknowledgement of receipt of all Addenda
(the numbers of which must be filled in on the Bid Form).
11.7. No alterations in Bids, or in the printed forms therefore, by
erasures, interpolations, or otherwise will be acceptable unless each
such alteration is signed or initialed by the Bidder; if initialed, OWNER
may require the Bidder to identify any alteration so initialed.
11.8. The address and telephone number for communications regarding the
Bid shall be shown.
12.0 BID PRICING.
Bids must be priced as set forth in the Bid Schedule or Schedules.
13.0 SUBMISSION OF BIDS.
13.1. Bids shall be submitted at the time and place indicated in the
Invitation to Bid and shall be enclosed in an opaque sealed envelope
marked with the Project title, Bid No., and name and address of the
Bidder and accompanied by the Bid Security, Bid Form, Bid Bond, Statement
of Bidders Qualifications, and Schedule of Subcontractors as required in
Section 00430. If the Bid is sent through the mail or other delivery
system, the sealed envelope shall be enclosed in a separate envelope with
the notation "BID ENCLOSED" on the face of it.
Rev 10/20/07 Section 00100 Page 5
DIVISION 1
SECTION 01330 — SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
PART 1 - GENERAL
1.01 Shop Drawings
A. Submit newly prepared information drawn accurately to scale. Highlight, encircle, or otherwise
indicate deviations from the Contract Documents. Do not reproduce Contract Documents or copy
standard information as the basis of Shop Drawings. Standard information prepared without specific
reference to the Project is not a Shop Drawing.
B. Shop Drawings include fabrication and installation Drawings, setting diagrams, schedules, patterns,
templates, and similar Drawings. Include the following information:
1. Dimensions.
2. Identification of products and materials included by sheet and detail number.
3. Compliance with specified standards.
4. Notation of coordination requirements.
5. Notation of dimensions established by field measurement.
6. Sheet Size: Except for templates, patterns and similar full-size Drawings, submit Shop Drawings
on sheets at least 8-1/2 by 11 inches but no larger than 24 by 36 inches.
7. Submittal: Submit 3 blue- or black -line prints and 2 additional prints where required for
maintenance manuals, plus the number of prints needed by the Contractor for distribution. The
Owner's Representative will retain 2 prints and return the remainder.
a. One of the prints returned shall be marked up and maintained as a "Record Document."
8. Do not use Shop Drawings without an appropriate final stamp indicating action taken.
1.02 Product Data
A. Collect Product Data into a single submittal for each element of construction or system. Product Data
includes printed information, such as manufacturer's installation instructions, catalog cuts, standard
color charts, roughing -in diagrams and templates, standard wiring diagrams, and performance curves.
1. Mark each copy to show applicable choices and options. Where printed Product Data includes
information on several products that are not required, mark copies to indicate the applicable
information. Include the following information:
a. Manufacturer's printed recommendations.
b. Compliance with trade association standards.
c. Compliance with recognized testing agency standards.
d. Application of testing agency labels and seals.
e. Notation of dimensions verified by field measurement.
f. Notation coordination requirements.
2. Do not submit Product Data until compliance with requirements of the Contract Documents has
been confirmed.
3. Preliminary Submittal: Submit a preliminary single copy of Product Data where selection of
options is required.
4. Submittals: Submit 2 copies of each required submittal; submit 4 copies where required for
maintenance manuals plus additional copies as needed by the Contractor for distribution. The
City of Fort Collins SECTION 01330 — SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
Park Planning & Development Division Page 1 of 3
Owner will retain one and will return the other marked with action taken and corrections or
modifications required.
Distribution: Furnish copies of final submittal to installers, subcontractors, suppliers,
manufacturers, fabricators, and others required for performance of construction activities. Show
distribution on transmittal forms.
a. Do not proceed with installation until a copy of Product Data is in the Installer's possession.
b. Do not permit use of unmarked copies of Product Data in connection with construction.
1.03 Samples
A. Submit full-size, full -fabricated Samples cured and finished as specified and physically identical with
the material or product proposed. Samples include partial sections of manufactured or fabricated
components, cuts or containers of materials, color range sets, and swatches showing color, texture, and
pattern.
1. Mount or display Samples in the manner to facilitate review of qualities indicated. Include the
following:
a. Specification Section number and reference.
b. Generic description of the Sample.
c. Sample source.
d. Product name or name of the manufacturer.
e. Compliance with recognized standards.
f. Availability and delivery time.
2. Submit Samples for review of size, kind, color, pattern, and texture. Submit Samples for a final
check of these characteristics with other elements and a comparison of these characteristics
between the final submittal and the actual component as delivered and installed.
a. Where variation in color, pattern, or other characteristic is inherent in the material or product
represented, submit at least 3 multiple units that show approximate limits of the variations.
b. Refer to other Specification Sections for requirements for Samples that illustrate
workmanship, fabrication techniques, details of assembly, connections, operation, and similar
construction characteristics.
c. Refer to other Sections for Samples to be returned to the Contractor for incorporation in the
Work. Such Samples must be undamaged at time of use. On the transmittal, indicated special
requests regarding disposition of Sample submittals.
d. Samples not incorporated into the Work, or otherwise designated as the Owner's property, are
the property of the Contractor and shall be removed from the site prior to Substantial
Completion.
3. Preliminary Submittals: Submit a full set of choices where Samples are submitted for selection of
color, pattern, texture, or similar characteristics from a range of standard choices. The Owner will
review and return preliminary submittals with the Owner's notation, indicating selection and other
action.
4. Submittals: Except for Samples illustrating assembly details, workmanship, fabrication
techniques, connections, operation, and similar characteristics, submit 3 sets. The Owner will
return one set marked with the action taken.
5. Maintain sets of Samples, as returned, at the Project Site, for quality comparisons throughout the
course of construction.
a. Unless noncompliance with Contract Document provisions is observed, the submittal may
serve as the final submittal.
b. Sample sets may be used to obtain final acceptance of the construction associated with each
set.
City of Fort Collins SECTION 01330 — SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
Park Planning & Development Division Page 2 of 3
B. Distribution of Samples: Prepare and distribute additional sets to subcontractors, manufacturers,
fabricators, suppliers, installers, and others as required for performance of the Work. Show distribution
on transmittal forms.
1.04 Quality Assurance Submittals
A. Submit quality -control submittals, including design data, certifications, manufacturer's instructions,
manufacturer's field reports, and other quality -control submittals as required under other Sections of
the Specifications.
B. Certifications: Where other Sections of the Specifications require certification that a product, material,
or installation complies with specified requirements, submit a notarized certification from the
manufacturer certifying compliance with specified requirements.
1. Signature: an officer of the manufacturer or other authorized individual shall sign Certification
documents.
C. Inspection and Test Reports: Requirements for submittal of inspection and test reports from
independent testing agencies are specified in Division 1 Section "Quality Control and Testing," and in
the applicable technical specifications.
PART 2 - PRODUCTS (Not Applicable)
PART 3 - EXECUTION (Not Applicable)
END OF SECTION
City of Fort Collins SECTION 01330 — SHOP DRAWINGS, PRODUCT DATA AND SAMPLES
Park Planning & Development Division Page 3 of 3
DIVISION I.
SECTION 01340 - SURVEY DATA
PART 1 - GENERAL
1.01 Survey Requirements
A. Contractor is responsible for the layout of the Work. The City will not provide surveying.
B. Base all measurements, both horizontal and vertical, on established control points. Verify all
established control points at site prior to laying out the work.
C. Perform layout of the Work with qualified personnel.
1. Minimum paved areas layout requirements: concrete trail• per line & curve tables, at all spot
elevations and at grade changes, changes in horizontal alignment, and at all the points displayed on
all cross -sections found in the plan set.
D. All field books, notes, and other data developed by Contractor in performing surveys required by the
Work will be available to City for examination throughout the construction period.
1.02 Submittals
A. Submit to City all survey data with other documentation required for final acceptance.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01340 —SURVEY DATA
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01450 - QUALITY CONTROL AND TESTING
PART 1 - GENERAL
1.01 General
A. Provide such equipment and facilities as the City may require for conducting field tests and for
collecting and forwarding samples. Do not use any materials or equipment represented by samples until
tests, if required, have been made and the materials or equipment are found to be acceptable. Any
product that becomes unfit for use after approval hereof shall not be incorporated into the work.
B. All materials or equipment proposed to be used may be tested at any time during their preparation or
use. Furnish the required samples without charge and give sufficient notice of the placing of orders to
permit the testing. Products may be sampled either prior to shipment or after being received at the site
of the work.
C. Tests shall be made by an accredited testing laboratory selected by the OWNER. Except as otherwise
provided, sampling and testing of all materials and the laboratory methods and testing equipment shall
be in accordance with the latest standards and tentative methods of the American Society for Testing
Materials (ASTM), and the American Association of Highway and Transportation Officials
(AASHTO).
D. Where additional or specified information concerning testing methods, sample sizes, etc., is required,
such information is included under the applicable sections of the Specifications. Any modification of,
or elaboration on, these test procedures which may be included for specific materials under their
respective sections in the Specifications shall take precedence over these procedures.
1.02 City's Responsibilities
A. City of Fort Collins shall be responsible for and shall pay all costs in connection with the following
testing:
1. Soils compaction tests.
2. Trench & Structural backfill.
3. Pipe and structural bedding.
4. Tests not called for by the Specifications of materials delivered to the site.
5. Concrete, mortar and grout tests.
6. Pavement tests
1.03 Contractor's Responsibilities
A. In addition to those inspections and tests called for in the General Conditions, Contractor shall also be
responsible for and shall pay all costs in connection with testing required for the following:
1. All performance and field testing specifically called for by the specifications.
2. All re -testing for Work or materials found defective or unsatisfactory, including tests covered by
1.02 above.
3. Testing of pipe.
4. Vacuum testing of manholes.
5. Concrete materials and mix designs.
6. Asphalt materials and mix designs
7. Gradation tests for embedment, fill and backfill materials.
City of Fort Collins SECTION 01450 — QUALITY CONTROL AND TESTING
Park Planning & Development Division Page 1 of 2
8. Material Substitution - any test for basic material or fabrication of equipment offered as a
substitution for a specified item on which a test may be required in order to prove it compliant with
the specifications.
Nothing contained herein is intended to imply that the Contractor does not have the right to have
tests performed on any material at any time for his/her own information and job control so long as
the Owner does not assume responsibility for the cost or for giving them consideration when
appraising quality materials.
1.04 Transmittal of Test Reports
A. Submit 2 copies of each report of tests and engineering data furnished by the Contractor for City
Representative's review. The Owner's Representative will retain one and will return the other marked
with action taken and corrections or modifications required.
B. The testing laboratory retained by the OWNER will furnish three (3) copies of a written report of each
test performed by laboratory personnel in the field or laboratory. Two (2) copies of each test report
will be transmitted to the City Representative and one (1) copy to the Contractor within seven (7) days
after each test is completed.
1.05 Contractor's Quality Control System .
A. General: The Contractor shall establish a quality control system to perform sufficient inspection and
tests of all items of work, including that of his subcontractors, to ensure conformance to the functional
performance of this project. This control shall be established for all construction except where the
Contract Documents provide for specific compliance tests by testing laboratories or engineers
employed by the City. Contractor's control system shall specifically include all testing required by the
various sections of the Specifications.
B. Contractor's quality control system is the means by which he assures himself that his construction
complies with the requirements of the Contract Documents. Controls shall be adequate to cover all
construction operations and should be keyed to the proposed construction schedule.
C. Records: maintain correct records on an appropriate form for all inspections and tests performed,
instructions received from the City and actions taken as a result of those instructions. These records
shall include evidence that the required inspections or tests have been performed (including type and
number of inspections or test, nature of defects, causes for rejection, etc.) proposed or directed
remedial action, and corrective action taken. Document inspections and tests as required by each
section of the Specifications. Provide copies to City in a reasonable time.
D. Pipe alignment and grade is to be maintained through the use of suitable surveying instruments or laser
equipment operated continuously during construction. Horizontal tolerances of+ 0.3 feet and vertical
tolerances of + 0.1 feet maximum deviation from plan and construction staking are to be maintained,
except that visible "snaking" of the horizontal alignment and changes in directions of slope will not be
permitted.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01450 — QUALITY CONTROL AND TESTING
Park Planning & Development Division Page 2 of 2
.DIVISION 1
SECTION 01500 - TEMPORARY CONTROLS
1.01 Noise Control
A. Take reasonable measures to avoid unnecessary noise when construction activities are being performed
in populated areas.
B. Construction machinery and vehicles shall be equipped with practical sound muffling devices, and
operated in a manner to cause the least noise consistent with efficient performance of the work.
C. Cease operation of all machinery and vehicles between the hours of 6:00 p.m. and 7:00 a.m.
1.02 Dust Control
A. Dusty materials in piles or in transit shall be covered to prevent blowing.
B. Earth and road surfaces subject to dusting due to construction activities and detouring of traffic shall be
kept moist with water or by application of a chemical dust suppressant.
1. Chemical dust suppressant shall not be injurious to existing or future vegetation.
1.03 Pollution Control
A. Prevent the pollution of drains and watercourses by sanitary wastes, concrete, sediment, debris and
other substances resulting from construction activities.
1. Retain all spent oils, hydraulic fluids and other petroleum fluids in containers for disposal off the
site.
2. Prevent sediment, debris or other substances from entering sanitary sewers, storm drains and
culverts.
1.04 Erosion Control
A. Take such measures as are necessary to prevent erosion of soil that might result from construction
activities.
1. Measures in general will include:
a. Control of runoff.
b. Trapping of sediment.
c. Minimizing area and duration of soil exposure.
d. Temporary materials such as hay bales, sandbags, plastic sheets, riprap or culverts to prevent
the erosion of banks and beds of watercourses or drainage swales where runoff will be
increased due to construction activities.
B. Preserve natural vegetation to the greatest extent possible.
C. Locate temporary storage and route construction traffic so as to preserve vegetation and minimize
erosion.
D. Comply with the City of Fort Collins' Storm Drainage Erosion Control Manual.
END OF SECTION
City of Fort Collins SECTION 01500 —TEMPORARY CONTROLS
Park Planning & Development Division Page 1 of 1
DIVISION 1
SECTION 01510 - TEMPORARY UTILITIES
PART 1 - GENERAL
1.01 Utilities
A. Furnish all utilities necessary for construction including, but not limited to temporary electric power
and pay all cost associated with utilities during and used for the contract period. All temporary utilities
installation shall meet the construction safety requirements of OSHA, State and local governing
agencies.
1.02 Water
A. Contractor is responsible for obtaining water for construction and shall pay all costs associated with
establishing a temporary meter used during construction.
1.03 Sanitary Facilities
A. Furnish temporary sanitary facilities at the site in the vicinity of the construction for the needs of
construction workers and others performing work or furnishing services on the Project.
B. Properly maintain sanitary facilities of reasonable capacity throughout construction periods.
C. Enforce the use of such sanitary facilities by all personnel at the site.
D. Obscure sanitary facilities from public view to the greatest extent practical.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01510 - TEMPORARY UTILITIES
Park Planning & Development Division Page'1 of 1
DIVISION 1 -
SECTION 01570 - TRAFFIC CONTROL
PART 1 - GENERAL
1.01 General
A. Traffic Control necessary to complete the project as depicted in the plans and specifications will be
provided by the Contractor and will not be paid for separately.
B. The Contractor must submit traffic control plans and coordinate all traffic control with the City's
Traffic Control Coordinator as well as any other agencies with R.O.W. jurisdiction. The traffic control
plans must be submitted and approved 72 hours prior to starting construction and before making each
modification.
C. Conformance: City of Fort Collins Work Area Traffic Control Handbook, Manual of Uniform Traffic
Control Devices (U.S. Dept. of Transportation), or applicable statutory requirements of authority
having jurisdiction.
D. Limited closures may be permitted for short periods up to three days to allow installation of concrete
pavement. Closures must be requested and approved 72 hours prior to anticipated closure.
E. Limited alternating one-way traffic operation may be permitted during the hours from 9:00 A.M. to
3:30 P.M. One-way traffic operation must be requested and approved 72 hours prior to anticipated
operation.
F. At all times, Contractor must maintain two-way traffic with a minimum of one lane of traffic in each
direction. Limited closures may be allowed.
G. The Contractor must coordinate with adjacent residents to provide and maintain them sufficient access
during the duration of the project. It will be the Contractor's responsibility to coordinate and
communicate with the residents during construction.
H. Keep traffic areas free of excavated material, construction equipment, pipe, and other materials and
equipment.
1. Keep fire hydrants and utility control devices free from obstruction and available for use at all times.
J. Conduct operations in a manner to avoid unnecessary interference with public and private roads and
drives.
K. Provide and maintain temporary approaches or crossings at streets, businesses, and residences.
L. Keep roads open and in acceptable condition, unless closure or detour has been approved by City's
Traffic Control Coordinator 72 hours prior to closure or detour.
M. Define a temporary pedestrian access route for children coming from the surrounding neighborhoods.
This pedestrian access route shall be located outside of the project limits. The pedestrian access route
shall be kept free of excavated material, construction equipment, pipe, and other materials.
1.02 Traffic Control Plan
A. Submit a detailed traffic control plan to Traffic Control Coordinator for review and acceptance. Plan
must be accepted 72 hours prior to work commencing at the site. Maintain the accepted plan
throughout all phases of construction. Provide copy to Owner prior to submittal.
1. Notify police, sheriff, ambulance services, and fire authorities of traffic control plan and the
schedule of it. Distribute copies if requested.
City of Fort Collins SECTION 01570 - TRAFFIC CONTROL
Park Planning & Development Division Page 1 of 2
1.03 Flaggers
A. Required where necessary to provide for public safety, or the regulation of traffic, or by jurisdictional
authorities.
B. Shall be properly equipped and licensed.
1.04 Warning Signs and Lights
A. Provide suitable barricades and warning signs for:
1. Open trenches and other excavations.
2. Obstructions, such as material piles, equipment, piled embankment.
B. Illuminate by means of warning lights all barricades and obstructions from sunset to sunrise.
C. Protect roads and driveways by effective barricades on which are placed acceptable warning signs.
1.05 Parking
A. Provide suitable parking areas for the use of all construction workers and others performing work or
furnishing services in connection with the Project so as to avoid interference with private property,
public traffic, City's operations, or construction activities. Such parking shall occur on the project site
or another suitable location, approved by the City.
1.06 Roadway Usage between Operations
A. At all times when Work is not actually in progress, Contractor shall make passable and shall open to
traffic such portions of the Project and temporary roadways or portions thereof as may be agreed upon
between Contractor and City and all authorities having jurisdiction over any properties involved.
PART 2 - MATERIALS (Not Used)
PART 3 - EXECUTION (Not Used)
PART 4 - MEASUREMENT & PAYMENT (Not Used)
END OF SECTION
City of Fort Collins SECTION 01570 - TRAFFIC CONTROL
Park Planning & Development Division Page 2 of 2
13.2. Bids shall be deposited at the designated location prior to the
time and date for receipt of Bids indicated in the Invitation to Bid, or
any extension thereof made by addendum. Bids received after the time and
date for receipt of Bids will be returned unopened. Bidder shall assume
full responsibility for timely delivery at the location designated for
receipt of Bids.
13.3. Oral, telephonic, telegraphic, or facsimile Bids are invalid and
will not receive consideration.
13.4. No Bidder may submit more than one Bid. Multiple Bids under
different names will not be accepted from one firm or association.
14.0 MODIFICATION AND WITHDRAWAL OF BIDS.
14.1. Bids may be modified or withdrawn by an appropriate document duly
executed (in a manner that a Bid must be executed) and delivered to the
place where Bids are to be submitted at any time prior to the opening of
Bids.
14.2. Bids may also be modified or withdrawn in person by the Bidder or
an authorized representative provided he can prove his identity and
authority at any time prior to the opening of Bids.
14.3. Withdrawn Bids may be resubmitted up to the time designated for
the receipt of Bids provided that they are then fully in conformance with
these Instructions to Bidders.
15.0 OPENINGS OF BIDS.
Bids will be opened and (unless obviously non -responsive) read aloud
publicly as indicated in the Invitation to Bid. An abstract of the
amounts of the Base Bids and major alternates (if any) will be made
available after the opening of Bids.
16.0 BIDS TO REMAIN OPEN SUBJECT TO ACCEPTANCE.
All Bids shall remain open for forty-five (45) days after the day of the
Bid Opening, but OWNER may, in his sole discretion, release any Bid and
return the Bid Security prior to that date.
17.0 AWARD OF CONTRACT.
17.1. OWNER reserves the right to reject any and all Bids, to waive any•
and all informalities not involving price, time or changes in the Work,
to negotiate contract terms with the Successful Bidder, and the right to
disregard all nonconforming, nonresponsive, unbalanced or conditional
Bids. Also, OWNER reserves the right to reject the Bid of any Bidder if
OWNER believes that it would not be in the best interest of the Project
to make an award to that Bidder, whether because the Bid is not
responsive or the Bidder is unqualified or of doubtful financial ability
Rev 10/20/07 Section 00100 Page 6
DIVISION 1
SECTION 01600 — MATERIALS AND EQUIPMENT
PART 1 - GENERAL
1.01 Related Documents
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and
other Division 1 Specification Sections, apply to this Section.
1.02 Summary
A. This Section includes administrative and procedural requirements governing the Contractor's selection
of products for use in the Project.
1.03 Definitions
A. Definitions used in this Article are not intended to change the meaning of other terms used in the
Contract Documents, such as "specialties," "systems," `'structure," "finishes," "accessories," and
similar terms. Such terms are self-explanatory and have well -recognized meanings in the construction
industry.
1. "Products" are items purchased for incorporation in the Work, whether purchased for the Project
or taken from previously purchased stock. The term "product" includes the terms "material,"
"equipment," "systems," and terms of similar intent.
2. "Materials" are products substantially shaped, cut, worked, mixed, finished, refined, or otherwise
fabricated, processed, or installed to form a part of the Work.
3. "Equipment'' is a product with operational parts, whether motorized or manually operated, that
requires service connections, such as wiring or piping.
1.04 Submittals
A. Product List: Prepare a list showing products specified in tabular form acceptable to the Owner.
Include generic names of products required. Include the manufacturer's name and proprietary product
names for each item listed.
1. Coordinate product list with the Contractor's Construction Schedule and the Schedule of
Submittals.
2. Form: Prepare product list with information on each item tabulated under the following column
headings:
a. Related Specifications Section number.
b. Generic name used in Contract Documents.
C. Proprietary name, model number, and similar designations.
d. Manufacturer's name and address.
e. Supplier's name and address.
f. Installer's name and address.
g. Projected delivery date or time span of delivery period.
3. Initial Submittal: Within 30 days of date commencement of the Work, submit 3 copies of an initial
product list. Provide a written explanation of omissions of data and for known variations from
Contract requirements.
4. Complete List: Within 60 days after date of commencement of the Work, submit 3 copies of the
completed product list. Provide a written explanation for omissions of data and for known
variations from Contract requirements.
City of Fort Collins SECTION 01600 — MATERIALS AND EQUIPMENT
Park Planning & Development Division Page 1 of 3
5. Owner's Action: The Owner will respond in writing to Contractor within 2 weeks of receipt of the
completed product list. No response within this period constitutes no objection to listed
manufacturers or products, but does not constitute a waiver of the requirement that products
comply with Contract Documents. The Owner's response will include a list of unacceptable
product selections, containing a brief explanation of reasons for this action.
1.05 Quality Assurance
A. Source Limitations: To the fullest extent possible, provide products of the same kind from a single
source.
B. Compatibility of Options: When the Contractor is given the option of seeking between 2 or more
products for use on the Project, the product selected shall be compatible with products previously
selected, even if previously selected products were also options.
C. Foreign Product Limitations: Except under one or more of the following conditions provide domestic
products, not foreign products, for inclusion in the Work:
1. Not available domestic product complies with the Contract Documents.
2. Domestic products that comply with the Contract Documents are available only at prices or terms
substantially higher than foreign products that comply with the Contract Documents.
1.06 Product Delivery, Storage and Handling
A. Delivery, store, and handle products according to the manufacturer's recommendations, using means
and methods that will prevent damage, deterioration, and loss, including theft.
1. Schedule delivery to minimize long-term storage at the site and to prevent overcrowding of
construction spaces.
2. Coordinate delivery with installation time to assure minimum holding time for items that are
flammable, hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.
3. Delivery products to the site in an undamaged condition in the manufacturer's original sealed
container or other packaging system, complete with labels and instructions for handling, storing,
unpacking, protecting, and installing.
4. Inspect products upon delivery to ensure compliance with the Contract Documents and to ensure
that products are undamaged and properly protected.
5. Store products at the site in a manner that will facilitate inspection and measurement of quantity or
counting of units.
6. Store heavy materials away from the Project structure in a manner that will not endanger the
supporting construction.
7. Store products subject to damage by the elements above ground, under cover in a weather -tight
enclosure, with ventilation adequate to prevent condensation.
PART 2 - PRODUCTS
2.01 Product Selection
A. General Product Requirements: Provide products that comply with the Contract Documents, that are
undamaged and, unless otherwise indicated, new at the time of installation.
B. Product Selection procedures: The Contract Documents and governing regulations govern product
selection. Procedures governing product selection include the following:
1. Proprietary Specification Requirements: Where Specifications name only a single product or
manufacturer, provide the product indicated. No substitutions will be permitted.
2. Semiproprietary Specification Requirements: Where Specifications name 2 or more products or
manufacturers or where Specifications specify products or manufacturers by name, accompanied
by the term "or equal" or "or approved equal," provide one of the products listed or comply with
City of Fort Collins SECTION 01600 — MATERIALS AND EQUIPMENT
Park Planning & Development Division Page 2 of 3
the Contract Document provisions concerning "substitutions" or obtain approval for use of an
unnamed product.
3. Nonproprietary Specification Requirements: When Specifications list products or manufacturers
that are available and may be incorporated in the Work, but do not restrict the Contractor to use
these products only, the Contractor may propose any available product that complies with Contract
requirements. Comply with Contract Document provisions concerning "substitutions" to obtain
approval for use of an unnamed product.
4. Descriptive Specification Requirements: Where Specifications describe a product or name, provide
a product or assembly that provides the characteristics and otherwise complies with Contract
requirements.
5. Compliance with Standards, Codes, and Regulations: Where Specifications only require
compliance with an imposed code, standard, or regulation, select a product that complies with the
standards, codes, or regulations specified.
6. Visual Matching: Where Specifications require matching an established Sample, the Owner's
decision will be final on whether a proposed product matches satisfactorily.
7. Visual Selection: Where specified product requirements include the phrase "... as selected from
manufacturer's standard colors, patterns, textures..." or a similar phrase, select a product and
manufacturer that complies with other specified requirements. The Owner will select the color,
pattern, and texture from the product line selected.
PART 3 - EXECUTION
3.01 Installation of Products
A. Comply with manufacturer's instructions and recommendations for installation of products in the
applications indicated. Anchor each product securely in place, accurately located and aligned with
other Work.
END OF SECTION
City of Fort Collins SECTION 01600 — MATERIALS AND EQUIPMENT
Park Planning & Development Division Page 3 of 3
DIVISION 1
SECTION 01700 — CONTRACT CLOSEOUT
PART 1 —GENERAL
1.01 Related Documents
A. Drawings and general provisions of the Contract, including general and supplementary conditions and
other Division 1 specification sections, apply to this section.
1.02 Summary
A. This Section includes administrative and procedural requirements for contract closeout including, but
not limited to, the following:
1. Inspection procedures.
2. Project record document submittal.
3. Operation and maintenance manual submittal.
4. Submittal of warranties.
5. Final cleaning.
B. Closeout requirements for specific construction activities are included in the appropriate Sections in
Divisions 2 through 16.
1.03 Substantial Completion
A. Preliminary Procedures: Before requesting inspection for certification of Substantial Completion,
complete the following. List exceptions in the request.
1. In the Application for Payment that coincides with, or first follows, the date Substantial
Completion is claimed, show 100 percent completion for the portion of the Work claimed as
substantially complete.
2. Advise the Owner of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, maintenance agreements, final certifications, and
similar documents.
4. Obtain and submit releases enabling the Owner unrestricted use of the Work and access to services
and utilities. Include occupancy permits, operating certificates, and similar releases.
5. Submit record drawings, maintenance manuals, final project photographs, damage or settlement
surveys, property surveys, and similar final record information.
6. Deliver tools, spare parts, extra stock, and similar items.
7. Make final changeover of permanent locks and transmit keys to the Owner. Advise the Owner's
personnel of changeover in security provisions.
8. Complete startup testing of systems and instruction of the Owner's operation and maintenance
personnel. Discontinue and remove temporary facilities from the site, along with mockups,
construction tools, and similar elements.
9. Complete final cleanup requirements, including touchup painting.
10. Touch up and otherwise repair and restore marred, exposed finishes.
City of Fort Collins SECTION 01700 — CONTRACT CLOSEOUT
Park Planning & Development Division Page 1 of 5
B. Inspection Procedures: On receipt of a request for inspection, the Owner will either proceed with
inspection or advise the Contractor of unfilled requirements. The Owner will prepare the Certificate of
Substantial Completion following inspection or advise the Contractor of construction that must be
completed or corrected before the certificate will be issued.
1. If the Owner's Representative determines that the work is not substantially complete at the time of
review or that deficiencies remain at time of compliance review, the Contractor shall pay for the
additional review(s) by Owner's Representative.
2. Results of the completed inspection will form the basis of requirements for final acceptance.
1.04 Status after Substantial Completion
A. The date of substantial completion marks the beginning of the maintenance period defined in Section
02970 — Planting Maintenance.
B. During maintenance period, the following conditions hold:
1. Insurance: Same as during construction.
2. Electricity and Irrigation Water: Supplied by Owner, as installed by Contractor under this contract.
3. Bonds: Remain in effect.
4. Retainage: Same as during construction.
1.05 Final Acceptance
A. Preliminary Procedures: Before requesting final inspection for certification of final acceptance and
final payment, complete the following. List exceptions in the request.
1. Submit the final payment request with releases and supporting documentation not previously
submitted and accepted. Include insurance certificates for products and completed operations
where required.
2. Submit an updated final statement, accounting for fmal additional changes to the Contract Sum.
3. Submit a certified copy of the Owner's final inspection list of items to be completed or corrected,
endorsed and dated by the Owner. The certified copy of the list shall state that each item has been
completed or otherwise resolved for acceptance and shall be endorsed and dated by the Owner.
4. Submit final meter readings for utilities, a measured record of stored fuel, and similar data as of the
date of Substantial Completion or when the Owner took possession of and assumed responsibility
for corresponding elements of the Work.
5. Submit consent of surety to final payment.
6. Submit a final liquidated damages settlement statement.
7. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
B. Reinspection Procedure: The Owner will reinspect the Work upon receipt of notice that the Work,
including inspection list items from earlier inspections, has been completed, except for items whose
completion is delayed under circumstances acceptable to the Owner.
1. Upon completion of reinspection, the Owner will prepare a certificate of final acceptance. If the
Work is incomplete, the Owner will advise the Contractor of Work that is incomplete or of
obligations that have not been fulfilled but are required for final acceptance.
2. If necessary, reinspection will be repeated.
1.06 Record Document Submittals
A. General: Do not use record documents for construction purposes. Protect record documents from
deterioration and loss in a secure, fire-resistant location. Provide access to record documents for the
Owner's reference during normal working hours.
City of Fort Collins SECTION 01700 — CONTRACT CLOSEOUT
Park Planning & Development Division Page 2 of 5
B. Record Drawings: Maintain a clean, undamaged set of blue or black line whiteprints of Contract
Drawings and Shop Drawings. Mark the set to show the actual installation where the installation varies
substantially from the Work as originally shown. Mark which drawing is most capable of showing
conditions fully and accurately. Where Shop Drawings are used, record a cross-reference at the
corresponding location on the Contract Drawings. Give particular attention to concealed elements that
would be difficult to measure and record at a later date.
1. Mark record sets with red erasable pencil. Use other colors to distinguish between variations in
separate categories of the Work.
2. Mark new information that is important to the Owner but was not shown on Contract Drawings or
Shop Drawings.
3. Note related change -order numbers where applicable.
4. Organize record drawing sheets into manageable sets. Bind sets with durable -paper cover sheets;
print suitable titles, dates, and other identification on the cover of each set.
5. Prior to Contract Closeout, obtain from the Owner a reproducible Mylar copy of the Drawings.
Using technical drafting pen, duplicate information contained on the Record Drawings maintained
on site.
Label each sheet "Record Drawing." On the first sheet, the Contractor or resident
Superintendent shall execute the following statement:
"Having reviewed this document and all attachments, I affirm that, to the best of my knowledge, the
information presented here is true and accurate."
Signed:
Position:
Date:
C. Record Specifications: Maintain one complete copy of the Project Manual, including addenda. Include
with the Project Manual one copy of other written construction documents, such as Change Orders and
modifications issued in printed form during construction.
1. Mark these documents to show substantial variations in actual Work performed in comparison
with the text of the Specifications and modifications.
2. Give particular attention to substitutions and selection of options and information on concealed
construction that cannot otherwise be readily discerned later by direct observation.
3. Note related record drawing information and Product Data.
4. Upon completion of the Work, submit record Specifications to the Owner.
D. Record Product Data: Maintain one copy of each Product Data submittal. Note related Change Orders
and markup of record drawings and Specifications.
1. Mark these documents to show significant variations in actual Work performed in comparison with
information submitted. Include variations in products delivered to the site and from the
manufacturer's installation instructions and recommendations. '
2. Give particular attention to concealed products and portions of the Work that cannot otherwise be
readily discerned later by direct observation.
3. Upon completion of markup, submit complete set of record Product Data to the Owner.
Miscellaneous Record Submittals: Refer to other Specification Sections for requirements of miscellaneous
record keeping and submittals in connection with actual performance of Work. Immediately prior to the
date or dates of Substantial Completion, complete miscellaneous records and place in good order. Identify
City of Fort Collins SECTION 01700 — CONTRACT CLOSEOUT
Park Planning & Development Division Page 3 of 5
miscellaneous records properly and bind or file, ready for continued use and reference. Submit to the
Owner.
F. Maintenance Manuals: Organize operation and maintenance data into suitable sets of manageable size.
Bind properly indexed data in individual, heavy-duty, 2-inch (51-mm), 3-ring, vinyl -covered binders,
with pocket folders for folded sheet information. Mark appropriate identification on front and spine of
each binder. Include the following types of information:
1. Emergency instructions.
2. Spare parts list.
3. Copies of warranties.
4. Wiring diagrams.
5. Recommended "turn -around" cycles.
6. Inspection procedures.
7. Shop Drawings and Product Data.
8. Fixture lamping schedule.
1.07 Warranties and Bonds
A. Provide duplicate notarized copies. Maintain copies of all Contractor's submittals and assemble
documents executed by subcontractors, suppliers, and manufacturers. Provide table of contents and
assemble in binder with durable plastic cover.
B. Submit material prior to final application for payment. For items of Work delayed materially beyond
date of substantial completion, provide updated submittal within ten days after acceptance, listing date
of acceptance as start of warranty period.
1.08 Final Payment
A. At the end of maintenance period, submit written certification that Contract Documents Work has been
reviewed and that Work is complete in accordance with Contract Documents and ready for Owner
Representative's review.
B. In addition to submittals required by the conditions of the Contract provide submittals required by
governing authorities, and submit a final statement of accounting giving total adjusted Contract Sum,
previous payments and sum remaining due.
C. Owner's Representative will issue a final Change Order reflecting approved adjustments to Contract
Sum not previously made by Change Order.
D. Retainage will be held until advertisement for liens and encumbrances is completed.
PART 2 — PRODUCTS (Not Applicable)
PART 3 — EXECUTION
3.01 Closeout Procedures
A. Operation and Maintenance Instructions: Arrange for each Installer of equipment that requires regular
maintenance to meet with the Owner's personnel to provide instruction in proper operation and
maintenance. Provide instruction by manufacturer's representatives if installers are not experienced in
operation and maintenance procedures. Include a detailed review of the following items:
1. Maintenance manuals.
2. Record documents.
3. Spare parts and materials.
4. Tools.
5. Lubricants.
6. Fuels.
7. Identification systems.
8. Control sequences.
9. Hazards.
City of Fort Collins SECTION 01700 — CONTRACT CLOSEOUT
Park Planning & Development Division Page 4 of 5
,DIVISION 1
SECTION 01800 — DEFINITION OF BID ITEMS
The following items describe the scope of work for this contract and are further clarified through limit -of -work lines,
notes on the drawings and specifications. The work described in each Bid Item may contain work from one or
several technical specifications sections. Contractor shall refer to the technical specifications that apply to the
individual components.
Bid Items 1 and 10 — Mobilization
This work includes the mobilization of personnel, equipment and supplies at the project site(s) in preparation for
work on the project, as well as the establishment of the Contractor's office, buildings and other necessary facilities,
and all other costs incurred or labor and operations which must be performed prior to beginning the other items
under the Contract. This item shall also include marshalling, disassembly and security of all items indicated on the
plans or specifications. Payment will be made as Work progresses. Payment for this item will follow in accordance
with CDOT Standard Specifications for Road and Bridge Construction, Section 626. The total amount for
mobilization shall not exceed five percent (5%) of the total bid.
Bid Items 2 and 11 — Traffic Control
Contractor shall furnish all labor, materials and equipment for completion of approved traffic control plan(s) by a
City of Fort Collins approved Traffic Control Company. This includes furnishing, installing, and maintaining traffic
control for the duration of the project. City detour or closure drawings are intended to provide a base traffic control
plan that the contractor will finalize and submit to all appropriate entities for approval.
Bid Items 3 and 12 —Surveying
Contractor shall furnish a professional land surveyor, licensed in the State of Colorado for construction staking and
for AS -BUILT verification. AS -BUILT verification shall include field verifying that all points on all cross -sections,
as detailed on drawings, comply with construction documents including, but not limited to, Section 01000,1.16.
Contractor shall submit a schedule of values for all surveying to be performed in accordance with the Drawings and
Specifications prior to the preconstruction conference.
Bid Items 4 and 13 — Erosion Control
Contractor shall furnish all labor, materials and equipment to install and maintain erosion control items during
construction in accordance with the Drawings and Specifications including, but not limited to Sections 107 and 208
of the most current CDOT Road & Bridge Construction Manual, construction entrance, silt fence, concrete washout,
bales, etc. All items subject to City Stormwater inspection and approval.
Bid Items 5 and 14 — Demolition
Contractor shall provide all labor and equipment for demolition and removal of asphalt and base material of the
existing 8' to 10' wide asphalt trail to a depth of 6 inches in accordance with the Drawings and Specifications.
Asphalt is typically 3" thick, but can be thicker in sections. Work includes removal, hauling, disposal and fees.
Bid Items 6 and 15 — Colored Concrete Paving — 5" Thick
Contractor shall furnish all labor, materials and equipment to install concrete paving in accordance with the
Drawings and Specifications. The unit price per square foot includes sub -grade preparation, installation of five -inch
(5") thick concrete with fiber mesh reinforcement, and integral color additive equaling 2 lbs. per sack of Yosemite
Brown color, forming; furnishing and applying curing compound; furnishing and edging the concrete surfaces; joints
; and all other related and necessary materials, work, and equipment required to construct the flatwork areas in
accordance with the Drawings and Specifications.
Bid Items 7 and 16 — Landscape Restoration
Contractor shall provide all labor and equipment to backfill concrete trail and fine grade disturbed areas for
preparation of seeding operations in accordance with the Drawings and Specifications. This item includes removing
any debris or rocks larger than 1 %2" from seed preparation areas.
City of Fort Collins Section 01800 - Definition of Bid Items
Park Planning & Development Division Page 1 of 2
Bid Items 8 and 17 —Hydro Seeding
Contractor shall provide all soil preparation; fine grading; fertilizer; herbicide; seed; labor; hydro -mulching and
equipment to seed areas in accordance with the Drawings and Specifications.
Bid Item 9 — Temporary Construction Access Crossing
Contactor shall provide all labor, material and equipment to construct and maintain the temporary access crossing
including but not limited to the placement of clean fill and a 24" culvert in the drainage channel in accordance with
the Drawings and Specifications. This item also includes complete removal of the temporary access crossing and
restoration of all affected areas to conditions "equal to or better than" existing site conditions that existed prior to
construction.
END OF SECTION
END OF DIVISION 1
City of Fort Collins Section 01800 - Definition of Bid Items
Park Planning & Development Division Page 2 of 2
DIVISION 2 - - -
SECTION 02050 - DEMOLITION
PART 1 - GENERAL
1.01 Description of Work
A. Demolition or salvage and removal of boulders (if found) for re -use in landscape; and remove
fencing, other plant material, and debris or other items on the site necessary for the construction of
the project.
1.02 Quality Assurance
A. Standards listed hereunder and referenced elsewhere in these specifications shall become a part of
this specification and are incorporated herein by reference. The latest edition, amendment or
supplements thereto in effect thirty (30) days before date of invitation shall apply.
1. City of Fort Collins, Street Cut and Excavation Repair Standards
2. City of Fort Collins, Stormwater Drainage Design and Construction Standards
PART 2 - MATERIALS - Not Used
PART 3 - EXECUTION
3.01 Inspection and Reviews
A. Schedule site meeting with Owner's Representative to verify and mark limits of demolition.
3.02 Protection
A. Refer to the General Requirements for site protection and temporary controls.
B. Erect barriers and warning signs as necessary to prevent injury to the public and construction
personnel.
C. Protect features and areas not marked for demolition. Limit use of site to the delineated areas.
D. Use of explosives is prohibited.
3.03 Demolition and Removal
A. Items listed for salvage remain the property of the City. Items listed for demolition shall become
the property of the Contractor and shall be recycled by Contractor at appropriate facilities.
B. Arrange for and pay costs associated with off -site disposal and recycling.
3.04 Hidden Conditions
A. A hidden condition is any feature that could not be discovered or reasonably inferred from a
careful inspection of the site prior to demolition.
B. Promptly report hidden conditions to the.
C. Hidden conditions may cause damage to features that are to remain in a finished work if
demolition operations continue. Stop demolition operations affected by hidden conditions until a
determination is made by the Owner's Representative.
D. Hidden conditions may cause a change in contract time or price; refer to the General Conditions.
END OF SECTION
City of Fort Collins Section 02050 - Demolition
Park Planning & Development Division Page 1 of 1
or fails to meet any other pertinent standard or criteria established by
OWNER. Discrepancies between the indicated sum of any column of figures
and the correct sum thereof will be resolved in favor of the correct sum.
17.2. In evaluating Bids, OWNER will consider the qualifications of the
Bidders, whether or not the Bids comply with the prescribed requirements,
and such alternates, unit prices and other data, as may be requested in
the Bid Form or prior to the Notice of Award.
17.3. OWNER may consider the qualification and experience of
Subcontractors, Suppliers, and other persons and organizations proposed
for those portions of the Work as to which the identity of
Subcontractors, Suppliers, and other persons and organizations is
submitted as requested by OWNER. OWNER also may consider the operating
costs, maintenance requirements, performance data and guarantees of major
items of materials and equipment proposed for incorporation in the Work
when such data is required to be submitted prior to the Notice of Award.
17.4. OWNER may conduct such investigations as OWNER deems necessary to
assist in the evaluation of any Bid and to establish the responsibility,
qualifications and financial ability of the Bidder's proposed
Subcontractors, Suppliers and other persons and organizations to do the
Work in accordance with the Contract Documents to OWNER's satisfaction
within the prescribed time.
17.5. If the Contract is to be awarded, it will be awarded to the lowest
responsive and responsible Bidder whose evaluation by OWNER indicates to
OWNER that the award will be in the best interest of the OWNER. Award
shall be made on the evaluated lowest base bid excluding alternates. The
basis for award shall be the lowest Bid total for the Schedule or, in the
case of more than one schedule, for sum of all schedules. Only one
contract will be awarded.
17.6. If the Contract is to be awarded, OWNER will give the Successful
Bidder a Notice of Award within forty-five (45) days after the date of
the Bid opening.
18.0 CONTRACT SECURITY.
The General Conditions and the Supplementary Conditions set forth OWNER's
requirements as to performance and other Bonds. When the Successful
Bidder delivers the executed Agreement to the OWNER, it shall be
accompanied by the required Contract Security.
19.0 SIGNING OF AGREEMENT.
When OWNER gives a Notice of Award to the Successful Bidder, it will be
accompanied by the required number of unsigned counterparts of the
Agreement with all other written Contract Documents attached. Within
fifteen (15) days thereafter, CONTRACTOR shall sign and deliver the
Rev 10/20/07 Section 00100 Page 7
DIVISION 2
SECTION 02100 - MOBILIZATION
PART 1 - GENERAL
1.01 Work Included
A. Prepare the site for construction.
B. Move in and move out personnel and equipment.
C. Set up and remove temporary offices, buildings, facilities and utilities.
1.02 Site Conditions
A. The City has provided the right-of-way, easement or project site for all permanent access or
permanent construction for the project. Any additional access, access right-of-way, construction
areas, or additional needed land which may be involved in the construction of this project shall be
the responsibility of the Contractor.
B. The land owned by the City may be used as site headquarters, storage yard, or base of operations
provided that the use of said land meets with all of the requirements and restrictions imposed by
the City at the time of usage.
1.03 Site Preparation for Contractor Occupancy
A. The Contractor shall provide all temporary facilities as required for performing the work. The
Contractor shall secure and maintain proper storage areas for equipment and materials in locations
she/he may deem necessary for the proper execution of the job as approved by the City
Representative. No storage yard or project headquarters site may be utilized in conflict with
objections from the adjacent property owners unless the Contractor obtains from the City specific
written permission for such objectionable use. No objectionable material will be allowed to blow
from, wash off or drain off of any storage yard on to adjacent property.
B. The Contractor shall maintain all storage yards in as neat and orderly a manner as possible,
allowing no accumulation of waste materials or disposal piles. The Contractor may construct a
temporary security fence for the protection of materials, tools, and equipment. The fence shall be
maintained during the construction period. Upon completion of work, the security fence shall be
removed from the site. The Contractor shall provide adequate parking facilities within the
designated area for personnel working on the project.
C. The Contractor shall obtain the necessary permits for connection to necessary services provided by
utility companies serving the project area.
D. Materials, equipment, and work required for temporary storm water management during the
construction period shall be provided by the Contractor as required to ensure public safety and to
protect the work in progress and materials stored on site.
1.04 Damage or Use -Fee Claims
A. Any damage or use -fee claims filed against the Contractor may become a part of the final
settlement of this project and may be cause for delay of final acceptance or delay of final payment.
City of Fort Collins Section 02100 — Mobilization
Park Planning and Development Division Page 1 of 2
PART 2 - NOT USED
PART 3 - EXECUTION
3.01 Obstructions
A. The location of some utilities and obstructions may not be shown. Bidders are advised to carefully
inspect the existing facilities before preparing their proposals. The removal and replacement of
minor obstructions such as electrical conduits, air, water, and waste piping and similar items shall
be anticipated and accomplished, even though not shown or specifically mentioned. Major
obstructions encountered that are not shown on the Contract Drawings or could not have been
foreseen by visual inspection of the site prior to bidding should immediately be brought to the
attention of the City Representative. The City Representative will make a determination for
proceeding with the work. If the City Representative finds that the obstruction adversely affects
the Contractor's costs or schedule for completion, a proper adjustment to the Contract will be made
in accordance with the General Conditions.
3.02 Demolition
A. Any pipes or existing structures encountered during construction shall be preserved until accepted
for removal by the City Representative. The Contractor shall be required to repair pipes or
structures in use that are damaged during construction at no cost to the City. The removal of
abandoned pipes shall be reviewed by the City Representative.
3.03 Removal and Salvage of Materials
A. The Contractor shall carefully remove materials specified to be reused or salvaged so as not to
damage the material. Reuse by the Contractor of salvaged material will not be permitted, except as
specifically shown or specified herein. Existing materials to be removed or replaced and not
specifically designated for salvage shall become the property of the Contractor. Provide and
maintain dust tight temporary partitions, bulkheads, or other protective devices during the
construction to permit normal operation of the existing facilities. Construct partitions of plywood,
insulating board, plastic sheets, or similar material.
END OF SECTION
City of Fort Collins Section 02100 - Mobilization
Park Planning and Development Division Page 2 of 2
DIVISION 2
SECTION 02200 - EARTHWORK AND GRADING
PART 1 — GENERAL
1.01 Description of Work
A. The Contractor shall provide all labor, materials and equipment necessary to perform the work
items called for on the bid schedule.
B. The Contractor shall perform all excavation regardless of the type, nature, or condition of material
encountered, as specified or required in order to accomplish the construction.
1.02 City Furnished Materials
A. None, unless otherwise noted on the Bid Schedule.
1.03 Site Conditions
A. The Contractor shall satisfy himself as to the kind and type of soil to be encountered and any water
conditions that might affect the construction of the project.
B. The locations of existing utilities are shown in an approximate way only and not all utilities may
be shown. The Contractor shall determine the exact location of all existing utilities prior to
commencing work. The Contractor shall be fully responsible for any and all damages that might
be occasioned by his failure to exactly locate and preserve any and all utilities. If utilities are to
remain in place, the Contractor shall provide adequate means of support and protection during
construction.
C. Should drawn, or incorrectly drawn, piping or other utilities be encountered during excavation, the
Contractor shall advise the City within thirty (30) minutes of encountering the utility. The
Contractor shall cooperate with the City and utility companies in keeping respective services and
facilities in operation to the satisfaction of the respective owners. The City reserves the right to
perform any and all work required should the Contractor fail to cooperate with the respective
companies, and back charge the Contractor for any and all expenses.
D. The Contractor shall provide barricades and signs in accordance with the Uniform Manual of
Traffic Control Devices where applicable. The Contractor shall maintain all devices in a working
manner.
1.04 Fill Material
A. Excess fill material, including rock, gravel, sod, broken concrete or asphalt, plaster, etc., shall be
hauled off the site and disposed of in accordance with applicable State and local regulations.
B. Additional fill material, if required, shall be hauled to the site from off the site as a necessary part
of the work. Material composition shall be subject to the requirements of the specifications.
1.05 Testing and Inspections
Coordinate and schedule testing with Owner's Representative.
City of Fort Collins Section 02200 — Earthwork and Grading
Park Planning & Development Division Page 1 of 5
IJI:4WMuTTA01VI1�y
2.01 Soil Materials
A. Coarse -grained soils free from debris, roots, organic material, and non -mineral matter containing
no particles larger than 4-inch size and classified as either:
1. Sands with fines (SM, SC) and less than 25 percent of the soil particles passing the No. 200
sieve, or
2. Clean sands (SW, SP)
3. Native soils as determined acceptable by the Owner's Representative.
PART 3 - EXECUTION
3.01 Preparation
A. Field measurements: Before commencing work, locate all baselines and coordinates required for
control of the work; establish required grade staking for control of excavation, fill and
embankment construction. Field verify by excavation the location all utility crossings, service
connections, and connections to existing lines before proceeding with earthwork.
B. Layout Lines and Levels:
1. Before earthwork operations are started, all construction items shall be completely staked out
for the Owner's approval.
C. Removal of Top Soil: Strip existing earthen material (topsoil) to a depth of 4 inches over the entire
site. Stockpile on site in area approved by Owner's Representative. Keep topsoil segregated.
Place, grade, and shape stockpile for proper drainage.
3.02 Excavation
A. Prior to beginning excavation operations, accomplish all site preparation in accordance with the
specifications. Perform excavation of every description to conform to the grades and elevations
per the plans and/or specifications.
3.03 Clearing the Site
A. All areas underlying new structures, paved areas, site fills and embankments shall be cleared of
stumps, shrubs, brush, and other vegetative growth.
B. Any material containing roots, grasses and other deleterious or organic matter generally found in
the top six inches of undisturbed natural terrain shall be stripped from all areas requiring
excavation, grading, trenching, subgrade preparation for foundations and embankment work. The
City will require stripped top soil deemed suitable for spreading over the finished grades to be
stockpiled and preserved until the finished grading operation, at which time it shall be spread
uniformly over areas to be seeded or sodded.
C. Upon completion of the project, phase of the project, or termination of the use of any particular
area, site, storage yard right-of-way or easement, the Contractor shall promptly and neatly clean up
the area and re-establish the ground to the contours required by the project or conditions prior to
project commencement.
City of Fort Collins Section 02200 — Earthwork and Grading
Park Planning & Development Division Page 2 of 5
3.04 Earth Fill Construction
A. The Contractor shall perform all grading to the lines and grades specified and/or established by the
Owner's Representative, with an appropriate allowance for topsoil. All slopes shall be free of all
exposed roots and stones exceeding 3-inch diameter, which are loose and liable to fall. Tops of
banks shall be rounded to circular curves not less than 6-feet in radius.
B. Rounded surfaces shall be neatly and smoothly trimmed. Topsoil shall be replaced to a depth of
4-inches in areas to be revegetated.
C. The Contractor shall protect the fill against freezing when -atmospheric temperature is less than 35
degrees F (1 degree Q.
3.05 Compaction
A. The Contractor shall meet minimum percentage density specified for each area classification as
follows. Percentage of Maximum Density Requirements: Compact soil to not less than the
indicated percentages of maximum density relationship determined in accordance with ASTM D
698.
Paved Areas, Utilities and Sidewalks - 95 percent
Unpaved Areas - 90 percent
B. Control moisture content within 2% of optimum moisture content as determined by ASTM D 698.
Where subgrade or layer of soil material is too dry to permit compaction to the specified density,
uniformly apply water to surface of cut area, subgrade, or loosely placed layer of soil material.
Mix soil and applied water by blading, disking, or other methods to achieve uniform moisture
content throughout the soil mass to be compacted.
C. Remove and replace, or scarify and air dry, soil material that is too wet to permit compaction to
specified density. Soil material that has been removed because it is too wet to permit compaction
may be stockpiled or spread and allowed to dry. Assist drying by disking, harrowing or
pulverizing until moisture content is reduced to a satisfactory value.
D. Puddling is not an acceptable method of compaction.
3.06 Grading
A. Paved Areas: Immediately prior to placing structural pavements, shape area to the required
lines, grades, and limits to provide the finished elevations indicated and roll with an approved
heavy vibratory roller until compacted to the specified density. Maintain moisture content within
2% of optimum during final rolling and until subgrade is covered by subsequent construction.
Remove loose material and protect subgrade until covered. The subgrade under all paved areas
shall conform to the proposed subgrade elevations of the trail.
B. Landscape Area and Remainder of Site:
1. Rough grade areas to 4 inches below finish grade. After rough grading is finished,
compacted and approved, scarify area to a depth of at least 6 inches.
2. Place previously stockpiled topsoil in all areas within the limits of the project not
indicated to receive subsequent foundations, slabs on grade, walks, safety surfacing
or other similar materials.
City of Fort Collins
Park Planning & Development Division
Section 02200 — Earthwork and Grading
Page 3 of 5
Uniformly distribute topsoil on the disturbed area and evenly spread to a thickness of
4 inches deep after light compaction. Perform spreading so that planting can proceed
with little additional soil preparation or tillage. Do not place topsoil when subgrade
is frozen, excessively wet, extremely dry or in a condition otherwise detrimental to
specified grading, seeding and planting specifications.
C. Finish Grading:
1. Grade all excavated sections, filled sections, construction disturbed areas and
adjacent transition areas to finish elevation. Make finished surfaces smooth,
compacted and free from irregular surface changes.
2. Unless indicated otherwise on drawings, finish grade area adjacent to sidewalks and
pavements to % inch below finish elevation of sidewalk and pavement.
3. Remove all construction debris. Grades not otherwise indicated shall be uniform
levels or slopes between such points and existing finish grade. Abrupt change in
slopes shall be rounded.
3.07 Settlement
A. Where completed compacted areas are disturbed by subsequent construction operations or adverse
weather, the Contractor shall scarify the ground surface, re -shape, and compact to required density
prior to further construction.
B. Any settlement in backfill, fill, or in structures built over the backfill or fill, which may occur
within the guarantee period in the General Conditions will be considered to be caused by improper
compaction methods and shall be corrected at no cost to the City. Any structure damaged by
settlement shall be restored to their original condition by the Contractor at no cost to the City.
3.08 Disposal of Excess Excavation and Waste Materials and Special Requirements
A. The Contractor shall dispose of all excess excavated material not required for fill on -site, as
directed by the Engineer.
B. The Contractor shall remove and be responsible for legally disposing of excess fill material not
placed on -site, waste materials, trash and debris.
C. The Contractor shall conduct all site grading operations and other construction activities to
minimize erosion of site soil materials. He/she shall be responsible to maintain streets/public
ROW daily by removing any spillage of dirt, rocks or debris from equipment entering or leaving
the site.
END OF SECTION
City of Fort Collins Section 02200 — Earthwork and Grading
Park Planning & Development Division Page 4 of 5
DIVISION 2
SECTION 02221 — TRENCHING, BACKFILLING, AND COMPACTION
PART 1 - GENERAL
1.01 Scope
Furnish all labor, materials, and equipment, and perform all operations to complete trenching, including
excavation, subgrade preparation, drainage, filter fabric installation, bedding, backfilling, compacting,
and finish grading for underground pipelines, service lines, sleeving, and appurtenances as shown on
the drawings and as specified herein.
1.02 Related Work
A. Section 02200 — Earthwork and Grading.
B. Section 02520 —Portland Cement Concrete Paving.
1.03 Protection
A. Obtain utility locations before commencing work. Protect all existing underground utilities, above
ground structures or plantings, or repair to original condition.
PART 2 MATERIALS:
2.01 Trench Backfill Material
A. Trench excavation or imported material free from frozen material, stumps, roots, brush, other
organic matter, cinders or other corrosive material, debris, and rocks or stones greater than 2
inches in any dimension.
2.02 Other
A. Bedding, piping, filter fabric, and other materials specified on the drawings and in related sections.
PART 3 EXECUTION
3.01 Preparation
A. Remove and stockpile topsoil from areas to be disturbed by construction. Keep topsoil segregated
from non -organic trench excavation materials and debris.
3.02 Trenching
A. Excavate trenches by open cut methods. Segregate suitable backfill. Rough trench excavation
will leave trench with uniform width and vertical sidewalls from an elevation one foot above the
top of installed pipe to the bottom of pipe.
B. Minimum trench width will provide 6 inch space between pipe wall and side of trench. Maximum
trench width will be shown on the drawings or in the appropriate pipeline section. If not specified
elsewhere the maximum trench width is the pipe O.D. plus 20 inches.
C. Grade trench bottom to provide uniform clearance for bedding material. De -water trench.
Remove loose material and foreign objects. When required, install filter fabric per manufacturer's
specifications.
City of Fort Collins Section 02221 — Trenching, Backfilling and Compacting
Park Planning & Development Division Page 1 of 2
D. Unstable sub -grade is not expected. If unstable subgrade material is encountered, report the
condition to the Owner. Remedy and payment for subgrade stabilization will be based on the
actual conditions encountered.
3.03 Bedding
A. Pipe will be bedded in accordance with the detailed drawings or the appropriate pipeline
specification.
3.04 Backfilling and Compaction
A. Backfill trench promptly after completion of pipe bedding.
B. Deposit material in uniform layers with thickness commensurate with the soil encountered and the
compaction equipment used.
C. Compaction requirements will be made at the moisture content and will meet the densities, by
zone, specified in Section 02200 — Earthwork and Grading.
D. Coordinate and schedule compaction tests with City Representative.
3.05 Surface Restoration
A. Restore pavements according to City of Fort Collins Standards.
B. Restore landscaped areas according to Section 02900 — Landscaping.
END OF SECTION
City of Fort Collins Section 02221 — Trenching, Backfilling and Compacting
Park Planning & Development Division Page 2 of 2
DIVISION 2
SECTION 02720 — AGGREGATE BASE COURSE
PART 1 — GENERAL
1.1 Description of work
A. The current edition of the Colorado Department of Transportation Standard Specification Booklet
is referenced into these specifications.
PART 2— REVISIONS
A. Subsection 304.01 is revised to include the following:
This work shall consist of placing Aggregate Base (Class 5) over previously prepared subgrade
approved by the Engineer. Aggregate Base will be used as fill under the curb, gutter, and
sidewalks if there is not any acceptable material onsite.
The proposed material shall meet the following minimum requirements:
LL Maximum: 30
PI Maximum: 6
"R" Value Minimum: 78
The minimum strength coefficient of the Class 5 Aggregate Base shall be 0.12.
B. Subsection 304.07 is revised to include the following:
Aggregate Base Course will be measured by the ton at proper moisture. Quality will be adjusted
accordingly if moisture is too high. Haul and water necessary to bring mixture to optimum
moisture will not be measured paid for separately, but shall be included in the price for Aggregate
Base.
C. Subsection 304/08 is revised to include the following:
The accepted qualities of Aggregate Base Course will be paid for at the contract price per ton.
D. Payment will be made under:
Pay Item Pay Unit
304-01 A.B.C.(C-5) Tons
The above prices and payments shall include full compensation for furnishing all labor, materials,
tools, equipment, and incidentals and for doing all work involved in placing Aggregate Base
Course including haul and water, complete -in -place, as shown on the plans, as specified in the
specifications, and as directed by the Engineer.
END OF SECTION
City of Fort Collins Section 02720 — Aggregate Base Course
Park Planning & Development Division Page 1 of 1
DIVISION 2
SECTION 02750 - PORTLAND CEMENT CONCRETE PAVING
PART 1 - GENERAL
Scope
A. Furnish all labor, materials, supplies, equipment, transportation, and perform all operations in
connection with and reasonably incidental to complete installation of concrete paving as shown on
the drawings and as specified herein. Items of work specifically included are:
B. Subgrade preparation for trail
C. Form work.
D. Reinforcement.
E. Surface finish.
F. Construction, expansion and control joints.
G. Curing.
H. Concrete trail
Work Not Included
A. Items of work specifically excluded or covered under other sections:
B. Excavation and backfill.
C. Earthwork and grading.
D. Cast -in -place structural concrete or precast concrete, such as foundations, drainage appurtenances,
and pad and building.
E. Joint sealers.
Related Work
A. Division 2 — Site Work:
a. Section 02050 — Demolition.
b. Section 02200 — Earthwork/Grading.
c. Section 02221 — Trenching, Backfilling, and Compaction.
References
A. ACI 301 — Specifications for Structural Concrete for Buildings.
B. ASTM C33 — Concrete Aggregate.
C. ASTM C 150 — Portland Cement.
D. ASTM C260 — Air Entraining Admixtures for Concrete.
E. ASTM C309 — Liquid Membrane — Forming Compounds for Curing Concrete.
F. ACI 304 — Recommended Practice for Measuring, Mixing, Transporting, and Placing Concrete.
G. ACI 305R— Hot Weather Concreting.
H. ACI 306R — Cold Weather Concreting.
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 1 of 8
required number of counterparts of the Agreement and attached documents
to OWNER with the required Bonds. Within ten (10) days thereafter, OWNER
shall deliver one fully signed counterpart to CONTRACTOR. Each
counterpart is to be accompanied by a complete set of the Drawings with
appropriate identification.
20.0 TAXES.
OWNER is exempt from Colorado State Sales and Use Taxes on materials and
equipment to be incorporated in the Work. Said taxes shall not be
included in the Contract Price. Reference is made to the General and
Supplementary Conditions.
21.0 RETAINAGE.
Provisions concerning retainage are set forth in the Agreement.
22.0 PURCHASING RESTRICTIONS.
Purchasing restrictions: The Bidder's authorized signature of this Bid
assures the Bidder's compliance with the City's purchasing restrictions.
A copy of the resolutions are available for review in the Purchasing and
Risk Management Division or the City Clerk's office.
A. Cement Restrictions: City of Fort Collins Resolution 91-121
requires that suppliers and producers of cement or products
containing cement to certify that the cement was not made in cement
kilns that burn hazardous waste as a fuel.
23.0 COLLUSIVE OR SHAM BIDS.
Any Bid deemed by the City in its sole discretion to be a collusive or
sham Bid will be rejected and reported to authorities as such. Your
authorized signature of this Bid assures that such Bid is genuine and is
not a collusive or sham Bid.
24.0 BID RESULTS.
For information regarding results for individual Bids send a self-
addressed, self -stamped envelope and a Bid tally will be mailed to you.
Bid results will be posted in the Purchasing office seven (7) days after
the Bid Opening.
END OF SECTION
Rev 10/20/07 Section 00100 Page 8
I. ACI 308 — Standard Practice for Curing Concrete.
J. ACI 309 — Recommended Practice for Consolidation of Concrete.
Regulatory Requirements:
A. Conform to applicable code of governing authority for paving work within public right-of-way.
Tests:
A. Submit proposed mix design to testing laboratory for review prior to commencement of work. For
standard premix concrete mixes, the supplier's quality control records may be substituted for job
mix testing.
B. Provide licensed Surveyor to test forms in the floodway for accuracy prior to concrete pours.
C. Concrete Testing Service: Owner will engage a testing laboratory to perform materials evaluation,
testing and design of concrete mixes. All testing costs will be borne by the Owner. Should any
test(s) fail 'to meet the specifications, the cost of the failed test and all subsequent testing shall be
borne by the Contractor.
D. Coordinate and schedule sampling testing during concrete placement with City Representative.
Submittals:
A. Submit product data under provisions of Section 01300 — Submittals.
B. Submit data on admixtures and curing compounds.
C. Submit manufacturer's data on leave -in -place construction joint form
Test Panels:
A. Provide a Y x Y test panel for finish and tooling of joints for Owner approval. Provide one panel
for each pavement type specified. In casting the panels, use personnel and methods to be
employed on the work.
B. If sample disapproved, cast additional samples until approval is obtained. Maintain test panel on
site until finished work is accepted. Test panel will represent minimum workmanship standard.
C. Work completed prior to text panel approval shall be subject to removal and replacement at
Owner's request.
PART 2 MATERIALS
2.01 Concrete Materials:
A. General: Provide materials of same brand and source throughout the project unless otherwise
noted.
B. Portland Cement: ASTM C150, Type I or Type 1/11, color to be 2 pounds per sack, Yosemite
Brown.
C. Aggregates: ASTM C33, normal weight. In addition, the combined aggregate shall comply with
the following gradation, shown in percent passing.
Sieve Size 1/4-Inch Nominal Maximum Size
'/ Inch
3/8 Inch
No. 4
City of Fort Collins
Park Planning & Development Division
90 — 100
60-80
40 — 60
SECTION 02750 — Portland Cement Concrete Paving
Page 2 of 8
No. 8 30 — 45
No. 16 20 — 35
No. 30 13 — 23
No. 50 5 — 15
No. 100 0-5
D. Water: Clean and not detrimental to concrete.
2.02 Form Materials:
A. Slab Edges: Two by lumber permitted for surfaces not exposed to view in the final work. Use
concrete -form grade hardboard, "plyform" grade plywood, or metal for forming surfaces exposed
to view. Forms shall be straight and sufficiently stiff and well braced to meet line tolerances
specified in Part 3.
B. Keyed Joint Form: Wooden key or leave -in -place metal construction joint form.
C. Form Coatings: Commercial form -coating compounds that will not bond with, stain, or adversely
affect concrete surfaces, and will not impair subsequent treatments of concrete surfaces.
2.03 Reinforcement:
A. Fibermesh: Bundled, fibrillated, virgin polypropylene fibers manufactured for use in premix
concrete and having the following characteristics:
1. Special Gravity: 0.91.
2. Tensile Strength: 70 to 100 ksi.
3. Fiber Lengths: %2 inch, 3/ inch.
4. Accepted Materials: "Fibermesh" by Fibermesh Company of Chattanooga, TN; or "Forta
CR" by Forta Corporation of Groove City, PA.
B. Dowels: ASTM A615; 40 or 60 ksi yield grade, plain steel, uncoated finish; matched sleeve and
cap one end. Provide dowel basket to hold dowels in parallel alignment.
2.04 Admixtures:
A. General: Unless specified in the mix or directed in Part 3, no admixtures shall be used without
approval of the Owner's Representative. Do not use admixtures that would result in mixing water
with a concentration of more than 150 ppm of chloride ion.
B. Air Entraining: ASTM C260.
C. Water Reducing: ASTM C494, Type A.
D. Accelerator: Nonchloride, ASTM C494, Type C or E.
E. Retarder: ASTM C494, Type B or D.
F. Color Agent: Yosemite Brown, Davis Colors of Los Angeles, California.
2.05 Related Materials:
A. Expansion Joint Filler: ASTM D1752, closed cell polyethylene, %2 inch thickness. .
B. Curing Compound for Concrete with Coloring Agent: Davis Seal Color to match colored
concrete.
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 3 of 8
2.06 Concrete Mix:
A. Mix concrete in accordance with ASTM C94.
1. Provide concrete for colored pavement (Poudre Trail) of the following characteristics:
Unit
a. Compressive Strength
at 28 days
b. Minimum Cement
c. Maximum Aggregate Size
d. Fibrous Reinforcement
e. Air Entrainment
f. Maximum Water/Cement Ratio
g. Coloring Agent
h. Maximum Slump
Measurement
4,000 psi
564 lb. / Cy
1 % inches
3/ lb. /CY
4% to 6%
0.46
per manufacturer's recommendations
4 inches
B. Use accelerating admixtures in cold weather as directed in Part 3.
C. Use set -retarding admixture during hot weather as directed in Part 3.
D. Water reducing agent is permitted.
2.07 Selection of Proportions:
A. Mix Design: Cost of concrete mix design is responsibility of Contractor.
B. Selection of Proportions: Use method of ACI 3013.9. Proportioning base on method of ACI 301
3.10 not allowed.
1. Field test records used for documentation of the average strength produced by a propos mix in
accordance with ACI 301 3.9.3.2 shall, in addition to the requirements listed, comply with the
following:
a. The test record shall represent production concrete from a single design mix produced
during the past year.
b. The test record shall represent concrete proportioned to produce the maximum slur
allowed by these specifications, and for air -entrained concrete, within a +0.5% of t
maximum air content allowed.
2. Mixes proportioned on the basis of trial mixtures shall meet the provisions of ACI 301 3.9.3.3.
PART 3 EXECUTION
3.01 Subgrade Preparation:
A. Shape and compact subgrade to match appropriate detail. Compact to 95% density as measured by
ASTM D698. Coordinate with Section 02200 — Earthwork, Article 3.05, Compaction.
B. Where subgrade cannot be compacted, remove subgrade. Replace with bed course. Compact to
95% density as measured by ASTM D698.
C. Moisten subgrade to minimize absorption of water from fresh concrete. Subgrade shall not be
muddy, soft, frozen, or covered with standing water when concrete is placed.
3.02 Form Work:
A. General: Design, construct, and brace forms in accordance with ACI 301 and ACI 347. In
addition to those requirements, forms shall be placed and braced so the finished edges and joints
meet the tolerances listed later in this section.
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 4 of 8
I . Forms in the floodway shall be surveyed by a licensed Surveyor for conformation with
existing grade elevation prior to concrete pour. This is a responsibility of the Contractor.
B. Preparation of Form Surfaces:
1. Clean reused forms of concrete matrix residue; repair and patch as required returning forms to
acceptable surface condition.
2. Coat contact surfaces of forms with specified form -coating compound before reinforcement is
placed. Apply form -coating compound according to manufacturer's instructions. Do not
allow excess form -coating material to accumulate in forms or to come in contact with concrete
surfaces against which fresh concrete will be placed.
D. For Surfaces Exposed To View: Form faces shall be free from raised grain, tears, worn edges,
patches, dents, or other defects which would impair texture of the concrete surfaces. Minimize
number of seams in form material, and arrange seams in an orderly manner.
3.03 Reinforcement and Embedments:
A. Fibrous Reinforcement:
1. Add fibrous concrete reinforcement to concrete materials at the time concrete is batched in
amounts in accordance with approved submittals for each type of concrete required.
2. Mix batched concrete in accordance with manufacturer's recommendations for uniform and
complete dispersion.
3.04 Joints:
A. General: Place joints in accordance with ACI 301. Conform to the tolerances listed later in Part
3.
B. Isolation/Expansion Joints: Isolation joint and expansion joint are synonymous for concrete
paving.
1. Place isolation joints where work abuts existing walls, curbs and structures, and where shown
on the drawings.
2. Interrupt reinforcement at isolation joint. Install dowels only where indicated on drawings.
3. Joint filler shall extend full depth of the slab. Hold back filler from top of slab as required for
sealant. Attach joint filler to first placement.
4. Seal all expansion joints per Section 07900.
C. Keyed/Construction Joints: Keyed joint and construction joint are synonymous for concrete
paving.
1. Reinforcement, if required, shall continue through the joint.
2. Install where indicated on drawings, or where required by concrete delivery or finishing rate.
3. Key first placement. Key shall be 1% inches wide and inches deep.
4. After first placement has hardened, clean and roughen face. Install control joint form at top of
slab.
5. Subject to Owner's Representative approval; manufactured leave -in -place cold joint form may
be used.
D. Control/Score Joint: Control joint and score joint are synonymous for concrete paving.
1. Control joints shall penetrate 1/3 of slab thickness.
2. Sawn Joints: Control joints on play area curb shall be sawn. Kerf shall be 3/16-inch wide.
Start cutting as soon as concrete is able to be sawn without dislodging aggregate. Complete
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 5 of 8
cutting before shrinkage cracks occur. Joints perpendicular to walls may be less than required
depth within 6 inches of the wall, and may stop 2 inches from the wall. Wash slurry from
concrete to avoid staining of slab.
3. Tooled Joints: Control joints maybe cut into the plastic concrete during finishing operations.
,Tooled joints shall have % radius, and shall not incorporate a troweled edge unless
specifically noted on the drawings.
4. Formed control joints are permitted only in conjunction with keyed joints.
5. Unless otherwise indicated, provide control joints at the following intervals:
Use
Colored sidewalk
3.05 Concrete:
Tyne Maximum Spacing
Sawn Joints 10' c-c &
Continuous along centerline
A. Preplacement Inspection: Form work installation, reinforcing steel placement, and installation of
all items to be embedded or cast in, to be verified by the Owner's Representative prior to
placement.
B. General: Comply with ACI 301, ACI 304, and as herein specified.
C. Added Water: Concrete mix has been designed to a specific water cement ratio in order to
enhance durability of the final product. Do not add water at the job site or concrete will not be
accepted.
D. Cold Weather Placement: When depositing concrete after the first frost or when the mean daily
temperatures area below 40 degrees, follow recommendations of ACI 306 as modified herein. Use
specified accelerator. Maintain concrete temperature at a minimum of 55 degrees for not less than
72 hours after depositing. Do not place concrete without approval of the Owner's Representative
on days when temperature at 9:00 a.m. is below 30 degrees. Job -cured cylinders for verification of
strength and/or the adequacy of the Contractor's protective methods will be required.
E. Hot Weather Placement: When depositing concrete in hot weather, follow recommendations of
ACI 305 as modified herein. When the air temperature is expected to exceed 90 degrees, the
Contractor shall obtain acceptance from the Civil Engineer or Owner's Representative of the
procedures to be used in protecting, depositing, finishing, and curing the concrete. The
temperature of concrete at the time of placement shall not exceed 90 degrees. Protect to prevent
rapid drying. Start finishing and curing as soon as possible. Specified water reducing retarding
admixture may be used. The use of continuous wetting or fog sprays may be required by the
Owner's Representative for 24 hours after depositing.
F. Placing: Deposit and consolidate concrete slabs in a continuous operation, within the limits of
construction joints, until the placing of a panel or section is completed. Deposit concrete as nearly
as practicable in its final location to avoid segregation.
G. Consolidation: Consolidate concrete with internal vibrators with a minimum frequency of 7,000
rpm. Maintain one standby vibrator for every three vibrators used. Consolidate according to ACI
309. Do not transport concrete with vibrators. Work concrete into corners and around
embedments and reinforcement.
H. Surface Leveling: Strike off and level surface with screed of sufficient length to span the slab.
On slabs greater than 15 feet wide, use intermediate screed strips.
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 6 of 8
3.06 Finishes:
A. Broom Finish: Concrete flatwork shall receive a heavy broom finish applied at a right angle to the
direction of travel. The plaza area shall have smooth troweled joints, 1 %2 inches from the
centerline of the joint, to result in a total trowel width of 3 inches. All other flatwork shall have
broom finish over joints.
B. Coordinate rate of concrete placement with pace of washing crew.
C. Formed Finishes:
1. Surfaces Not Exposed to View: Patch tie holes and defects. Chip off fins greater than '/4 inch
in height.
2. Surfaces Exposed to View: Patch tie holes and defects. Completely remove fins.
Schedule of Finishes:
1. Sidewalk — heavy broom finish.
3.07 Curing/Sealing:
A. Apply curing compound within 30 minutes of completing finish. Follow manufacturer's
recommendations for applying compound. Reapply in areas exposed to rain within 3 hours of
initial application. Maintain continuity of coating and repair damage during 7-day curing period.
Follow manufacturer's instructions for sealing interior slabs.
3.08 Tolerances:
A. Surface Planeness: Unless otherwise specified, produce slabs with a Class B tolerance.
1. Finishes with Class B tolerances shall be true planes within % inch in 10 feet, as determined
by a 10-foot straight edge placed anywhere on the slab in any direction.
B. Formed Surfaces, Joints, and Embedments: Unless otherwise specified, the finished work shall
meet the following tolerances:
1. Variations of formed, or cut or tooled linear element:
a. In 20 feet: %2 inch.
b. For entire length: 1 inch.
3.09 Field Quality Control:
A. Field inspection and testing will be performed under provisions of Paragraph 1.06, Tests, and as
specified below.
B. Forms in the floodway shall be surveyed by a licensed Surveyor prior to concrete pour to ensure
conformation to current grade conditions. This is a responsibility of the Contractor.
C. Concrete Tests:
1. Shall be provided by the Contractor and shall be accordance with requirements of AC1 301,
Chapter 16 — Testing, except as noted or modified in this section.
a. Strength test.
i. Mold and cure four cylinders from each sample.
ii. Test one at 7 days and one at 14 days for information and one at 28 days for
acceptance. Keep the remaining one as a spare to be tested as directed by the Owner.
b. Minimum samples.
i. Collect the following minimum samples for each 28-day strength concrete used in the
work for each day's placing:
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 7 of 8
Quantity Number of Samples
50 cubic yards or less one
50 to 100 cubic yards two
100 cubic yards or more two plus one sample for each
additional 100 cubic yards
c. Sample marking.
i. Mark or tag each sample of compression test cylinders with date and time of day
cylinders were made.
ii. Identify location in work where concrete represented by cylinders was placed.
iii. Identify delivery truck or batch number, air content, and slump.
d. Slump test.
Conduct test for each strength test sample and whenever consistency of concrete appears
to vary.
e. Air content.
Conduct test from one of first three batches mixed each day and for each strength test
sample.
D. Acceptance of Concrete:
1. If the average of three consecutive 7-day tests falls below the specified 7-day strength, the
Owner shall have the right to require conditions of temperature and moisture necessary to
secure the required strength and may require core tests in accordance with ASTM C-42.
2. Strength level of concrete will be considered satisfactory so long as average of all sets of three
consecutive strength test results equals or exceeds specified 28-day strength and no individual
strength test result falls below specified strength by more than 500 psi.
E. Failure of Test Cylinder Results:
1. Upon failure of the 28-day test cylinder results, Owner may require Contractor, at his expense,
to obtain and test at least three cored samples from area in question.
2. Concrete will be considered adequate if average of three core tests is at least 85 percent of,
and if no single core is less than 75 percent of the specified 28-day strength.
3. Upon failure of core test results, Owner may require Contractor, at his expense, to perform
load tests as specified in ACI 318, Chapter 2.
4. In the event an area is found to be structurally unsound, the Owner may order removal and
replacement of concrete as required. The costs of the core tests, the load test and the
structural evaluation shall be borne by the Contractor.
5. Fill all core holes with a non -shrink grout as Master Builders Masterflo 713 or approved
equal.
F. Maintain records of placed concrete items. Record date, location of pour, quantity, air
temperature, and test samples taken.
END OF SECTION
City of Fort Collins SECTION 02750 — Portland Cement Concrete Paving
Park Planning & Development Division Page 8 of 8
DIVISION 2
PART 1 - GENERAL
1.01 Description of Work
A. The work covered by this specification includes the furnishing of all materials and application of
fertilizer, seed and mulch to areas defined in the plans or required by field condition. The work
shall be completed in accordance with these specifications, accepted horticultural practice, and
with the plans.
1.02 Related Work
A. See appropriate sections for site work needed prior to work required in this section. Obtain
approval from the Engineer prior to starting work required in this section.
1.03 Submittals
A. Submit manufacturer's specifications and literature on all products.
B. Submit materials list including quantities and description of materials.
1.04 Quality Assurance
A. Source Quality Control: Manufacturer's test for purity and germination of seed, dated within six
months of seeding.
B. Certificates: Manufacturer's certification that fertilizer meets specification requirements.
PART 2 - MATERIALS
2.01 Grass Seed
A. Grass seed shall be of the latest crop available. Seed shall meet Colorado Department of
Agriculture Seed Laws, Chapter 35, Article 27.
B. The seeding mixture shall be applied at a pure live seed (PLS) rate per acre AS SHOWN ON
PAGE 3 OF 3 OF THIS SECTION.
C. Do not use seed which has become wet, moldy, or otherwise damaged in transit or in storage.
D. The Contractor shall compensate for percentage of purity and germination by furnishing sufficient
additional seed to equal the specified pure live seed product. The formula for determining the
quantity of pure live seed (PLS) shall be: Pounds of Seed (Bulk) x Purity x Germination =
E. Pounds of Pure Live Seed (PLS)
F. The Contractor shall present to the Engineer a certificate of the PLS test of the grass seed which he
intends to use. All grass furnished shall be delivered in sealed bags showing the weight, analysis
and vendor's name.
2.02 Fertilizer
A. Commercial fertilizer type and application rate shall be AS SHOWN ON PAGE 3 of 3 OF THIS
SECTION.
City of Fort Collins Section 02900 - Site Revegetation
Park Planning & Development Division Page 1 of 3
2.03 Mulch
A. Hydraulically spray or approved equal.
2.04 Topsoil
A. Topsoil shall be select earth material of loose friable loam reasonably free of admixtures of
subsoil, refuse stumps, roots, rocks, brush, weeds or other material which can be detrimental to the
proper development of ground cover.
PART 3 - EXECUTION
3.01 General
A. The pattern of seeding and mulching, and fertilization if required, shall be as detailed or as
required by field conditions to provide a uniform stand of grass acceptable to the City. In no case
shall revegetation occur within 30 days of the application of a chemical weed control substance.
B. Warranty excludes replacement of plants after final acceptance because of injury by storm,
drought, drowning, hail, freeze, insects or diseases.
3.02 Preparation
A. Verify that soil preparation has been completed prior to seeding.
B. Seed areas damaged by construction activities as directed by the Owner's Representative.
C. Apply by broadcasting or drillings at the rate specified herein.
D. Selection of the time of seeding shall be Contractor's responsibility, consistent with erosion
control.
E. Rework previously prepared areas that have become compacted or damaged by rains or traffic.
F. I Do not drill or sow during windy weather or when ground is frozen or untillable.
G. Cover seed to depth between % to %z inch by raking or harrowing.
H. Firm seed areas with roller weighing maximum of 100 lbs. per foot to width.
3.03 Hydraulic Seeding and Mulching
A. Seed and fertilize in the amounts per acre designated. Wood cellulose fiber mulch at 2,000 Ibs/
acre.
B. Combine with water to provide a slurry. Perform hydraulic application in such a manner that the
liquid carrier will uniformly distribute the material over the entire area to be seeded at rates not
less than indicated herein. Do not compact. Double the amount of seed per acre if seed and mulch
are applied in a single application.
3.04 Drill Seeding
A. Seed shall be applied in a minimum of two passes at 90 degrees two each other.
3.05 Reseeding and Repair
A. Reseed and mulch areas where there is not a satisfactory stand of grass at the end of 60 days after
seeding.
B. Minimum satisfactory stand: 4 plants per square foot.
City of Fort Collins Section 02900 — Site Revegetation
Park Planning & Development Division Page 2 of 3
3.06 Areas to be Seeded
A. All areas that have been damaged or disturbed by the Contractor's operation shall be reseeded
according to these specifications and as indicated on the plans.
3.07 Maintenance
A. No maintenance is required, UNLESS NOTED ON THE BID SCHEDULE.
Fertilizer and Seed Mix
Commercial Fertilizer (18-46-0) Percent available by weight
Nitrogen 18
Phosphorus 46
Potassium 0
Application rate of 250 lbs per acre
-Seed Mix Pure Live Seed Lbs. /Acre Seed
Buffalo Grass 20%
13
Blue Gramma 30%
14
Sheep's Fescue 50%
13
100
40
END OF SECTION
City of Fort Collins Section 02900 — Site Revegetation
Park Planning & Development Division Page 3 of 3
SECTION 00300
BID FORM
APPENDIX
•.t
•,,�� ,..• � t \� �'' .j, ' ?--OAR � � �S r ,� `%" �.
Trail Closed
'N
I KINGFISHER POINT NATURAL AREA
-^' ..-.-•_`. '*..... t �-__:...:.. '. r' � ' ,.� HER•
NIX NATURAL' AREA
! t
uYUj
Trail Closed•' CATT US NA1�A E
Legend _ j r`' CC ii - Trail Closed i
— Saoarm and Wtchaa, } 7 .. �'�.• �"��� r I � ,
WouAh F•ana IAfea c^'
E P1tpSREGT-'RD K
`YI � E P .
NaYurd nieea •i S '+ �. I r_ Z� �' '. ~`
abaMaloni THEs'GOTERak
IE _ —
Parcd Addrntiaes � F-- �.�.._.U� ..- _ .. 'a � -
Unw OTTO
y�
)6ty ume 4f - 'f
I
I M/Op' v�� O ,
p Trail detour sign
POUDRE TRAIL REHABILITATION.
By.
A_ 1 JUNCTION — TRAIL DETOUR MAP
KINGFISHER POLNT NATURAL "AREA {
y
I d `RIVER ENb. RO
CATTAIL,C
Trail Pro'ect ,
Construction Access I i
I Crossing w/ Culvert h 1
Legend
-«wismdLaaa
—mamma and Md.
a
Comedlne uEda - - -- _ _ _ EPROSPECTRD
CiRvks • —.Or
SirldFitaloro
�/Yinaratlans. I .0qty
.. U ib
POUDRE TRAIL REHABILITATION;
A-2 JUNCTION — ACCESS ROUTE MAP
POUDRE TRAIL REHABILITATION
A-3 I ELC - TRAIL DETOUR MAP
��.
c+enom ey.
;art Collins
POUDRE TRAIL REHABILITATION AT POUDRE TRAIL AND SPRING CREEK TRAIL JUNCTION
LOCATED IN THE SOUTHWEST QUARTER OF SECTION 17, TOWNSHIP 7 NORTH, RANGE 68 WEST
OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
SEPTEMBER 2009
SITE
VICINITY MAP
SCALE: NTS
BENCHMARK:
CITY OF FORT COLLINS BENCHMARK 29-0 I. LOCATED SOUTH OF PROSPECT
ROAD EAST OF THE WEST 1 25 FRONTAGE ROAD. FOUND 2" ALUMINUM CAPON
A CONCRETE HEADWALL.ELEVATION=4901.22 NGVD 1929 UNADJUSTED
CITY OF FORT COLONS BENCHMARK 5101. WESTSIDEOF TIMBERLINEROAD
AT THE NORTH END OF A BRIDGE OVER THE POUDRE RIVER ON TOP OF THE
PARAPET WALL APPROXIMATELY 0.2 MILES SOUTH OF THE SOUTH SIDE OF
WEST MULBERRY STREET, ELEVATION = 492375
INDEX OF SHEETS
SHEET NO. DESCRIPTION OF SHEETS
1................................—ER....
2.4................................ TRAIL. PUN 6 P-1-
5.6................................ TRAM CRD9S'.fECTIDNS
................................ C01-01 -A
LEGEND
O
OWNER / CONSTRUCTION
SITE OPERATOR
Crt OF FORT cow -I
PARK PLANNING AND DEVELOPMENT
215 MABON STREET
FORT OOwHS, COLORADO 80D22
PH.970.221.6616
CONTACT: CRAIC FOREMAN
CALL UnUrr NonF¢AnoN
UWMR v cocaxAoO
811
DaaW NNaa '
C.
�IkMN��I N aw.wa�eFPu. �«a
Ie uy.My •m.u,.Im.
Da..w a.a. P•
o•/iu 0ma
CIS Of
,.Fort` Collins
POUDRE TRAIL REHABILITATION
AT POUORE TRAIL AND SPRING
CREEK JUNCTION
COVER SHEET
a.. /oo/09 .I
N/A I
i
i
i
, , � • a-.assl $ SCALE. I
_ SPRI�EEK TRAIL r
910
.905
.900
8
R
R
g
g
8
g
8
8
8
$
R
8
E.�
8
8
�•
g
$'
b'
S'
8•
S'
1>
�
Irw1 ��
CALL U`TY xCnnCA—
CE- 0E CIXq+a00
811
ion/1av Dol.
Fort Collins
rro�1 xwM w ar..•
POUDRE MABR TRAIL RElTATION
AT POUDRE TRAIL AND SPRING
CREEK JUNCTION
TRAIL PLAN k PROFILE
ooa 09/08/09 2
xw 1 u30
1 I
1 i 1
-----------1 --
1905
4
2
2
4895
e*00
----------------
a
a R
8
s
s
R
a
a
8
R
a 8
8
s
R
s
8
a
R
8
8
e
R
a
Rg
5'
41
E
ire) wwc
J asOs
J
E
a900
.15
C— IM— ROi�R�Cn
CC, RR a ca0 —
81,
Notn
woN�.. 001.
City of
Fort Collins
POUORE TRAIL RENARIUTATIDN
AT POUDRE TRAIL AND SPRING
CREEK JUNCTION
TRAIL PLAN k PROFILE
mw O9/o8/O9 3
1910
1905
a;W
M
8
8 88
8
8
A
4895
CILL UDUr; 10,
cc—CONCoo�
811
1.
City of
Fort Collins
POLIDIRE 'PAL REHABIUTAnoN AT PouDRE TRAIL AND SPRING
CREEK JUNCTION
TRAIL PLAN & PROFILE
.30
0+35.00
902 4902
a900
ae9e a898
ae96 898
-20 -10 10 20
1+82.00
4— 1902
Q. 900
iox
898 4
1—
-zo -10 o Io zo
4+14.00
902 o02
a900 900
lox
a99e � — .eae
aa96 1896
-20 -10 0 10 20
6+03.00
a902 a902
a9W a900
1.0s
489B — —
a09 a89fi
-20 -10 0 10 20
8+13.00
a902 4902
900 a900
Loz
a89B aa99
89fi 896
-20 -10 0 10 20
0+77.00
4902 4902
900 _ 1900
aa99 898
a89fi a696
-20 -10 10 20
2+43.00
a902 a902
a900 900
1.oz
a89B a99e
a696 aa96
-20 -10 0 10 20
4+47.00
902 902
900 900
1.0;
.e9e � ae9e
a89fi e96
-20 -t0 0 10 20
6+37.00
1902 4902
a900 a9M
I.OS
09B 098
a696 89fi
-20 -10 0 10 20
8+76.00
a902 4902
a9. 4-
1 0%
4e9e
a89fi a89fi
-20 -10 0 10 20
1+20.00
4902 4902
4900 % a900
aa99 ae9e
�96 e96
-20 -Io 0 10 20
3+04.00
a902 a902
a900 900
ox
4898 \ 898
aa96 4896
-20 -10 0 10 20
4+90.00
4902 002
a900 a900
1.Oz
ae9e .e9a
a89fi 4-
-20 -10 0 10 20
7+02.00
a902 4902
a900 4900
I.Os
aa99 89e
89fi a96
-zo -1a o 1D 20
9+43.00
4902 002
a900 a900
I.ox
998 / a89B
a89fi 4—
-20 -10 0 10 20
1+52.00
a902 a902
4900 _Ox a900
a89e ae9B
a89fi a89fi
-20 -10 0 10 20
3+58.00
1902 4902
a900 a900
1.ox
a899 a89B
4— a89fi
-20 -ID D Io 20
5+40.00
4902 a902
a900 a900
1 ax
996 a89fi
-20 -10 0 10 2D
7+62.00
4902 a902
a900 a900
1Os
a89B
89fi a89fi
-2o -10 o 10 20
9+93.00
4902 a902
000 a900
a89B � a89B
48% 89fi
-20 -10 0 10 20
GMrd NAn
�9•/Ka 091r
City of
Fort Collins
POUORE TRAIL ^REHABILITATION
AT POUDRE TRAIL AND SPRING
CREEK JUNCTION
CROSS SECTIONS
w� /00/09 J5
-.09
1 10'
10+26.00
a%2 a902
a900 a900
I.ox —
4898 B9B
aB9fi a89fi
-20 -10 0 ID 20
12+53.00
%2 4902
a900 I.O; a90D
B9B 4—
,am4—
,am 1896
-20 -10 0 t0 20
14+52.00
a902 902
a900 a900
aB9B 4811
89B 8%
-20 -10 0 10 20
16+78.00
a%2 ON
%0
a898 B9B
89B B%
-20 -10 0 t0 20
10+70.00
a%2 4902
a900 a900
aB9B
a89fi a89fi
-}0 -10 0 10 20
13+01.00
4902 .902
a900 1.0t a900
aB9B aB9B
B9B aB9B
-IO -10 0 10 20
15+03.00
a902 1102
0
4 a900
a898 a89B
89B aB9B
-xo -10 0 1D 20
17+09.00
4 1102
1.0
000
89B a89B
8% 4-
-20 -10 0 10 20
11+41.00
a902 902
49. a%0
1.o>c
898 a8%
896 8%
-20 -10 0 10 20
13+37.00
a902 4.2
/
a900 a%0
690 a6%
My -IO -10 0 10 20 aB%
15+59.00
a902 002
0
a900 a900
a89B a8%
1896 B%
-20 -10 0 t0 20
17+28.00
4902 a902
a9. 49.
a898 a69fi
a89fi 8%
-20 -10 0 10 30
12+00.00
4902 1902
a900 a900
aB9B — aB9B
a096 a69fi
-20 -10 10 20
14+02.00
a902 4902
a900 a900
aB9B aB9B
-20 -10 0 10 20 aB9B
16+13.00
a902 002
1.Of
900 a900
a898 a89B
a89B a89fi
-20 -10 0 10 20
17+50.00
402 4902
a900 a900
I \ \
a89B a69fi
a 69fi
-20 -10 0 10 20
o•/�aa Data
Ciof
Fort Collins
V
nu•..1 a... ..a
POUORE TRAIL RENARIWATION
AT POUDRE TRAIL AND SPRING
CREEK JUNCTION
CROSS SECTIONS
Raya1
09/08/09 6
eaa• 1-_10.
PROJECT:
SECTION 00300
BID FORM
Place
Date
1. In compliance with your Invitation to Bid dated 20 and
subject to all conditions thereof, the undersigned
a (Corporation, Limited Liability Company, Partnership, Joint Venture, or
Sole Proprietor) authorized to do business in the State of Colorado
hereby proposes to furnish and do everything required by the Contract
Documents to which this refers for the construction of all items listed
on the following Bid Schedule or Bid Schedules.
2. The undersigned Bidder does hereby declare and stipulate that this
proposal is made in good faith, without collusion or connection with any
other person or persons Bidding for the same Work, and that it is made in
pursuance of and subject to all the terms and conditions of the
Invitation to Bid and Instructions to Bidders, the Agreement, the
detailed Specifications, and the Drawings pertaining to the Work to be
done, all of which have been examined by the undersigned.
3. Accompanying this Bid is a certified or cashier's check or standard Bid
bond in the sum of
($ ) in accordance with the Invitation To Bid and Instructions
to Bidders.
4. The undersigned Bidder agrees to execute the Agreement and a Performance
Bond and a Payment Bond for the amount of the total of this Bid within
fifteen (15) calendar days from the date when the written notice of the
award of the contract is delivered to him at the address given on this
Bid. The name and address of the corporate surety with which the Bidder
proposes to furnish the specified performance and payment bonds is as
follows:
5. All the various phases of Work enumerated in the Contract Documents with
their individual jobs and overhead, whether specifically mentioned,
included by implication or appurtenant thereto, are to be performed by
the CONTRACTOR under one of the items listed in the Bid Schedule,
irrespective of whether it is named in said list.
6. Payment for Work performed will be in accordance with the Bid Schedule or
Bid Schedules subject to changes as provided in the Contract Documents.
7. The undersigned Bidder hereby acknowledges receipt of Addenda No.
through
Rev10/20/07 Section 00300 Page 1
t
SECTION D— TYPICAL SE —ON DETAIL
2' 2 2, ,Z�ENEG OF -EN 6 W.0 D. BE CF EF CNEC�10
a=D-"' . ENE
I CF CNEEN I., — 1. E'
ROCK CHECK DAM
C�Cd= I CEN—it IE—....
CONCRETE TRAIL
TYPICAL SECTION
NOTTO—LE
VTC
Cn
L- c
4L
—Vill Zo— v
—T—
�T
SIFT FENCE
City of
Fort Collins
Zu'c;W TRAIL RENABIUTAnOM
AT POUIDRE TRAIL AND SPRING
CREEK JUNCTION
CONSTRUCTION DETAILS
t 09
o /05/09 7 EgwogE
POUDRE TRAIL REHABILITATION AT THE ENVIRONMENTAL LEARNING CENTER
LOCATED IN THE SOUTHWEST QUARTER OF SECTION 21, TOWNSHIP 7 NORTH, RANGE 68 WEST
OF THE SIXTH PRINCIPAL MERIDIAN, CITY OF FORT COLLINS, COUNTY OF LARIMER, STATE OF COLORADO
AUGUST 2009
VICINITY MAP
SCALR: NT5
BENCHMARK:
CITY OF FORT COLLINS BENCHMARK 2901. LOCATED SOUTH OF PROSPECT
ROAD EAST OF THE WEST 1.25 FRONTAGE ROAD. FOUND 2" ALUMINUM CAP ON
A CONCRETE HEADWALL ELEVATION=4901.22 NGVD 1929 UNADJUSTED
CITYOF FORT COLLINS BENCHMARK 5I0I. WESTSIDEOF TIM13ERLINEROAD
AT THE NORTH END OF A BRIDGE OVER THE POUDRE RIVER ON TOP OF THE
PARAPET WALL APPROXIMATELY 0.2 MILES SOUTH OF THE SOUTH SIDE OF
WEST MULBERRY STREET. ELEVATION = 4923.75
INDEX OF SHEETS
SHEET NO. DESCRIPTION OP SHEETS
1................................ COY" Sma-
2.3................................ TRAILPLAN9PRO-
4................................ TRAIL CRG888¢CTONe
5................................ CON¢TRNCTION DET —
LEGEND
OWNER / CONSTRUCTION
SITE OPERATOR
Cm OF FORT COWNB
PARK PLANNING ANO DMLOPMeNT
215 M— STR¢¢T
FORT COWN9. COLOR—W522
PH.9T0.221.5518
CONTACT: Cl— FGRE.IAN
CALL U—Y NORE¢AIII
CENLER a caa+AGo
811
wR.n RR..
usa�. •sue +na M muu N iw.
eq.+p w.eu.�w
�u� wrrauv. ixx. M
u��gp�i wa u.
u ev.��.e..mawur
. O.wgN un
.iup r..a
a
µ.`me � N ..„ .....w....
o.... Dol.
F�CCity of
Collins
POUDRE TRNL REHABILITATION
AT ME ENVIRONMENTAL
LFARNWO CENTER
COVER SHEET
EN/A
Ig"
I>
I�
Iw
Is
----------
COUMYROAD9
� •may
____�-'� r'i ..ate fl I \� � I\` -�• ' \��� 1 �/ i ' /\` 1\\�\
i
� a ay.. is Rs ♦, , P°UORE PNEF �
EA G GRAVEL
� PARKINGLOT
8
8
v
f
R
8
8
R
8
9 8
A
�•
E �
y
�
S
� �
S•
�
5;
itlr
`•bt
.870
=.00
c— uL,T. NoTI„- —
Ccxrca a Caona�oo
oil
,.,Fort Collins
oo
POUDRE TRAIL RENARILITAnoN
AT ME ENVIRONMENTAL
LEARNING CENTER
TRAIL PLAN k PRORLE
a.. 08/25/09 2
I.e30.
I 1
I; 1
h I
1
Iq �
I
I
I
I
.8M
5+00
a999 Aoso
k
g
g
$
A
$
8
$
-
R
�TroI uw[
Ce UTwrr NO-CA—
C_R a Caauoo
811
c.a.a N,...
ion/ia. Dol.
Fort Collins
lo
POOORE TRAIL REHABILITATION
AT THE ENVIRONMENTAL
LEARNING CENTER
TRAIL PLAN k PROFILE
E
3
0+10.00
m. .ea.
.Be2 .eat
1 ax
4m0 Bm
4878 a)e
-20 -10 o 10 20
2+05.00
4884 4884
4m2 \ \ 1.0 .882
mo 4BBo
4.1e .me
-20 -lo0 to xo
3+85.00
4884 4-
-2 BB2
1 x
4m0 .em
4878 4878
-2. -10 0 10 20
5+60.00
.m4 4-
-2 4882
Lo
aea .aeo
B7e 4ma
-z0 -10 0 to 20
7+6&00
4.1 .884
4m2 4882
eao 4Bao
ma 078
-20 -10 0 t0 20
0+52.00
.m. -4
asz -2
I ox
4Bm / m0
4878 4878
-20 -10 o 10 20
2+56.00
aea -4
4882 Q82
4m0
.ma )e
-m -10 10 2.
4+3&00
4884 4884
4.2 4.2
\ IOx
48m 4ma
4878 4878
-20 -lo l0 20
6+25.00
4m. 4884
4.2 4882
.Bea .eeo
4878 4878
-20 -10 0 10 z0
7+90.00
.ma 4884
4.2 4m2
.mo .aeo
.me 4ma
-20 -lo o to 20
1+02.00
m. 4.4
.mz 4aez
amo em
.1. .8]B
-20 -10 0 10 20
2+98.00
am. .e84
amz 4882
I ox
amo - - - 4am
.e7e 4
-20 10 o zo
4+58.00
4.4 m.
4.2 m2
\ IOx
amo Bm
4878 .87.
-za -la la zo
6+68.00
4m4 .BB4
4m2 4882
1.0
m0 / Q.0
4070 4878
-zo -la o la zo
1+43.00
48B. ee.
Lo
802 4.2
8m .m0
a8)8 4878
-20 -10 0 10 20
3+38.00
4m4 4m4
48Bz .m2
1 x --
4mo 4mo
4- 4878
-20 -100 10 20
5+12.00
.m4 4m4
.m2 mz
1.0 _
8m 4m0
48]e 48]e
-20 -1. 10 20
7+30.00
.m. 4m.
-2 0 4m2
-0 amo
-8 B]8
-20 -10 0 10 20
cwa wN.
.an/Is. Oeb
FCity of
lirt Collins
POUDRE TRAIL REHABILITATION
AT THE ENVIRONMENTAL
LEARNING CENTER
CROSS SECTIONS
o-� 08/25/09 4
5 COxCNE21xuL
TuOK 6' *0 ALLO VEat xStuµ
R YCTCN xEEvmIG E NEw iRul
wwE�u:.� .rowi onw�iE.
w.uL .xo arvosi a�.rEx�...
xorEs rs coxcxtrz wm nazwEsx
o�LLma�ioars: � ro a:xrzw
"caa E ELL"e g �.". —
wAnx ro a „x Aw.. Exow muL
LesEow°s u.". wxLE BR —
CONCRETE TRAIL
TYPICAL SECTION
r(r<w)C-1 ro=r
tVNIE W ETtx
WATTLE DETAIL
W1 �o,To�,,LF
^7O•i YYY Y — -
w�.
Fort Collins
_—�
POUORE TRAIL REHABILITATION
AT THE ENVIRONMENTAL
LEARNING CENTER
CONSTRUCTION DETAILS
aw 08�iS,D9 5
x N/A
8. BID SCHEDULE (Base Bid)
Project: Poudre Trail Rehabilitation: Junction and ELC
BID SCHEDULE (BASE BID)
Bid items are described in Section 01800
BID
ESTIMATED
UNIT ITEM
ITEM
DESCRIPTION
QUANTITY
UNIT PRICE TOTAL
Junction Sectlon:` -
1
Mobilization
1.00
LS
2
Traffic Control
1.00
LS
3
Surveying
1.00
LS
4
Erosion Control
1.00
LS
5
Demolition
16,295.00
SF
6
Colored Concrete Paving - 5' Thick
17,510.00
SF
7
Landscape Restoration
7,004.00
SF
8
Hydro Seeding
7,004.00
SF
9
Temporary Construction Access Crossing
1.00
LS
', ELC Section'.
rY „
10
Mobilization
1.00
LS
11
Traffic Control
1.00
LS
12
Surveying
1.00
LS
13
Erosion Control
1.00
LS
14
Demolition
7,910.00
SF
15
Colored Concrete Paving - 5" Thick
8,010.00
SF
16
Landscape Restoration
3,164.00
SF
17
Hydro Seeding
3,164.00
SF
TOTAL OF BASE BID
(Total Base Bid Written)
Rev10720707 Section 00300 Page 2
5. There is difference of 1215 SF between Demolition and New Paving. Shouldn't the
quantity be the same?
Answer. Certain sections of the asphalt trail are 8' wide. The new concrete trail will
be 10' wide
6. How is the restoration quantity derived?
Answer. A strip 2' wide on either side of the new concrete trail.
Please contact John D. Stephen, CPPO, CPPB, Senior Buyer at (970) 221-6777 with
any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
where renewal is a way of life
9. PRICES
The foregoing prices shall include all labor, materials, transportation,
shoring, removal, dewatering, overhead, profit, insurance, etc., to cover
the complete Work in place of the several kinds called for.
Bidder acknowledges that the OWNER has the right to delete items in the
Bid or• change quantities at his sole discretion without affecting the
Agreement or prices of any item so long as the deletion or change does
not exceed twenty-five percent (250) of the total Agreement Price.
RESPECTFULLY SUBMITTED:
CONTRACTOR
BY:
Signature
Title
License Number (If Applicable)
(Seal - if Bid is by corporation)
Attest:
Address
Telephone
Email
Date
Rev10/20/07 Section 00300 Page 3
SECTION 00400
SUPPLEMENTS TO BID FORMS
00410 Bid Bond
00420 Statement of Bidder's Qualifications
00430 Schedule of Subcontractors
Rev 10/20/07
SECTION 00410
BID BOND
KNOW ALL MEN BY THESE PRESENTS: that we, the undersigned
as Principal, and as Surety, are hereby held and firmly bound unto the City of
Fort Collins, Colorado, as OWNER, in the sum of $ for the
payment of which, well and truly to be made, we hereby jointly and severally
bind ourselves, successors, and assigns.
THE CONDITION of this obligation is such that whereas the Principal has
submitted to the City of Fort Collins, Colorado the accompanying Bid and
hereby made a part hereof to enter into a Construction Agreement for the
construction of Fort Collins Project, 7076 Poudre Trail Rehabilitation -
Junction and ELS.
NOW THEREFORE,
(a) If said Bid shall be rejected, or
(b) If said Bid shall be accepted and the Principal shall execute and deliver
a Contract in the form of Contract attached hereto (properly completed in
accordance with said Bid) and shall furnish a BOND for his faithful
performance of said Contract, and for payment of all persons performing
labor or furnishing materials in connection therewith, and shall in all
other respects perform the Agreement created by the acceptance of said
Bid, then this obligation shall be void; otherwise the same shall remain
in force and effect, it being expressly understood and agreed that the
liability of the Surety for any and all claims hereunder shall, in no
event, exceed the penal amount of this obligation as herein stated.
The Surety, for value received, hereby stipulates and agrees that the
obligations of said Surety and its BOND shall be in no way impaired or
affected by any extension of the time within which the OWNER may accept such
Bid; and said Surety does hereby waive notice of any such extension.
Surety Companies executing bonds must be authorized to transact business in
the State of Colorado and be accepted by the OWNER.
Rev10/20/07 Section 00410 Page 1
IN WITNESS WHEREOF, the Principal and the Surety have hereunto set their hands
and seals this day of , 20_, and such of them as are
corporations have caused their corporate seals to be hereto affixed and these
presents to be signed by their proper officers, the day and year first set
forth above.
PRINCIPAL
Name•
Address:
By:
Title:
ATTEST:
By:
(SEAL)
By:
Title:
SURETY
(SEAL)
Rev10/20/07 Section 00410 Page 2
SECTION 00420
STATEMENT OF BIDDER'S QUALIFICATIONS
All questions must be answered and the data given must be clear and
comprehensive. This statement must be notarized. If necessary, questions may
be answered on separate attached sheets. The Bidder may submit any additional
information he desires.
1. Name of Bidder:
2. Permanent main office address:
3. When organized:
4. If a corporation, where incorporated:
5. How many years have you been engaged in the contracting business
under your present firm or trade name?
6. Contracts on hand: (Schedule these, showing the amount of each
contract and the appropriate anticipated dates of completion.)
7. General character of Work performed by your company:
8. Have you ever failed to complete any Work awarded to you?
If so, where and why?
9. Have your ever defaulted on a contract?
If so, where and why?
10. Are you debarred by any government agency?
If yes list agency name.
Rev 10/20/07 Section 00420 Page 1
11. List the more important projects recently completed by your company,
stating the approximate cost of each, and the month and year completed,
location and type of construction.
12. List your major equipment available for this contract.
13. Experience in construction Work similar in importance to this
project:
14. Background and experience of the principal members of your organization,
including officers:
15. Credit available: $
16. Bank reference:
17. Will you, upon request, fill out a detailed financial statement and
furnish any other information that may be required by the OWNER?
18. Are you licensed as a General CONTRACTOR?
If yes, in what city, county and state?
class, license and numbers?
19. Do you anticipate subcontracting Work under
Contract?
If yes, what percent of total contract?
and to whom?
20. Are any lawsuits pending against you or your firm at this time?_
IF yes, DETAIL
Rev10/20/07 Section 00420 Page 2
What
this
21. What are the limits of your public liability? DETAIL
What company?
22. What are your company's bonding limitations?
23. The undersigned hereby authorizes and requests any person, firm or
corporation to furnish any information requested by the OWNER in
verification of the recital comprising this Statement of Bidder's
Qualifications.
Dated at this day of , 20 .
Name of Bidder
By:
Title:
State of
County of
being duly sworn deposes and says that he
is of and that
(name of organization)
the answers to the foregoing questions and all statements therein contained
are true and correct.
Subscribed and sworn to before me this day of , 20
Notary Public
My commission expires
Rev10/20/07 Section 00420 Page 3
SECTION 00430
SCHEDULE OF SUBCONTRACTORS
List all subcontractors for the work items listed below and all subcontractors
performing over 150 of the contract.
ITEM
SUBCONTRACTOR
Section 00430 Page 1
SECTION 00500
AGREEMENT FORMS
00510 Notice of Award
00520 Agreement
00530 Notice to Proceed
SECTION 00510
NOTICE OF AWARD
Date:
TO:
PROJECT: 7076 Poudre Trail Rehabilitation - Junction and ELS
OWNER: CITY OF FORT COLLINS
(hereinafter referred to as "the OWNER")
You are hereby notified that your Bid dated 20 for the above
project has been considered. You are the apparent successful Bidder and have
been awarded an Agreement for 7076 Poudre Trail Rehabilitation - Junction and
ELS.
The Price of your Agreement is
Three (3) copies of each of the proposed Contract Documents (except Drawings)
accompany this Notice of Award. Three (3) sets of the Drawings will be
delivered separately or otherwise made available to you immediately.
You must comply with the following conditions precedent within fifteen (15)
days of the date of this Notice of Award, that is by 20
1. You must deliver to the OWNER three (3) fully executed counterparts of
the Agreement including all the Contract Documents. Each of the Contract
Documents must bear your signature on the cover of the page.
2. You must deliver with the executed Agreement the Contract Security
(Bonds) as specified in the Instructions to Bidders, General Conditions
(Article 5.1) and Supplementary Conditions.
Failure to comply with these conditions within the time specified will entitle
OWNER to consider your Bid abandoned, to annul this Notice of Award and to
declare your Bid Security forfeited.
Within ten (10) days after you comply with those conditions, OWNER will return
to you one (1) fully -signed counterpart of the Agreement with the Contract
Documents attached.
By:
City of Fort Collins
OWNER
James B. O'Neill, II, CPPO, FNIGP
Director of Purchasing & Risk Management
Section 00510 Page 1
F6rt of
�Purc�hasi�ngg�
Financial Services
Purchasing Division
215 N. Mason St. 2"' Floor
PO Box 580
Fort Collins, CO 80522
970.221.6775
970.221.6707
fcgov. com/purchasing
SPECIFICATIONS
AND
CONTRACT DOCUMENTS
FOR
Poud re Trai I Rehabilitation -
Junction and ELS
BID NO. 7076
PURCHASING DIVISION
215 NORTH MASON STREET, 2ND FLOOR, FORT COLLINS
October 6, 2009 — 3:00 P.M. (OUR CLOCK)
SECTION 00520
AGREEMENT
THIS AGREEMENT is dated as of the day of in the year of 20
and shall be effective on the date this AGREEMENT is signed by the City.
The City of Fort Collins (hereinafter called OWNER) and
(hereinafter called CONTRACTOR)
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1. WORK
CONTRACTOR shall complete all Work as specified or indicated in the Contract
Documents. The Project for which the Work under the Contract Documents may be
the whole or only a part is defined as the construction of the 7076 Poudre
Trail Rehabilitation - Junction and ELS and is generally described in Section
01100.
ARTICLE 2. ENGINEER
The Project has been designed by City of Fort Collins Engineering, who is
hereinafter called ENGINEER and who will assume all duties and
responsibilities and will have the rights and authority assigned to ENGINEER
in the Contract Documents in connection with completion of the Work in
accordance with the Contract Documents.
ARTICLE 3. CONTRACT TIMES
3.1 The Work shall be Substantially Complete within forty (40) calendar
days after the date when the Contract Times commence to run as provided in the
General Conditions and completed and ready for Final Payment and Acceptance in
accordance with the General Conditions within fifty (50) calendar days after
the date when the Contract Times commence to run.
3.2. Liquidated Damages. OWNER and CONTRACTOR recognize that time is of
the essence of this Agreement and that OWNER will suffer financial loss if the
Work is not completed within the times specified in paragraph 3.1. above, plus
any extensions thereof allowed in accordance with Article 12 of the General
Conditions.
They also recognize the delays, expenses and difficulties involved in proving
in a legal proceeding the actual loss suffered by OWNER if the Work is not
completed on time. Accordingly, instead of requiring any such proof, OWNER
and CONTRACTOR agree that as liquidated damages for delay (but not as penalty)
CONTRACTOR shall pay OWNER the amounts set forth hereafter.
Section 00520 Page 1
1) Substantial Completion:
Five Hundred Dollars ($500.00) for each calendar day or fraction
thereof that
Substantial
Complete.
expires after the forty (40) calendar day period for
Completion of the Work until the Work is Substantially
2) Final Acceptance:
After Substantial
for each calendar
ten(10) calendar <
the Work is ready
ARTICLE 4. CONTRACT PRICE
Completion, One Hundred Fifty Dollars ($150.00)
day or fraction thereof that expires after the
ay period for Final Payment and Acceptance until
.or Final Payment and Acceptance.
4.1. OWNER shall pay CONTRACTOR for performance of the Work in
accordance with the Contract Documents in current funds as follows: ($ ),
$ Dollars, in accordance with Section 00300, attached and incorporated
herein by this reference.
ARTICLE 5. PAYMENT PROCEDURES
CONTRACTOR shall submit Applications for Payment in accordance with
Article 14 of the General Conditions. Applications for Payment will be
processed by ENGINEER as.provided in the General Conditions.
5.1. PROGRESS PAYMENTS. OWNER shall make progress payments on account
of the Contract Price on the basis of CONTRACTOR's Application for Payment as
recommended by ENGINEER, once each month during construction as provided
below. All progress payments will be on the basis of the progress of the Work
measured by the schedule of values established in paragraph 2.6 of the General
Conditions and in the case of Unit Price Work based on the number of units
completed, and in accordance with the General Requirements concerning Unit
Price Work.
5.1.1. Prior to Substantial Completion, progress payments will be in the
amount equal to the percentage indicated below, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
determine, or OWNER may withhold, in accordance with paragraph 14.7 of the
General Conditions. 90% of the value of Work completed until the Work has
been 50% completed as determined by ENGINEER, when the retainage equals 5% of
the Contract Price, and if the character and progress of the Work have been
satisfactory to OWNER and ENGINEER, OWNER on recommendation of ENGINEER, may
determine that as long as the character and progress of the Work remain
satisfactory to them, there will be no additional retainage on account of Work
completed in which case the remaining progress payments prior to Substantial
Completion will be in an amount equal to 100% of the Work completed. 90% of
materials and equipment not incorporated in the Work (but delivered, suitably
stored and accompanied by documentation satisfactory to OWNER as provided in
paragraph 14.2 of the General Conditions) may be included in the application
for payment.
Section 00520 Page 2
5.1.2. Upon Substantial Completion payment will be made in an amount
sufficient to increase total payments to CONTRACTOR to 950 of the Contract
Price, less such amounts as ENGINEER shall determine or OWNER may withhold in
accordance with paragraph 14.7 of the General Conditions, or as provided by
law.
5.2. FINAL PAYMENT. Upon Final Completion and Acceptance of the Work in
accordance with paragraph 14.13 of the General Conditions, OWNER shall pay the
remainder of the Contract Price as recommended by ENGINEER as provided in said
paragraph 14.13.
ARTICLE 6. CONTRACTOR'S REPRESENTATION
In order to induce OWNER to enter, into this Agreement, CONTRACTOR makes
the following representations:
6.1. CONTRACTOR has familiarized himself with the nature and extent of
the Contract Documents, Work, site, locality, and with all local conditions
and Laws and Regulations' that in any manner may affect cost, progress,
performance or furnishing of the Work.
6.2. CONTRACTOR has studied carefully all reports of explorations and
tests of subsurface conditions and drawings of physical conditions which are
identified in the Supplementary Conditions as provided in paragraph 4.2 of the
General Conditions.
6.3. CONTRACTOR has obtained and carefully studied (or assumes
responsibility for obtaining and carefully studying) all such examinations,
investigations, explorations, tests, reports, and studies (in addition to or
to supplement those referred to in paragraph 6.2 above) which pertain to the
subsurface or physical condition at or contiguous to the site or otherwise may
affect the cost, progress, performance or furnishing of the Work as CONTRACTOR
considers necessary for the performance or furnishing of the Work at the
Contract Price, within the Contract Times and in accordance with the other
terms and conditions of the Contract Documents, including specifically the
provisions of paragraph 4.2 of the General Conditions; and no additional
examinations, investigations, explorations, tests, reports, studies or similar
information or data are or will be required by CONTRACTOR for such purposes.
6.4. CONTRACTOR has reviewed and checked all information and data shown
or indicated on the Contract Documents with respect to existing Underground
Facilities at or contiguous to the site and assumes responsibility for the
accurate location of said Underground Facilities. No additional examinations,
investigations, explorations, tests, reports, studies or similar information
or data in respect of said Underground Facilities are or will be required by
CONTRACTOR in order to perform and furnish the Work at the Contract Price,
within the Contract Times and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provision of
paragraph 4.3. of the General Conditions.
Section 00520 Page 3
6.5. CONTRACTOR has correlated the results of all such observations,
examinations, investigations, tests, reports and data with the terms and
conditions of the Contract Documents.
6.6. CONTRACTOR has given ENGINEER written notice of all conflicts,
errors or discrepancies that he has discovered in the Contract Documents and
the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
ARTICLE 7. CONTRACT DOCUMENTS
7.1 The Contract Documents which comprise the entire Agreement between
OWNER and CONTRACTOR concerning the Work consist of the General Conditions,
Supplementary Conditions, those items included in the definition of "Contract
Documents" in Article 1.10 of the General Conditions, and such other items as
are referenced in this Article 7, all of which are incorporated herein by.this
reference.
7.2 Forms for use by CONTRACTOR in performing the Work and related
actions in carrying out the terms of this Agreement are deemed Contract
Documents and incorporated herein by this reference, and include, but are not
limited to, the following:
7.2.1Certificate of Substantial Completion
7.2.2Certificate of Final Acceptance
7.2.3Lien Waiver Releases
7.2.4Consent of Surety
7..2.5Application for Exemption Certificate
7.2. 6 Application for Payment
7.3 Drawings, consisting of a cover sheet and sheets numbered as
follows:
APFE_lDU
,Sheet A40 l''n='= - Tr it Detzilr E:ION-ft
Sheet A-2 Fmcbm- Tn0. Demir Ex.YI t
Sheet A-3 ELL -T elDevarEVh:.�hdt
S>3EDLLE OF'DR-UlTiG'S
Shest 0 1wrtion - Cover Sheet, ; Vi m ty Map
: ,l(s) 2 - 4 kmction - Tnil Flan. &w Pjahle
Sheet(s) 5-6 junctim - C-TQSi 5 GM
5hee,# 5 unrt on
Sheet, EZC - Gare u Sbeu & Vidairy.Mzrp
.Shee, 2 - ELF -Trail Plan Pr fi
4 ELF-Gms.,=5erbcs
Sheet(},) 5 l=LC - Deraib
The Contract Drawings shall be stamped "Final for Construction" and dated.
Any revisions made shall be clearly identified and dated.
Section 00520 Page 4
7.4. Addenda Numbers to , inclusive.
7.5. The Contract Documents also include all written amendments and
other documents amending, modifying, or supplementing the Contract Documents
pursuant to paragraphs 3.5 and 3.6 of the General Conditions.
7.6. There are no Contract Documents other than those listed or
incorporated by reference in this Article 7. The Contract Documents may only
be amended, modified or supplemented as provided in paragraphs 3.5 and 3.6 of
the General Conditions.
ARTICLE 8. MISCELLANEOUS
8.1. Terms used in this Agreement which are defined in Article I of the
General Conditions shall have the meanings indicated in the General
Conditions.
8.2. No assignment by a party hereto of any rights under or interests in
the Contract Documents will be binding on another party hereto. without the
written consent of the party sought to be bound; and specifically but not
without limitations, moneys that may become due and moneys that are due may
not be assigned without such consent (except to the extent that the effect of
this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or
discharge that assignor from any duty or responsibility under the Contract
Document.
8.3. OWNER and CONTRACTOR each binds itself, its partners, successors,
assigns and legal representatives to the other party hereto, its partners,
successors, assigns and legal representatives in respect to all covenants,
Agreement and obligations contained in the Contract Document.
Section 00520 Page 5
OWNER: CITY OF FORT COLLINS CONTRACTOR:
By:
JAMES B. O'NEILL II, CPPO, FNIGP
DIRECTOR OF PURCHASING
AND RISK MANAGEMENT
Date:
Attest:
City Clerk
By:
Title:
Date:
(CORPORATE SEAL)
Attest:
Address for giving notices: Address for giving notices:
P. 0. Box 580
Fort Collins, CO 80522
LICENSE NO.:
Approved as to Form
Assistant City Attorney
Section 00520 Page 6
SECTION 00530
NOTICE TO PROCEED
Description of Work: 7076 Poudre Trail Rehabilitation - Junction and ELS
To.
This notice is to advise you:
That the contract covering the above described Work has been fully executed by
the CONTRACTOR and the OWNER.
That the required CONTRACTOR's Performance Bond and Payment Bond have been
received by the OWNER.
That the OWNER has approved the said Contract Documents.
Therefore, as the CONTRACTOR for the above described Work, you are hereby
authorized and directed to proceed within ( ) calendar days from
receipt of this notice as required by the Agreement.
Dated this day of 20
The dates for Substantial Completion and Final Acceptance shall be
20 and 20 , respectively.
City of Fort Collins
OWNER
By:
Title:
ACKNOWLEDGMENT OF NOTICE
Receipt of the above Notice to Proceed is hereby acknowledged this
day of 20
CONTRACTOR:
By:
Title:
Section 00530 Page 1
SECTION 00600
BONDS AND CERTIFICATES
00610 Performance Bond
00615 Payment Bond
00630 Certificate of Insurance
00635 Certificate of Substantial Completion
00640 Certificate of Final Acceptance
00650 Lien Waiver Release (CONTRACTOR)
00660 Consent of Surety
00670 Application for Exemption Certificate
SECTION 00610
PERFORMANCE BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address )
hereinafter referred to as "the Surety", are held and firmly bound unto
City of Fort Collins, 300 Laporte Ave, Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as the "OWNER", in the penal
sum of in lawful money of
the United States, for the payment of which sum well and truly to be made, we
bind ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the _ day of , 20_,
a copy of which is hereto attached and made a part hereof for the performance
of The City of Fort Collins project,7076 Poudre Trail Rehabilitation -
Junction and ELS.
NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its
duties, all the undertakings, covenants, terms, conditions and agreements of
said Agreement during the original term thereof, and any extensions thereof
which may be granted by the OWNER, with or without Notice to the Surety and
during the life of the guaranty period, and if the Principal shall satisfy all
claims and demands incurred under such Agreement, and shall fully indemnify
and save harmless the OWNER from all cost and damages which it may suffer by
reason of failure to do so, and shall reimburse and repay the OWNER all outlay
and expense which the OWNER may incur in making good any default then this
obligation shall be void; otherwise to remain in full force and effect.
Rev10/20/07 Section 00610 Page 1
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of , 20 .
IN PRESENCE OF: Principal
(Corporate Seal)
IN PRESENCE OF:
(Title)
(Address)
Other Partners
By:
By:
IN PRESENCE OF: Surety
By:
By:
(Surety Seal)
(Address)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
Rev10/20/07 Section 00610 Page 2
CONTRACT DOCUMENTS TABLE OF CONTENTS
Section Pages
BID INFORMATION
00020 Notice Inviting Bids 00020-1 - 00020-2
00100 Instruction to Bidders 00100-1 - 00100-9
00300 Bid Form 00300-1 - 00300-3
00400 Supplements to Bid Forms 00400-1
00410 Bid Bond 00410-1 - 00410-2
00420 Statements of Bidders Qualifications 00420-1 - 00420-3
00430 Schedule of Major Subcontractors 00430-1
CONTRACT DOCUMENTS
00500 Agreement Forms 00500-1
00510 Notice of Award 00510-0
00520 Agreement 00520-1 - 00520-6
00530 Notice to Proceed 00530-1
00600 Bonds and Certificates
00600-1
00610 Performance Bond
00610-1 - 00610-2
00615 Payment Bond
00615-1 - 00615-2
00630 Certificate of Insurance
00630-1
00635 Certificate of Substantial Completion
00635-1
00640 Certificate of Final Acceptance
00640-1
00650 Lien Waiver Release(Contractor)
00650-1 - 00650-2
00660 Consent of Surety
00660-1
00670 Application for Exemption Certificate
00670-1 - 00670-2
CONDITIONS OF THE CONTRACT
00700 General Conditions 00700-1 - 00700-34
Exhibit GC -A GC -All - GC-A2
00800 Supplementary Conditions 00800-1 - 00800-2
00900 Addenda, Modifications, and Payment 00900-1
00950 Contract Change Order 00950-1 - 00950-2
00960 Application for Payment 00960-1 - 00960-4
SPECIFICATIONS
SECTION 00615
PAYMENT BOND
Bond No.
KNOW ALL MEN BY THESE PRESENTS: that
(Firm)
(Address)
(an Individual), (a Partnership), (a Corporation), hereinafter referred to as
the "Principal" and
(Firm)
(Address.)
hereinafter referred to as "the Surety", are held and firmly bound unto the
City of Fort Collins, 300 Laporte Ave., Fort Collins, Colorado 80522 a
(Municipal Corporation) hereinafter referred to as "the OWNER", in the penal
sum of in lawful money of the
United States, for the payment of which sum well and truly to be made, we bind
ourselves, successors and assigns, jointly and severally, firmly by these
presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered
into a certain Agreement with the OWNER, dated the _ day of , 20 ,
a copy of which is hereto attached and made a part hereof for the performance
of The City of Fort Collins project, 7076 Poudre Trail Rehabilitation -
Junction and ELS.
NOW, THEREFORE, if the Principal shall make payment to all persons, firms,
subcontractors, and corporations furnishing materials for or performing labor
in the prosecution of the Work provided for in such Agreement .and any
authorized extension or modification thereof, including all amounts due for
materials, lubricants, repairs on machinery, equipment and tools, consumed,
rented or used in connection with the construction of such Work, and all
insurance premiums on said Work, and for all labor, performed in such Work
whether by subcontractor or otherwise, then this obligation shall be void;
otherwise to remain in full force and effect.
Rev10/20/07 Section 00615 Page 1
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates
and agrees that no change, extension of time, alteration or addition to the
terms of the Agreement or to the Work to be performed thereunder or the
Specifications accompanying the same shall in any way affect its obligation on
this bond; and it does hereby waive notice of any such change, extension of
time, alteration or addition to the terms of the Agreement or to the Work or
to the Specifications.
PROVIDED, FURTHER, that no final settlement between the OWNER and the
CONTRACTOR shall abridge the right of any beneficiary hereunder, whose claim
may be unsatisfied.
PROVIDED, FURTHER, that the Surety Company must be authorized to transact
business in the State of Colorado and be acceptable to the OWNER.
IN WITNESS WHEREOF, this instrument is executed in three (3) counterparts,
each one of which shall be deemed an original, this day of 20
IN PRESENCE OF: Principal
(Corporate Seal)
IN PRESENCE OF:
IN PRESENCE OF:
(Surety Seal)
By:
(Title)
(Address)
Other Partners
Surety
By:
By:
(Address)
NOTE: Date of Bond must not be prior to date of Agreement.
If CONTRACTOR is Partnership, all partners should execute Bond.
Rev 10/20/07 Section 00615 Page 2
SECTION 00630
CERTIFICATE OF INSURANCE
CONTRACTOR shall insert his own standard form for Certificate of Insurance.
Rev10/20/07 Section 00630 Page 1
SECTION 00635
CERTIFICATE OF SUBSTANTIAL COMPLETION
TO: CITY OF FORT COLLINS
(OWNER)
DATE OF SUBSTANTIAL COMPLETION: PROJECT TITLE:7076 Poudre Trail
Rehabilitation - Junction and ELS
PROJECT OR SPECIFIED PART SHALL LOCATION: Fort Collins, Colorado
INCLUDE:
OWNER: City of Fort Collins
CONTRACTOR:
CONTRACT DATE:
The Work performed under this contract has been inspected by authorized
representatives of the OWNER, CONTRACTOR, and the ENGINEER and the project (or
specified part of the project, as indicated above) is hereby declared to be
substantially completed on the above date.
A tentative list of items to be completed or corrected is appended hereto.
This list may not be exhaustive, and the failure to include an item on it does
not alter the responsibility of the CONTRACTOR to complete all the Work in
accordance with the Contract Documents.
ENGINEER
AUTHORIZED REPRESENTATIVE DATE
The CONTRACTOR accepts the above Certificate of Substantial Completion and
agrees to complete and correct the items on the tentative list within the time
indicated.
By:
CONTRACTOR
AUTHORIZED REPRESENTATIVE DATE
The OWNER accepts the project or specified area of the project as
substantially complete and will assume full possession of the project. or
specified area of the project at 12:01 a.m., on The
responsibility for heat, utilities, security, and insurance under the Contract
Documents shall be as set forth under "Remarks" below.
CITY OF FORT COLLINS, COLORADO By:
OWNER
AUTHORIZED REPRESENTATIVE
REMARKS:
Rev10/20/07 Section 00635 Page 1
DATE
SECTION 00640
CERTIFICATE OF FINAL ACCEPTANCE
TO:
Gentlemen:
You are hereby notified that on the day of
Fort Collins, Colorado, has accepted
for the City of Fort Collins project, 7076
,Tnnrrti nn and F.T.S
20
, . 20_, the City of
the Work completed by
Poudre Trail Rehabilitation -
A check is attached hereto in the amount of $
as Final Payment for all Work done, subject to the terms of the Contract
Documents which are dated , 20
In conformance with the Contract Documents for this project, your obligations
and guarantees will continue for the specified time from the following
date: , 20
Sincerely,
OWNER: City of Fort Collins
By:
Title:
ATTEST:
Title:
Rev10/20/07 Section 00640 Page 1
SECTION 00650
LIEN WAIVER RELEASE
(CONTRACTOR)
TO: City of Fort Collins, Colorado (OWNER)
FROM:
(CONTRACTOR)
PROJECT:7076 Poudre Trail Rehabilitation - Junction and ELS
1. The CONTRACTOR acknowledges having received payment, except retainage
from the OWNER for all work, labor, skill and material furnished,
delivered and performed by the CONTRACTOR for the OWNER or for anyone in
the construction, design, improvement, alteration, addition or repair of
the above described project.
2. In consideration of such payment and other good and valuable
consideration, the receipt and adequacy of which are hereby acknowledged,
the CONTRACTOR voluntarily waives all rights, claims and liens, including
but not limited to, mechanic's liens, Miller Act claims (40 U.S.C.A. 270
a and b), stop notices, equitable liens and labor and material bond
rights which the CONTRACTOR may now or may afterward have, claim or
assert for all and any work, labor, skill or materials furnished,
delivered or performed for the construction, design, improvement,
alteration, addition or repair of the above described project, against
the OWNER or its officers, agents, employees or assigns, against any fund
of or in the possession or control of the OWNER, against the project or
against all land and the buildings on and appurtenances to the land
improved by the project.
3. The CONTRACTOR affirms that all work, labor and materials, ,furnished,
delivered or performed to or for the construction, design, improvement,
alteration, addition or repair of the project were furnished, delivered
or performed by the CONTRACTOR or its agents, employees, and servants, or
by and through the CONTRACTOR by various Subcontractors or materialmen or
their agents, employees and servants and further affirms the same have
been paid in full and have released in full any and all existing or
possible future mechanic's liens or rights or claims against the project
or any funds in the OWNER'S possession or control concerning the project
or against the OWNER or its officers, agents, employees or assigns
arising out of the project.
4. The CONTRACTOR agrees to defend and hold harmless the OWNER, the lender,
if any, and the Surety on the project against and from any claim
hereinafter made by the CONTRACTOR'S Subcontractors, materialmen,
employees, servants, agents or assigns against the project or against the
OWNER or its officers, employees, agents or assigns arising out of the
project for all loss, damage and costs, including reasonable attorneys
fees, incurred as a result of such claims.
Rev10/20107 Section 00650 Page 1
5. The parties acknowledge that the description of the project set forth
above constitutes and adequate description of the property and
improvements to which this Lien Waiver Release pertains. It is further
acknowledged that this Lien Waiver Release is for the benefit of and may
be relied upon by the OWNER, the lender, if any, and Surety on any labor
and material bonds for the project.
Signed this day of
CONTRACTOR
By:
Title:
ATTEST:
Secretary
STATE OF COLORADO )
) ss.
COUNTY OF LARIMER )
, 20
Subscribed and sworn to before me this day of
20 , by
Witness my hand and official seal.
My Commission Expires:
Notary Public
Rev 10/20/07 Section 00650 Page 2
SECTION 00660
CONSENT OF SURETY
TO: City of Fort Collins, Colorado
(hereinafter referred to as the "OWNER")
CONTRACTOR:
PROJECT: 7076 Poudre Trail Rehabilitation - Junction and ELS
CONTRACT DATE:
In accordance with the provisions of the Contract between the OWNER and the
CONTRACTOR as indicatedabove, for
(Surety)
on bond of
hereby approves of the Final Payment to the CONTRACTOR, and agrees that Final
Payment to the CONTRACTOR shall not relieve the Surety Company of any of its
obligations to the OWNER, as set forth in the said Surety Company's Bond.
IN WITNESS WHEREOF, the Surety Company has hereunto set its hand this
day of ,
(Surety Company)
By
ATTACH: Power of Attorney and Certificate of Authority of Attorney(s)-in-
Fact.
Rev10/20/07 Section 00660 Page 1
SECTION 00670
ON
DR 0172 (12/98)
COLORADO DEPARTMENT OF REVENUE
DENVER CO 80261
(303) 232-2416
CONTRACTOR APPLICATION
FOR
EXEMPTION CERTIFICATE
Pursuant to Statute
Section 39-26.114(1)(a)(XIX)
DO NOT WRITE IN THIS SPACE
The exemption certificate for which you are applying must be used only for the purpose of purchasing construction and building materials
for the exempt project described below. This exemption does not include or apply to the purchase or rental of equipment, supplies, and
materials which are purchased, rented, or consumed by the contractor and which do not become part of the structure, highway, road,
street, or other public works owned and used by the exempt organization.
Any unauthorized use of the exemption certificate will result in revocation of your exemption certificate and other penalties provided by
law.
A separate certificate is required for each contract.
Subcontractors will not be issued Certificates of Exemption by the Department of Revenue. It is the responsibility of the prime contractor
to issue certificates to each of the subcontractors. (See reverse side).
FAILURE TO ACCURATELY COMPLETE ALL BOXES WILL CAUSE THE APPLICATION TO BE DENIED.
count No. (to be assigned by DOR)
E
Period
0170-750 (999) $0.00
CONTRACTOR INFORMATION
Trade name/DBA:
Owner, partner, or corporate name:
Mailing address (City, State, Zip):
Contact Person
E-Mail address:
Federal Employer's Identification Number:
Bid amount for your contract:
Fax Number:
( )
Business telephone number:
Colorado withholding tax account number:
Copies of contractor agreement pages (1) identifying the contracting parties
EXEMPTION INFORMATION and(2) contammg signatures of contracting parties must be attached.
Name of exempt organization (as shown on contract):
Exempt organization's number:
98 -
Address of exempt organization (City, State, Zip):
Principal contact at exempt organization:
Principal contact's telephone number:
Physical location of project site (give actual address when applicable and Cities and/or County (ies) where project is located)
Scheduled Month Day Year
Estimated Month Day Year
construction start date:
completion date:
I declare under penalty of perjury in the second degree that the statements made in this application are
true and complete to the best of my knowledge.
Signature of owner, partner or corporate officer:
Title of corporate officer:
Date:
DO NOT WRITE BELOW THIS LINE
Section 00670 Page 1
SECTION 00020
INVITATION TO BID
Special Notice
Contractors who have completed this application in the past, please note the following changes in
procedure:
The Department will no longer issue individual Certificates of exemption to subcontractors. Only prime
contractors will receive a Contractor's Exemption Certificate on exempt projects.
Upon receipt of the Certificate, the prime contractor should make a copy for each subcontractor involved in
the project and complete it by filling in the subcontractor's name and address and signing it.
The original Certificate should always be retained by the prime contractor. Copies of all Certificates that
the prime contractor issued to subcontractors should be kept at the prime contractor's place of business
for a minimum of three years and be available for inspection in the event of an audit.
Once an 89# has been assigned to you, please use the next five numbers following it for any applications
submitted for future projects. This should be your permanent number. For instance, if you were assigned
89-12345-0001, every application submitted thereafter should contain 89-12345 on the application. The
succeeding numbers will be issued by the Department of Revenue. DO NOT enter what you believe to be
the next in sequence as this may delay processing of your application.
Section 00670 Page 2
SECTION 00700
GENERAL CONDITIONS
GENERAL CONDITIONS
Is] aIItt ]
CONSTRUCTION CONTRACT
These GENERAL CONDITIONS have been developed by using; the
STANDARD GENERAL CONDITIONS OF THE CONSTRUCTION
CONTRACT prepared by the Engineers Joint Contract Documents
Comm ittec, WCDC INC. 1910-8 (1990 Edition), as a base, Changes to
that document are shown by underlining text that hac been added and
striking through teat that has been deleted.
EJCDC GEN ERAI, CONDITIONS 1910-8 (1990 EDITION)
WITH CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
Article or Paragraph
Number & Title
TABLE OF CONTENTS OF GENERAL, CONDITIONS
Page Article or Paragraph
Number Number & Title
DEFINITIONS
i
IA
Addenda.............................................1
1.2
Agreement.........................................1
1.3
Application for Payment...,, ..................
1.
1.4
Asbestos
1
1.5
Bid.....................................................I
1.6
Bidding Documents .............................1.
1.7
Bidding Requirements ,,,,,,,,,,,,,,,,,,,,,,,,,,1.
1.8
Bonds.................................................1
1.9
Change Order ... .................................I
I.IQ
Contract Documents ...............:..............
I
1.I1
Contract Price,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,I
1.12
Contract Times ....:............_...... -,_..,_.,.I
1.13
CONTRACTOR
1
1.14
de'fi? L�.............................................
1.15
Drawings...................................I........1
1.16
Effective hate of the Agreement..,._..,.
1
1.17
ENGINEER
I
1.18
ENGINEER's Consultant ......................�
1.1.9
Field Order,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,1
1.20
General Requirements ..........................
1.21
Hazardous Waste .................................
2
1.22.a
Laws and Regulations; Laws or
Regulations
1.22.b
Legal holidays,,,,,,,,,,,,,,,,,, ,,,,,„
2
1.23
Liens
1.24
Milestone
2
1.25
Notice of Award ..................................
2
26
Notice to Procced2
1.27
OWNER.............................................:2
1.28
Partial Utilization,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,2
1.29
PCBs
2
1.30
Petroleum
2
1.31
Project ...... ......................... ....... ...........
1.32a
Radioactive Ndaterial ............................I
1.32.b
Regular Working Hours
2
1.33
Resident Project Representative
1.34
......
Samples,,,,.,,,
,._...2
1.35
Shop Drawings .................. ......:...........
2
1.36
Specifications
?
1.37
Subcontractor ......................................
2
1.38
Substantial Completion,,,,,,,,,,,,,,,,,,,,,
1.39
Supplementary Conditions,.._.,.._...,,_,.
1.40
Supplier.......
.........................................
2
1.41
Underground Facilities .....................1-3
1.42
Unit PriceWork ..................................3
1.43
Work:....:...........................................:3
1.44
Work Change Directive ..... ......... .........
3
1.45
Written Amendment
Page
Number
2. PRELRNMNARY !(-RATTERS
3
2.1
Delivery of Bonds.... I .......................
3
22
Copies of DocumcnL .........................3
2-3
Commencement of Contract
Times; Notice to Proceed ...........
2.4
Starting theWork...
3
2.5-2.7
Before Starting Construction:
CONTRACTOR'S Responsibility
to Report; Preliminary Schedtles;
Delivery of Certificates of
Insurance ...................................
3-4
2.8
Preconstruction Conference
4
19
Initially Acceptable Schedules.,,,-
....4
3. CONTRACT DOCUMENTS: INTENT,
ANWN'DING,
REUSE...........................................4
3.1-3.2
Intent......._ ..............
d
3.3
Reference to Standards and Speci-
fications of Technical Societies;
Reporting and Resolving Dis-
crepancies .................................
4-5
3.4
Intent of Certain 'Germs or
Adjectives .....................................
5
3.5
Amending Contract Docunents.........
5
3.6
Supplementing Contract
Documents
5
3.7
Reuse ofDoculnents .........................j
4. AVAILABILITY OF LANDS;
SUBSURFACE
AND PHYSICAL CONDITIONS:
REFERENCE POINTS.........................................5
4.1
Availability of Lands ..... ................
5-6
4.2
Subsurface and Physical
Conditions ........ ...... .....---- .---- ........
6
4.2.1
Reports and Drawings .......................6i
4.2.2
Limited Reliance by CONTRAC-
TOR Authorized; Technical
Data............................................
6
4.2.3
Notice of Differing Subsurface
or Physical Conditions,,,,,,,,,,,,,,,,,,
G
4.2.4
ENGINF.ER's Review ........................
6
4.2.3
Possible Contract Document. -
Change.........................................6
4.2.6
Possible Price and Times
Adjustments ...............................G-7
43
Physical Conditions --Underground
Facilities .......................................
7
4.3.1
Shown or Indicated ..,,,.„.„,,...,„...„.,7
4.3.2
Not Shown or Indicated.
....................
7
4.4
Reference Points.., .......... .................
7
EJCDC- GENERAL CONDtr10NS 1910.8 (1990 t:1>rnoN)
w! CITY OF FORT COLONS MODIFICATIONS (RF.V 9/99)
Article or Paragraph Page. Article or Paragraph Page
Number & Title Num her Number & Titic Number
4.5 Asbestos, PCBs, Petroleum,
Hazardous 1Vaste or
Radioactive Nlaterial 7-8
.....................
5. BONDS AND INSURANCE .................................
8
5.1-5.2
Performance. Payment and Other
Bonds ...............................................
8
5.3
Licensed Sureties and Insurers;
Certificates of Insurance_-_ ................
8
5.4
CONTRACrOR's Liability
Insurance ..........................................
9
5.5
OWNER's Liability Insurance.............„9
5.6
Property Insurance ............... ...........
9-10
5.7
Boiler and Machinery or Addi-
tional Property Insurance..................10
5.8
Notice of CancellationPrOVsion
10
5.9
CONTRACTOR's Responsibility
for Deductible Amounts....................
10
5:10
Other Special Insurance'
to
5.11
Waiver of Rights
I I
5.12-5.13
Receipt and Application of
Insurance Proceeds ......................
10-11
5.14
Acceptance of Bonds and Insu-
ance; Option to Replace....................1
l
5.15
Partial Utilization --Property
Insurance.............:..........................11
6. CONTRACTOR'S RESPONSIBILITIES
11
6.1-6.2
Supervision and Superintendence .......
11
6.3-6.5
Labor, Materials and Equipment,_.
11-12
6.6
Progress Schedule_ ..... .................
.... 12
6.7
Substitutes and "Or -Equal" Items;
CONTRACTOR's Expense-,
Substitute Construction
Methods or Procedures-,
ENGINEER's Evaluation .............
12-13
6.8-6.11
Concerning Subcontractors,
Suppliers and Others;
Waiver of Rights ........ .................
13-14
6.12
Patent Fees and Royalties.... ................
14
6.13
Permits...................._..-....................14
6,14
Laws and Regulations,, ......................
14
6.15
Taxes ...........................................
14-I5
6.16
'Use of Premises ................................
15
6.17
Site Cleanliness ................................
IS
6.18
Safe Structural Loading.....................15
6.19
Record Documents.-..._......................15
6.20
Safety and Protection ......... ...... _....
15-16
6.21
Safety Representative....,_..................16
6.22
Hazard Communication Programs,..,.,
16
6.23
Emergencies....... ........ .....................
16
6.24
Shop Drawings and Samples ..............
16
6.25
Submittal Proceedures; CON-
TRACTOR's Review Prior
to Shop Drawing or Sample
Submittal
16
6.26
Shop Drawing & Sample Submit-
tals Review by ENGINEER_ ....
16-17
6.27
Responsibility for Variations
From Contract Documents ............
17
6.28
Related Work Performed Prior
to ENGfNEER's Review and
Approval of Required
Submittals..............:....................17
6.29
Continuing the Work,,,,,,,,,,,,,,,
l7
6.30
CONTRACTOR's General
Warranty and Guarantee .... ,........
-_17
6.31-6.33
Indemnification..........................
17-18
6.34
Survival of Obligations ...................
IS
7. OTI(ER WORK.................................................18
7.1-7.3
Related Work at Site. . ......................
18
7.4
Coordination........................18
S. OWNER'S RESPONSIBH..ITIF.S ..........................1
S
8-1
Communications to CON-
TRACTOR
IS
8.2
Replacement of EINGIIvEER...........IS
8.3
Furnish Data andPay Promptly
WhenDue..................................18
8.4
Lands and Easements; Reports
and'rests-__._._....................18-19
8.5
Insurance.......................................19
8.6
Change Orders ...............................
19
8.7
Inspections, Tests and
Approvals...................................19
8.8
Stop or Suspend Work;
-Terminate CONTRAC'I'OR's
Services ...................................19
8.9
Limitations on OWNER'S
Responsibilities . ... ........... *............19
8.10
Asbestos, PCBs, Petroleum,
Hazardous Waste or
Radioactive Material
19
8. I 1
Evidence of Financul
Arrangements ....,.... I...................19
9. ENGINEER'S STATUS DURING
CONSTRUCTION............:................................19
9,I
OWNER's Representative ...............
19
9.2
Visits to Site..................................19
9.3
Project Representative. ................
19-21
9.4
Clarifications and Interpre-
tations.........................................21
9.5
Authorized Variations in 11brk........21
E1CDC UTNEF-AL CONDITIONS 1910 •S (1990 EDITION)
w/ CITY OF FORT COLLINS MODIFICATI6NS (RF,V 9/99)
Article or Paragraph Page Article or Paragraph Page
Number&'title Number Number: -"title Number
9.6
Rejecting Defective Work ............
......'1
13.8-13.9
Uncovering XVorkatLNGI-
9.7-9.9
Shop Drawings, Change Orders
NEERs Request .....................27-28
and Payments.....................................21
13.10
OWNER Ma} Stop the. Work...........28
9.10
Determinations for Unit Prices
21-22
1111
Correction or Removal of
9.11-9.12
Decisions on Disputes; ENGI-
Defective Work ...........................28
NEER as Initial Interpreter,,,,,,.....,„22
13.12
Correction Period ...........................28
9.13
Limitations on ENGINEERS
13.13.
Acceptance ofDefeclive Work ..........28
Authority and Responsibilities.,,.
22-23
13.14
OWNER May Correct Defective
Work .....................................
2 8 -2 9
CHANGES I
T THE WORK...:..:........_.,.....,.....,.,,,,...23
IRl
OWNER's Ordered Change................^3
14. PAYM} NI'S TO CONfRAC-I.OR AND
10.2
Claim for Adjustment ........................
23
COMPLETION
........................ ..........................
9
103
Work Not Required by Contract
14.1
Schedule of Values ........................29
Documents...................................23
142
Application for Progress
10.4
Change Orders., .... ........ 1 .........
23
Payment ............. .............
10.5
Notification of Surety ........
_. 23
14.3
CONfRACTOR's Warranty of
Title
29
CHANGE OF CON'I'RACI' PRICE ............................
.
. 23
14.4-14.7
Review of Applications for
1 Ll-1 L3
Contract Price; Claim for
Progress Paymients„-„-„.......„
29-30
Adjustment; Value of
14.8-14.9
Substantial Completion......_ ,,_,
30
the Work. ................ ...... ........
14.10
Partial Utilization, ......... ........ ....
3i1-31
11 A
Cost of the Work ...........................2a
25
14.11
Final Inspection ...........................
..31
11.3
Exclusions to Cost of the Work ............
25
14.12
Final Application for Payment,..,-,,,31
11.6
CONTRACTOR's Fee
25
14.13-14.14 Final Payment and Acceptance...,
.,31
11.7
Cost Records.....................5-26
-
14.15
Waiver of Claims,,..„..,-,.„.,...,..31-32
11.8
Cash Allowances ................................
26
11.9
Unit Price Work................................26
15. SUSPENSION OF WORK AND
TERMINATION ..................:.............................
32
CI -I %.Ni GE OF CONTRACT TWIES..........................
. y6
15.1
OWNER May Suspend Work -,..-,,,,,32
12.1
Claim for Adjustment_.....................'6
15.2-15.4
OWNER May Terminate....___......_32
12.2
Time of the Essence ............:.............
_6
15.5
CONTRACTOR May Stop
12.3
Delays Beyond CONTRACTOR's
Work or Terminate,,,,,,,,,,,,,,,,,
32-33
Control
26-27
12.4
Delays Beyond OWWF.R's and
16. DISPUTE. RF.,SOLIMON..................................
33
CONTRACTOR's Control .................
27
TESTS AND INSPECTIONS; CORRECTION
REMOVAL OR ACCEP.1.ANCE OF
DEFEC77DE WORK
27
13.1
Notice of Defects...............................27
13:2
Access to the Work ..,_.,...,,.._,,,.,,......')7
13.3
Tests and Inspections;
CONTRACTOR's Cooperation,-.......27
13.4
OWNER's Responsibilities:
Independent Testing Laboratory .,,,,,27
13.5
CO\)'TRACTOR's
Responsibilities...............................27
1:3.6-13.7
Covering Work Prior to Inspec-
tion. Testing or Approval...............„?7
17, MISCELLANEOUS
33
17.1 GivingNotice ................ .:..............
33
17.2 Computation of Times............_......33
17.3 Notice of Claim ...........................
33
.....
17.4 Cumulative Remedies ......................
33
17.5 Professional Fees and Court
Costs Included .............-----.-_.._,-,33
17.6 Applicable State Laws ...............
33-34
Intentionally left blank.......................................35
EXHIBIT GC -A: (Optional)
Dispute Resolution Agreement .....................
GC -AI
161-16.6 Arbitration
(.(;-AI
16.7 Mediation
GC-AI
E1CDC: GE•NLRAL CONDITIONS 1910-8 (1990 EDITION)
te/ G1TY OF FORT COLUM MODIFICATIONS (REV 9199)
INDEX TO GENERAL, CONDITIONS
City of Fort Collins modifications to the General Conditions of the Construction Contract are not shown in this index
Article or Paragraph
Number
Acceptance of --
Bonds and insurance
5.14
defective Work„.........................10.4.1,
13.5, 13.13
Final payment........................................9.12,
14.15
insurance
5.14
other Work, by CONTRACTOR ............._._,...
7.3
Substitutes and "Or -Equal" Items.....................6.7.1
Work by OWNER .... .................
.........:2.5, 6.30, 6.34
Access to the --
Lands, OWNER andCONTRACI'OR
responsi bi li ties .............................................
4.1
site, related Work_... .....................
.............. 7.2
Work, ..........................................13.2.
13.14, 14.9
Acts or Omissions--, Acts and Omissions--
CONTRACTOR..,,..„...........................6.9.1,
9.13.3
ENGINEER ...............................
...6.20, 9.13.3
OWNER............_ .....................................
6.20. 8.9
Addenda--definitionof(also see
definition of Specifications) .......
(1.6. 1.10, 6.19), 1.1
Additional Property Insurances ................................
5.7
Adjustm ents--
Contract Price or Contract
Times., .......... ... 11 .... 1.5,
3.5. 4.1. 4.3.2, 4.5.2.
_ _......................... 4.5.3, 9.4, 9.5, 10.2-10.4,
................................. I., .....
11, 12, 14.8, 15.1
progress schedule........._ ..................................
6.6
Agreement --
definition of ...................... ..........
I ......... I ............ 1 2
"All -Risk" Insurance, policy form .........................
._ i.6.2
Allowances, Cash....................................................11.8
Amendinc Contract Documents ................................
3.5
Amendment, Written --
in general.................LM 1.45,
3.5, 5.10, 5.12, 6.6.2
.....................ti,8.2, 6.19, 10.1, 10.4, 11.2
....
12.1, 13.12.2, 14.7.2
Appeal, OWNER or CONTRACTOR
intent to ........................... 9.10, 9.11, 10.4, 16.2, 16.5
Application for Payment—
definition of......................................................1.3
ENGINF.F.R's Responsibility ..............................
9.9
final payment,.. ........ _.... 9.I3A, 9.13.5, 14.12-14.15
in general.......... I...............2.8,
2.9, 5.6.4, 9.10, 15.5
progress payment......................................14.1-14.7
review of................................................:.14.4-14.7
Arbitration ......................................................
16.1-16.6
Asbestos --
claims pursuant thereto ... ..............
..._,,...4.5.2, 4.5.3
CONTRACTOR authorized to stop Work „..........5.2
definition of.
Article or Paragraph
Number
OWNER responsibility for,..,.. I.......................4.5.1,
8.10
possible price and times change ........................4.5
2
Authorized Variations in Work..... .....
3.6. 6.25. 6.27, 9.5
Availability of Lands ........................ :
................. 4.1, 8.4
Award, Notice of --defined, ........................
11 ........... 11.25
Before Starting Construction...............................).5-2.8
Bid --definition of........................1.5
(1.1, 1.10, 2.3, 3.3,
_.................. 4.2.6.4, 6.13, 11.4.3, 11,9.1)
Bidding Docurents-definition
of_............................_......,1.6(6.8.2)
Bidding Requirements --definition
of ............... I ...... I ................
...1.7 (1.1, 4.2.6.2)
Bonds --
acceptance of,..,. . ..........................
............... _.-S.14
additional Bonds..............„...,,,._,..,-.-.,,10.5,
11.4.5.9
Cost of the Work,. ......................
................... 11.5.4
definition of .............................:.........................1.8
delivery of....................................................2.1,
5.1
Final Application for Payment.__.. ....
....... 14.12-14.14
general......................................1.10,
5.1-5.3, 5.13,
9.13. 10.5. 14.7.6
Performance, Payment and Other .......
............ 5.1-5.2
Bonds and Insurance --in general.................................5
Builder's risk "all-risk" policy form .........................5.6.2
Cancellation Provisions, Insurance_..__.;
5.4.11, 5.8. 5.15
Cash Allowaances .....................................................
11.8
Certificate of Substantial Completion .........
1.38, 6.30.2.3,
14.8, 14.10
Certificates of Inspection .................._9.13.4,
13.5, 14.12
Certificates of Insurance --- -......... 2.7,
5.3. 5.4,11, 5.4.13,
...................... .5.6.5, 5.8,
5.14, 9.13.4, 14.12
Change in Contract Price --
Cash Allowances, ................... ..........................
11.8
claim for price
adjustment.............4.1, 4.2.6,
4.5, 5.15, 6.8.2, 9.4
.... _,._...--- .----- .5, 9.11, 10
2, 10.5, 11.2. 13.9.
........................13.13, 13.14,
14.7, 15.1, 15.5
CONTRACTOR's fee .........................................11.6
Cost of the Work
general... ................. ............................
11.4-1 13
Exclusions to..............................................a
1.5
Cost Records.....................................
................ 11.7
in general .............. 1,19, 1.44, 9,11, 10.4.2, 10.4.3, 11
Lump Sum Pricing..........................................11.3.2
Notification of Surety_ .......................
I .........
Scope of ................... ........... ........
......... ...... 10.3-10.4
Testing and Inspection,
Uncovering the Work ..................................
13.9
E1CDC GENERAL CONDITIONS 1910.5 (1990 EDITION)
wl CITY OF FORT COM.M1 MODIFICATION'S (REV 9/99)
Unit Price Work 11.9
Article or Paragraph
Number
Value of Work_ .......................
........ ...... j 1.3
Change. in Contract `dimes --
Claim for times adjustment .........
4.1, 4.2.6, 4.5, 5.15.
6.3.2. 9A. 9.5. 9.11.
10.2, 10.5. 12.1.
..............13.9, 13.13, 13.14,
14.7, 15.1, 15.5
Contractual time limitsI'2?
Delays beyond CONTRACTOR's
control................................................
_..... 122.3
Delays beyond OWNF.R's and
CONTRAc`rows control ....................._.....12.4
Notification of surety.... .......................
............ 110.5
Scope ofchange.......... .......................
.......10.3-16.4
Change Orders --
Acceptance ofDzfective Work.....
......... __ -------- 13.1.3
Amending Contract Documents ..........................
3.5
Cash Allowances...............................................
11.5
Change of Contract Price-- .........
........ .......
Change of Contract Times,,,,,,,,,,,,,,,,,,,,,,,,,,,
.12
Changes in theWork.................................
.....
CONIRAcTOR's fee., ........... I .............
............ 11.6
Cost of the Work .......................................
11.4-11.7
Cost Records..........._.......................................11:7
definition of.......................................................1.9
emergencies.....................................................0.23
ENGINEERs responsibility......_
9.9, 10.4, 11.21 12.1
execution of ...............................................:.......
1o.4
Indemnifictioq ....................... 6.12, 6.16, 6.31-6.33
Insurance; Bonds and ............... ..........10,
5.13, 10.5
OWNER may terminate .... .....................
....15.2-15.4
OWNER'S Responsibility ............................
S.6. 10.4
Physical Conditions --
Subsurface and..............................................4.2
Underground Facilities--............................4.3.2
Record Documents...........................................6.19
Scope of Change .........................
............... 10.3-10.4
Substitutes... ......... ..................
....... 6.7.3, 6.5.2
Unit Price Work ...............................................
l 1.9
value of Work, covered by .... I ............................
113
Changes in the Work.... ........ .....................................10
Notification of surety
10.5
OWNER's and CONTRACTOR's
responsibilities............................................10.4
Right to an adjustment......................................10.2
Scope of change.. . ........ ............................
10.3-10.4
Claims --
against CONTRACTOR... .... ...............
............ 6.16
against ENGInMER.........................................
6.32
against OWNER. ........ ...................
......... _6.32
Change of Contract Price,, ........................A,
11.2
Change of Contract Times ........................9A,
12.1
CONTRACTOR's---------- _-.4, 7.1,
9.4, 9.5, 9.11, 10.2,
..........................11.2, 11.9,
12.1, 13.9, 14.S,
15.1. 15.5. 17.3
CONTRAGI'Ms Fee 11.6
r`Vticle or Paragraph
Number
CONTRACTOR's liability ,,,,,,,,.„5.4, 6,12, 6.16, 6.31
Cost of the Work ...............
l 1.4, 11,5
Decisions on Disputes ................ ...............
9,11-, 9.12
Dispute Resolution,,,,,,,,,,,,,,,,,,,*........................
j6.1
Dispute Resolution Agreement ....................16.1-16.6
ENGINEER as initial interpreter .......................9.11
Lump Sum Pricing .........................................
11.3.2
Notice of
I T3
OWNFR's................... 9.4, 9.5, 9.11,
10?, 11.2, 11.9
........................12.1. 13.9, 13.13.
13.14, 17.3
OIINER's liability.. I ... 11 .... I .... I ... - I -
. ....... 1.1-1.....5.5
OWNER may refuse to make payment,,,,,..,.„14.7
Professional Fees and Court Costs
Included ..... ......... .........................
......... 17.5
request for formal decision on............................9.11
Substitute Items
6.T1-2
Time Extension., ..... .11 ... I .........................
I ......... 12.1
Time requirements....................................9.1
I, 12.1
Unit Price Work..........................._................11.9.3
Valueof...........................................................1,13
Waiver of --on Final Payment„..............14.14,
14,15
Work Change Directive .......................:.............
10.2
written notice required ......................9.11,
11.2. 12.1
Clarifications and Interpretations.,,,,,,,,_„
3.6.3, 9.4, 9.11
CleanSite...........................................................
6.17
Codes of'rechnical Society, Organization
or Association. . ..................................................
3.3.3
Commencement of ContractTimes.-....-.__
...............?3
Communications --
general ...........:....... ............... ............
6.2, 6.9.2. 8.1
Hazard Communication Programs ......................0.22
Completion --
Final Application for Payment .........................14.12
Final Inspection..............................................14.11
Final Payment and Acceptance...............14.13-14.14
Partial Utilization ;14.10
Substantial Completion....., ... I ............
1.38, 14.5-14.9
Waiver of Claims............................................14.15
Computation of Times...............................1
T2.1-17.22
Concerning Subcontractors, Suppliers
and Others.................................................6.M.I
I
Conferences --
initially acceptable schedules..... .... .....................
2.9
prcconstructioli..................................................
2: S
Conflict, Error, Ambiguity, Discrepancy --
CONTRACTOR to Report ..........................25,
3.3.2
Construction, before starting by
'CONfRAGI'OR............................................2.5
�.7
Construction Machinery, Equipment, etc,.,,
.... .........6.4
Continuing the Work......................................6.29,
10.4
Contract Documents--
Amending...........................................................
.5
Bonds..........I.......................
5.1
EJCDC GENERAL CONDITIONS 1910-3 (1990 EDITION)
w! CITY OF FORT COLUNS MODIFICATIONS 1RF.V 9199)
Cash Allowances 11.9
Article or Paragraph
Number
Change of Contract Pricq ....... ............. ..............
11
Change of Contract .................
12
Changes in the Work ........ .......................
I U.4-10.5
check and verifv
2.5
Clarifications and
Interpretations ............ ............. 3.2, 3.6,
9.4, 9.11
definition of ....................... .........
... 1.10
ENGINEER as initial interpreter of.., ...........
I .... 9.11
ENGINEER as OWNER's representative ..............
9.1
general]l
Insurance
5.3
Intent
minor variations in the Work_ ........
.... 3.6
Okk INERs responsibility to furnish data ...............8.3
OWINFIR's responsibility to make
Prompt payment ..........................8.3, 14.4.
14.13
precedence ..............................................1.3.1,
33.3
Record Documents ............................................6.19
Reference to Standards and Specifications
of Technical Societies
3.3
Related Work
7.2
Reporting and Resolving Discrepancie
_22.5, 3.3
Reuseof . ......... ........................ .......................
3.7
Supplementing, .................................. ..............
16
Termination of ENGINEER's Employment...,
...... 8.,)
Unit Price Work .................................I..............11.9
variations .............. 3.6,
......... **"* ............ *
'
6.23, 6.27
:
Visits to Site, E.NGINUR's ........ .................
U
Contract Price --
adjustment of ... _ ........... 3.5. 4. L 9.4. 10.3.
11.2-11.3
Changeof ..........................................................
j I
Decision on Disputes ........................................9.11
definition of
1.11
Contract Time-s--
adjustment of ........................... 3.5. 4.1, 9.4. 10.3. 12
Change of ................................................
12.1-12.4
Commencement of.. . ............ ................
2.3
definition of
12
CONTRACTOR -
Acceptance of Insurance ...................................
5,14
Communications
6.12. 6.9.2
Continue Work .... *** .................................
j6.29. 10.4
oo crdination and scheduling ............................6.9.2
definition of .....................................................1.13
Limited Reliance on Technical
Data Authorized .........................................
4.2.2
May Stop Work or Terminate......................I.....1.5.5
provide site access to other-, .......................
7.2, 13.2
Safety and Protection... ...............33. 1 - 2, 6.16, 6. 18,
............................. * ........ 6.21-6.23,
7.2, 13,2
Shop Drawing and Sample Review
Prior to Submittal
6.25
Stop Work requirements ..................................4.5.2
CON URACTOR'sm-
Article or Paragraph
Number
Compensation ............... ___ ... .......
11.1-11.2
Continuing Obligation .....................................
14.15
Deftctive Work ............. .................. 9.6. 13.10-13.14
Duty to correct defective Work ......... .................
13.11
Duty to Report --
Changes in the Work caused by
Emergency ........................ ...................
6.23
Defect- in Work of Others
7.3
Differing conditions.......,._ . .......
... 4.2.3
Discrepancy in Documents........ 2. 5, 13.2, 6. 14.2
Underground Facilities not indicated ...........
4.3.2
Emergencies .......... ...... ....................
..... 6.23
Equipment and Machinery Rental, Cost
of the Work
11.4.5.3
Fee --Cost PILL 0-4.5-6, 11.5.1,
11.6
General Warrantv and Guarantee .......................
6-30
Hazard Communication Programs, .............
....... 6.22
Indemnification ............ 1'), 6,16,
6.31-6,33
........... * ..............
Inspection of the Work- " "
7.3, 13.4
:
Labor, Materials and Equipment .....................
6.3-6.5
Laws and Regulations, Compliance by ..............
6.14.1
Liability Insurance ....... ............. .......... I .............
5.4
Notice of Intent to Appeal..._ ...................
9.M 10.4
obligation to perform and complete
theWork ....................................................6.30
Patent Fees and Royalties, paid for by,,,,,,,,,,,,,,,,
G. 12
Performance and Other Bonds
.............
5.1
Permits, obtained and paid for by',,,,,,,,,,,,,,,,
6.13 .......
Progress Schedule,,,,,,,,,,,,,,,,, ........ ,2.6. 2.8. 2.9. 6.67
.......................................6.29. 10.4, 15.2.1
Request for formal decisionon disputes ...............
9A 1
Responsibilities --
Changes in the Work ...................................
10.1
Concerning Subcontractors. Suppliers
and Others
6.8-6.11
Continuing the Work ..........................6.29,
104
CONTRACTOR's expense ............................
6.7.1
CONTRACTORs General Warranty
and Guarantee,..,_,,,, _ ....... ...........
6.30
CONTRACTOR!s review prior to Shop
Drawing or Sample submittal ............
Coordination of Work.., .............................
69.2
Emergencies ...............................................
c .23
ENGINTEERs evaluation, Substitutes
or "Or -Equal" Items .............................6.7.3
For Acts and Omissions
of Others ......................... _.6.9.1-6.9.2, 9.13
for deductible amounts,insurance., .....
I ... 1.1.5.9
general ........................................6, 7.2,
73, 8.9
Hazardous Communication Programs--...
-.6. 2 2
Indemnification
6.31-6.33
vii rJCDC GENERAL com)rnONS 1910-8 (1990 EDITION)
wl CITY OF FORT COLUNISMODIFICATTONS (REV 9/99)
Labor, Materials and Equipment ............. CONTRACTORS --other .... ,...... ................................... 7
Laws and Regulations...:....._...............:.......6.14 Contractual Liability Insurance 5.4.10
Liability Insurance,.,,.,,,. ........ 5.4 Contractual Time Limits,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,122
Article or Paragraph
Number
Notice of variation from Contract
Documents .................... .....................
6.27
Patent Fees and Roy.a.lties
1..............................
6.12
Permits .......................................................6.13
Progress Schedule, ..... .........
.. 6.6
Record Documents .......................................
6.19
related Work performed prior to
ENGINEER's approval of required
subm ittals.............................................
6.25
safe structural loading.................................6.18
Safety and Protection,,.._..............6.20,
T2, 13.2
Safety Representative........__.................„-_.,6.21
Scheduling the Work ................ ..................
6.9.'
Shop Drawings and Samples,,,,,,,,,,,,,,,,,,,,,,,
6.24
Shop Drawings and Samples Review
by ENGINEER......................................6.26
Site Cleanliness ........
6.17
Submittal Procedures ...................................
6.25
Substitute Construction Methods
and Procedures......:.........._......,.......,..:6.72
Substitutes and "Or -Equal" Items...... ..........
6. 7.1
Superintendence .... . ..............................I
........6•
Supervision ..................... ..................6.1
Survival of Obligations................................6.34
Taxes
15
'tests and Inspections........-_ --------- -.......
...... 13.5
ToReport.. ............... ........... ......... ...........
_2. 5
Use of Premises ...................... 6.16-6.1b• 6.30.2.4
Review Prior to Shop Drawing or
Sample Submittal.
0.25
Right to adjustment or.chan.g.e.s„i•n the Worlti.„.,10.2
right to claim ............. 4, 7.1, 9A, 9.5, 9.11,
10.2,11.2,
11.9. 12.1. 119, 14.8. 15.1,
15. 5, 17.3
Safety and Protection,,,,,,,,,,,,,,,,,, 6.20-6.22, 7.2, 13.2
Safety Representative .......................................
6.21
Shop Drawings and Samples Submittals .....
6.24'-62S
Special Consultants ...... ....... .._..........._.__....,.11.4.4
Substitute Construction Methods and Procedures 6.7
Substitutes and "Or -Equal" Items,
Expense..........................................6.7.1,
6.7.2
Subcontractors, Suppliers and Others,,,,,,.,,
6.5-6.11
Supervision and Superintendence ......... 6.1,
0.2, 6.21
Taxes. Payment.by......... ......... ..........................
6.15
Use of Premises ...................„.,,,,.„.-.,-..._.
0.16-6.13
Warranties and guarantees......._................6.5,
6.30
Warranty of-1-itle..............................................
14.3
Written Notice Required --
CONTRACTOR stop Work or term inate........
15.5
Reports of Differing Subsurface
and Physical Conditions .......................
4.2.3
Substantial Completion ........... .....................14.8
viii
Article or Paragraph
Num ber
Coordination--
CONI'RACTOR's responsibility .......................6.9.2
Copies of Documents ...............................................
22
Correction Period.,...................................:.......:....13.
L
Correction, Removal or Acceptance
of Defective Work--
in general ,,,..,,._.•,,. „10.4.1,
...................
13.10-13,14
Acceptance ofDeJective Work .............
.............1.3.13
Correction or Removal of
Defective Work ......... ........... ....... :.....6.30,
13.11
Correction Period ........................ I. I.................13.12
OWNF",R May Correct Defective Work..
,..., ,..,„ 13,14
OWNER May Stop Work .........................
I ....... 13.10
Cost --
of Tests and Inspections ................ I...............,....13.4
Records 11.7
Cost of the Work --
Bonds and insurance, additional ...................)1.4.5.9
Cash Discounts..............................................11.4?
CONTRACfOR'q Fee
I L6
Employee Expenses,,,.„ ..............................a
1.4.5.1
Exclusions to.......:.....:.........................:.....::....:.1
1.5
G eneraI 11.4-11.5
Nome office and overhead expenses ....................11.5
Losses and damages.....................................11.4.5.6
Materials and equipment... ...................
--------- 11. 4. 2
Minor expenses ...........................................
1 1.4.5.8
Payroll costs on changes.................................11.4.1
performed by Subcontractors,,,,,,,,,,,,,;,,,,,,,,,1-1-4.3
Records 11.7
Rentals of construction equipment
and machinery .......................................
11A.53
Royalty payments. permits and
license fees ............................„-.„..-,..,.„
11.4.5.5
Site office and temporaryFicilities,,,,,,,,,,11.4.5.2
Special Consultants, CONTRACTOR's........
_... j1.4.4
Supplemental ...._........ .................... _..............11.4.5
'faxes related to the Work„..........................11.4.5.4
Tests and Inspection..........................................13.4
Trade Discounts, ........................... ................
* 11.4.2 .
Utilities, fuel and sanitary facillties..............11.4.5.7
Work after regular hours...............................
..11.4.1
Covering Work............................................13.6-13.7
Cumulative Remedies ..............__....._.-_,,,_...,.
„17.4-17.5
Cutting, fitting and patching: ....... ......... ......
... 7.2
Data, to be furnished by OWNER ...........................
8.3
Day --definition of .... ................. ..................
.......... 17.')
Decisions on Disputes,,,,,,.....* ..............*.........
9.11, 9.12
defective --definition of, ................ ........
--------- -.1. 14
defective Work --
Acceptance of....., .... ...........
10.4.1. 13.13
E1CDC GENERAL CONDITIONS 1910-5 (1990 EDfr10N)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/99)
SECTION 00020
INVITATION TO BID
Date: September 15, 2009
Sealed Bids will be received by the City of Fort Collins (hereinafter referred
to as OWNER), at the office of the Purchasing Division, 3:00 P.M., our clock,
on October 6, 2009, for the Poudre Trail Rehabilitation - Junction and ELS;
BID NO. 7076. If delivered, they are to be delivered to 215 North Mason
Street, 2nd Floor, Fort Collins, Colorado, 80524. If mailed, the mailing
address is P. 0. Box 580, Fort Collins, CO 80522-0580.
At said place and time, and promptly thereafter, all Bids that have been duly
received will be publicly opened and read aloud.
The Contract Documents provide for the construction of Bid 7076 Poudre Trail
Rehabilitation - Junction and ELS. The contract documents provide for
construction including removal of existing asphalt, new 10' wide concrete
trail, minor earthwork, traffic control, erosion control, culvert, landscape
restoration, seeding and surveying. The project has two sections; one at the
junction of the Poudre River Trail and the Spring Creek Trail, and the other
section at the CSU Environmental Learning Center..
All Bids must be in accordance with the Contract Documents on file with The
City of Fort Collins, 215 North Mason St., 2nd floor, Fort Collins, Colorado
80524.
Contract Documents will be available September 15, 2009.
A prebid conference and job walk with representatives of prospective Bidders
will be held at 10:00 a.m., on September 24, 2009, at 215 N. Mason, Conference
Room 2A, Fort Collins.
Prospective Bidders are invited to present their questions relative to this
Bid proposal at this meeting.
The Contract Documents and Construction Drawings may be examined online at:
• City of Fort Collins BuySpeed: https://secure2.fcgov.com/bso/login.js
Bids will be received as set forth in the Bidding Documents.
The Work is expected to be commenced within the time as required by Section
2.3 of General Conditions. Substantial Completion of the Work is required as
specified in the Agreement.
Rev10/20/07 Section 00020 Page 1
Correction or Removal of. .......... ......... ... 10.4.1, 13.11
Correction Period 13.12
in general.........................................13, 14.7. 14.11
Article or Paragraph
Number
Observation by ENGINEER ................................
9.2
OWNER May StopWozk.................................13.10
Prompt Notice of Delects.................................1.13.1
Rejecting.......:.............:.....................................9.6
Uncovering the Work.......................................13.5
Definitions ................................................................
1
Delays......................................4.1, 6.29, 12.3-12.4
Delivery ofBonds .....................................................2.1
Delivery of certificates of insurance. ...........................
2.7
Determinations for Unit Prices ........................
...... , 9.10
Differing Subsurface or Physical Conditions--
Noticeof.........................................................4.2.3
F.,NGTNF.ER's Review......................................4.2.4
Possible Contract Documents Change ...............
4.2.5
Possible Price and Times Adjustments..............4.2.6
Discrepancies -Reporting
and Resolving................................2.5, 3.3.2,
6.14,2
Dispute Resolution—
Agreemcnt................................................16.1-16:6
Arbitration .................................................
16.1-16.5
genera116
lediation........................................................16.6
Dispute Resolution Agreement .................. .......
16, I-16.6
Disputes, Decisions by ENGLNF..ER............. .....9.11-9.12
Documents --
Copies of ... ._
Record 6.19
Reuseof............................................................
3.7
Drawings --definition of...........................................1.15
Easements ................... ..........................................
1.1
Effective date of Agreement -- definition of,,,,,,,,,,,,,,
l.16
Emergencies ........................... .......................
........ 6, 23
ENGINEER --
as initial interpreter on disputes,,,,,,,,,,,,,,,,
9.11-9.12
definition of
J.,17
Limitations on authority and responsibilitics...... 9,13
Replacement of ..................................................
3.2
Resident Project Representative .......... ...........I.._.9.3
ENGINEER's Consultant -- definition ot,,,,,•,,,,.,...,,.1.18
ENGDTEER's--
authority and responsibility, limitations on ......... 9.13
ize Authord Variations in the Work915
Change Orders, responsibility for. ....... 9.7, 10, 11, 12
Clarifications and Interpretations ...............3.6.3,
9.4
Decisions on Disp"utes....... .........................
9.11-9.12
defective Work, notice of•.,.,.„ ...........................13.1
Evaluation of Substitute Items,,,,,,,,,,,,,,,,,,,,,
,,, , 6.7.3
Liability ..................................................
6.32, 9.12
Notice Work is Acceptable ............. ...........
...._.14.13
Observations...........................................6
30.2, 9.2
OWNER's Representative - --- - ----------- ------- -- ------ -9.1
Payments to the CONTRACTOR,
Responsibilityfor.. ...... ....... 9.9. 14
Recommendation of Payment...., ............... 14A, 14.13
Article or Paragraph
Number
Responsibilities --Limitations on..................
9.11-9.13
Review of Reports on Differing Subsurface
and Physical Conditions .............................
4.2.4
Shop Drawings and Samples, review
responsibility ..............................................
6.26
Status During Cmstruction--
authorized variations in the Work. . ................
9.5
Clarifications and Interpretations. •,••,,,
.9.4
Decisions on Disputes.,...... I................9,
t 1-9.12
Determinations on Unit Price, ......................
9.10
ENGINEER as Initial Interpreter._ ........
9.11-9.12
ENi GINF.F.R's Responsibilities ................9.1-9.12
Limitations on ENGINF.,ER's Authority
and Responsibilities ............. I................9.13
MA NER's Representative ..............................
9.1
Project Representative ................... ................
9.3
Rejecting Defective Work ..............................
9.6
Shop Drawings, Change Orders
and Payments ......... ...........................
9.7-9.9
Visits to Site ..................................................
9.2
Unit Price determinations ...........:......................
9.10
Visits to Site.......................................................9.2
Written consent required .............................
T2, 9.1
Equipment, Labor, Materials and ........................6i.3-6.5
Equipment rental, Cast of the. Work --- .--- .-__.,..-,_
11.4.5.3
Equivalent Materials and Equipment.__„_.I...............
6.7
error or omissions..................................................6.33
Evidence of Financial Arrangements...... ........
........ 81 1
'Explorations of physical conditions .......................
A2.1
Fee, CONTRACTOR's--Costs Plus ...........................11.6
Field Order --
definition of.....................................................1.19
issued by ENGINEER ................................
3.6.1E 9.5
Final Application for Payment..............................14.12
Final Inspection., .................................. ..........
_.. 14.11
Final Payment --
And Acceptance .... .................. _............14.13-14.14
Prior to, for cash allov�ances...............................11.8
General Provisions..........................................17.3-17.4
General Requirements --
definition of.....................................................1.20
principal references to, ... .......... 2.6, 6.4,
6:6-6.7, 6,24
Giving Notice.........................................................17.1
Guarantee of INfork--by CONTRACTOR........
6.30. 14:12
Hazard Communication Programs ............. I
...... I ...... .22
Hazardous Waste --
definition of, ..................................................1.21
general ................................
4.5
OWNER's responsibility for ..............................?
lt)
Lx EJCDC GENERAL CONDITIONS 1910.8 (1990 EDITION)
w/ CITY OF FORT COLONS MODIFICATIONS (RFV 9199)
Indemnification ........... ........ ..........
6.1? 6.16, 6.31-6-33
Initially Acceptable Schedules,,,,;,
,
Inspection --
Certificates of
:..............................9.13.4,
13.5, 14.12
Final...........................................................14.11
Article or Paragraph
Number
Special, required byENGI EER.........................9.6
Tests and Approval ............................ 8.7, 13.3-13.4
Insurance --
Acceptance of, by OWNF.R...............................5.14
Additional, required by changes
in the Work ..... ......... .... .......... .......... ......11.4.5:9
Before:starting the Work„...................................23
Bonds -and --in general..........:...............................15
Cancellation Provisions......, ........................
- .... 1.5.8
Certificates of ........ ..........17, 5, 5.3, 5A.1
I, 5.4.13,
......I................6.5, 5.8, 5.14, 9.13.4,
14.12
completed operations ..... .... ..........................
...5.4.13
CONTRACTOR's Liability..................................5.
F
CONTRACTORS objection to coverage,,,,,,,,,,
5.14
Contractual Liability......................................5.4.
U)
deductible amounts, CONIRACTOR's
responsibility................................................5.9
Final Application for Payment .........................14.12
Licensed Insurers .............. ...............................
5.3
.
Notice requirements, material change4,,,,,,,,5.8,
10.5
Option to Replace ..... ......... ......................_.......5.14
other special insurances,,,,,,,,,,,,,,,, ...................
.5.10
OWNER as fiduciary for insureds ..............
5.12-5.13
iability.................._.....-........--
OWNF R's Liability_ ........ ......... ..... . ---
- - -----5.5
W ONER's Responsibility.... .................................8.5
Partial Utilization, Property Insurance ...........
_,5.15
Property....................................... . .............5.6-5.10
Receipt and Application of Insurance
Proceeds ..............................................
5.12-5.13
Special Insurance ...... ....... ................................
5.10
Waiver of Rights., ............................................5.11
Intent of Contract Documents
3.1-3.4
Interpretations and Clarification 5.................I...
3.6:3, 9.4
Investigations of physical conditions ...............
I........., 4.2
Labor, Materials and Equipment ............... ..........
(..ands --
and Easements ..........................
..8.4
Availability of.............................................1.1,
8.4
Reports and Tests ................ ...... .....................
....F:4
Laws and Regulations --Laws or Regulations--
Bonds
5.1-5.2
Changes in the Work.........................................10.4
Contract Documents,
....__...3.1
COi PI'RACTOR's Responsihi I ities .....................6.1
3
Correction Period,cIefectrve Work„.................13.12
Cost of the Work, taxes ...............................
11.4.5.4
definition of ......... .................................
........1.^_2
general6.14
Indemniticatioq_......................._.......... _.
6.31-6.33
Insurance........................_..........:......................5.3
Precedence...... ... _ ...... ; .............. .......
-.3.1, 3.3.3
Reference to .....................................................
3.3.1
Safety and Protection, ... ...........................
6.20, 13.2
Subcontractors, Suppliers and Others ...........
6.8-6.11
Article or Paragraph
Number
Tests and Inspections...................................13.5
Use of Premises ................................................
6.16
Visitsto Site... ........... ._......................................
9.2
Liability Insurance--
CONT R ACTO R's ................., .............................
5.4
OW N E R's:..........................................................5.
5
Licensed Sureties and Insurers., .......... - .........
5.3.
Liens --
Application for Progress Payment14.2
CONTRACTOR's Warranty of'I'itle ., ,.
14.3
Final Application for Payment .........................14,12
definition of
.......................................................
1.23
.
Waiver of Claims .................:..........................
WAS
Limitations on ENTGNEER's authority and
responsibilities............ .... -• - ..... .............9.13
Limited Reliance by CONTRACTOR
Authorized ........................................................
4.2.2
Maintenance and Operating %,Innuals--
Final Application for Payment„.......................14.12
Manuals (of others) --
Precedence.... _...... _............. _.......................i.3.3.1
Reference to in Contract Documents ..................3.3.1
Materials and equipment --
furnished by CONTRAC'1'01Z............................_
6.3
not incorporated in Work...................................14.2
Materials or equipment --equivalent ...............I...........6.7
Mediation (Optional)..............................................16.7
Milestones --definition of
..........................................
1.24
Miscellaneous --
Computation offimcs................ .......................17.2
Cumulative Remedies .........:..............................
17.4
Giving Notice....................................................17.1
Notice of Claim ..................................................
17.3
Professional Fees and Court Costs Include¢17.5
Multi -prime contracts ............... ....... ........... ...I ......
.... ., 7
Not Shown or Indicated
4.3.2
Notice of --
Acceptability of Project,,,,,,,,,,,,, ....:.................
.14.13
A%vard, definition of.........................................1.25
Claim... .................... ........I.............17.3
...............
Defects,13, l
Differing Subsurface or Physical Conditions .......
4.23
Giving............................................................17.1
Tests and Inspections........................................13.3
Variation. Shop Drawing and Sample,,,,,,,.,,,.„.,G 27
Notice to Proceed --
definition of......................................................I.26
givingof............................................................2 3
E1CDC. GENERAL CONDITIONS 1910-5 (1990 EDITION)
wl CITY OF FORT COLLINS N1ODIFICAII6NS (RF.V 9199)
Notification to Surety..............................................10.5
Observations, by FNGINE.Ell—...... .._._:,
........... 6.30, 9.2
Occupancy of the Work,,,,,,,,,,,,,,,,,,,
5.15, 6.30.2.4. 14.10
Omissions or acts by CONTRACTOR...............6.9, 9.13
Open Peril policy form, Insurance......
. ......... ......... -.6.2
Option to Replace...................................................5.14
Article or Paragraph
Number
"Or Equal" Items ...................... .......................
6.7
I........
Other work 7
Overtime Work --Prohibition of ...........
6.3
OWNER --
Acceptance ofdefective Work,,,,,,,,,,,,,,,,,,,,,,,,,,
13,13
appoint -an ENGINEER_ ........ ...........................
8.2
as fiduciary ....................... ........................
5..12-5.13
Availability of Lands, responsibility ....................
4.1
definition of ......................................... ..........1.27
data, furnish ..............
....8.3
May Correct Defective Work...........................1.3.14
vlay refuse to make pa}miens.............................14.7
May Stop the Work....... I ......................... ....
.. ..1310
May Suspend Work,
Terminate ...........................8.8, 13.10,
15.1-15A
Payment, make prompt ............. .........U, 14.4,
14.13
performance of other work ..................................
7.1
permits and licenses, requirements
6,13
purchased insurance requirements ...........
... 5.6-5.10
OI.VNER's--
Acceptance of the Work...............................6.30.2.5
Change Orders, obligation to execute,,,,,,,,,,
8.6, 10.4
Communications
8.1
Coordination of.the Work
7.4
Disputes, request for decision ............................9.
I I
Inspections, tests and approvals.................8.7.
13.4
Liability Insurance
5 5
Notice of Defects.................:........................„„13.1
Representative --During Construction,
ENGINEER's Status ......................................
9.1
Responsibilities --
Asbestos, PCBs, Petroleum, Hazardous
Waste or Radioactive Material .................
8.10
Change Orders..............................................8.6
Changes in the Work._.........................._....10.1
communications
8.1
CONTRACTOR's responsibilities .................
8.9
evidence of financial arrangements... ............
8.11
inspections, tests and approvals ...........
........... 8-7
insurance .......................................................
8.5
lands and easements ......................................
8.4
prompt payment by........................................8.3
replacement of ENGINEER ...........................8.2
reports and tests.... ........... I ...... I ..... I .............
8.4
stop or suspend Work;,,,,,,,,,,,,,,,,, b.8, 13.10,.
15.1
terminate CONTRACTOR's
services .....................................
8.8, 15.2
separate representative at site..............................9.3
testing, independent ............. _.......................... 13.4
use or occupancy
of the Work. 5. I5. 6.30.2.4. 14.10
written consent or approval
required.........................................9.1, 6.3, 11.4
Xi E1CDC GLNER.AI. CONDITIONS 1910.8 (1990 EDMON)
wJ CITY OF FORT COLI,INS \CODIFICATIONS (REV 9/49)
Article or Paragraph
Num her
written notice required ........................7.1,
9.4, 9.1 I,
.................................. l 1.2, I L9, 14.7, 15.4
PCBs --
definition of .... ......... ...... .........................
....... -3.29
..... 4. ;
OWNEWs responsibility for ............................
.5.10
Partial Utilization --
definition of......................................................1.28
genera16.30.2.4, 14,10
Property Insurance ..........................................
..5.15
Patent Fees and Royalties ........................................
.1'2
Payment Bonds ..................................................
........
Payments, Recommendation of, .............
14.4-14.7, 14.13
Payments to CONTRACTOR and Completion
—
Application for ProgressPnyments ......................14.2
CONTRACTOR's Warranty of T itle ...........
_......14.3
Final Application for Payment..... I...................14.12
Final Inspection_, ... ............... _ ......
..... __ ...... 14.11
Final Payment and Acceptance ................
14.13-14.14
general........................................................
5.3, 14
Partial Utilization
14.10
Reta i n age..........................................................14.2
Review of Applications for
Progress Payments ...............................
14.4-14. 7
prompt payment... ................................................5.3
Schedule of Values....
.........................................
14.1
Substantial Completion...............................14.8-14.9
Waiver of Claims ............................................)
4' 15
when payments due ................................
14.4, 14.13
withholding paymcnt................. .......
.............. .,14.7
Performance Bonds ............ ................................?
1-S 2
Permits............................................................6.13
Petroleum --
definition of......................................................1.30
general..............................................................4.5
OWNER's responsibility for...............................8.10.
Physical Conditions --
Drawings of, in or relating to ......................„
4.2.12
F.NGINEER's review......,.., ...........................
.... 4.2.4
existing structures.,..._ ....:............ ...................4.2.2
general 42.1.2 ....... . ......................
Notice of Differing Subsurface or.... ..............
... 4.2.3
Possible Contract Documents Change
I ................
4.25
Possible Price and Times Adjustments,,,,,,,,,,,,,,
4.2.6
Reports and Drawings......................................4.2
1
Subsu rface and,..., _...............
.....:1.2
Subsurface Conditions
4.2.1,1
Technical Data, Limited Reliance by
CONTRACTOR Authorized ..........
4.2.2
Underground Facilities —
general........................................................4.3
Not Shown or Indicted..............................a.3
2
Protection of.........................................4.3,
6.20
Article or Paragraph
Num her
Shown or Indicated ..............................:.................
1.3.1
Technical Data__... ...... ...............
........... 4. 22
Reconstruction Conference.................................2.8
Preliminary Matters
2
Prelim inary Schedules ..............................................
2.6
Premises. Use of ...... ........ ...... ........I .........
I .... ,. 6.16-6.18
Price, Change of Contract, .... 11.1 .......
I I ... — .........
Price, Contract --definition o.f„.......... ..........
I ....... ....
Progress Payment, Applications for_..............._.......14.2
Progress Payment--retainago.... ...............................
14.2
Progress schedule, CONTRACTOR'S............
2.6, 2.8, 2.9,
................................ 6.6.6.29. 10.4. 15.2.1
Project --definition or.... ...
.................. 1.31
Project Representative--
GNGINEER's Status During Construction ............. 9.3
Project 12cpreseniafivc, Resident --definition
of .... ,.... 1.33
prompt payment by OWNF,R.....................................8.3
Property Insurance--
Additional........:...............................:................?.7
general5.6-5.10
Partial Utilization................................5.15,
14.10.2.
receipt and application of proceeds ...
......... 5.12-5,13
Protection, Safety and.. . ................. .........
6.20-6.21, 13.2
Punch list
14.11
Radioactive Miterial--
defintion of ...................:.....:......:....:..:............1.32
genera14.5
OWNER's responsibility for....„..„.,.,,,,...„•.,•.,•,$:10
„ Recommendation of Payment,....,._,•.•...14.4,
14.5, 14.13
Record Documents... ....... ..............................
& 19, 14.12
Records, procedures for maintaining„........................2.8
Reference Points ................ ................ I...
I..................4.4
Reference to Standards and Specifications
of Technical Societies.........................................3.3
Regulations, Laws and(or)......................................
6.14
Rejecting Defective Work..........................................9.6
Related Work --
atSite ......................... ...................
............ 7.1-7.3
Performed prior to Shop Drawings
and Samples submittals review ....................6.28
Remedies; cumulative.*....,.__,,..1.......,-_„__....17.4,
17.5
Removal or Correction ofDefective Work
..... .........13.11
rental agreements, OWNER approval required, .... 11.4.5.3
replacement of ENGINEER. by OWNER ............
....... S.2
Reporting and Resolving
Discrepancies................................15,
3.3.2, 6.14.2
Reports --
and Drawings.................................................p2.1
and Tests. OWNER's responsibility .....................8.4
Resident and Project Representative --
definition of.......................................:.............1.33
provisionfor ................. ....................... :.................... .3
xii LJCDC GENERAL CONDrrIONS.1910.8 (1990 L'.DITION)
w/ Cf TY OF FORT COLLINS \IODIFICA -nONS (REV 9/W)
Article or paragraph
Number
Resident Superintendent, CONTRACTOR's............... 6.2
Responsibilities --
CONTRACTOR s-in general .................................. 6
ENGINEER's-in general........................................9
Limitations on
9.13
..................
OWNERS -in general.............................................8
Retainage....................................
1.4?
Reuse of Docunients
3:7
Review by CONCRACTOR: Shop Drawings
and Samples Prior to Submittal ..........................6.25
Review of.Applications for
Progress Payments .... ........... ....................
..14.4-14.7
Right to an adjustment..........................................10.2
Rightsof Way ... ..................................
_...................4.1
Royalties, Pa[ent Fees and,,,,,,,,,,,,,,,,,;,,
I................. 6.12
Safe Structural Loading..........................................6.18
Safety --
and Protection...............................4.3.2,
6.16, 6.18,
................ I ...... ......... ...--- 6.20-6.21,
7.2. 13.2
general....................................................
........
Representative, CONTRACTOR's......................6.21
Samples --
definition of......................................................1.34
general ....................................................
6.24-6.28
Review by CONTRACTOR ...............................
6:25
Review by ENGIiNTEER..............................6.26,
6.27
related Work.....................................................U.23
submittal of
6.24.2
submittal procedures ................................
.........6.25
Schedule of progress.............................2.6,
2.8-2.9. 6.6.
.........................................6,29,
10.4, 15.2.1
Schedule of Shop Drawing and Sample
Submittals., .............................2.6,
2.8-2.9, 6.24-6.2S
Schedule of Values .,.._,._.-.,.._........__2.6,
2.8-2.9, 14.1
Schedules --
Adherence to .................................................15.2.1
Adjusting....... ....................................................
6-6
Change of Contract Times.................................10.4
Initially Acceptable .... ................... ................
2.8, 2.9
Preliminary ...................................
Scope of Changes ..... ....... ...............
............ 10.3-10.4
Subsurface Conditions,,,,,,,,,,,,,,,,,,,,,,:...._.,-.........
.2.1.1
Shop Drawings --
and Samples, general.................................6.24-6.28
Change Orders & Applications for
Payments, and ........ ............ ......
............... 9.7-9.9
definition of......................................................1.35
F..NGIN6ER's approval of.................................3.6.2
ENGINEERS responsibility
for review .....................................
9.7, 6.24-6.28
related Work......_........_ .................
.._..............4.28
review procedures................................2.8,
6.24-6.28
Article or Paragraph
Number
submittal required ........ .......................................
Submittal Procedures
use to approve substitutions ... ................. ...__._.6.7.3
Shown or Indicated .................................................
4.3.1
Site Access......................................................7.2.
13.2
Site Cleanliness....
....................................................
6.17
Site, Visits to --
by ENGNEER................I..........................9.2.
13.2
by others
13.2
"special causes of loss" policy form,
insurunea........................................................5.6.2
definition of.........................................:...........1.36
Specifications—
defination of .................................................1.36
of'I'cchnical Societies, reference to., .................
3.3.1
precedence ................................................
I .....3. 3.3
Standards and Specifications
of Technical Societies ....... ...•.............................
3:3
Starting Construction, Before :................ I ..............
2._5-2.8
Starting the Work ...................... ....................
.......... :.4
Stop or Suspend Work --
by CONTRACTOR...........................................15.5
by OWNER.....................................8.9, 13.10,
15.1
Storage of materials and equipment.................._41,
7.2
Structural Loading, Safety........................................6.18
Subcontractor --
Concerning, ...............................................
6.8-6.11
definition of.....................................................L37
delays
12.3
waiver of rights......:.........................................6.
11
Subcontractors --in
Subcontracts --required provisions.....,,,,6.11, 6.11,
11.4.3
Submittals --
Applications for Payment.................................14.2
Maintenance and Operation Manuals...............14.12
Procedures.......................................................6.
25
Progress Schedules......................................2.6.
2.9
Samples ............................ ....................6.24-6
28
Schedule of Values.....................................-1.6,
14.1
Schedule of Shop Drawings and Samples
Submissions., ... ............ .... I .... -2.6,
2.8-2.9
Shop Drawings ............... ...................... ....
6.24-6.25
Substantial Completion—
certification of... .............. ........ 6.30.23,
14.8-14.9
definition of.............................................:.......1.38
Substitute Construction Methods or Procedures........(),
7.2
Substitutes and "Or Equal" Items
..............................
6.7
.
CONTRACTOR's Expense...........................6.7.1.3
ENGINEER's Evaluation
..................... ............
6.7.3
"Or -Equal" ...................................................
6.7.1.1
Substitute Construction Methods
GJCD . GENERAL CONIJrnONS 1910.5 (1990 EDITION)
w/ CITY OF FORT COLLINS MODIFICATIONS 1RF.V 94)
Article or Paragraph
Number
or Procedures ..............................................
6.7.2
Substitute Items... ...... ...... .....................
4T 1.2
Subsurface and Physical Conditions --
Drawings of,. in or relatng to ........................
4.2.1.2
ENGrntEER's Review .......................................
4.2.4
general, .............................................................
4...2
Limited Reliance by CONTRACTOR
Authorized
4.2.2
Notice of Differing Subsurface or
Physical Conditions .............. ...........................4.2.3
Physical Conditions
4.2.1.2
Possible Contract Documents Change...............4.2.5
Possible Price andTimes Adjustments.._,
.......... 4.2.6
Reports and Drawings.._..................................4,2.1
Subsurface and
4.2
Subsurface Conditions at the Sitz
3.2.1.1
Technical Data
................:..................................
4.22
Supervision—
CONTRACTOR's responsibility,,,,,,,,,,,,,,,,,,,6,
l
OWNER shall not supervise...............................8.9
ENGIiNrEER shall not supervise ................
9.2, 9.13 2
Superintendence......................................................6.2
Superintendent, CONTRACTOR's resident., .......
...... 6.2
Supplemental costs...............................................11.4.5
Supplementary Conditions--
dc6nition of . ..........................................
........... 1:39
principal references to................1.10, 1,18,
2.2, 2.7,
....4.2, 4.3, 5.1, 5.3,
5.4, 5.6-5:9,
........ I ....... S.1 I, 6.8, 6.13, 7.4, 8.11,
9.3, 9.10
Supplementing Contract Documents .........................3.6
Supplier—
definition of ....................................... I ......
I ....... 1-40
principal references to ........... 3.7, 6.5, 6.8-6.11, 6.20,
.............. ............_..........6.24,
9.13, 14.12
Waiver of Rights...............................................6.11
Surety—
consentto final payment ........................14.12,
14.14
F.NGMER has no duty to...............................9.13
Notiticationof...................._..,....._,.10.1,
10.5, 15.2
qualification of . ........................... ...... .......
:... 5.1-5.3
Survival of Obligations,,,,,.,,.................................6.34
Suspend Work, OWNER May .......................13.10,
15.1
Suspension of Work and Termination- :.....................15
CONTRACTOR Nfay Stop Work.
orTerminate...............................................15.5
OWNER May Suspend Work........... ...................I5.1
OkV ER May Terminate........... I ... ..............
15.2-15.4
Taxes --Payment by CONTRACTOR..........................
6-15
Technical Data --
Limited Reliance by CONTRACTOR................:4,2.2
Possible Price and Times Adjustment* ... _
--- _.,--4.2.6
Reports of Differing Subsurface and
Physical Conditions.........................I..........4.2.3
xiv
Temporary construction facilities____,__, ............. ,„-_,4,1
Article, or Paragraph
Number
Termination --
by CONTRACTOR ................-- ......................
l5.5
by OWNER........................................K.R,
15.1-15.4
of ENGINEER's employment..............................18
2
Suspension of Work-in general..,, .................
.... 15
Terms and Adjectives..............................................3.4
Tests and Inspections --
Access to the Work, by others,,,_,,,,,,,,,,,,,,,,,,,,,
13.2
CONI'RACTOR's responsibilities .......................13.5
cost of 13.4
covering Work prior to,,,,,,,,, ,,,,,,,,,,,,t3.6-13.7
Laws and Regulations(or), .......... _ ...................
13.5
Notice of Defects...............................................13.1
OWAtER May Stop Work... _: ...... ...................
...13.10
OWNER's independent testing ........................„
13.4
special, required by ENGINEER ..........................
9.6
timely notice required ......... ..................
............ 13.4
Uncovering the Work, at ENGIN&ER's
request_ _ ................... _ .. _ .............. ,
..... 13.8-13.9
Times—
Adjusti ng..........................................................
6.6
Change of Contract.............................................12
Computation of................................................17.2
Contract Times --definition of ;1.12
day..........................................................
7.2.2
b4ilcstones ...........................................................
12
Requirements --
appeals..... :...:.................... ...._............
9.10, 16
clarifications,
claims and disputes .................. 9.11.
11.2. 1'_
Commencement of Contract Times?.3
Preconstruction Conference.,,,,,,,,,,,,,,,,,;2.8
schedules .........................................
2.6, 2.9, 6.6
Starting the Work..........................................2.4
Title, Warranty of ....._. ....................
....................
....14.3
Uncovering Work ..........13.8-13.9
...............................
Underground Facilities, Physical Conditions --
definition of ....:...............................................
1.41
Not Shown or Indicated..._-.,
4.3.2
protection of .......................... .:_.............,-i.3,
6.20
Shown or Indicated, ......... .....................
........ 4.3.1
Unit Price Work --
claims ....:.................
1,1.9.3
definition of ......................................................1,42
generall1.9, 14.1, 14.5
Unit Prices—
genera I11.3.1
Determination for,,,,,,,, .
9.1U
Use of Premises ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,6.16, 6.18,
6.30.2.4
Utility owners ,,,,,,,,,,,,,,,,,,,,,,,,,,,,6:13, 6.20, 7.1-7.3, 13.2
Utilization, Partial .................. _1:28, i.15, 6.30.2.4. 14.10
Value of the Work....................................................11.3
Values, Schedule of..............................�2.6. 2.8-2.9, 14.1
EJCDC: GENLRAL CONDITIONS.1910.8 (1990 EDITION)
w! CITY OF FORT COLLINS MODIFICATIONS (RF.V 9/99)
Variations in Work --Minor
Authorized .... ....... __ .......... ....... _ .... 6,25, 6.27, 9.5
Article or Paragraph
Number
Visits to Site --by ENGINEER ..... I ..............................
9.2
Waiver of Claims --on Final Payment ..........
...... 14,15
Waiver of Right% by insured parties ..................
5. 11, 6.11
Warranty and Guarantee. General --by
CONTRACTOR......6.30
................ 11 .........
11, .........
Warranty of Title, CONTRACTORS ........................14.3
Work --
Access to ................. * .................... .........
..... 112
by others ..................... * ............. * .........................
7
Changesin the ....................................................1.0
Continuing the .................................................
6.29
CONTRACTOR IMay Stop Work
or Terminate. � ......... ...... ..................
15.5
Coordination of....................................
---------- ... 7.4
Cost of the
11.4-11.5
definition of ............... ..............................
1.43
neglected by CONTRACTOR ... : ...................
.... 1.3.14
other Work
7
OWNER May Stop Work ..... ...........................
13.10
OWNER May Suspend Work ...................13.10,
15.1
Related, Work at Site ........... I .........................
7.1-7.3
Starting the .........................................................2.4
2.4
Stopping by CONTRACTOR .................
........... 15.5
Stopping by OWNER .... ............................
15.1-15.4
Variation and deviation authorized, minof ........... 3.6
Work Change Directive --
claims pursuant to .............................
............ 10.2
definition of
1.44
principal references to .............. .........
3.5.3, 10.1-10.2
Written Amendment—
definition of ........................................
........ .... 1.45
principal references to ............... 1. 10,
3.5, 5.10,15.12'
........................¢.6.2, 6.3.2,
6.19, 10.1. 10.4.
1 1.2, 111,
13.12-2, 14.7.2
Written Clarifications and
Interpretations ...... I ... I ... I ....................
3.6.19.4. 9.11
Written Notice Required —
by CONTRACTOR .............................
7.1, 9.10-9.11,
10-4, 11.2. 12.1
by OWNER .............. 10-9.11,
10.4, 11.2, 13.14
'IV
EICDC. G -'E NERAL coNi)rriONS 1910-3 (1990 EDITION
wl CITY OF FORT COLLINS MODIFICATIONS (REV 91W)
(This page left blank intentionally)
` %i E1CDC GENERAL CONDITIONS 1910 •S (1990 L:DITION)
w/ CITY OF FORT COLLINS MODIFICATIONS (REV 9/9V.)
GENERAL CONDITIONS
ARTICLE 1--DEFLNITIONS
Wherever used in these General Conditions or in the other
Contract Documents the following terms have the
meanings indicated which are applicable to both the
singular and plural thereof:
1.1. 4ddenda--Written or graphic instruments issued
prior to the opening of Bids which clarify. correct or
change the Bidding Requirements or the Contract
Documents,
I.1. Agreement —The written contract between OWNER
and CONTRACTOR covering the Work to be performed;
other Contract Documents are attached to the Agreement
and made a part thereof as provided therein.
1.3. Application for Ygvment- f he ti rm accepted by
ENGINEER which is to be used by CONTRACTOR in
requesting progress or final payments and which is to he
accompanicA by such supporting documentation as is
required by the Contract Documents.
1.4. 4sbestos--Any material that contains more than one
percent asbestos and is friable or is releasing asbestos fibers
into the air above current action levels established by the
United States Occupational Safety and Health
Administration.
1.5. But—Thc offer or proposal of the bidder submitted
on the prescribed font setting firth the prices for the Work
to he performed.
1.61 Bidding Doctonents—The advertisement or
invitation to Bid, instructions to bidders, the Bid form, and
the proposed Contract Doemmnents (including all Addenda
issued prior to receipt of Bids).
1.7. Bidding Requirements --The advertisement or
invitation to Bid, instructions to bidders, and the Bid form.
L8. Bonds —Performance and Payment bonds and other
instruments of security.
1.9. Change Order —A document recommended by
ENGft\TM,R, which is signed by CONTRACTOR and
OWNER and authorizes an addition, deletion or revision in
the Work, or an adjustment in the Contract Price or the
Contract Times, issued on or after the Effective Date of the
Agreement
L10. Contract Documents —The Agreement, Addenda
(which pertain to the Contract Documents),
CONfRACTOR's Bid (including documentation
accompanying the Bid and any post Bid documentation
submitted prior to the Notice of Award) when attached as
an exhibit to the Agreement, the Notice to Procced, the
Bonds. these General Conditions, the Supplementary
Conditions, the Specifications and the Drawings as the
EXI)COENEM cONDmONS 1910-8 (1990 E(itim)
w/ CITY OF FORT' COLLINS \IOUIIICA'I'IONS (REV 4l1000)
saute are more specifically identified in the Agreement,
together with all Written Amendments, Change Orders,
Work Change Directives, Field Orders and ENGINEER%
written interpretations and clarifications issued pursuant to
paragraphs3.5. 3.6.1 and 3.6.3 on or after the Effective
Date of the Agreement. Shop Drawing submittals
approved pursuant to paragraphs 6.26 and 6.27 and the
reports and drawings referred to in paragraphs 4.2.1 and
4.2.2 are not Contract Documents.
1.11. Contract Price —The motleys payable by
OWNER to CONTRACTOR for completion of the Work
in accordance with the Contract Documents as stated in
the Agreement (subject to the provisions of
paragraph 11.9.1 in the case of Unit Price Work),
1.12. Contract Tines —The numbers of days or the
dates stated in the Agreement: (i) to achieve Substantial
Completion, and (ii) to complete the Work so that it is
ready for final payment as evidenced by ENGINHER's
written recommendation of final payment in accordance
with paragraph 14.13.
1.13. COMRAC'I'OR—The person, tint or corporation
with whom (.')WNER has entered into the Agreement
1,14. defective —An adjective which when modifying
the word Work refers to Work that is unsatisfactory, faulty
or deficient in that it does not conform to the Contract
Documents, or does not meet the requirements of any
inspection reference standard, test or approval referred to
in the Contract laocumcnts, or has been damaged prior to
ENGINEER's recommendation of final payment (unless
responsibility for the protection thereof has been assumed
by OWNER at Substantial Completion in accordance with
paragraph 14.8 or 14,10).
1.15. Drawings --The drawings which show the scope,
extent and character of the Work to be furnished and
performed by CONTRACTOR and which have been
prepared or approved by ENGP LEER and are referred to
in the Contract Documers. Shop drawings are not
Drawings as so defined
L16. Effective Date of the agreement -The date
indicated in the Agreement on which it becomes effective;
but if no such date is indicated it means the date on which
the Agreement is signed and delivered by the last of the
two parties to sign and deliver.
1.17. EMG1AlER—The person, firm or corporation
named as such in the Agreement.
L18. ENGhNEER's Consroltant--A person. firm or
corporation having a contract with ENGINEER to furnish
services as ENGLNTEER's independent professional
associate or consultant with respect to the Project and who
is identified as such in the Supplementary Conditions.
1.19. Fie&i Order —A written order issued by
ENGINEER which orders minor changes in the Work in
accordance with Paragraph 9.5 but which does not involve
a change in the Contract Price or the Contract Times.
1 20. General Requirements —Sections of Division I of
the Specifications.
121, Hazardous A,'ante—The term Hazardous Waste shall
have the meaning provided in Section 1004 of the Solid
Waste Disposal Act (42 USC Section 6903) as amended
from time to time.
L22:a. Laas and Regtdatioru; Latta or Regrdations--Any
and all applicable laws, rules, regulations. ordinances,
codes and orders of any and all governmental bodies,
agencies, authorities and courts having jurisdiction.
1 22.b. Legal Holidays--shall be those holidays observed
by the City of Fort Collins.
1.23. Liens —Liens, charges, security interests or
encumbrances upon real property or personal property.
124. Milestone --A principal event specified in the
Contract Documents relating to an intermediate completion
date or time prior to Substantial Completion of all the
Work.
1.25. Notice of.gtvani—A written notice by OWNER to
the apparent successful bidder stating that upon compliance
by the apparent successful bidder with the conditions
precedent enumerated therein, within the time specified,
OWNER will sign and deliver the Agreement.
1.26. Alonee to Proceed -A written notice given by
OWNER to CONTRACTOR (_with a copy to ENGINEER)
fining the date on which the Contract Times will
commence to run and on which CONTRACTOR shall start
to. perform CONTRACTOR'S obligations under the
Contract Documents.
L27, 0111YER--The public body or authority.
corporation, association, firm or person with whom
CONTRACTOR has entered into the Agreement and for
whom the Work is to be provided
1.28. Partial Utilization -Use by OWNER of a
substantially completed part of the Work for the purpose
for which it is intended (or a related purpose) prior to
Substantial Completion of all.the Work.
1?9. PCBs —Polychlorinated biphenyls.
1.30, Peirolemur--Petroleum, including crude oil or any
fraction thereof which is liquid at standard conditions of
temperature and pressure (60 degrees Fahrenheit and
14.7 pounds per square inch absolute), such as oil,
petroleum, fuel oil, oil sludge, oil refuse, gasoline, kerosene
and oil mieed with other non -Hazardous Wastes and crude
oils:
1.31. Project —The total construction of which the Work
'to be provided under the Contract Documents may be the
whole, or a part as indicated elsewhere in the Contract
Documents
1.32.a. Radioactive Xiaterial—Source, special nuclear. or
byproduct material as defined by the Atomic Energy Act of
EJCDC GENERAL COND1110NS 1910- (1990 Editim)
at CITY OF FORT COLLINS (MODIFICATIONS (REV 4P-00()
1954 (42 USC Section 2011 et seq.) as ainended from
time to time.
1.32.b. Regular liforking Hours --Regular working hour
are defined as 7:00am to 6:00pm unless otherwise
specified in the General Requirements.
133_ Resident Project Representative —The authorized
representative of ENGrNT-ER who may be assigned to the
.site or any part thereof.
1.34. Samples —Physical examples of materials,
equipment, or workmanship that are representative of
some portion of the Work and which establish the
standards by which such portion of the Work will be
judged
1.35. Shop Dranings--AII drawings; diagrams,
illustrations, schedules and other carta or information
which are specifically prepared or assembled by or for
CONTRACTOR and submitted by CONTRACTOR to
illustrate some portion of the Work.
1.36. Specifications —Those portions of the Contract
Documents consisting of written technical descriptions of
materials, equipment, construction systems, standards and
workmanship as applied to the Work and certain
administrative details applicable thereto.
L37. Stdxontractor---An individual, Linn or corporation
having a direct contract with CONTRACTOR or with any
other Suhcontractor for the performance of a part of the
Work at the site.
1.33. Substantial Completion --The Work (or a
specified niter thereof) has progressed to the point where,
in the opinion of ENGiNFER as evidenced by
ENGINEER's definitive certificate of Substantial
Completion, it is sufficiently complete, in accordance with
the Contract Documents, so that the Work (or specified
part) can be utilized for dint purposes for which it is
intended, or if no such certificate is issued when the
Work is complete arcs ready for final payment as
evidenced by FNGfNF,F..R's written recommendation of
final payment in aeccudanee with paragraph 14.13. The
terms "substantially complete" and "substantially
completed" as applied to all or part of the Work refer to
Substantial Completion thereof:
1.39. Supplementary Conditions —The part, of the
Contract Documents which amends or supplements these
General Conditions.
1.40. Supplier —A manufacturer. fabricator, supplier,
distributor, materialman or vendor hiving a direct contract
with CONTRACTOR or 'with any Subcontractor to.
furnish materials or equipment to be incorporated in the
Work by CONTRACTOR or any Subcontractor.
1.41. Untlergrorard Facilities -:all pipelines, conduits,
ducts, cables, wires, manholes, vaults, tanks tunnels or
other such facilities or attachments, and any encasements
containing such facilities which have been installed
underground to fumish any of the following services or
The successful Bidder will be required to furnish a Performance Bond and a
Payment Bond guaranteeing faithful performance and the payment of all bills
and obligations arising from the performance of the Contract.
No Bid may be withdrawn within a period of forty-five (45) days after the date
fixed for opening Bids.
The OWNER reserves the right to reject any and all Bids, and to waive .any
informalities and irregularities therein.
Bid security in the amount of not less than 50 of the total Bid must accompany
each Bid in the form specified in the Instructions to Bidders.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City
Council, shall have a financial interest in the sale to the City of any real
or personal property, equipment, material, supplies or services where such
officer or employee exercises directly or indirectly any decision -making
authority concerning such sale or any supervisory authority over the services
to be rendered. This rule also applies to subcontracts with the City.
Soliciting or accepting any gift, gratuity favor, -entertainment, kickback or
any items of monetary value from any person who has or is seeking to do
business with the City of Fort Collins is prohibited
City of Fort Collins
By
James B. O'Neill, II, CPPO, FNIGP
Purchasing & Risk Management Director
Rev10/20/07 Section 00020 Page 2
J
materials: electricity, gases, steam, liquid petroleum
products, telephone or other communications, cable
television, sewage and drainage removal. traffic or other
control s+stems or water.
1.42, Unit Price Work Work to be paid for on the basis
Of unit prices.
1,43. fVoA---The entire completed construction or the
various separately identifiable parts thereof required to be
furnished under the Contract Documents. Work includes
and is the result of performing or furnishing labor and
furnishing and incorporating materials and equipment into
the construction, and performing or furnishing, services and
famishing documents, all as required by the Contract
Documents.
1.44. ifork. Change Directive —A written directive to
CONTRACTOR. issued on or after the Effective Date of
the Agreement and signed by OWNER and recommended
by ENTOMER ordering an addition. deletion or revision
in the Work, or responding to differing or unforeseen
physical condition under which the Work is to be
performed as provided in paragmph 4.2 or 4.3 or to
emergencies under paragraph 6.23. A Work Change
Directive will not change the Contract Price or the Contract
Times, but is evidence that the parties capect that the
change directed or documented by a Work Change
Directive will be incorporated in a subsequently issued
Change Order following negotiations by the parties as to its
effect, if any, on the Contract Price or Contract 'Times as
provided in paragraph 10.=.
1.45. Witten .anmmfinent—A written amendment of the
Contract Documents, signed by OWNER and
CONTRACTOR on or after the Effective Date of the
Agreement and normally dealing with flu nonengineering
or nontecluulihl rather than strictly construction -related
aspects of the Contract Documents.
ARTICLE 2—PRELL-NIIrN-ARY NLkTTERS
Delivery ofBondv:
2.1. When CONTRACTOR delivers the executed
Agreements; to OWNER, CONTRACTOR shall also
deliver to OWNER such Bonds as CONTRACTOR may
be required to furnish in accordance with paragraph 5.1.
Copies of Documents:
2.2 OIVNER shall furnish to CONTRACTOR up, to ten
copies (unless otherwise specified in the Supplementary
Conditions) of the Contract Documents as are reasonably
necessary for the execution of the Work. Additional copies
will be furnished upon request, at the cost of reproduction.
Commencement of Contract Times; Notice to Proceed-
2.3. The Contract Times will commence to non on the
thirtieth day after the Effective Date of the Agreement, or,
EJCDCGENERAL CONDITIOM 191U-8 (1990 EdtioO
a•/ CITY OI; FORT COLU NS.MODIFICATIONS tRL-V arz000y
if a Notice to Proceed is given, on the day indicated si the
Notice to Proceed. A Notice.to Proceed may be given at
any time within thirty days after the Effective Date of the
Agreement.
commence to Port iateF�thatrt#w -i' th-day-afterthe day
o€-Bid-opening-ix-the-thirtieth-day-a fter-the-Fffective-1)ate
of -the ,Agreement-whichtvrrdate-is-zttrlier-
Starting the Work:
14. CONTRACTOR shall start to perform the Work
on the date when the Contract Times commence to run,
but no Work shall be done at the site prior to the date on
which the Contract Times commence to run.
Before Starting CmLctruction:
2.5. Before undertaking each part of the Work,
CONff2ACfOR shall carefully study and compare. the
Contract Documents and check and verify pertinent
figures shown thereon and all applicable field
measurements. CON'TRAC1'OR shall promptly report in
writing to ENGINEER any conflict, error, ambiguity or
discrepancy which CONTRACTOR may discover and
shall obtain a written interpretation or clarification from
FNCr VEER bLtbre proceeding with an), Work affected
thereby; however, CONfRAUfOR shall not be liable to
OWNER or FNGINFr-,,R for failure to reportany conflict,
error, ambiguity or discrepancy in the Contract
Documents, unless CONTRACTOR knew or reasonably
should have known thereof.
2.6. Within ten days after the Etfective Date of the
Agreement (unless otherwise specified in the General
Requirements), CONTRACTOR shall submit to
ENGINEER for review:
2.6.1. a prel'uninary progress schedule indicating
the times (numbers of days or dates) for starting and
completing the various stages of the Work, including
any Milestones specified in the Contract Documents;
2.6.2. a preliniinuy schedule of Shop Drawing and
Sample submittals which will list each required
submittal and the times for submitting, reviewing and
processing such submittal;
2.6.2.1. In no case will a schedule be
acceptable which allows less than 21 calendar
cows for each review by Eneineer.
2.6.3. A preliminary schedule of values for all of
the Work which will include quantities and prices of
items aggregating the Contract Price and will
subdivide the Work into component parts in sufficient
detail to serve as the basis for progress payments
during construction Such prices will include an
appropriate amount of overhead and profit applicable
to each item of Work.
2.7. Before any Work at the site is started.
COYMAC'I'OR and E7LLNPR shall eaeh deliver to the
othef OWNER. with copies to
identified-411 the 9trpfilemetltA�,*endit4ons FNGINEX
certificates of insurance (and other evidence of insurance
Which-either-Of-thaI ddi4M* -inured-may
rcasably—request . requested by OWNER) which
CONTRACTOR -and (;AA WI R respcwtivelyttre is required
to purchase and maintain in accordance with
paragmpliq 5.4,-5:6-and 5->!.
Preconstruetion Conference:
2.8. Within twenty days after the Contract'Times start to
run, but before any Work at the site is started, a conference
attended by CONTRACTOR. ENGINEER and others as
appropriate will be held to establish a working
understanding among the parties as to the Work and to
discuss the schedules referred to in paragraph 2.6,
procedures for handling Shop Drawings and other
submittals processing Applications for Payment and
maintaining required records.
Initially Acceptable Schedules:
2.9. Unless otherwise provided in the Contract
Documents, at-leit-+ten-J---s-6eA9re quhmiiisqian of the fir
Application €el�aytttent ttefore. any work at the site begin
a conference attended by CONTRACTOR, ENGINEER
and others as apf ef)riate designated tell by OWNER. will be
held to review for acceptability to ENGINEER as provided
below the schedules submitted in accordance with
paragraph2.6. and Division I - General -Re irements.
CONTRACTOR shall have an additional ten days to make
corrections and adjustments and to complete and resubmit
the schedules. No progress payment shall be made to
CONTRACTOR until the schedules are submitted to and
acceptable to FNGINEFR as provided helow. The
progress schedule will be acceptable to ENGINEER as
providing an orderly progression of the Work to
completion within arty specified Milestones and the
Contract Times, but suchacceptance will neither impose on
ENGINEER responsibility for the sequencing scheduling
or progress of the Work nor interfere with or relieve
CONTRACTOR from CONTRACTOR's full
responsibility therefor. CONTRAC'TOR's schedule of
Shop Drawing and Sample submissions will be acceptable
to ENGINEER as providing a workable arrangement for
reviewing and processing the required submittals
CONTRACTOR's schedule of values will be acceptable to
ENC VEER as to form and substance.
ARTICLE 3-CONTRACT DOCUNIUNTS: TtVTV ENT,
AMENDLNG, REUSE
Intent:
3.1. The Contract Documents comprise the entire
agreement between OWNER and CONTRACTOR
concerning the Work. The Contract Documents arc
complementary: what is called for by one is as binding as if
called for by all. The Contract Documents will be
construed in accordance with the law of the place of the
Project.
3.2. It is the intent of the Contract Documents to
EXI)C OENf RAL CONDI'n ONS 19 t 0-8 (1990 Editiai )
col CITY OF FORT COLLINS MODIFICATIONS (REV 4T2000)
describe a functionally complete Project (or tart thereof)
to be constructed in accordance with the Contract
Documents. Any Work, materials or equipment that may
reasonably be inferred from the Contract Documents or
from prevailing custom or trade usage as being required to
produce the intended result will be furnished and
performed whether or not specifically called for. When
words or phrases which Itave a well-known technical or
construction industry or trade meaning are used to
describe Work. materials or equipment, such words or
phrases shall be interpreted in accordance with that
meaning. Clarifications and interpretations of the Contract
Documents shall be issued by ENGINEER as provided in
paragraph 9.4.
3.3. Reference to Srandardr and Specifrcalions of
Technical Societies; Reporting and Resolving
Discrepancies:
3.3.1. Reference to standards, specifications,
manuals or codes of any technical society, organization
or tissocintion, or to the Laws or Regulations of any
governmental authority, whether such reference be
specific or by implication, shall mean the latest
standard, specification, manual, code or Laws or
Regulations in ctlect at the time of opening of Bids (or,
on the Effective Date of the Agreement if there were
no Bids), except as may be otherwise specifically
stated in the Contract Documents.
3.3.2. If, during the performance of the Work,
CONTRACTOR discovers any conflict, error,
ambiguity or discrepancy within the Contract
Documents or between the Contract Documents and
any provision of any such Law or Regulation
applicable to the performance of the Work or of any
such standard, specification, manual or code or of any
instruction of any Supplier referred to in paragraph 6.5.
CONTRACTOR shrill report it to ENI GINTEER in
writing at once, and, CONTRACTOR shall not
proceed with the Work affected thereby (except in an
emergency as authorized by paragraph 6.23) until an
amendment or supplement to the Contract Documents
has been issued by one of the methods indicated in
paragraph 3.5 or 3.6: provided however, that
CONTRACTOR shall not be Gable to OWNER or
ENGINEER for failure to report any such conflict,
error, ambiguity or discrepancy unless
CONTRACTOR knew or reasonably should have
known thereof.
3.3.3. Except as otherwise specifically stated in the
Contract Documents or tic may be provided by
amendment or supplement thereto issued by one of the
methods indicated in paragraph 3.5 or 3.6, the
provisions of the Contract Documents shall take
precedence in resolving any conflict, error, ambiguity
or discrepancy between the provisions of the Contract
Documents and:
3.3.3.1. the provisions of any such standard,
specification, manual, code or instruction (whether
or not specifically incorporated by reference in the
Contract Documents); or
3.3.3.2. the provisions of any such Laws or
Regulations applicable to the performance of the
Work (unless such an interpretation of the
provisions of the Contract Documents would result
in violation of such Law or Regulation).
own nsk.
No provision of any such standard, specification, manual,
code or instruction shall be effective to change the duties
and responsibilities of OWNER, CONTRACTOR or
ENGINEER, or any of their subcontractors, consultant%
agents or employees from those set forth in the Contract
Documents, nor shall it be effective to assign to OWNER,
FNiINFF..R or any of FNGINF.F.R's Consultant% agents or
employees any duty or authority to supervise or direct the
furnishing or per6rmance of the Work or any duty or
authority to undertake responsibility inconsistent with the
provisions of paragraph 9.13 or any other provision of the
Contract Documents.
3.4. Whenever in the Contract Documents the terms "as
ordered", "as directed", "as required", "as allowed", "as
approved" or terms of like effect or import are used, or the
adjectives "reasonable", "suitable", "acceptable", "proper"
or "satisfactory" or adjectives of like effect or import are
used to describe a requirement, direction, review or
judgment ofENGLNEER as to the Work, it is intended that
such requirement, direction, review or judgment will be
solely to evaluate, in general, the completed Work for
compliance with the requirements of and information in the
Contract Documents and conformance with the design
concept of the completed Project as a functioning whole m
shown or indicated in the Contract Documents (unless there
is a specific statement indicating otherwise). The use of
any such term or adjective shall not be effective to assign to
ENGINEER any duty or authority to supervise or direct the
furnishing or performance of the Work or any duty or
authority to undertake responsibility contrary to the
provisions of paragraph 9.13 or any other provision of the
Contract Documents.
Amens ing and Supplementing Contract Documents.
3.5. The Contract Documents may be amended to
provide for additions, deletions and revisions in the Work
or to modify the terns and conditions thereof in one or
more of the following ways:
3.5.1. a formal Written Amendment
3.5.2. a Change Order (pursuant to paragraph 10.4),
WCDC GENERAL CONDITIONS 1910-3 (1990 E(ition)
ed CITY OF FORT COLLI NS MODIFICA,nONS (REV 4Q000)
3.5.3. a Work Change Directive (pursuant to
Paragraph 10.I).
3.6. In addition, the requirements of the Contract
Documents may be supplemented, and minor variations
and deviations in the Work may be authori7.ed, in one or
more of the following ways:
3.6.1. A Field Order (pursuant to paragraph 9.5),
3.6.2. I NG NEFR's approval of a Shop Drawing or
Sample (pursuant to paragraphs 6.26 and 6.27), or
3.6.3. ENG11i IEER's written interpretation or
clarification (pursuant to paragraph 9.4).
Reuse of Documents.
3.7. CONTRACTOR, and any Subcontractor or
Supplier or other person or organisation performing or
furnishing any of the Work under a direct or indirect
contract with OWNER (i) shall not have or acquire any
title to or ownership rights in any of the Drawings,
Specifications or other documents (or copies of any
thereof) prepared by or hearing the seal of FNGiNEFR or
F.NGCNEER's Consultant, and (ii) shall not reuse any of
such Drawings, Specifidations, other documents or copies
on extensions of the Project or any other project without
written consent of OWl a'NrER and ENGINEER and specific
written verification or adaptation by ENGINEER.
ARTICLE 4-AVAILABILITY OF LAINMS;
SUIISURFACE AND PHYSICAL CONDITIONS;
REFERENCE POINTS
Availability of Lands.
4.1. OWNER sli all furnish, as indicated in the Contract
Documents, the lands upon which the Work is to be
performed, rights -of -way and easements for access
thereto, and such other lands which are designated for the
use of CONTRACTOR Upon -reasonable -written -request;
AV?o s1tall ftiish nvxSri R❑GTOc with it andct
statement-of-record-legal-title-and-legal-descript ion-ofthe
lands-upon-which-the-Wort-is-ic> be-performed-tmd
OWNER's-interesE-therein-as-nzc:essary-fir-Lev iar�-noticx
of-or-Ealing-a-mechanics=liaat-agaiatst-such-lands-in
H66&klanea with Hpplieabla Laws and Regulatiens
OWNER shall identity any encumbrances or restrictions
not of general application but specifically related to use of
lands so furnished with which CONTRACTOR will have
to comply in performing the Work. Easements for
permanent structures or permanent, changes in existing
facilities will be obtained and paid for by OWNER, unless
otherwise provided in the Contract Documents. If
CONTRACTOR and OWNER are unable to agree on
entitlement to or the amount or extent of any adjustments
in the Contract Price or the Contract Times as a result of
any delay in OWNER's furnishing these lands, rights -of -
way or easements. CONTRACTOR may make a claim
therefor as provided in Articles I and 12,
CONTRACTOR shell provide for all additional lands and
access thereto that may be required for temporary
construction facilities or storage of materials and
equipment.
4.2. Subsurface and Pkpsical Conditions:
4.2,1. Reports and Drtnrings: Reference is made to
the Supplementary Conditions for identification of:
42,1.1. Subsurface Coiuh ions: Those reports of
explorations and tests of subsurface conditions at or
contiguous to the site that have been utilized by
ENGINEER in preparing the Contract Documents;
and
4.2.t2. Physical avotions. 'Those drawings of
physical conditions in or relating to existing surface
or subsurface structures at or contiguous to the site
(except Underground Facilities) that have been.
utilized by ENGINEER in preparing the Contract
Documents.
4.2.2. Limited Relimtce by CONMICMRAuthoriaeck
Technical Data: CONTRACTOR may rely upon the
general accuracy of the "technical data" contained in such
reports and drawings, but such reports and drawings are not
Contract Documents. Such "technical data" is identified in
the Supplementary Conditions. Except for such reliance on
such "technical data", CONTRAC 1'OR, may not rely upon
or make any claim against OWNER, FNGINFFR or any of
ENGINEFR's Consultants with respect to:
4.2 2.1. the completeness of such reports and
drawings for CONTRACTOR's purposes,
including, but not limited to, any aspects of the
means, methods, techniques, sequences and
procedures of construction to be employed by
CONTRACTOR and safety precautions and
programs incident thereto, or
4.2.2.2. other data, interpretations, opinions
and information contained in such reports or shown
or indicated in such drawings, or
4.2.2.3. any CONTRACTOR interpretation of
or conclusion drown tram any "technical data" or
any such data, interpretations; opinions or
information.
4.2.3. A'oBce of Dif%rit,g Subsurface or Physical
Conditions. if CONTRACTOR believes that any
subsurface or physical condition at or contiguous to the site
that is uncovered or revealed either:
4.2.3.1. is of such a nature as to establish that
any "technicil data" on which CONTR\C'TOR is
entitled to rely as provided in paragraphs 4.2.1 and
4.2.2 is materially inaccurate. or
4.13.2. is of such a nature as to require a
change in the Contract Documents, or
4.2_3.1 differs materially from that shown or
EJCDC GENERAL CONDI •nom 19 t 0-8 (1990 Edition)
lv/ Cl'lY OF FORT COLLI N'3 MODIFICATIONS (RL:V -Ir OOO)
indicated in the Contract Documents, or
4.2.3.4. is of an unusual nature. and differs
materially from conditions ordinarily encountered
and generally recognized as inherent in work of
the character provided for in the Contract
Documents; then
CONTRACTOR shall, pFamptly immediately after
becoming aware thereof and before further disturbing
conditions affected thereby or performing any Work in
connection therewith (except in an emergency as
permitted by paragraph 6.23), notify OWNER and
ENGINEER in writing about such condition.
CONTRACTOR shall not further disturb such conditions
or pertarnt any Work in connection therewith (except as
aforesaid) until receipt of written order to do so.
4.2.4. E:NGINEER's Review. ENGINEER will
promptly review the pertinent conditions, determine the
necessity of OWNER's obtaining additional exploration or
tests with respect thereto and advise OWNER in writing
(with a copy to CONTRACTOR) of ENGINEER's
findings and conclusions.
4.2.5. Posvible Contract Dwu rents Change: If
ENGINEER concludes that a change in the Contract
Documents is required as a result of a condition that meets
one or more of the categories in paragraph 4.2.3, a Work
Change Directive or a Change Order will be issued as
provided in Article 10 to reflect and document the
consequences of such change.
4.2.6. Pocrible ['Pico and Times A#ustmenls: An
equitable adjustment in the Contract Price or in the
Contract Times, or both, will be allowed to the extent that
the existence of such uncovered or revealed condition
causes an increase or decrease in CONTR\CTOR's cost.
of, or time required for performance of the Work, subject,
however, to the following:
4.2.6.1. such condition must meet any one
more of the categories described
Paragraphs 4.2.3.1 through 4.2:3A, inclusive;
4.2.6.2. a change in the Contract Dex:uments
pursuant to paragraph 4.2.5 will not be an
automatic authorization of nor a condition
precedent to entitlement to any such adjustment;
4.2.6.1 with respect to Work that is paid for
on a Unit price Basis, any adjustment in Contract
Price will be subject to the provisions of
parajaphs 9: I0 and 11.9: and
4.2.6.4. CONTRACTOR shall not be entitled
to any adjustment in the Contract Price or Times
if;
4.2.6.4.1. CONTRACTOR knew of
the existence of such conditions at the
time CONTRACTOR made a final
commitment to OWMI ER in respect of
Contract Price and Contract Times by the
submission of a bid or becoming bound
under a negotiated contract; or
4.2.6.4.2. the existence of such
condition could reasonably have been
discovered or revealed as a result of any
erammalion, investigation, exploration,
test or study of the site and contiguous
areas required by the Bidding
Requirements or Contract Documents to be
conducted by or for CONTRACTOR prior
to CONTRACTOR's making such fatal
commitment, or
4.2.6,4.3. CONTRACTOR failed to
give the written notice within the time and
as required by paragraph 4.2.3.
If OWNER and CONTRACTOR are unable to agree on
entitlement to or as to the amount or length of anv such
equitable adjustment in the Contract Price or Contract
Times, a claim.may be made therefor as provided in
Articles i i and 12. However, OWNER, FNGiNF.ER and
ENGINFFR's Consultamg shall not be liable to
CONTRACTOR for any claims, costs, losses or damages
sustained by CONTRACTOR on or in connection with any
other project or anticipated project
4.3. Physical Conditions —Underground Facilities.
4.3.1. .Shosoi or 1ndcate& The information and data
shown or indicated in the Contract Documents with
respect to existing Underground Facilities at or
contiguous to the site is based on information and data
furnished to OWNER or ENGINEER by the owners of
such Underground Facilities or by others. Unless it is
otherwise expressly provided in the Supplementary
Conditions:
4.3.1.1. OWNER and ENGINEER shall not be
responsible for the accuracy or completeness of any
such information or data; and
4.3.1.2. The cost of all of the following will he
included in the Contract Price and CONTRACTOR
shall have full responsibility for: (i) reviewing and
checking all such information and data, (ii) locating
all Underground Facilities shown or indicated in the
Contract Documents,(iii) coordination of the Work
with the owners of such Underground Facilities
during construction, and '(iv) the safety and
protection of all such Underground Facilities as
provided in paragraph 6.20 and repairing any
damage thereto resulting from the Work.
4.3.2. Not Shown or htcficate& If an Underground
Facility is uncovered or revealed at or contiguous to
the site which was not shown or indicated in the
Contract Documents, CONTRACTOR shall, promptly
immediately after becoming aware thereof and before
further disturbing conditions affected thereby or
[xi -forming any Work in connection therewith (except
in an emergency as required by paragraph 6.23),
identify the owner of such Underground Facility and
EXI)CGENERAL CONDITIONS 191" (1990 E(titian)
w•t CI7Y OI; fORT COLLI NS NiODIFI CA'r10Ns (RL• v 4R 000 )
give written notice to that owner and to OWNER and
ENGINEER ENGINEER will promptly review the
Underground Facility and determine the extent, if
any, to which a change is required in the Contract
Documents to reflect and document the consequences
of the existence of the Underground Facility, If
ENGR\rEER concludes that a change in the Contract
Documents is required, a Wort: Change Directive or a
Change Order will be issued as provided in Article IU
to reflect and document such consequences. During
such time, CONTRACTOR shall be responsible for
the safety and protection of such Underground
Facility as provided in paragraph 6._0.
CONTRACTOR shall may be allowed an increase in
the Contract price or an extension of the Contract
Times, or both, to the extent that they are attributable
to the existence of any Underground Facility that was
not shown or indicated in the Contract Document-,
and that CONTRACTOR did not know of and could
not reasonably have been expected to be aware of or
to have anticipated. 1f O 'NER and CONTRACTOR
are unable to agree on entitlement to or the amount or
length of any such adjustment in Contract price or
Contract Times, CONTRACTOR may make a claim
therefor as provided in Articles l l and 12. However,
OWNFR, ENGIN1 F.R and ENGiNFFWs
Consultants shall not be Iiahle to CONTRACTOR for
any claims, costs, losses or damages incurred or
sustained by CONTRACTOR on or in connection
with any other project or anticipated project.
Reference Points.
4.4. OWNER shall provide engineering surveys to
establish reference points for construction which in
ENGINEER's judgment are necessary to enable
CONTRACTOR to proceed with the Work.
CONTRACTOR shall be responsible for laying out the
Work, shall protect and preserve the established reference
points and shall make no changes or relocations without
the prior written approval of OWNfiR. CONTRACTOR
shall report to ENGINEER whenever any reference point
is lost or destroyed or requires relocation because of
necessary changes in grades or locations, and shall he
responsible for the accurate replacement. or relocation of
such reference points by professionally qualified
personnel.
4.5. Asbestos, PCBs, Petroleum, hazardous lVasre or
Radioactive .1laterial:
4.5.1. OWNER shall be responsible for any
Asbestos, PCBs, Petroleum, Idazardous Waste or
Radioactive Material uncovered or revealed at the site
which was not shown or indicated in Drawings or
Specifications or identified in the Contract
Documents to be within the scope of the Work and
which may present a substantial danger to persons or
property exposed thereto in connection with the Work
at the site. OWNER shall not be iesponsible for any
such materials brought to the site by
CONTRACTOR, Subcontractors, Suppliers or
anyone else for whom CONTRACTOR is
responsible.
4-5.�: 6't�, I-TRt\tyTCIR shall-immediataly-(i)-stop•all
-44'E�trwonneet+en-w+th-sets-h-#tn�rtlotts-senEltttott-enEl
F`1.,�f..,.�ctvrv.i•c`"�r'.c�rE2ii4i%
HS--F' kluif:ed biY—••••-••.••.•••I. !. n_7\ .,,1 /::\ i`
fld—tliE:Eefrfiel=6E}}}f}FfR
such -notice -in -writing) —OW NER-sha ll-promptly
wnsult-with-E GGRNEER-concerning-the-necrssity-for
OWNLrR tc�-ratain-a-gtlialified-axpart-to-evaluata-such
h azardetis eendiiien oF take ooffeeiiye autier, ifany.
GON=FI:AGFOR shall-not-be-required-to-resume-Wexk
in 60nneution with At! aiffirdaus eandilien OF in
such affeetnGAC1,MR has obtained
any -required -permits -related -thereto -and -delivered -to
G9�9"FFiF sperciel wFtt
that-such-eonditien and-tny-affested- tree-is-or-hes-b n
►cndered-saf-ftw-6'-e-r . or
iif}ing any-speeiukendatons-ttttdrr ••.'-,. rh sue
Werl�mev ba-rasumad-safely-lf-E3Ur'NER-and
GQN'FR,4"W- Rreannot agree -us Ae-entitlement-trror
tlx aanmer>r-if xnv-in
1'e D.L... �• r>.,., ..i ,ram..,..
IR
Work -stoppaga-er-such-spectal cond4ions-under-whlsh
either -party -may -make a shim therefer es provided -in
4 5 1 If Af f,. 4MOipt-afsueh :.pesinl-Nritten-noose
C-ONT-R•AGT.OR-&L-v-not-agree-to-resume-such-wmkk
agrees to resume gust• Vrp;- UACIRF ••,-1i—:�iCEi#ni
eonditiottt-than-C-.)�V:F�12-m.^.. ^.r�n'�' ;ash-poramn-of'
ca n eeE
the WGFIE- if OWNI;R Find G0N'I"I4,kQ*Qk cannot
eortdttion-oF+rt-sueh-att�:ted area to-be-dalateEl-1FEtln
ngree-as-to•entidement-to or-the-nmount•tw-e\-tent•of--an
adjustment -if ctnp itGamma Pfiee or Gentreet-44iiws
A-,; n rasult nfEk;leting sueh pertien of tlt® 41 Earl-tlte+t
aithar-partwanay-make-a-claim-dtarc+fcx-as-pruyidad-in
Artieles-1 l arteF I^_. Ot FER may -;a 4-deleted
portion -of -the -Work: perfbniied-Gv-QWNER's-own
forcas or-otbtars•irraccor<Innca-with-�lrticla �-
".+1A. To the fullest-e ttenE partittiteil by -Estes ettcl
Raguhatiorts-OR'N5R-shall-indemni fv-and-lx�ld
}farm'll lPasiisE—CEO�?/'i�T��RT�EER!9 Consultants and the
t\CTOR—Sulkontrttctors;
e\fficers—diractors,—employees,—agents.—other
c:onsu Manes-tincl-subwni meters -of -each -and -any -of
them-front-and_against-a4l-claimsrcosty-losses-and
damages -arising -out of -or -resulting -from -such
wst-foss-or-damage-is-attributable-to-buddy-injury;
siskftas4 disaas�or ckat#�E -teen
of tangible-preparFy-(otherthan-thr-W"'t
tnclEltlittg-tha-loss-of-usa-resulting-IharafrE>irt-and
(ii)•nothing-in-this-subparagraph-4.5:4-shall-obligate
0Wi','13R--to-indemnify-nny-parson-or-entity-from-tnd
against 1140 c0nsetluensas e€ tkat pa.,.,..d��.,•�,-entity's
own•negligcme:
G: The pfevisioens of p ,,.t.,. 4.2 • -„ 1 4.3 aFa
nat intended to apply torAieNni
l4azutlous of:
,red
EJCDC GENERAL CONDITIONS 19 M (1990 Edition!
e•J CITY OF FORT COLLINS MODIFICATIONS (REV 4R 000 )
ARTICLE 5--MOWS AND INSMAINCE
Perforntan'ee, Payment and Other BonrG:
5.1. CONTRACTOR shall furnish Performance and
Payment Bonds• each in an amount at least equal to the
Contract Price as security for the faithful performance and
payment of all CON'rK.4CfOR's obligations under the
Contract Documents. These Bonds shall remain in effect
at least until one year after.the date when final payment
becomes due, except as provided otherwise by I.,nws or
Regulations or by the Contract Documents.
CONTRACTOR shall also titmish such other Bonds as
are required by the Supplementary Conditions, All Bonds
shall be in the form prescribed by the Contract Documents
except as provided otherwise by I..aws or Regulations and
shall be executed by such sureties as are named in the
current list of "Companies. Holding Certificates of
Authority as Acceptable Sureties on Federal Bonds and as
Acceptable Reinsuring Companies" as published in
Circular 570 (amended) by the Audit Staff, Bureau of
Government Financial Operations, U.s. Treasury
Department All Bonds signed by an agent must be
accompanied by a certified copy of such agent's authority
to act.
5.2. If the surety on any Bond furnished by
CON'I'RA( fOR is declared a bankrupt or becomes
insolvent or its right to do business is terminated in any
state where any part of the Project is located or it ceases to
meet the requirements of paragraph 5.1, COti f RACTOR
shall within ten days thereafter substitute another Bond
and surety, both of which must be acceptable to OWNT.R.
5.3. Licensed Sureuev and Insurers; Certificates of
Insurance:
5.3.1. All Bonds and insurance required by the
Contract Documents to be purchased and maintained
by OIVNTER or CONTRACTOR shall be obtained
from surety or insurance companies that are duty
licensed orauthorized in the jurisdiction in which the
Project is located to issue Bonds or insurance policies
for the limits and coverages so required such surety
and insurance companies ,shall also meet such
additional requirements and qualifications as may be
provided in the Supplementary ConcGtions,
5.3.2. CONTRACTOR shall deliver to OXWER,
with copies to each additional insured identified in the
Supplementary Conditions; certificates of insurance
(and other evidence of insurance requested by
OWNER or any other, additional insured) which
CONTRACTOR is required to purchase and maintain
in accordance with pntt�.aph 5.4. O"ER shall
dative s-to-aaeh
additional -insured -identified -in -the -Supplementary
gondiliE)nA edflift6at
ayidtvaEtl of in-m-n, Lae;e'FI-bV d to
rt Emir
5� 5 ? 1-,errof
CONTR4CTOR's Liability Insurance:
5.4. CONTRACTOR shall purchase and maintain such
liability and other insurance as is appropriate for the Work
being performed and famished and as will provide
protection from claims set forth below which may arise out
of or result from CONTR\C1'OR's performance and
furnishing of the Work and CONTRACTOR's other
obligations under the Contract Documents, whether it is to
be performed or furnished by CONTRACTOR, any
Subcontractor or Supplier. or by anyone directly or
indirectly employed by any of them to perform or furnish
any of the Work, or by anyone for whose acts any of them
may be liable:
5.4.1. claims under workers compensation disability
benefits and other similar employee benefit acts;
5.4.2, claims for damages because of bodily injury,
occupational sickness or .disease, or death of
CONI' RAGI'OR's employees;
5.4.3. claims for damages because of bodily injury,
sickness or disease, or death of any person other than
CONTRACTOR's employees;
';:4:4. claims-for-damages-insured-by--custommy
pzr5Hna1 ieh- e—� .'
tly-re�'i�Q r,r >t'
indiree_lFiled to -the employment omen bF
by then r
C;9e�4ER�C-t-OR-oFFtt�-.•--„=:-cn*�,-i,� ^mot,.-Fi:y
other -reason
5.4.5. claims for damages, other than to the Work
itselC because of injury to or destruction of tangible
property wherever located, including loss of use
resulting therefrom; and
5,4.6. claims for damages because of bodily injury or
death of any person or property damage arising out of
the ownership, maintenance or use of any motor
vehicle.
The policies of insurance so required by this paragraph 5.4
to be purchased and maintained shall:
5.4.7. with respect to insurance required by
paragraphs 5.4.3 through 5.4.6 inclusive and 5.4.9,
include as additional insureds (subject to any
customary exclusion in respect of professional
liability), OWNTER, ENGINEER, ENGhNTEER's
Consultants and arry other persons or entities identified
in the Supplementary Conditions, all of whom shall be
listed as additional insureds, and include coverage for
the respective officers and employees of all such
additional insureds;
5.4.5. include the specific coverages and be written
for not less than the limits of liability provided in the
Supplementary Conditions or required by Laws or
Regulations, whichever is greater,
5.4.9. include completed operations insurance;
EXI)CCiENERAL cOt xnOM 191" (1990 EtGtiotrj
w/ CITY OF FORT COLLINS MODIFICA'r10NS (RL• V 42000)
5.4.10. include contractual liability insurance
covering CONTRACTOR's indemnity obligations
under paragraphs 6.12, 6.16 and 6.31 through 6.33;
5.4.11. contain a provision or endorsement that the
coverage afforded will not be cancelled, materially
chanced or renewal refused until at least thirty days'
prior written. notice has been given to OWNER and
CON'I'RACf'OR and to each other additional insured
identified in the Supplementary Conditions to whom
a certificate of insurance has been issued (and the
cenificatec of insurance furnished by the
CONTRACTOR pursuant to paragraph5.3.2 will so
provide);
5.4.11 remain in effect at least until final payment
and at all times thereafter when CONTRACTOR may
be correcting, removing or replacing defec•tivi, Work-
in accordance with paragraph 13.12; and
5.4.13. with respect to completed operations
insurance, and any insurance coverage written on a
claims -made basis, remain in effect for at least two
years after final payment (and CON'rRAC'I'OR shall
furnish OW-NF.R and each other additional insured
identified in the Supplementary Conditions to whom
a cenitcate of insurance has been issued evidence
satisfactory to O\\Tt7R and any such additional
insured of continuation of such insurance at final
payment and one year thereafter),
01117YER's Liability Insurance:
5.5. In addition to insurance require to be provided
by CONTRACTOR under paragraph 5.4, OWNTER, at
OWNER'S option, may purchase and maintain at
O\1NNTER's expense OWNGR's own liability iltsurance as
will protect OWNER against claims which may arise from
operations under the Contract Documents.
Property Insurance:
:ti—l-tnl�s-otherwise-provided-hrtha-�Su�>lementary
Comlitioeu,-ON r�R-shell-purchase-and-maintain
of-the-full-replacemetx-cost-thereof-(subject-to-su(3h
deductible-amounts-as-may-bt+--proyieled-in-the
Supplementary-C-orKhtions-oi-required-by-Eases-and
Regu latiotu).-This-insurance-shall .
5:6-l—include—the—interests—of—OWt4ER:
entities-identified-in-the-Supplementary-C-onditions;
each•ol:whonris•deemed•to•hava-an-insurable-interest
and•shall-be-listed-tts-un-insured-or-ad(litiom I -insured;
5:6•=• be-writtert-on-a-Buikkki's-Risk='cell-risk-or
open peril eF spe6iii! s to that
damage tcthe Warirtern
v°against 1-least
the—felkrwing—perils: fire, lightning —emended
coverage.-than-vnndti lism- n nd-m a lici6u s-m ischiet-,
�rtrtltttuakis-soil , ckhris-rantevsl-E6molition
water-.... - ..de eh .theF ...,may -be
spasiFwally rec{aired by-tlia Supplamcwter GendHiens;
5:6.3-include-expenses-incurred-in-the-repair-or
replacement-ofany-insured•prc>party-(irtslttclir>°-lxit-nut
linriEad-te---€aas--•aad--ctttrrges-�L�-rT-.ffR; �
archiEncts)c
5 6 '1- 9e4rr-m9:E069115 a
or-nt-anot her loeAtion thni-was-agreed-to-rn-writm-- by
provided-Ehat-sEtcn;ate is And eyt::tn.;^� r .have -been
me tided-in-ere-.Apptiemier foF�t-r�niended
S:Fr.5-6e-mttinEainetl-in-ellevt-until-t'atat-payment-is
made - aig-by
OkW;ER-. 0944oAGTO and &I--nrcry A
thirty-dAys-w'ritteta-trotice-to-each-dthe�ndditionAl
issued- .
���tk'?FF,R-shell-purehtne-end-maintain-queli-Hailer
and n}Aclainaty i+rsun: az c FlAiitional fa
ss-may--lie-required-by-tile-Supplamzninry-C:imditionrcx
'GP any-ether-paMFA er-entitieS
idant+lizd-ii3-tha�;ut�}�4amantnrv-(�3ndiEionr �;��1-,- :�wr�.�,•
is deantad-tu hnvaRn-iersurable�intarast ar>fl-shall-Ha-lisiad-as
arrinsured-oradditianal-i».,urad-
$:€. -.•^�'t-dte-liutiaias-u�iiiseiranea-(need-fha-eattifienfas-car
GdleF OVidEllto-ha-purehe ed-end
inninteined-bv-OV."NER--in-accordance-with-parngmplis :6
. ^^a��:'.-;will-corttatn-a-•pruyisii�rt-ur�nckxsetnzrk-Fhaf-the
coverage-ntFordad-wil t-not-ba-cancel lad=or-mAferinl ly
chat,gad•or-renewal-ratitsad-ant i}-nt.•lansf-thirty-dAys=prior
written-notice-hers-been-given-W-OVR4ER--and
`-•r�?rrCCr-��rRAci OR and to aetYOfl
whoni-a-certificate-of-i nsumnee-hAs-keen-issued-and-wi 11
contain -waiver -provisions -in -accordance -with
1*lftfgFHPh �'1 F.
5:9. OWNER.shall not be responsible for purchasing
and maintaining any property insurance to protect the
interests of CONTRACTOR. Sub wntraetors or others in
a WttrlC stir E'Old HFREIUHts_�
identibed-in-the-Supplementary-Eonditiom.=l=ha-risk of
less within-such-idery ified•deduutiblaa
by. -GQ3h4P\GTOR ul ontrastor or titers sat irtg any
such-k)ss=anal-if-env-of-them-wishes-propetty-tnsuranw
covrras�e-within-tlx-limits-of-such-amottrtts-tFtch-map
purchnse4ind-maintain-it-at-the-purchaser's owrte.,g)onsa.
5:lli.-if-GON-1 RAUFOR-rNuests-in-writirig that -other
fipCatai-kfLSk i4yftSdran61!
-.
"hall:e _..:ice--, ' '-;aciri.;su=n:e�-a Q-dte-cost r ill I...
HPPFQpFi-
chang,._a-- .de' - Prier -to
EJCOC GENERAL CONUI77ON51910-3 (1990 E(htiai)
'A'I CITY OF FORT COLLI M DIOUII;ICA'riONS (REV.lr.000)
cummencamant-o�iha-Work-nt-tiw-site;-41�AFGR sltnll-in
w'rititig-ttdvi:..�-•no-� rT•rn.1C��l�whathar-eFiir3k-sttc#t-dither
OW t
b1—lMaiveFej-RrgJrrs.
SA-1-1—OWNER—and—COONf-RAGTOR-intend-that aII
policies-purchased-in-accorckaice-with-piriigraplis 5:6
and-54 will pfie cxEsurts or entities iderAifie
-
Subecxttraeturs—EN6lNEEli, Ei�lG1NEER's
in the SupplemefitaFy Gunditions te be listed
insureds-ctr-additions!-insureds-in-stieh-policies-and
krsas-and
damagesis wvered -thereby. All
stieh poli ;-''n.t•ef,Rtain prE>WSions to Elsa a eet fhat
in-t#ta-ewrnFe€-payment-of-any-toss or-damage-ttw
insurers -will have ne right���t raeovet aga+nsEAny a€
the -insureds -or--ttdditionul-insured-thereunder.
OWNER
director:�ent ployee�nnci-agents-fciF-t+ll-lo:ses�ind
any o tlw-perils-severed by-sush--policies-and-any
otheF 44a4ha-44x4_and;
in-additian-watve-.4. ueh fighu again t
SHhaE7iifrtiGikX r, m.�ci�. tr•-lei {4, EN(; :jki.5t1's
Consultants•and-nl} other-persons•or-entities•identified
waver. -Hy Party
-stt makingeh-waiver-ma}LHave te-tlie-proeaacis u€
insurance -held by OWNER ER s wu..0 ear otherwi,e
►xiynble-under-any-poi icyso•is sued-
against C-O-1TRAGT012, Subcoiitmctcxs;
EN �FEEIt-�tO Rr) Iis-Eomttttants-Itnd-tHa
otlicers,-directors-employees-and-agents-of-a iiy-ol'
them -for:
311 .1- 10a0 due to ass ias 1 intznitptietx less
of'-use-oFoth�x�mns<quenE ial-liras-extending
beyond-d'vact physical-loss-ur-damage-to
arising -out -of or-resulting-from-fire-or-otlier-peril;
whether-or-nut-instired-by-OWNER and
5-l-1-2-�-1oss-or-clam age-to-Eha-scx» plated
FKijaol-c�pttr�-tlterdE�sticlsefl-by-ttristt�-oat-efor
rasultilig-from-fire•or--other-imured-peril-covered
by—any'-PrApat#y-insunancd-mninkaina, t.,-v.-,-t.'-ti
cem.ple eraol-f�v-O414�1
during- partied-utili mtlon-pursutmt-to
parHgaph-14;10--after-Substantial-C-ompletioh
pursuant-to-peiragraph-148-or-aller-Eared-payment
piii$ii'art to ....-...... ph 14. ! 2
Art), ins peliby-niby 03AV146evarir>b
laf t dAi
in the-rvenl 4-paynta _
consequential-!c' t rMar.i—.rncaW5-wlll-vwel rl8-rtg.��-of
recovery -ago inst-any-of-GUNTRAGTOR-Subcontractors;
sukants and the otliurs;
Receipt andAppGtution oflnsurance Proceet6:
5.12. Any insured loss under the policies of insurance
required by paragraphs 5.6 and 5.7 will be adjusted with
OWNER and made payablc to OWNER as fiduciary for the
insureds. as their interests may appear, subject to the
requirements of any applicable mortgage clause and of
paragraph 5.13. OWNiER shall deposit in a separate
account any money so received, and shall distribute it in
accordance with such agreement as the parties in interest
may reach. If no other special agreement is reached the
damaged Work shall be repaired or replaced, the moneys so
received applied on account thereof and the Work and the
cost thereof covered by an appropriate Change Order or
Written Amendment.
5.13, OWNER as fiduciary, shall have power to adjust
and settle any loss with the insurers unless one of the
parties in interest shall object in writing within fifteen days
after the occurrence of lass to OWNER's exercise of this
power. If such objection be made, OWNER as fiduciary
shall make settlement with the insurers in accordance with
such agreement as the parties in interest may reach. If no
such agreement among the parties in interest is reached,
OWNER as fiduciary shall adjust and settle the loss with
the insurers in
0
s.
Acceptance of l3ondc andInsurance; Option to Replace:
i.14. If either -patty EOWNE
OWNER has any objection to the coverage afforded by or
other provisions of die Bonds -or insurance required to be
purchased and maintained by the other —party
CONTRACTOR in accorcb ice with Article 5 on the basis
of nonconformance with the Contract Documents, the
objecting-partyshall-so-notify-the-other-pariv OW TER will
notify COiNUZACTOR in writi% within ten, fifteen days
after receipt dclivc , of the certificates (or -other -evidence
requested) to QWNGR_ a required by paragraph 2.7.
nrlm:�.�i-.mac-a
other-such-additional-uifomiation-in-respect-oFinsurance
provided-as-the-other-may-reasonably-requast—lf either
party-does-not-purchase-or-maintain-till-o[ the -Bonds -and
insurance--rujuired-of-such-party-by-dw-Contract
Documents, sueh patty- shall tv-iit
wa-i6rg-of-such-failure-te-purchase-prior-to-the-start-of-the
�4tir(reiFoFsash frtilara to maintain prto�to any shange-4p
tliegttirrd sevr a .Withoutr-righE
or-remedy-the-other-party-may-alect-to-obtain-equ ivtdent
Bonds-or-insurance-to-prot,ect-slue:h•odw-partyes-interests•tit
the-expense-of-this-pnr-tv-who-wwiis-reclu ired-to-provide-such
eciveffige; and a Gar Order.
Borltract-price•awordingly-
Partial Utilization -Property Insurance:
5.15. If OWNER finds it necessary to occupy or use a
portion or portions of the Work prior to Substantial
EJCDC GENEK,% CONDITIONS 1910-5 f 1990 Edilim j
w/ CUT 01; FORT COLLINS MODIFICATIONS (RLV,IP-000)
Completion of all the Work, such use or occupancy may
be accomplished in accordance with paragraph 14.10;
provided that no such use or occupancy shall commence
before the insurers providing the property insurance have
acknowledged notice thereof and in writing effected any
changes in coverage necessitated thereby. The insurers
providing the property insurance shall consent by
endorsement on the policy or policies, but the property
insurance shall not be canceled or permitted to lapse on
account of any such partial use or occupancy.
AKI' IC IA. 6-CONTRACTOR'S
RESPONSIBILITIES
Supenrision and.Superintendence:
6.1, CONTRACTOR shall supervise, inspect and
direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and
expertise as may be necessary to perform the Work in
accordance with the Contract Documents.
CONTRACTOR shall be solely responsible for the means,
method~, techniques, sequences and procedures of
construction, but CONTRACTOR shall not be responsible
for the negligence of others in the design or specification
of a specific means. method, technique, sequence or
procedure of construction which is shown or indicated in
and expressly required by the Contract Documents.
CONTRACTOR. shall be responsible to sec that the
completed Work complies accurately with the Contract
pocumcnts.
6.2. CONTRACTOR shall keep on the Work at all
times during its progress a competent resident
superintendent, who shall not be replaced without written
notice to OWNER and i NGMEER except under
extraordinary circumstances. The superintendent will be
CONTRACTOR's representative at the siteand shall have
authority to act on behalf of CONTRACTOR All
communications to the superintendent shall be as binding
as if given to CONTRACTOR.
Labor, 11aterials and Equipment:
6.3. CONTRACTOR shall provide competent,
suitably qualified personnel to survey, lay out and
construct die Work as required by the Contract
Documents. CONTRACTOR shall at all times maintain
good discipline and order at the site. Except as otherwise
required for the safety or protection of persons or the
Work or property at the site or adjacent thereto, and
except as otherwise indicated in the Contract Documents,
all Work at the site shall be performed during regular
working hours and CONTRACTOR will not permit
overtime work or the performance of Work on Saturday,
Sunday or any legal holiday without OWNER's written
consent given after prior written notice to ENGINEER.
CONTRACTOR shall submit requests to the ENGINEER
no Icss than 49 hours in advance of anv Work to be
performed on Saturday, Sunday, Holidays or outside the
Regular Workirte Hours.
6.4. Unless otherwise specified in the General
Requirements, CONTRACTOR shall furnish and assume
full responsibility for all materials, equipment, labor,
transportation, construction equipment and machinery,
tools, appliances, fuel power, light, heat, telephone, water,
sanitary facilities, temporary facilities and all other
facilities and incidentals necessary for the furnishing,
performance, testing, start-up and completion of the Work.
6.4.1. Purchasing_ Restrictions: CON'TR-ACI'OR
must comply with the Citvs purchasing restrictions. A
copy of the resolutions are available for review in the
offices of the Purchasing and Risk Management
Division or the Citv Clerk's office.
6.4.2. Cement Restrictions: Citv of Fort Collins
Resolution 91-121 requires that suppliers and producers
of cement or products containing cement to certify that
the cement was not made in cement kilns that bum
hazardous waste as a fuel.
6,5. All materials and equipment shall be of good
quality and new, except as otherwise provided in the
Contract Documents. All warranties and guarantees
specifically called for by the Specifications shall expressly
run to the benefit of OWNER. If required by ENGINEER,
CON-rRAC OR shall furnish satisfactory evidence
(including report-, of required tests) as, to the kind and
quality of materials and equipment. tW materials and
equipment shall be applied, installed, connected, erected,
used, cleaned and conditioned in accordance with
instruction..- of the applicable Supplier, except as otherwise
provided in the Contract Documents.
Progress Schedule:
6.6, CONTRACTOR shall adhere to the progress
schedule established in accordance with paragraph 2.9 as it
may be adjusted from time to time as provided below:
6.6.1. CONTRACTOR shall submit to ENGINEER
for acceptance (to the extent indicakd in
paragraph 2.9) proposed adjustments in the progress
schedule that will not change the Contract Times (or
,Milestones). Such adjustments will conform generally
to the progress schedule then in effect and additionally
will comply with any provisions of the General
Requrements applicable thereto.
6.6.2. Proposed adjustments in the progress schedule
that will change the Contract Times (or Nfilestones)
shall be submitted in accordance with the requirements
of paragraph 12.I. Such adjustments may only be
made by a Change Order or Written Amendment in
accordance with Article 12. '
6.7. Subs7itutesand "Or -Equal" Items
6.7.1, Whenever an item of material or equipment is
specified or described in the Contract Documents by
using the name of a proprietary item or the name of a
articular Supplier, the specification or description is
intended to establish the type, function and quality
required. Unless the specification or description
EJCUC GENERAL CONDITIONS 1910-5 0990 Edition)
12 w/ CITY OF FORT COLLINS blODIFICATiONS (REV 4R--000)
contains or is followed by words reading that no like,
equivalent or "or -equal" item or no substitution is
permitted, other items of material or equipment or
material or equipment of other Suppliers may be
accepted by ENGINEER under the following
circumstances:
6.7.1.1. "Or -Equal": If in ENGINEI R's sole
discretion an item of material or equipment
proposed by CON'1'RACI'OR is functionally
equal to that named anal sufficiently similar so that
no change in related Work will be required, it may
b6 considered by ,ENGINEER as an "or -equal"
item, in which case review and approval of the
proposed item may, in ENGINEEWs sole
discretion, he accomplished without compliance
with some or all of the requirements -for
acceptance of proposed substitute items.
6.7.1.2. Substitute Menu: If in ENGINEER's sole
discretion an item of material or equipment
proposed by CONTRACTOR does not qualify as
an "or -equal" item under subparagraph 6.7.1.1, it
will be considered a proposed substitute item.
CON TRACTOR shall submit sufficient
information as provided below to allow
FNGTNEER to determine that the item of material
or equipment proposed is essentially equivalent to
that named and an acceptable substitute therefor.
The procedure for review by the ENGHgEER will
include the following as supplemented in the
General Requirements and as ENGINEER may
decide is appropriate under the circumstances.
Requests for review of proposed substitute items
of material or equipment will not he accepted by
ENGINEER from anyone other than
CONTRACTOR If CONTRACTOR wishes to
furnish or use a substitute item of material or
equipment, CONTRACTOR shall first make
written application to ENGINEER for acceptance
thereof, certifying that the proposed substitute.will
perform adequately the functions and achieve the
results called for by the general design, be similar
in substance to that specified and be suited to the
same use as that specified. The application will
state the extent, if any, to which the evaluation
and accxptance of the proposed substitute will
prejudice CONTRACTOR's achievement of
Substantial Completion on time, whether or not
acceptance of the substitute for use in the Work
will recptire a change in any of the. Contract
Documents (or in the provisions of any other
direct contract with OWNER for work on the
Project) to adapt the design to the proposed
substitute and whether or not incorporation or use
of the substitute in connection with the Work is
subject to payment of any license fee or royalty.
All variations of the proposed substitute kom than
specified will be identified in the application and
availuble maintenance. repair and replacement
service will be indicated. The application will
also contain an itemized estimate of all costs or
credits that will result directly or indirectly from
acceptance of such substitute. including costs of
redesign and claims of other contractors affected
SECTION 00100
INSTRUCTIONS TO BIDDERS
by the resulting change, all of which will be
considered by ENGNEER. in evaluating the
proposed substitute. ENGINEER may require
CONTRACTOR to furnish additional data about
the proposed substitute.
6.7.1.3. CONM4CTOR's Expense: All data to be
provided by CONTRACTOR in support of any
proposed "or -equal" or substitute item will be at
CONTRACTOR's expense.
6.7.2. Substitute Cunstrurtion AfethocG or
procedures: If a specific means, method, technique,
sequence or procedure of construction is shown or
indicated in and expressly required by the Contract
Documents, CONTRACTOR may furnish or utilize a
substitute means, method. technique, sequence or
procedure of construction acceptable to ENGINEER.
CONTRACTOR shall submit sufficient information to
allow ENGINEER, in ENGINEER'S sole discretion, to
determine that the substitute proposed is equivalent to
that expressly called for by the Contract Documents.
The procedure for review by ENGINEER will be
similar to that provided in subparagraph 6-7.1.2.
6.7.3. Engineer's F.valtration: FNGfNEER will be
allowed a reasonable time within which to evaluate
each proposal or submittal made pursuant to
paragraphs 6.1.1.2 and 6.7.2. ENGINEER will be the
sole judge of acceptability. No "or -equal' or
sulmitute will be ordered, installed or utilized without
ENGINE'E.R's prior written acceptance which will be
evidenced by either a Change Order or an approved
Shop Drawing. OWN[ R may require
CONTRACTOR to furnish at CONTRACTOR's
expense a special performance guarantee or other
surety with respect to any "or -equal" or substitute.
ENGNEER will record time required by
ENGINMER and ENGINEER's Consultants in
evaluating substitutes proposed or submitted by
CONTRACTOR pursuant to paragraphs 6.7.1.2 and
6.1.2 and in making changes in the Contract
Documents (or in the provisions of any other direct
contract with OWNER for work on the Project)
dxdnsioned thereby. Whether or not ENGINEER
accepts a substitute item so proposed or submitted by
CONTRACTOR, CONTRACTOR shall reimburse
OWNER for the charges of ENGINEER and
ENGNEER's Consultants for evaluating each such
proposed substitute item.
6_8. Concerning Subcontractors, Suppliers and
Others:
6.8.1. CONTRACTOR shall not employ any
Subcontractor, Supplier or other person or organization
(including those acceptable to . OWNER and
ENGINEER as indicated in paragraph 6.8.2), whether
initially or as a substitute. against whom OWNER or
ENGINEER may have reasonable objection.
CONTRACTOR shall not be required to employ any
Subcontractor, Supplier or other person or organization
to furnish or perform any of the Work against whom
CON'I'RACfOR has reasonable objection.
EICDCGENER NL CONDITIONS 1910-S (1990 E(fitioa)
ail CITY OF FORT COLLINS MODIFICATIONS (RL•"y 4P000)
6_9.
CONTRACTOR shall perform not less than 20
percent. of the Work with its own forces (that. is,
without subcontracti ia). The 20 percent requirement
shall be understood to refer to the Work the value of
which totals not less than 20 percent of the Contract
Price.
6.8.2. lf--the Supplenmentaiv Gonditions Bidding
Documents require the identity of certain
Subcontractors, Suppliers or other persons or
organizations (including those who are to furnish the
principal items of materials or equipment) to be
submitted to OWNER in -advance -of -the -specified
data prior to the Effective Date of the Agreement for
acceptance by OWNER and F.,NGINEER—and—if
ed—a— list —thereraf—in
t eeNdame—wit#r-the St}p{�letnentufy—ConEGtienr,
OWNE:R's or ENGINEER's acceptance (either in
writing or by failing to make written objection thereto
by the date indicated for acceptance or objection in
the bidding documents or the Contract Documents) of
nn�such-Subsoatrncto�Supplier--dx--other-person-er
lv,r.".,.,_; t_c raasenabte-abjestien-a#er-due investigation,
aed,d ptable—salt titttt therttruet—Priee—wifl—be
adjusted by the-test-caetsh3ned by
such-substitution-and-an-appropriate-6hange-Order
. will
constitute a condition of the Contract re uq iring the
use of the named subcontractors, suppliers or other
persons or organization on the Work unless prior
written approval is obtained from OWNER and
ENGINI E,R. No acceptance by OWNER or
ENGINEER of any such Subcontractor, Supplier or
other person or organization shall constitute a waiver
of any right of OWNER or ENGINEER to reject
dlefective Work.
6.9.1. CONTRACTOR shall be fully responsible to
MINER and ENGINEER for all acts and omissions
of the Subcontractors, Suppliers and other persons
and organizations performing or furnishing any of the
Work under a direct or indirect contract with
CONTRACTOR just as CONTRACTOR is
responsible for CONTRACTOR's own acts and
omissions. ?Nothing in the Contract Documents shall
cre,ite for the benefit of any such Subcontractor,
Supplier or other person or organization any
contractual relationship between OWNER or
ENG VEER and any such Subcontractor, Supplier or
other person or organization. nor shall it create any
obligation on the part of O\XWER, or ENG WEER to
pay or to see to the payment of any moneys due any
such Subcontractor, Supplier or other person or
organization except as may otherwise be required by
Laws and Regulations. OWNER or ENGINEER may.
furnish to any subcontractor, supplier or other person
or organization evidence of amounts paid to
CONTRACTOR in accordance with
CONTRACTOR'S "Applications for Payment".
6.9.2. CONTRACTOR shall be solely responsible
for scheduling and coordinating the Work of
Subcontractors. Suppliers and other persons and
organirntions performing or furnishing any of the
Work under a direct or indirect contract with
CON'I'RA(-I'OK. COMI'RAC'I'OR shall require all
Subcontractors, Suppliers and such other persons and
organizations performing or furnishing an of the
Work to communicate with the ENGINEER through
CONTRACTOR
6.10. The divisions and sections of the Specifications and
the identifications of any Drawings shall not control
CONTRACTOR in dividing the Work among
Subcontractors or Suppliers or delineating the Work to be
performed by any specific trade.
6.11. All Work performed for CONTRACTOR by a
Subcontractor or Supplier will be pursuant to an
appropriate agreement between CONTRACTOR and the
Subcontractor or Supplier which specifically binds the
Subcontractor or Supplier to the applicable tents and
conditions of the Contract Documents for the benefit of
OWNER and 6INGINEER. When•• --any su raa ee.. Pt
fan
additienHl-t untnee-provided in
r rrt'rn{ths - I or 5.7, ha --agreement he :yee n-th
GOTONTR-,�16TnR: and -the Suix:tntractor--tx Supplier -will
cventsirt Ixewisicrz4 trheral>y-the"Subeffitraeter of supplief
vvntyas-nll-rhtt-agptttt-�}L13,jHR, rn�rrunr•rnv
kil�IE+INccv,�,,,�_F�.��,.,.�.,.tr_ c srccn�or •,.:..^�knntr.-card-n11-e41teF
,o.,.,,-i,~��.�A „i,._,.,c,. � :s-a+td-dentage�„�.ed-1�
arising -out ef�resultittg-frottt-arty-of-t}ta-perils-eovarrd-by
SHC A
the-Work.—if-the-insurers-on-any-such-IxAicier-require
setxerfttz�vairer-fFxms tame -sign I
Patent Fees and Royalties:
6.12. CONTRACTOR shall pay all license fees and
royalties and assume all costs incident to the use in the
performance of the Work or the incorporation in the Work
of any invention, design, process, product or device which
is the subject of patent right- or copyrights held by others.
If a particular invention, desi6nt, process, product or device
is specified in the Contract Documents for use in the
performance of the Work and if to the actual knowledge of
OWNER or ENGTNEL•R its use is subject to patent rights
or copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights shall be
disclosed by OWNER in the Contract Documents. To the
fullest extent permitted by Laws and Regulations
CONTRACTOR shall indemnifv and hold harmless
OIVNER, ENGINEER, ENGINEER's Consultants and the
officers, directors• employees, agents and other consultants
of each and any of them from and against all claims, costs,
losses and damages arising out of or resulting from any
infringement of patent rights or copyrights incident to the
use in the performance of the Work or resulting from the
incorporation in the Work of any invention, design.
process, product or device not specified in the Contract
Documents.
EJCDCOENEY.ALCOND1770NS19IM(1990Editicnl 14
nI C1'IY OF t--ORT COLLI NS h10DII; I CA'rIONS (KL'y.1/ 000)
Permits:
6.13. finless otherwise provided in the Supplementary
Conditions, CONTRACTOR shall obtain and pay for all
construction permits and licenses. OWNER shall assist
CONTRACTOR, when necessary, in obtaining such
permits and licenses. CONTRACTOR shall pay all
governmental cli<arges and inspection fees necessary for
the prosecution of the Work, which are applicable at the
time of opening of Bids, or, if there are no Bids, on the
Effective Date of the Agreement. CONTRACTOR shall
pay all charges of utility owners for connections to the
Work, and OWNER shall pay all charges of such utility
owners for capital costs related thereto such as plant
investment fees.
6.14. Laws andRegulakvns:
6.14.1. CON'1RAC't'OR shall give all notices and
comply with all haws and Regulations applicable to
furnishing and performance of the Work. Except
where otherwise expressly required by applicable
Laws and Regulations, neither OWNFR nor
FNGINF.FR shall he responsible for monitoring
CONTRACfOR's compliance with any Laws or
Regulations.
6.14?. if CONTRACTOR performs any Work
knowing or having reason to knoiv that it is contrary
to Laws or Regulations, CONTRACTOR shall bear
all claims, cost-, losses and damages caused by,
arising out of or resulting therefrom, however, it shall
not be CONTRACTOR's. primary responsibility to
make certain that the Specifications and Drawings are
in accordance with Laws and Regulations, but this
shall not. relieve CONTRACTOR of
CONTRACTOR's obligations under paragraph 3.3.2.
Taxes:
6.15. CONTRACTOR shall pay all sales, consumer,
use and other similar taxes required to be paid by
CONTRACTOR in accordance with the Laws and
Regulations of the place of the Project which are
applicable during the performance of the Work.
6.15.1. OWNER is exempt front Colorado State and
local sales and use taxes on materials to be
permanently incorporated into the project. Said taxes
shall not be included in the Contract Price.
CONTRACTOR must apply for. 'and receive. a
Certificate of Exemption from the Colorado
Department of Revenue for construction materials to
be sically incorporated into the project.. This
Certification of Exemption provides that the
CONTRACTOR shall neither pay nor include in his
Bid. Sales and Use Taxes on those building an
construction materials olivsicalh• incorporated into
the proiect.
Address:
Colorado Department of Revenue
State Capital Annex
1375 Sherman Street
Denver, Colorado 80261
Sales and Use Taxes for the State of Colorado
Regional Transportation District (RTD) and certain
Colorado counties are collected by the State of
Colorado and are included in the Certification of
Exemption.
All appliatble Sales and Use Taxes (including State
collected taxes), on any items other than construction
and building materials physically incorporated into the
project are to be paid by CONTRACTOR and are to
be included in appropriate bid items.
Use of Premises:
6.16. CONTRACTOR shall confine construction
equipment, the storage of materials and equipment and the
operations of workers to the site and land and areas
identified in and permitted by the Contract Documents and
other land and areas permitted by Laws and Regulations,
rights -of -way, permits and casements, and shall not
unreasonably encumber the premises with construction
equipment or other materials or equipment.
CONTRACTOR shrill assume full responsibility for any
damage to any such land or area, or to the owner or
occupant thereof or of any adjacent land or arras, resulting
Gum the performance of the Work. Should any claim be
made by any such owner or occupant because of the
performance of the Work, CON'I'RACI'OR shall promptly
settle with such other party by negotiation or otherwise
resolve the claim by arbitration or other dispute resolution
proceeding or at law. CONTRACTOR shall, to the fullest
extent permitted by Laws and Regulations, indemnify and
hold harntless OWNER, ENGINEER, IRNGUsTEER's
Consultant and anyone directly or indirectly employed by
any of them from and against all claims, costs, losses and
damages arising out of or resulting from any claim or
action, legal or equitable, brought by any such owner or
occupant against 0WiNtER, ENGINEER or any other party
indemnified hereunder to the extent caused by or based
upon CON'TRACTOR's performance of the Work-
6.17. During the progress of the Work, CONTRACTOR
shall keep the premises Gee from accumulations of waste
materials, rubbish and other debris resulting from the
Work. At the completion of the Work CONTR_%CTOR
shall remove all waste materials, rubbish and debris from
and about the premises as well as all tools, appliances,
construction equiprent and machinery and surplus
materials. CONTRACTOR shall leave the site clean and
ready for occupancy by MWER at Substantial
Completion of the Work. CONTRACTOR shall restore to
original condition all property not designated foralteration
by the Contract Documents.
6.18. CONTRACTOR shall not load nor permit any part
of any structure to be loaded in any manner that will
endanger the structure, nor shall CONTRACTOR subject
any part of the Work or adjacent property to stresses or
pressures that .will endanger it.
Record Documents.,
EX13COENERAL CONDITIONS I910-3 (1990 E(fition)
eel C11T OF FORT COLLI IS MODIFICATIONS (RLV 4P000)
6.19. CONTRACTOR shall maintain in a safe place at
the site one record copy of all Drawings, Specifications,
Addenda. Written Amendments, Change Orders, )York
Change Directives, Field Orders and written
interpretations and clarifications (issued pursuant to
paragraph 9:4) in good order and annotated to show all
changes made during construction These record
documents together with all approved Samples and a
oounterpart of all approved Shop Drawings will be
available to ENGINEER for reference. Upon completion
of the Work, and prior to release of final payment, these
record documents. Samples and Shop Drawings will be
delivered to ENGINEER for OWNER,
Safety and Protection:
6.20. CONTRACTOR shall be responsible for
initiating maintaining and supervising all safety
precautions and programs in connection with the Work.
CONTRACTOR shall take all necessary precautions for
the safety oC and shall provide the necessary protection to
prevent damage, injury or loss to:
6,20.1. all persons on the Work site or who may be
affected by the Work,
6.20.2. all the Work and materials and equipment to
be incorporated therein, whether in storage on or off
the site; and
6.20.3. other property st the site or adjacent thereto,
including trees, shrubs, lawns, walks, pavements,
roadways, structures, utilities and Underground
Facilities not designated for removal, relocation or
replacement in the course of construction.
CONTRACTOR, shall comply with all applicable Laws
and Regulations of any public body having jurisdiction for
safety of persons or property or to protect them from
damage, injury or loss; and shall erect and maintain all
necessary safeguards for such safety and protection.
CONTRACTOR shall notify owners of.adjacent property
and of Underground Facilities and utility owners when
prosecution of the Work may affect then, and shall
cooperate with them in the protection, removal, relocation
and replacement of their property. All damage. injury or
loss to any property referred to in paragraphs 6.20.2 or
6.20.3 caused, directly or indirectly, in whole or in pout by
CONTRACTOR any Subcontractor. Supplier or any
other person or organization directly or indirectly
employed by any of them to perform or furnish any of the
Work or anyone for whose acts any of them may be liable.
shall be remedied by CONTRACTOR (except damage or
loss attributable to the fault of Drawings or Specifications
or to the acts or omissions of OWNER or ENGINEER or
ENGINEER's Consultant or anyone employed by any of
them or anyone for whose acts any of them may be liable,
and not attributable, directly or indirectly, in whole or in
part, to the fault or negligence of CONTRACTOR or any
Subcontractor, Supplier or other person or organization
directly or indirectly employed by any of them).
CONTRAC'ToR's duties and responsibilities for the safety
and protection of the Work shall continue until such time
as all the Work is completed and ENGINEER has issued a
notice to OWNER and CONTRACTOR in accordance
with paragraph 14.13 that the Work is acceptable (except as
otherwise expressly provided in connection with
Substantial Completion).
6.21. Safety Representative.
CONTRACTOR shall designate a qualified and
experienced safety representative at the site whose duties
and responsibilities shall be the prevention of accidents and
the maintaining and supervising of safety precautions and
programs.
Hazarrl Communication Programs:
6.22. CONTRACTOR shall be responsible for
coordinating any exchange of material safety data sheets or
other hazardcommunication information required to be
made available toor exchanged between or among
employers at the site in accordance with Laws or
Regulations.
Emergencies-
6.23. In emergencies atTccting the safety or protection of
persons or the Work or property at the site or adjacent
thereto, CONTRAM'OR, without special instruction or
authorisation from OWNER or FNGINEER, is obligated to
act to prevent threatened damage, injury or loss.
CONTRACTOR shall give FNGINFFR prompt, written
notice if CONTRACTOR believes that any significant
changes in the Work or variations from the Contract
Documents have been caused thereby. If ENGINEER
determines that a change in the Contract Documents is
required because of the action taken by CONTRACTOR in
response to such an emergency, a Work Change Directive
or Change Order will be issued to document the
consequences of such action
6.24. Shop Drawings and Samples:-
6.'24.1. CONTRACTOR shall submit Shop Drawings
to ENGINEER for review and approval in accordance
with the accepted schedule of Shop Drawings and
Sample submittals (see paragraph 2.9). Allsubmittals
will be identified as ENGINEER may require and in
the number of copies specified in the General
Requirements. The data shown on the Shop Drawings
will be complete with respect to quantities,
dimensions, specified performance and design criteria,
materials and similar data to show ENGP,,T-ER the
materials and equipment CONTRACTOR proposes to
provide and to enable 17NGINF-ER to review the
information for the limited purposes required by
paragraph 6.26.
6.24.2. CONTRACTOR shall also submit Samples to
1N-GMER for review and approval in accordance
with said accepted schedule of Shop Drawings and
Sample submittals. Each Sample will be identified
clearly as to material. Supplier, pertinent data such as
catalog numbers and the use for which intended and
otherwise as ENGINEER may require to enable
ENGI;NF'FR to review the submittal for the limited
16 EJCDC GENERAL CONDITIONS 1910$ (1990 Editimj
col Cl'lY OF FORT COLLI NS AIODti;I CATIONS (.REV ,IPOO )
purposes required by paragraph6.26. The numbers
of each Sample to be submitted will be as specified in
the Specification.
6.25. Submittal Procedures:
6._5.1. Before submitting each Shop Drawing; or
Sample, CONTRACTOR shall have determined and
verified:
6,25.1.1. all field measurements, quantities,
dimensions, specified performance criteria.
installation requirements, materials, catalog
numbers and similar information with respect
thereto,
6.25.1.2. all materials with respect to intended
use, fabrication, shipping, handling, storage,
assembly and installation pertaining to the
performance of the Work, and
6.25.13. all information relative to
CONCRACfOft's sole responsibilities in respect
of means, methods, techniques, sequences and
procedures of construction and safety precautions
and programs incident thereto,
CONTRACTOR shall also have reviewed and
coordinated each Shop Drawing or Sample with other
Shop Drawings and Samples and with the
requirements of the Work and the Contract
Documents.
6.25.2. Each submittal will bear a stamp or specific
written indication that CONTRACTOR has satisfied
CONTRACTOR's obligations under the Contract
Documents with respect to CON`rRAC'rOR's review
and approval of that submittal.
6.25.3, At the time of each submission,
CONTRACTOR shall rive ENTGHTCER specific
written notice of such variations, if any, that the Shop
Drawing or Sample submitted may have from the
requirements of the Contract Documents, such notice
to be in a written communication separate from die
submittal; and, in addition, shall cause a specific
notation to be made on each Shop Drawing and
Sample submitted to ENGINEER for review and
approval of each such variation
6.26. ENGE\TEER will review and approve Shop
Drawings and Samples in accordance with the schedule of
Shop Drawings and Sample submittals. accepted by
ENGINEER as required by paragraph 2.9. ENG[NEER's
review and approval will be only to determine if the items
covered by the submittals will, aRer installation or
incorporation in the Wort:, conform to the information
given in the Contract Documents and be compatible. with
the design concept of the completed Project as a
functioning whole as indicated by the; Contract
Documents. ENGINEER's review and approval will not
extend to means, methods, techniques, sequences or
procedures of construction (except where a particular
means, method, technique, sequence or procedure of
construction is specifically and expressly called for by the
Contract Documents) or to safety precautions or programs
incident thereto. The review and approval of a separate
item as such will not indicate approval of the assembly in
which the item functions. CONTRACTOR shall make
corrections required by and shall return the
required number of corrected copies of Shop Drawings and
submit as required new Samples for review and approval.
CONTRACTOR shall direct specific attention in writing to
revisions other than the corrections called for by
-JGLNTEER on previous submittals.
6.2T ENGINEER'S review and approval of Shop
Drawings or Samples shall not relieve CONTRACTOR
from responsibility for any variation from the requirements
of the Contract Documents unless CONTRACTOR, has in
writing called ENGIIN'EER's attention to each such
variation at the time of submission as required by
paragraph 6.25.3 and ENGINEER has given written
approval of each such variation by a specific written
notation thereof incorporated in or accompanying the Shop
Drawing or Sample approval; nor will any approval by
ENGINEER relieve CONTRACTOR from responsibility
for complying with the requirements of paragraph 6.25.1.
6.23. Where a Shop Drawing or Sample is required by
the Contract Documents or the schedule of Shop Drawing
and Sample submissions accepted by F.NGNF.ER as
required by paragraph2.9, any related Work performed
prior to f;NGiNEER's review and approval of the pertinent
submittal will be at the sole expense and responsibility of
CONE RACTOR.
Continuing the Mork:
6.29. CONTRACTOR shall carry on the Work and
adhere to the progress schedule during all disputes or
disagreements with OWNER. No Work shall be delayed or
postponed pending resolution of any disputes or
disagreements, except as permitted by paragraph 15.5 or as
WNER and CONTRACTOR may otherwise agree in
writing.
6.30. CONTRACTOR's Ceneral fharrantp and
Guarantee.
630.1. CONTRACTOR warrants and guarantees to
OWNER, E-NIGNEER and ENI GNEER's Consultants
that all Work will be in accordance with the Contract
Documents and will not be defective.
CONTRACTOR's warranty and guarantee hereunder
excludes defects or damage caused by:
6.30.1.1. abuse, modification or improper
maintenance or operation by persons other than
CONTRACTOR, Subcontractors or Suppliers; or
6.30.1.2. normal wear and tear under normal
usage.
6.30.2. CONTRACTOR's obligation to perform and
complete the Work in accordance with the Contract
Documents shall be absolute. None of the following
will constitute an acceptance of Work that is not in
EXUGGENERAL CONDITIONS 1919-8 (1990 EOtion)
WICITY 01; FORT COLLI NS MODIFICATIONS (REv 4/10oo)
accordance with the Contract Documents or a release
of CONTRACTOR's obligation to perform the Work
in accordance with the Contract Documents:
6.30.2.1. observations by ENGINEER
6.30.2.2. recommendation of any progress or
final payment by ENGINEER;
6.30.2.3. the issuance of a certificate of
Substantial Completion or any payment by
OWNER to CONTRACTOR under the Contract
Documents;
630.2.4. use or occupancy of the Work or any
part thereof by OWNER;
630 2.5. anv acceptance by OWNER or any
failure to do so;
6.30.2.61 any review and approval of a Shop
Drawing or Sample submittal or the issuance of a
notice of acceptability by F'NGfNFFR pursuant
to paragraph 14.13,
6.30.2.7. any inspection, test or approval by
others; or
6.30.2.8. any correction of clefecrive Work by
OWNER.
IndenwificaAon:
6,31. To the fullest extent permitted by Laws and
Regulations, CONTRACTOR shall indemnify and hold
harmless 'OWiNTER, ENGDIUR, LNG NEERs
Consultants and the officers, directors, employees, agents
and other consultants of each and any of them from and
,against all claims, costs, losses and damages (including,
but not limited to, all fees and charges of engineers,
architects, attomeys and other professionals and all court
or arbitration or other dispute resolution costs) caused by,
arising out of or resulting from the performance of the
Work, provided that any such claim, cost, loss or damage:
(i) is attributable to tWily injury, sickness. disease or
death, or to injury to or destruction of tangible property
(other than the Work itself), including the loss of use
resulting therefrom, and (ii) is caused in whole or in part
by any n ugligent act or omission of CONTRACTOR any
Subcontractor, any Supplier, any person or organi7 ion
directly or indirectly employed by any of them to perform
or furnish any of the Work or anyone for whose acts any
of them may be liable, regardless of whether or not caused
in part by any negligence or omission of a person or entity
indemnified hereunder or whether liability is imposed
upon such indemnified party by Laws and Regulations
regardless of the negligence of any such person or entity.
6.32. In any and all claims against OWNER or
ENGLNrEER or any of their respective consultants, agents,
officers, directors or employees by any employee (or the
survivor or personal representative of such employee) of
CONTRACTOR. any Subcontractor. any Supplier, any
person or organisation directly or indirectly employed by
any of them to perform or furnish any of the Work or
anyone for whine acts any of them may be liable, the
indemnification obligation under paramwaph 6.31 shall not
be limited in any way by any limitation on the amount or
qTe of damages, compensation or benefits payable by or
for CONTRACTOR or any such Subcontractor, Supplier or
other person or organization under workers compensation
acts, disability benefit acts or other employee benefit acts.
6.33. 'The indemnification obligations of
CONTRACTOR under paragraph6.31 shall not extend to
the liability of ENGNEER and ENG iNEER's Consultants.
officers. directors, employees or agents caused by the
professional negligence, errors or omissions of any of them.
Surf-i cal. of Obligations:
6.34, All representations, indemnifications, wan -antics
and guarantees made in required by or given in accordance
with the Contract Documents, as well as all continuing
obligations indicated is the Contract Doc:umrnts, will
survive final payment, completion and acceptance of the
Work and termination or completion of the Agreement.
ARTICLE 7--OTFFER WORK
Related I4'ork at Site:
TL OWNER may perform other work related to the
Pro je:t at the site by OWNER's own forces, or let other
direct contracts therefor which shall contain General
Conditions similar to these, or have other work performed
by utility owners. If the fact that such other work is to be
performed was not noted in the Contract Documents, then:
(i) written notice thereof will be given to CONTRACTOR
prior to starting any such other work and
(ii) CONTRACTOR may make a claim therefor as
provided in Articles I 1 and 12 if CONTRACTOR believes
that such performance will involve additional expense to
CONTRACTOR or requires additional time and the parties
are on, to agree ns to the annount or extent thereof.
72. CONTR\C'COR shall allord each other contractor
who is a party to such a direct contract and each utility
owner (and Ot\rNER, if OWNER is performing the
additional work with OWNER'S employees) proper and
s.afa access to the site and a reasonable opportunity for the
introduction and storage of materials and equipment and
the execution of such other work and shall properly connect
and coordinate the Work with theirs. Unless otherwise
provided in the Contract Documents. CONTRACTOR
shall do all cutting, fitting and patching of the Work that
may be required to make its several parts come together
properly and integrate with such other work.
CONTRACTOR shall not endanger any work of others by
cutting, excavating or otherwise altering their work and
will only cut or alter their work with the written consent of
ENGfNTEER and the others whose work will be affected.
The duties and. responsibilities of CONTRACTOR- under
this paragraph are for the benefit of such utility owners and
other contractors to the e.\tent that there aree comparable
l � EXDCG6'NERAL COND111ONS 1910-8 (1990Edition)
wl C1'[Y OF FORT COLLI NS MODIFICATIONS (REV 4P000
provisions for the benefit of CONTRACTOR, in said
direct contracts between OWNER and such utility owners
and other contractors.
7.3. If the proper execution or results of any part of
CUNI'RACTOR's Work depends upon work performed.
by others under this Article 7, CONTRACTOR shall
inspect such other work and promptly report to
ENGti E-ER it writing any delays, defects or deficiencies
in such other work that render it unavailable or unsuitable
for the proper execution and results of CONTRACTOR's
Work. CONTR4CTOR's failure so to report will
constitute an acceptance of such other workas fit and
proper for integration with CONTRACTOR's Work
except for latent or nonapparent defects and deficiencies
in such other work.
Coordination:
7.4. If OWNER contracts with others for the
performance of other work on the Project at the site, the
following will be set forth in Supplementary Conditions:
T4:1. the person, firm or corporation who will have
authority and responsihility for coordination of the
activities anmong the various prime contractors will be
identified;
7.4.2.. the specific matters to be covered by such
authority and responsibility will be itemized; and
7.4.3, the extent of such authority and
responsibilities will he provided.
Unless otherwise provided in the Supplementary
Conditions, OWNER shall have sole authority and
responsibility in respect of such coordination.
ARTICLE 8--ONVINER'S RESPONSIBILITIES
8.1. Except as otherwise provided in these General
Conditions, OWNTF,R shall issue all communications to
CONTRACTOR through ENGTNEER.
8.2. In case of termination of the employment of
ENGINEER; OWNER shall appoint an engineer against
whom-COl*;TR.AC-T-OR-m akt-s=no-reasonable-object ion;
whose status under the Contact Documents shall be that
of the former ENGINEER.
83. OWNER shall furnish the data required of
OWNER under the Contract Documents promptly and
shall make payments to CONTRACTOR promptly when
they are due as provided in paragraphs 14.4. and 14.13.
8.4. OWNI ER's duties in respect of providing lands
and Casements and providing erlgmeermg surveys to
establish reference points are set forth in paragraphs 4.l
and 4.4. Paragraph 4.2 refers to OWNER's identifying
and making available to CONTRACTOR copies of
reports of explorations and tests of subsurface conditions
at the site and drawings of physical conditions in existing
stnmctures at or contiguous to the site that have been utilized
by ENGINT EER. in preparing the Contract Documents.
shasin1'
aacl-mirting-liability-artd-praperty--ins-arcs-sut
forth-in-paragrapK%-5-3-through �-1 A-
8.6. OtVNER is obligated to execute Change Orders as
indicated in parat aph 10.4.
8.7. OWNMR's responsibility in respect of certain
inspections, tests and approvals is set forth in
paragraph 13.4.
8.8. In connection with OWNER'S right to stop Work or
suspend Work, sce paragraphs 13.10 and 15.1.
Paragraph 15.2 deals with OWNER's right to terminate
sa'rvices of CONTRAC'f(7R under certain circumstances.
8.9. The OWNER shall not supervise, direct or have
control or authority over, nor be responsible for.
CONTRAC'I'OR's means, methods, techniques, sequences
or procedures of construction or the safety precautions and
programs incident thereto, or for any failure of
CONTRACTOR to comply with Laws and Regulations
applicable to the Furnishing or performance or the Work.
OWNER will not he responsible for COM'RACTOR's
failure to perform or furnish the Work in accordance with
the Contract Documents.
940. esponsibifity ia,= of undi-zlesed
5. r FC-F3& petroleum, u �,,,;ro—or
Rftdiomive-ly aterials-unetwered of at -the -site -is
set f " Faragmph
�hz extent-OWNE
orTangemtnts-Itavr-bt�n-mach-to-satisfrOGl�I�s
obligati�ya� de; -use•.. . ,..,anal Doe,ae n;,ts G
responsibility -in -respect -thereof -will -be -as -sat Forth -in -the
Supplementary -Conditions.
ARTTCLF.- 9-ENGINFER'S STATUS DURING
CONSTRUCTION
OWNER's Representative:
9.1. ENGINEER will be OWNER's representative
during the construction period. The duties and
responsibilities and the limitations of authority of
ENGINEER as OWNER'S representative during
construction are set forth in the Contract Documents and
shall not be extended without written consent of OWNER
and ENO INTER.
hints to Site:
9.2. ENGMER will make visits to the site at intervals
appropriate to the various stages of construction as
ENGINEER deems necessary in order to observe as an
experienced and qualified design professional the progress
EJC:DCOENERAL CONDITIONS 1910-8 (1990 Edtimj
w/ CITY 01; PORT COLLINS MODIFICATIONS tRL1%42000)
that has been made and the quality of the various aspects
of CONCR4C_TOR's executed Work. Based on
information obtained during such visits and observations.
ENGINEER will endeavor for the benefit of OWIMER to
determine, in general, if the Work is proceeding in
accordance with the Contract Documents. ENGINEER
will not be required to make exhaustive or continuous on -
site inspections to check the quality or quantity of the
Work. ENGINEER's efforts will be directed toward
providing for OWNER a greater degree of confidence that
the completed Work will conform generally to the
Contract Documents. On the basis of such visits and on -
site observations, ENGINEER will keep OWNER
informed of the progress of the Work and will endeavor to
guard OWNER against defective Work. ENGINEER's
visits and on -site observation-, are subject to all the
limitations on ENGINEFR's authoritv and responsibility
set forth in paragraph 9.13, and particularly, but without
limitation during or as a result of ENGINEER's on -site
visits or observations of CONTRACTOR's Work
ENGINEER will not supervise, direct. control or have
authority over or be responsible for C01VI'RAC7'OR's
means, methods, techniques, sequences or procedures of
construction, or the safety precautions and programs
incident thereto, or for any failure of CONTRACTOR to
comply with Laws and Regulations applicable to the
furnishing or performance of the Work.
Project Representative
9.3. If OWNER and ENGINEER agree, ENGINEER.
will furnish a Resident Project Representative to assist
ENGINEER in providing more continuous observation of
the Work. The responsibilities and authority and
limitations thereon of any such Resident Project
Representative and assistants will be as provided in
paragraphs 9.3 and 9.13 mid -in the Supplamen
Conditions of these General Conditions. If OWNM
desi6mates another representative or agent to represent
OWNER at the site who is not ENGNEER's Consultant;
agent or employee, the responsibilities and authority and
limitations thereon of such other person will be as
provided in the iuppkztttertittry Eericliitem Wriyaph 9.3
of these General Conditions If the ENGNF.FIZ furnishes
a Resident Project RzI?resentntive or other
:I.ssistants or if the OWNER desismates a Representative
or agent, all as provided in paragraph 9.3 of the General
Conditions these Representatives shall have the authority
and limitations as provided in paragrah 9.13 of the
General Conditions and shall be subieetto the following:
9.3.1. The Representative's dealings in matters
pertaining to the on -site work will, in general, be with
the ENGflgEER and CONTRACTOR But. the
Representative will keep the OWNER proMUy
advised about such matters. The Representative's
dealings with subcontractors will only be through or
with the full knowledge and approval of the
CONTRACTOR
9.3.2. Duties and Responsibilities. Representative
will:
9.3.2.1. Schedules - Review the progress
schedule and other schedules prepared by the
CONTRACTOR and consult with the
ENGINEER concerning ac(xptability.
9.3.2.2. Conferences and Meeting - Attend
meeting with the CONI'RA( '['OR such as
precunstruction conferences progress meetings
and other job conferences and prepare and
circulate copies of minutes of meetings.
93.23. Liaison
9.3.2.3.1. Serve as ENGINEER.'S liaison
with CONTRACTOR, working principally
through CONTRACTOR'S superintendent to
assist the CONTRACTOR in understandini
the Contract Documents.
9.3.2.3.2. Assist in obtaining from OWNER
additional details or information, when.
required, for proper execution of the Work.
9a?3.3. Advise the FNGINF':F:R and
CONTRACTOR of the commencement of
any Work requiring a Shop Drawing or
s-imple submission if the submission has not
been approved by the RNGI:NEFR.
9.3.2 4.Review of WorkReiection of Defective
Work�Ittsl)ections and "tests -
9.3.2.4,1. Conduct on -site observations of
the Work in progress to assist the ENGINEER
in detennining that the Work is proceeding in
accordance %vith the Contract Documents.
9.3.2.4.3. Accompany visitingins ep ctors
representing public or other agencies having
jurisdiction over the Proicct record the results
of these inspections and report to the
ENGINEM-
9.32'S. Interpretation of Contract
Documents. Report to ENGINTEER when
clarifications and interpretations of the Contract
Documents are needxl and transmit to
CONTF ACI'OR clarification and interprcuation
of the Contract Documents as issued by the
ENGINEER.
9.3.2A Modifications. Consider and
evalunte CONTRACTOR'S sunixestions for
?� EJCDCGENEKALCONIN17GNS1910-3(1990Editim)
n'i CITY OF 1'OR I' COLLINS NIODII'ICATIONS (REV 412000j
modification in Drmviu,s or Specifications and
report these recommendations to ENGINEER.
Accurate►v transmit to CONTRACTOR
decisions issued by the ENGINEER.
9.3.2.7. Records.
9.3.2.7.2. Keep a diary, daily
report form, or log book, recording hours on
the iob site, weather conditions data relative
to questions of work directive changes,
Change Orders, or chanced conditions, list
of job site visitors, daily activities, decisions
observations 'in ocncral and specific
observations in more detail as in the caw of
obsarvin test procedures: send copies to the
ENGINEER.
9.3.2.23. Record names
addresses and telephone numbers of all
CONTRACTORS, subcontractors and
for suppliers of equipment and materials.
9.3.2.8. Reports,
9.3.2.8.1. Furnish ENG [N --ER periodic
reports, as required, of the progress of the
Work and of the CONTRACTORS
compliance with the progress schedule and
schedule of shop Drawing and sample
submittals
93.2,5.1 Consult with FmrrhmER in
advance of scheduling major tests
inspections or start of important phases of the
Work.
9.3 2.5.3 Draft proposed Change Orders
and Work Directive Chan, obtaining
backup material from the CONTRACTOR
and recommend to ENGMEER Change
Orders, Work Directive Chanaes and field
orders
9.32.8A. Report immediately to
ENGINEER and OWT JER the occurrence of
any accident.
93.2.9. Pavment Requests. Review applications
for payment with CONTRACTOR for compliance
with the established procedure for their
submission and forward with recommendation to
ENGINEER noting particularly the relationship of
the `rayment requested to the schedule of values
work completed and materials and equipment
delivered at the site but not incorporated in the
Work.
9.3.2.10. Cora leP lion:
9.3 2.10.1. Before L"i 1GTNEER issues a
Certificate of Substantial Completion, submit
to CONTRACTOR a list of observed items
requiring correction or completion
9.3 2.10.2. Conduct final inspection in the
company of the ENGINEER, OWNER and
CONTRACTOR and prepare a final list of
items to be corrected or completed.
9.3.2.10.3. Observe that all items on the
final list have been corrected or completed and
make recommen&ations to ENGINEER
concemine acceptance.
9.3.3. Limitation of Authority: The Representative shall
not:
9.3.3.1. Authorize any deviations from the
Contract Documents or accept any substitute
materials or equipment, utilz. authorized�y the
ENGINEER.
9.3.3.2. Excccd limitations of ENGINEER'S
authority asset forth in the Contract Documents.
9.3.3.3. Undertake any of the responsibilities
of the CONTRACTOR- Subcontractors, or
CONTRACTORS superintendent.
9.3.3.4. Advise on. or issue directions relative
to or assume control over any=aspect or the
means methods, technicl p-s, sequences or
procedures for construction unless such is
ppecifically called for in the Contract Documents.
9.3.3.5. Advise on or issue directions
rzglyding_or assume control over safety_
precautions and pro ams in connections with the
Work.
9.3.3.6. Accept Shop Drawings or sample
submittals from anyone other than the
CONTRACTOR_
9.3.3.7. Authorize OWNER to occupy the
lVork in whole or in part.
9.3.3.8. Participate in specialized field or
laboratory tests or inspections conducted by others
eecept as specifically authorized by the
ENGINEEK
Clarifications and Interpretations:
9.4. ENGINEER will issue with reasonable promptness
such written clarifications or interpretations of the
EXI)CGENERAL CONDITIOM 19I0-S 0990 Etitimj
w! CITY 01; FORT COLLINS MODIFICATIONS (REV 9IZ000)
requirements of the Contract Documents (in the form of
Drawings or otherwise) as ENGTNT U R may determine
necessary. which shall be consistent with the intent of and
reasonably inferable from the Contract Documents. Such
written clarifications and interpretations will be binding on
OWNER and CON"TRAC'TOR_ If OWNER or
CONTRACTOR believes that a written clarification or
interpretation j(astities anadjustment in the Contract Price
or the Contract Times and the parties are unable to agree
to the amount or extent thereof if any. OWNER or
CONTRACTOR may make a written claim therefor as
provided in Article I I or Article 12.
Authorized Variations in Work:
9.5. ENGINFER may authorize minor variations in
the Work from the requirements of the Contract
Documents which do not involve an adjustment in the
Contract Price or the Contact Times and are compatible
with the design concept of the completed Project as a
functioning whole as indicated by the Contract
Documents. These may be accomplished by a Field Order
and will be binding on OWNER and also on
CONTRACTOR who shall perform the Work involved
promptly. If OWNER or CONTRACTOR believes_ that a
Field Order justifies an adjustment in the Contract Price or
the Contract Times and the parties are unable to agree as
to the amount or extent thereof, Olb'NER or
CONTRACTOR may, make a written claim therefor as
provided in Article 11 or 12.
Rejecting Defective Work:
9.6. ENGINEER will have authority to disapprove or
reject Work which ENGNEER believes to be defective,
or that ENGNEER believes will not produce a completed
Project that conforms to the Contract Dcx:wnents or that
will prejudice the integrity of the design concept of the
completed Project as a functioning whole as indicated by
the Contract Documents. ENGNEER will also have
authority to require special inspection or testing of the
Work as provided in paraaaph 13.9, whether or not the
Work is fabricated, installed or completed.
Shop Drawings, Change Orders and Pajmeents:
9.7. In connection with ENGNEER's authority as to
Shop Drawings and Samples, see paragraphs 6.24 through
6.28 inclusive.
9.& In connection with ENG rNEER's authority as to
Change Orders. see Articles 10, 11. and 12.
9.9. In connection with ENGLNEERs authority as to
Applications for Payment, see Article 14.
Determinations for Unit Prices:
9.10. ENGINEER will determine the actual quantities
and classifications of Unit Price Work performed by
CONTRACTOR. ENGINEER will review with
CONTRACTOR the ENGINF;F,R's preliminary
determination on such matters before rendering a written
decision thereon (by recommendation of an Application
for Payment or otherwise). ENG tINrU-R's written decision
thereon will be final and binding upon OWNER and
CONTRACTOR, unless, within ten days after the date of
any such decision, either OWNTER or CONTRACTOR
delivers to the other and to ENGINEER written notice of
intention to appeal from ENGINFER's decision and: (i) an
appeal from ENGINEER's decision is taken within the time
limits and in accordance with the procedures set forth in
Exhibit 'GC -A, "Dispute Resolution Agreement", entered
into between OWNER and CONTRACTOR pursuant to
Article 16, or (ii) if no such Dispute Resolution Agreement
has been entered into. a formal proceeding is instituted by
the appealing party in a forum of competent jurisdiction to
exercise such rights or remedies as the appealing party may
have with respect to ENGINEER's decision, unless
otherwise agreed in writing by OWNER and
CONTRACTOR. Such appeal will not be subject to the
procedures of paragraph 9.11.
Decisions on Di puter
9.11. ENGINEER will be the initial interpreter of the
requirements of the Contract Documents and judge of the
acceptability of the Work thereunder. Claims, disputes and
other matters relating to the acceptability of the Wort: or
the interpretation of the requirement- of the Contract
Documents pertaining to the performance and furnishing of
the Work and claims under Articles 11 and 12 in respect of
changes in the Contract Price or Contract Times will be
referred initially to.FNGINEER in writing with a request
for a formal decision in accordance with this paragraph.
Written notice of each such claim, dispute or other matter
will be delivered by the clainant to ENGINEER and the
other party to the Agreement promptly (but in no event
later than thirty days) after the start of the occurrence or
event giving rise thereto, and written supporting data will
be submitted to HNGiNEF:R and the other party within
sixty days after the start of such occurrence or event unless
ENGINEER allows an additional period of time for the
submission of additional or more accurate data in support.
of such claim, dispute, or other matter. The opposing party
shall submit any response to ENGINEER and the claimant
within thirty days after receipt of the claimant's last
submittal (unless- ENGTNF.F.R allows additional time).
ENGINEER will render a formal decision in writing within
thirty days alter receipt of the opposing party's submittal, it
any, in accordance with this paragraph. ENGINEER's
written decision on such claim, dispute or other matter will
be final and binding upon OWNER and CONTRACTOR
unless: (i) an,appeal from ENGINMR's decision is taken
within the time limits and in accordance with the
procedures set forth in EXHIBIT GC -A. "Dispute
Resolution Agreement", entered into between OWNER and
CONTRACTOR pursuant to Article 16. or (ii) if no such
Dispute Resolution Agreement has been entered into, a
written notice of intention to appeal from ENGIN`E.ER's
written decision is delivered by OWNER or
CONTRACTOR to the other and to lNGINEER within
thirty days after the date of such decision and a formal
proceeding is instituted by the appealing party in a forum of
competent jurisdiction to exercise such rights or remedies
as the appealing party may have with respect to such claim,
dispute or other matter in accordance with applicable Laws
and Regulations within sixty days of the date of such
MI)C GENERAL COND111ONS 1910-8 (1990 Edition) �2
col CITY OF FORT COLLI NS INIODIFICAuONS (REV 4P0W)
decision, unless otherwise agreed in writing by OWNER
and CONTRACTOR.
9.12. When functioning as interpreter and judge under
paragraphs 9.10 and 9.11. ENGINEER will not show
partiality to OWNER or CONTRACTOR and will not be
liable in connection with any interpretation or decision
rendered in good ti'tith in such capacity. The rendering of
a decision by L'iVGINEER pursuant to paragraphs 9.1 U or
9.11 with respect to any such claim, dispute or other
matter (except any which have been waived by the making
or acceptance of fatal, payment as provided in
paragraph 14.15) will be a condition precedent to any
exercise by OWNER or CONTRACTOR of such rights or
remedies as either may otherwise have under the Contract
Documents or by Laws or Regulations in respect of any
such claim, dispute or other matter -pursuant te-\Fuele46.
9.13. Limitations on ENG(NEER's Authority and
Responsibilities.
9.13.1. Neither EN'GiNEFR's authority or
respximsibility under this Article 9 or under any other
provision of the Contract Documents nor any decision
made by ENGINEER in good faith either to exercise
or not exercise such authority or responsibility or the
undertaking atercise or performance. of any authority
or responsibility by ENGNF.ER shall create, impose
or give rise to any duty owed by ENGINEER to
CONTRACTOR, any Subcontractor, any Supplier,
any other person or organimtion,.or to any surety for
or employee or agent of any of them,
9A3.2. ENGINEER will not supmise, direct,
control or have authority over or lie responsible for
CONTRACTOR's means, methods, tecluiiques,
sequences or procedures of construction, or the safety
precautions and programs incident thereto, or for any
failure of CONTRACTOR to comply with Laws and
Regulations applicable to the furnishing or
performance of the Work. ENGTNT'ER will not be
responsible for CONTRACTOR's failure to perform
or furnish the Work at accordance with the Contract
Document-.
9.13:3. ENG tNEER will not be responsible for the
acts or omissions of CONTRACTOR or of any
Subcontractor, any Supplier, or of any other person or
organization performing or furnishing any of the
Work.
9.13.4. ENGINEER's review oftho final Application
for Pavment and accompanying documentation and
all maintenance and operating instructions, schedules.
guarantees, Bonds and certificates of inspection, tests
and approvals and other documentation required to be
delivered by paragraph 14.12 will only be to
determine generally that their content complies with
the requirements of, and in the case of certificates of
inspections, tests anti approvals that. the results
certified indicate compliance with. the Contract
Documents.
9.13.5. The limitation- upon authority and
SECTION 00100
INSTRUCTIONS TO BIDDERS
1.0 DEFINED TERMS
Terms used in these Instructions to Bidders which are defined in* the
Standard General Conditions of the Construction Contract (No. 1910-8,
1990 ed.) have the meanings assigned to them in the General Conditions.
The term "Bidder" means one who submits a Bid to OWNER, as distinct from
a sub -bidder, who submits a Bid to Bidder. The terms "Successful Bidder"
means the lowest, qualified, responsible and responsive Bidder to whom
OWNER (on basis of OWNER's evaluation as hereinafter provided) makes an
award. The term "Bidding Documents" includes the Advertisement or
Invitation to Bid, Instructions to Bidders, the Bid Form, and the
proposed Contract Documents (including all Addenda issued prior to
receipt of Bids).
2.0 COPIES OF BIDDING DOCUMENTS
2.1. Complete sets of Bidding Documents may be obtained as stated in the
Invitation to Bid. No partial sets will be issued. The Bidding
Documents may be examined at the locations identified in the Invitation
to Bid.
2.2. Complete sets of Bidding Documents shall be used in preparing Bids;
neither OWNER nor Engineer assumes any responsibility for errors or
misinterpretations resulting from the use of incomplete sets of Bidding
Documents.
2.3. The submitted Bid proposal shall include Sections 00300, 00410,
00420, and 00430 fully executed.
2.4. OWNER and Engineer, in making copies of Bidding Documents available
on the above terms, do so only for the purpose of obtaining Bids on the
Work and do not confer a license or grant for any other use.
3.0 QUALIFICATION OF BIDDERS
3.1 To demonstrate qualifications to perform the Work, each Bidder must
submit at the time of the Bid opening, a written statement of
qualifications including financial data, a summary of previous
experience, previous commitments and evidence of authority to conduct
business in the jurisdiction where the Project is located. Each Bid must
contain evidence of Bidder's qualification to do business in the state
where the Project is located or covenant to obtain such qualification
prior to award of the contract. The Statement of Qualifications shall be
prepared on the form provided in Section 00420.
Rev 10/20/07 Section 00100 Page 1
responsibility set forth in this paragraph 9.13 shall also
apply to 1:14CMER's Consultants, Resident Project
Representative and assistants.
ART ici,E 10—CHANGES IN THE WORK
10.1. Without invalidating the Agreement and without
notice to any surety, OWNER may, at any time or from
time to time. order additions, deletions or revisions in the
Work. Such additions, deletions or revisions will be
authorized by a Written Amendment, a Change Order, or a
Work Change Directive. Upon receipt of any such
document, CONTRACTOR shall promptly proceed with
the Work involved which will be performed under the
applicable conditions of the Contract Documents (except as
otherwise specifically provided).
10.2. If OWNER and CONTRACTOR are unable to
agree as to the eRtenL if any, of an adjustment in the
Contract Price or an adjustment of the Contract T imes that
should be allowed as a result of a Work Change Directive,
a claim may be made therefor as provided in Article I i or
Article 12,
10.3. CONTRACTOR shall not be entitled to an increase
in the Contract Price or an extension of the Contract T times
with respect to any Work performed that is not required by
the Contract Documents as amended, modified and
supplemented as provided in paragraphs 3.5 and 3.6, except
in the case of an emergency as provided in paragraph6.23
or in the case of uncovering Work as provided in
paragraph 13.9.
10.4. OWNER and CONTRACTOR shall execute
appropriate Change Orders recommended by ENGINEER
(or Written Amendments) covering:
10.4.1, changes in the Work which are (i) ordered
by OWN[ R pursuant to paragraph W.1, (ii)required
beumuse of acceptance of defective Work under
paragraph 13.13 or correcting defective Work under
paragraph 13.14, or (iii) agreed to by the parties:
10.4.2; changes in the Contract Price or Contract
Times which are agreed to by the parties; and
10.43. changes in the Contract Price or Contract
Times which embody the substance of any written
decision rendered by ENGINEER pursuant to
paragraph 9.11,
provided than, in lieu of executing any such Change Order,
an appeal may be taken from any such decision in
accordance with the provisions of the Contract Documents
and applicable Laws and Regulations, but during any such
appeal, CONTRACTOR shall carry on the Work and
adhere to the progress schedule as provided in
paragraph 6.29.
10.5. If notice of any change affecting the general scope
of the Work or the provisions of the Contract Documents
ExDCGENERAL coNurnoNs 191" 0990 E,filion)
cal C1TY 017 FORT COLLI NS MOD111CATIONS (REV 4P000)
(including, but not limited to, Contract Price or Contract
Times) is required by the provisions of any Bond to be
given to a surety, the giving of any such notice will be
CONTRACTOR'S responsibility, and the amount of each
applicable Bond will be adjusted accordingly.
ARTICLE II —CHANGE OF CONTRACT PRICE
11.1. The Contract ['rice constitutes the total
contpcn.-.ttion (subject to authorized adjustments) payable
to CONTRACTOR for perfbmlutg the Work. All duties.
responsibilities and obligation-, assigned to or undertaken
by CONTRACTOR shall beat CONTRACTOR's e,pense
without change in the Contract ['rice.
11.2. The Contract Price may only be changed by a
Change Order or by a Written Antendrncnt Any claim
for an adjustment in the Contract Price shall be based on
written notice delivered by the party making the claim to
the other party and to ENGINEER promptly (but in no
event later than thirty days) after the start of the
occurrence or event giving rise to the. claim and stating the
general nature of the claim. Notice of the amount of the
claim with supporting data shall be delivered within sixty
days after the startof such occurrence or event (unless
Fi`TGiNF.ER allows additional time for claimant to submit
additional or more accurate data i i support of the claim)
and shall be accompanied by claimant's written statement
that the adjustment claimed covers all known amounts to
which the claimant is entitled as a result of said
occurrence or event. All claims for adjustment in the
Contract Price shall be determined by ENGNEER in
accordance with paragraph 9.1 1 if OWNER and
CONTRACTOR cttnnol otherwise agree on the amount
involved. No claim for an adjustment in the Contract
Price will be valid if not submitted in accordance with this
paragraph 112.
11.3. The value of any Work covered by a Change
Order or of any claim for an adjustment in the Contract
Price will be determined as follows:
11:3.1. where the Work involved is covered by unit
prices contained in the Contract 'Documents, by
application of such unit -prices to the quantities of the
items involved (subject to the provisions of
23
paragraphs 11.9.1 through 11.93, inclusive);
11.3.2. where the Work involved is not covered by
unit prices contained in the Contract Documents, by a
mutually agreed payment basis, including lump sum
(which may include an allowance for overhead and
profit not necessarily in accordance with
paragraph 11.6.2);
11.33. where the Work involved is not covered by unit
prices contained in the Contract Documents and
agreement to a lump sum is not reached under
paragraph 11.3.2, on the basis of the Cost of the Work
(determined as provided in paragraphs 11.4 and 11.5)
plus a CONTRAC'I'OR's fee for overhead and profit
(determined as provided in paragraph 1 1.Cr).
Cost of the Work:
11A. The term Cost of the Work means the suns of all
costs necessarily incurred and paid by CONTRACTOR in
the proper performance of the Work. Except as otherwise
may be agreed to in writing by OWNER, such costs shall
be in amounts no higher than those prevailing in the
locality of the Project shall include only the following
items and shall not include any of the costs itemized in
paragraph 11.5:
1 lA.l. Payroll costs for employees in the direct
employ of CONTRACTOR in the performance of the
Work under schedules of job classifications agreed
upon by OWNER and CONTRACTOR. Such
employees shall include without limitation
superintendents, foremen and other personnel
employed full-time at the site. Payroll costs for
employees not employed full-time on the Work shall
he apportioned on the basis of their time spent on the
11%ork. Payroll costs shall include,Aut•not be lint ited to;
salaries and wages plus the cost of tinge benefits
which shall include social security contributions,.
unemployment, excise and payroll taxes, workers'
compensation, health and -retirement benefits, bonuses;
siekktwc; Yee ticm and helidaN, Pw applicable thereto.
The exlx-uses of perforating Work alter regular
working hours, on Saturday, Sunday or legal holidays,
shall be included in the above to the extent authorized
by OWNER.
11.4.2. Cost of all materials and equipment furnished
and incorporated in the Work, including costs of
transportation and storage thereof, and Suppliers' field
services required in connection therewith. All cash
discounts shall accrue to CONTRACTOR unless
OWNER deposits funds with CONTRACTOR with
which to make payments, in which case the cash
discounts shall accrue to OWNER. All trade
discounts, rebates and refunds .and returns from sale of
surplus materials and equipment shall accrue to
OWNER, and CONTRACTOR shall make provisions
so that they may be obtained..
11.4.3. Paymcnts made by CONTRACTOR to the
Subcontractors for Work performed or furnished by
Subcontractors. If required by OWNER,
EJCDCGENERALCONOMONSI910-8(1990Eeitim) �4
w/ CITY OF FORT COLLI NS DIODIIICA'nONS (RLV 4T1000)
CONTRACTOR shall obtain competitive bids from
Subcontractors acceptable to OWNER and
CONTRACTOR and shall deliver such bids to
OWNER who will then determine, with the advice of
ENGMER which bids, if any, will be accepted. if
any subcontract provides that the Subcontractor is to
be paid on the basis of Cost of the Work plus a fee,
the Subcontractor's Cost of the Work and fee shall be
determined in the same manner as CONTRACTOR'S
Cost of the Work and fee as provided in
paragraphs 11.4, 11.5, 11.6 and 11.7. All
subcontracts shall be subject to the other provisions of
the Contract Documents insofar as applicable.
11.4.4. Costs of special consultants (including but
not limited to engineers, architects, testing
laboratories. surveyors, attorneys and accountants)
employed for services specifically related to the
Work.
11.4.5. Supplemental costs including the following:
11.4.5.1. The proportion of necessary
transportation, travel and subsistence expenses of
CONTRACTOR's employees incurred in
discharge of duties connected with the Work,
11.4.5.2. Cast, including transportation and
maintenance, of all materials, supplies,
equipment, machinery, appliances, office and
temporary facilities at the site and hand tools not
owned by the workers; which are consumed in the
performance of the Work, and cost less market.
value of such items used but not consumed which
remain the property of CONTRACTOR.
11.4.5.3. Rentals of all construction
equipment and machinery and the parts thereof
whether rented from CONTRACTOR or others in
accordance with rental agreements approved by
OWNER with the advice of ENGMI -ER: and the
costs of transportation, loading, unloading,
installation; dismantling and removal thereof —all
in accordance with terms of said rental
agreements. The rental of any such equipment,
machinery or parts shall cease when the use
thereof is no longer necessary for the Work.
11.4.5.4. Sales, consumer, use or similar taxes
related to the Work, and for which
CONTRACTOR is liable, imposed by Laws and
Regulations.
11.4.5.5. Deposits lost for causes other than
negligence of CONTRACTOR, any
Subcontractor or anyone directly or indirectly
employed by any of them or for whose ucts any
of them may be liable, and royalty payments and
fees for permits and licenses.
11.4.5.6. Losses and damages (and related
expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained
by CONTRACTOR in connection with the
performance and furnishing of the Work (except
losses and damages within the deductible amount~
of property insurance established by OWNI ER in
accordance with pargnaph 5.9), provided they
have resulted from causes other than the
negligence of CONTRACTOR, any
Subcontractor, or anyone directly or indirectly
employed by any of them or for whose acts any of
them may be liable. Such losses shall include
settlements made with the written consent and
approval of OWNER. No such losses, damages
and expenses shall be included in the Cost of the
Work for the purpose of determining
CONTRACTORSs fee. If, however, any such loss
or damage requires reconstruction and
CONTRACTOR is placed in charge thereof,
CONTRACTOR shall be paid for services a fee
proportionate to that stated in paragraph 11.6.2.
11.4.5.7. The cost of utilities, fact and sanitary
facilities at the site.
11 A.5.8. Minor expenses such as telegrams,
long distance telephone calls, telephone service at
the site, expressage and similar petty cash items in
connection with the Work.
11.4.5.9. Cast of premiums for additional Bonds
and insurance required because of changes in the
Work.
1 1.5. The term Cost of the Work shall not include any of
the. following:
11.5.1. Payroll costs anal other compensation of
CONTRt\CTOR's officers, executives, principals (of
partnership and sole proprietorships), general managers,
engineers, arcNtects, estimators, attorneys, auditors,
accountants, purchasing and contracting agents,
expediters, timekeeper.-,. clerks and other personnel
employed by CONTRACTOR whether at the site or in
CONTRACTOR's principal or a branch office for
general administration of the Work and not specifically
included in the agreed upon schedule of job
classifications referred to in paragraph 11.4.1 or
specifically covered by paragraph 11.4.4=all of which
are to be considered administrative costs covered by the
CONTRACTORS fee.
11.5.2. Expenses of CONTRACTOR's principal and
branch offices other than CONTRACTOR's office at
the site.
11.5.3. Any part of CONTRACTORSs capital
expenses, including interest on CONTRACTOR'S
capital employed for the Work and charges against
CONTRACTOR for delinquent payments.
11.5.4. Cost of premiums for ull Bonds and for all
insurance whether or not CONTRACTOR is required
by the Contract Documents to purchase and maintain
the same (except for the cost of premiums covered by
subparagraph 11.4.59 above).
HJCDCOENERAL CONDITIONS 1910-3 (1990 Ettilion)
a/ CITY Oh FORI- COLLI NS h10DIFICA,r1ONS (Rn IrOOO)
11.5.5. Casts due to the negligence of
CONTRACTOR, any Subcontractor, or anyone
directly or indirectly employed by any of them or for
whose acts any of them may be liable, including but
not limited to, the correction of ckfective Work.
disposal of materials or equipment wrongly supplied
and making good any damage to property.
11.5.6. Other overhead or general excpense casts of
any kind and the costs of any item not specifically and
expressly included in paragraph 11 A
11.6. The CONI'RACrOR's fee allowed to
CONTRACTOR for :overhead and profit shall be
determined as follows:
11.6.1. a mutuallyacceptable Fixed fee: or
11.6.2. if a Cued fee is not agreed upon, then a lee
Imsed on the following percentages of the various
portions of the Cost of the Work:
1IA2.1, for costs incurred under
paragraphs 11.4.1 and I I A2, the
CONf RACI-OR's fee shall be fifteen percent;
11.6.2.2. for costs incurred under
paragraph 11.4.3, the CONTRAC:TOR's fee shall
be five percent:
11.623- where one or more tiers of
subcontracts are on the basis of Cast of the Work
plus a fee and no fixed fee is agreed upon, the
intent of paragraphs 11.4.1, 1 1.4.2„ 1 1.4.3 and
11.6.2 is that the Subcontractor who actually
performs or furnishes the Work, at whatever tier,
will be paid a fee of fifteen percent of the cost-,
incurred by such Subcontractor under paragraphs
11.4.1 and 11.4.2 and that any higher tier
Subcontractor and CONTRACTOR will each be
paid a Cee-af-five percent af-the amamE-paict-to
the•txxt-lewertier-Sulx untrttctor, to be negotiated
Li good faith with the OWNER but not to exceed
five percent of the amount paid to the next lower
tier Subcontractor.
11.6.2.4. no fee shall be payable on the basis
of costs itemized under paragraphs 11.4.4, l 1.4.5
and I I.S;
11.6 2.5. the. amount. of credit to be allowed
by CONTRACTOR to OWNER for any change
which results in a net decrease in cost will be the
amount of the actual net decrease in cost plus a
deduction in CONERACTOR's fee by an amount
equal to five percent of such net decrease; and
11.6.2.6. when both additions and credits are
involved in any one change, the adjustment in
CONTRACTOR's fee shall be computed on the
basis of the net change in accordance with
paragraphs 11.6.2.1 through 11.6.2.5, inclusive.
11.7. Whenever the cost of any Work is to be
25
determined pursuant to paragraphs 11.4 and 1 L5,
CONTRACTOR will establish and maintain records
thereof in accordance with generally accepted accounting
practices and submit in form acceptable to ENGM—ER an
itemized cost breakdown together with supporting data.
Cash Allowances:
I I.S. It is understood that CONTRACTOR has included
in the Contract Price all allowances so named in the
Contract Documents and shall cause the Work so covered
to be furnished and performed for such sums as may be
acceptable to OIVNFR and ENGINEER. CONTRACTOR
agrees that:
11,8.1. the allowances include the cost to
CONTRACrOR (less any applicable trade discounts)
of materials and equipment required by the allowances
to be delivered at the site, and all applicable taxes; and
I I.S.2. CONTRACTOR's costs for unloading and
handling on the site, labor, installation costs, overhead,
profit and other expenses contemplated for the
allowances have been included in the Contract Price
and not in the allowances and no demand for
additional payment on account or any of the foregoing
will bo valid.
Prior to final payment. an appropriate Change Order will be
issued as recommended by ENGINEER to reflect actual
amounts due CONTRACTOR on account of Work covered
by allowances, and the Contract Price shall be
correspondingly adjusted.
11.9- Unit Price Work-
11.9.1. Where the Contract Documents provide that all
or part of the Work is to be Unit Price Work, initially
the Contract Price will be deemed to include for all
Unit Price Work an amount equal to the sum of the
established unit prices for each separately identified
item of Unit Price Work times the estimated quantity
of each item as indicated in the Agreement. The
estimated quantities of items of Unit price Work are
not guaranteed and are solely for the purpose of
comparison of Bids and determining an initial Contract
Price. Determinations of the actual quantities and
classifications of Unit Price Work performed by
CONTRACTOR will be made by ENGINEER in
accordance with paragraph 9,1 U.
11.9.2. Each unit price will be deemed to include an
amount considered by CONTRACTOR to be adequate
to cover CONTRACTOR's overhead and profit for
each separately identified item.
11.9.3.OWNER or CONfRAC rOR may make a
claim for an adjustment in the Contract Price in
accordance with Article l 1 if.
11.9.3.1. the quantity of any item of Unit Price
Work performed by CONTRACTOR differs
materially and significantly from the estimated
quantity of such item indicated in the Agreement;
EJCDCUENERAL COND111ONS 1910-$ (1990 Edition)
26 wJ Ct'ry OF FORT COLLINS MODIFICA'r10NS (REV 4l2000)
and
1.19.3.2. there is no corresponding adjustment
with respect to any other item of Work; and
119.33. if CONTRACTOR believes that
CONTRACTOR is entitled to an increase in
Contract Price as a result of having incurred
additional e.Vmw or OWNER believes that
OWNER is entitled to a decrease in Contract Price
and the parties are unable to agree as to the
amount of any such increase or decrease.
11.9.3.4. CONTRACTOR acknowledges that
the OWNER has the right to add or delete items in
the Bid or change quantities at OWNER'S sole
discretion without affecting the Contract Price of
any remaining item so lone as the deletion or
addition does not exceed twenty-five percent of
the original total Contract Price.
Affl ICLE: 12--CHXNGF. OF C0NTRwT ,ruvu,.S
12.1. The Contract Times (or Milestones) may only be
changed by a Change Order or a Written Amendment.
Any claun for an adjustment of the Contract Times (or
N,filestoncs) shall be based on written notice delivered by
the party making the claim to the other party and to
ENGINEER promptly (hut in no event later than thirty
days) after the occurrence of the event giving rise to the
claim and stating the general nature of the claim. Notice
of the extent of the claim with supporting data shall he
delivered within sixty days after such occurrence (unless
ENGINEER allows additional time to ascertain more
accurate data in support of die claim) and shall be
accompanied by the claimant's written statement that the
adjustment claimed is the entire adjustment to which the
claimant has reason to believe it is emitted as a result of
the occurrence of said event. All claims for adjustment in
the Contract Times (or Milestones) shall be determined by
FNGINF.F..R in accordance with pamgraph 9.11 it
OWNER and CONTRACTOR cannot otherwise agree.
No claim for an adjustment in the Contract Times (or
Milestones) will be valid if not submitted in accordance
with the requirements of this paragraph 12.1.
12.2. All time limits stated in the Contract Documents
are of the essence of the Agreement.
123. 1Vhere CONTRACTOR. is prevented from
completing any part of the Work within the Contract
Times (or Nfilestones) due to delay beyond the control of
CONTRACTOR, the Contract Times (or Milestones) will
be extended in an amount equal to time lost due to such
delay if a claim is made therefor as provided in
paragraph 12.1. Delays beyond the control of
CONTRACTOR shall include, but not be limited to, acts
or neglect by OWNER, acts or neglect of utility owners or
other contractors performing other work as contemplated
by Article 7, Fires. floods, epidemics. abnormal weather
conditions or acts of God. Delays attributable to and
within the control of a Subcontractor or Supplier shall be
deemed to be delays within the control of CONTRACTOR.
12.4. Where CONTRACTOR is prevented from
completing any part of the Work within the Contract Times
(or ivtilestones) due to delay beyond the control of both
OWNER and CONTRACTOR, an extension of the
Contract Tunes (or (Milestones) in an amount equal to the
time lost due to such delay shall be CONTRACTOR's sole
and exclusive remedy for such delay. In no event shall
OWNNER be liable to CONtTRACTOR, any Subdzmtractor,
any Supplier, any other person or organization or to any
surety for or employee or agent of any of them, for
damages arising out of or resulting from (i) delays caused
by or within the control of the CON'rRACI'OR, or
(ii) delays beyond the control of both parties including, but
not limited to, fires, floods, epidemics; abnormal weather
conditions, acts of God or acts or neglect by utility owners
or other contractors performing other work as contemplated
by Article 7.
ARTICLE: 13—'ruvrs rtNND INSPECTIONS;
CORRECTION, RUMO AL OR ACCE:P7'ANNCE: OF
DEFECTIVE WORK
13.1. Notice of Defects:
Prompt notice of all defective Work of which OWNER or
FNGINFFR have actual knowledge will he given to
CONTRACTOR All defective Work may be rejected,
corrected or accepted as provided in this article 13.
Access to Work:
13.2. OWNER, ENGLVEER, EN IGINEER's Consultants,
other representatives and personnel of OWNER,
independent testing laboratories and governmental agencies
withjurisdictionnl interests will have access to the Work at
reasonable —times for their observation inspecting and
testing. CONTRACTOR shall provide them proper and
safe conditions for such access and advise them of
CONTRACTOR'S site safety procedures and programs so
that they may comply therewith as applicable_
Tess and Inspections:
13.3. CONTRACTOR shall give ENGINEER timely
notice of readiness of the Work for all required inspections,
tells or approvals. and shall cooperate with inspection and
testing personnel to facilitate required inspections or tests.
13.4. OWNER shall employ and pity for the services of
an independent testing laboratory to perform all
inspections, tests, or approvals required by the Contract
Documents except:
13.4.1. for inspections, tests or approvals covered
by paragraph 13.5 below;
13.4.2. that costs incurred in connection with tests
or inspections conducted pursuant to paragraph 119
UMCOENERAL CONDI om i910-s (logo E(itim)
"ICITY 01; FORT COLLINS MoDimc vrtONS (11,EV MZ000)
below shall be paid as provided in said
paragraph 13.9; and
13.4.3. as otherwise specifically provided in the
Contract Documents.
13.5. If Laws or Regulations of any public body having
jurisdiction require any Work (or part thereot) specifically
to be inspected. tested or approved by an employee or
other representative of such public body, CONTRACTOR
shall assume full responsibility for arranging and
obtaining such inspections. tests or approvals, pay all costs
in connection therewith, and famish F.',NGINEER. the
required certificates of inspection or approval.
CONTRACTOR shall also be responsible for arranging
and obtaining and shall pay all costs in connection with
any inspections, tests or approvals required for OWNER's
and ENGINE R's acceptance of materials or equipment to
be incorporated in the Work, or of materials, mix designs,
or equipment submittal for approval prior to
CONTRACTOR's purchase thereof for incorporation in
the Work.
13.6. If any Work (or the work of others) that is to be
inspected, tested or approved is covered by
CONTRACTOR without written concwrcnce of
FNGINFFR, it must, if requested by FaNGINU R, be
uncovered for observation.
13.7. Uncovering Work as provided in paragraph 13.6
shall be at CONTRACI'OR's expense unless
CONTRACTOR has given ENGINEER timely notice of
CONTRACTOR's intention to cover the same and
ENGINEER has not acted with reasonable promptness in
response to such notice.
Uncovering Work:
13.8. If any Work is covered contrary to the written
request of ENGINEER, it must, if requested by
ENGINEER, be uncovered for ENGINEER's observation
and replaced at CONTRACTOWs expense.
13.9. if FNt GINF,F,R considers it necessary or advisable
that covered Work be observed by ENGINEER or
inspected ar tested by others. CONTRACTOR, at
ENGINEERS request, shall uncover, expose or otherwise
make available for observation, inspection or testing as
ENGINEER may require, that portion of the Work in
question, furnishing all necessary labor, material and
equipment. If it is found that such Work is defective,
CONTRACTOR shall pay all claims, costa losses and
damages caused by, arising out of or resulting from such
uncovering, exposure, observation, inspection and testing
and of satisfactory replacement or reconstruction,
(including but not limited to all costs of repair or
replacement of work of others); and OWNER shall be
entitled to an appropriate decrease in the Contract Price,
and, if the parties are unable to agree as to the amount
thereof; may make a claim therefor as provided in
Article 11. If, however, such Work is not found to be
cd,/ective, CONTRACTOR shall be allowed an increasein
the Contract Price or an extension of the Contract Times
(or Milestones), or both, directly attributable to such
27
uncovering, e..poo't re, observation, inspection, testing;
replacement and reconstruction; and, if the parties are
unable to agree as to the amount or extent thereof.
CONTRACTOR may make a claim therefor as provided in
Articles I I and 12.
010VER May Stop the Work:
13.10. If the Work is defective, or CONTRACTOR fails
to supply sufficient skilled workers or suitable materials or
equipment, or fads to furnish or perform the Work in such a
way that the completed Work will conform to the Contract
Documents, OWNER may order CONTRACTOR to stop
the Work, or any portion thereof, until the cause for such
order has been elimimted; however, this right of OWNER
to stop the Work shall not give rise to any duty on the part
of OWNER to. exercise this right for the benefit of
CONE RACTOR or any surety or other party.
Correction or Removal ofDefeedve Work:.
13.11. If required by ENGINEER, CONTRACTOR shall
promptly, as directed, either correct all defective Work,
whether or not fabricated, installed or completed, or, if the
Work has been rejected by ENGINEER, remove it from the
site and replace it with Work that is not defective.
C6N1'R,ACI'OR sktll pay all claims, costs, losses and
damages caused by or resulting from such correction or
removal (including but not limited to all casts of repair or
replacement of work of others).
13.12. Correction Period•
13.12.1. If within one year- two years after the date of
Substantial Completion or such longer period of time as
may be prescribed by Laws or Regulations or by the
tennis of any applicable special guarantee required by
the Contract Documents or by any specific provision of
the Contract Documents, any Work is found to be
cfeetive, CONTRACTOR shall promptly, without cost
to OWNER and in accordance with OWNER's written
instructions: (i) correct such defective Work, or, if it has
been rejected by OWNER, remove it from the site and
replace it with Work that is not defective, and (ii)
satisf-
actorily correct or remove and replace any damage
to other Work or the work of others resulting therefrom.
If CONTRACTOR does not promptly comply with the
terms of such imtructiom, or in an emergency where
delay would cause serious risk of loss or damage,
OWNER may have the defective Work corrected or the
rejected Work removed and replaced acid all claims,
costs, losses and damagescaused by or resulting from
such removal and replacement (including but not
limited to all costs of repair or replacement of work of
others) will be paid by CONTRACTOR.
13.12.2. In special circumstances wherea particular
item of equipment is placed in continuous service
before Substantial Completion of all the Work, the.
correction period for that item may start to run from an
earlier date if so provided in the Specifications or by
Written Amendment
13.12.3. Where defective Work (and damage to other
EXDC OSNE'RAL CONDMON51910.8 (1990 Edition)
2S
nt CITY OF FORT COLLI NS MODIFICATIONS (RLV-1P000)
Work resulting therefrom) has been corrected,
removed or replaced under this paragraph 13.12, the
correction period hereunder with respect to such Work
will be extended for an additional period of en -yeaf
two vears after such correction or removal and
replacement has been satisfactorily completed.
Acceptance of Defective Work.
13.13. If. instead of requiring correction or removal and
replacement of defective Work, OWNER (and, prior to
ENGINEER's recommendation of final payment, also
ENGINEER) prefers to accept it, OWNER may do so.
CONTRACTOR shall pay all claims, costs, losses and
damages attributable to OWNER's evaluation of and
determination to accept such defective Work (such costs to
be approved by ENOIN- EER as to reasonableness). If any
such acceptance occurs prior to ENGINEFR's
recommendation of Final payment, u Change Order will be
issued incorporating the necessary revisions in the
Contract Documents with respect to the Work: and
OWNER shall be entitled to an appropriate decrease in the
Contract Price, and, if the parties are unable to agree as to
the amount thereof,, OIAIi IER may make a claim therefor
as provided in Article 11. If the acceptance occurs after
such recommendation, an appropriate amount will be paid
by CONTRACTOR to OWNER.
0IDNER.11aF CorrectDefeetive Work.
13,14. If COi ITRACCOR fails within a reasonable time
after written notice from ENGINEER to correct defective
Work or to remove and replace rejected Work as required
by ENGINEER in accordance with paragraph 1111, or if
CONTRACTOR fails to perform the Work. in accordance
with the Contract Documenm or if CONTRACTOR fails
to comply with any other provision of the Contract
Documents, OWNER may, after seven days' written
notice to CONTRACTOR; correct and remedy any such
deficiency. In exercising the rights and remedies tinder
this paragraph OWNER shall proceed expeditiously. In
connection with such corrective and remedial action,
OWN R may exclude CONTRACTOR from all or rrt of
the sitq take possession of all or part of the Work, and
suspend CCNTRACTOR's services related thereto, take
possession of CONTRACTOR's tools, appliances,
construction equipment and machinery at the site and
incorporate in the Work all materials and equipment
stored at the site or for which OWNER has paid
CONTRACTOR. but which are stored elsewhere.
CONTRACTOR shall allow OWNER, OWNER's
representatives, agents and employees. OWNER's other
contractors and ENGINEER and LNGUEER.'s
Consultants access to the site to enable OWNER to
exercise the rights and remedies under this paragraph fdl
claims; costs, losses anddamages incurred or sustained by
OWNE-M in exercising such rights and remedies will be
charged against CONTRACTOR and a Change Order will
be issued incorporating the necessary revisions in the
Contract Documents with respect to the Work; and
OWNER shall be entitled to an appropriate decrease in the
Contract Price, and, if the parties are unable to agree as to
the amount thereof. OWNER may make a claim therefor
as provided in Article 11. Such claims, acts, losses and
damages will include but not be limited to all costs of
repair or replacement of work of others destroyed or
damaged by correction, removal or replacement of
CONTTRACTOR's defective Work. CONTRACTOR shall
not be allowed an extension of the Contract Times (or
Milestones) because of any delay in performance of the
Work attributable to the exercise by Ok\TIER of 01VNERs
rights and remedies hereunder.
ARTICLE 14--PAYINEENTS TO CONTRACTOR AND
COMPLETION
Schedule of halues:
14.1, The schedule of values established as provided in
paragraph 2.9 will serve as the basis for progress payments
and will be incorporated into a form of Application for
Payment acceptable to ENGINEER. Progress payments on
account of Unit Price Work will be based on the number of
units completed.
Application for Progresc Payment:
14.2, At least twenty days before the elate established for
each progress payment tout not more often than once a
month), CONTRACTOR shall submit to ENGINEER for
review an Application for Payment filled out and signed by
CONI'RAC'1'OR covering the Work completed as of the
date of the Application and accompanied by such
supporting documentation as is required by the Contract
Documents. If payment is requested on the basis of
materials and equipment not incorporated in the. Work but
delivered and suitably stored at the site or at another
location agreed to in writing, the Application for Payment
shall also be accompanied by a bill of sale, invoice or other
documentation warranting that OWNER has received the
materials and equipment free and clear of all Liens and
evidence that the materials and equipment are covered by
appropriate property insurance and other arrangements to
protect OWNIER's interest therein, all of which will be
satisfactory to OWNER. The amount of rctainagc with
respect to progress pxayanents will be as stipulated in the
Agreement. Any funds that are withheld by the OWNER
shall not be subject to substitution by the CONTRACTOR
with securities or any am ements involving an escrow or
custodianship.:I3y exzcuting the application for pravment
form the CONTRACTOR expresshv waives his right to the
benefits of Colorado Revised Statute----, Section 24-91-Itll.
el seq.
C01VTR4CT0R's Warranij+ of Tide:
14.3. CONTRACTOR warrants and guarantees that title
to all Work, 'materials and equipment covered by any
Application for Payment, whether incorporated in the
Project or not, will pass to OWNER no later than the time
of payment free and clear of all Liens,
Review of.4pplieations for Progress Payment:
14.4. ENGINTEER will. within ten days after receipt of
each Application for Payment, either indicate in writing.a
EJCUC GENERAL CONDI7 ONS 1910-3 (1990 E(fition)
AV/ CITY Of FORT MUMS MODIFICA,rIONS (REV J0000) -
recommendation of payment and present the Application
to O1«=ER or return the Application to CONTRACTOR
indicating in writing ENGLNEER's reasons for refusing to
recommend payment. In the latter case, CONTRACTOR
may make the necessary corrections and resubmit the
Application. 'fen days after presentation of the
Application for Payment to OWNER with ENGINTEERs
recommendation, the amount recommended will (subject
to the provisions of the last sentence of paragraph 14.7)
become due and when due will be paid by OWNER to
CONTRACTOR
14.5. FNGINFFRs recommendation of any payment
requested in an Application for Payment will constitute a
representation by ENGINI-.ER to OWNER, based on
ENGINEER's on -site observations of the executed Work
as an experienced and qualified desitm professional and on
ENGINEER's review of the Application for Payment and
the accompanying data and schedules, that to the best of
ENGINEER'S knowledge, information and belief:
14.5.1. the Work has progressed to the point
indicated,
14.5.2. the quality of the Work is generally in
accordance with the Contract Documents (subject to
an evaluation of the Work as a functioning whole
prior to or upon Substantial Completion, to the results
of any subsequent tests called for in the Contract
Documents, to a final determination of quantities and
classifications for Unit Price Work under
paragraph 9.10, and to any other qualifications stated
in the recommendation), and
14.5:3. the conditions precedent to
CONTRACTOR's being entitled to such payment
appear to have been fulfilled insofar as it is
ENGINEER's responsibility to observe the Work.
However, by recommending any such payment
ENGINEER will not thereby be deemed to have
represented that: (i) exhaustive or continuous on -site
inspections have been made to check the quality or the
quantity of the Work beyond the rcaponsihilities
specifically assigned to ENGINEER in the Contract
Documents or (ii) that there may not be other matters or
issues benvein the parties that might entitle
CONTRACTOR to be paid additionally by OWNER or
entitle OWNER to withhold payment to CONTRACTOR
14.6. ENGINEERS recommendation of any payment,
including final payment, shall not mean that ENGINEER
is responsible for CONTRACTOR's means,- methods,
techniques, sequences or procedures of construction or
the safety precautions and programs. incident thereto, or
for anv failure of CONTRACTOR to comply with Laws
and Regulations applicable to the furnishing or
performance of Work, or for any failure of
CONTRACTOR to perform or furnish Work in
accordance with the Contract Documents.
14.7, ENGI NEER may refuse to recommend the whole
or any part of any payment if. in ENGII TEER's opinion it
would he incorrect to make the representations to
29.
OWNER referred to in pamgmph 14.5. ENCINTER may
also refuse to recommend any such payment, or, because of
subsequently discovered evidence or the results of
subsequent inspections or tests, nullify any such payment
previously recommended, to such extent is may be
necessary in ENG[NF.ER.'s opinion to protect OWNER
from loss because:
14.7.1. the Work is defective, or completed Work has
been damaged requiring correction or replacement,
14.7.2. the Contract Price has been reduced by
Written amendment or Change Order,
14.7.3. OWIR has been required to, correct
defective Work or complete Work in accordance with
paragraph 13.14. or
14.7.4. L-IGINEER has actual knowledge of the
occurrence of any of the events enumerated in
paragraphs ,15.2.1 through 15.2.4 inclusive,
OWNER may refuse: to make payment of the full amount
recommended by ENGINEER because:
14.7.5. claims have been made against OWNER on
account of CONTRACrOR's performance or furnishing
of the Work,
14.7,6, Liens have been filed in connection with the
Work, eeceIit where CONTRACTOR has delivered a
specific Bond satisfactory to OWNER to securc the
satisfaction and discharge of such Liens,
14.7.7. there are other items entitling OWVNF.,R to a sct-
offngainst the amount recommended or
14.7X OWNER has actual knowledge of the
occurrence of any of the events enumerated in
paragraphs 14.71 through 14.7.3 or pa ragmphs 15 2.1
through 15.2.4 inclusive:
but OWNER must give CONTRACTOR immediate
written notice (with a copy to ENGINEER) stating the
reasons for such action and promptly pay CONTRACTOR
the amount so withheld, or any adjustment thereto agreed
to by OWNER and CONTRACTOR, when
CONTRACTOR corrects to OWNER's satisfaction the
reasons for such action
Subm nt4al Completion:
14.5. When CONTRACTOR considers the entire Work
ready for its intended use CONTRACTOR shall notify
OWNER and ENGINEER in writing that the entire Work
is substantially complete (except for items specifically
listed by CONTRACTOR as incomplete) and request than
ENGINEER issue a certificate of Substantial Completion.
Within a reasonable time thereafter. OWNER.
CONTRACTOR and ENGINEER shall make an inspection
of the Work to determine the status of completion. If
ENGINEER, does not consider the Work substantially
complete. ENGL EER will notify CONTRACTOR in
writing giving the reasons therefor. If ENGINEER
;� UCDCGENER L COND11IONS 1910-S (1990 Editim)
e'/ CITY OF FORT' COLLI NS MODIFICATIONS (REV 412000)
considers the Work substantially complete. ENGINEER
will prepare and deliver to OWNER a tentative certificate
of Substantial Completion which shall fir the date of
Substantial Completion. There shall be attached to the
certificate a tentative list of items to be completed or
corrected before firml payment. OWNER shall have seven
days after receipt of the tentative certificate during which
to make written objection to L•N TUNEER as to any
provisions of the certificate or attached list. If, after
considering such objections, ENGINEER concludes that
the Work is not substantially complete, ENGR SEER will
within fourteen days after submission of the tentative
certificate to OWNER notify CON TRACTOR in writing,
stating the reasons therefor. If, after consideration of
OWNER's objections, ENGINEER considers the Work
substantially conipletc; ENGINEER %ill within said
fourteen days execute and deliver to OWNER and
CONTRACTOR a definitive certificate of Substantial
Completion (with a revised tentative list of items to be
completed or corrected) reflecting such changes from the
tentative certificate as ENGINEER believes justified after
consideration of any ohjections from OWNER. At the
time of delivery of the tentative certificate of Substantial
Completion ENGINEER will deliver to OWNER and
CONTRACTOR a written recommendation as to division
of responsibilities pending final payment between
OWNER and CONTRACTOR with respect to security,
operation, safety, maintenance, heat, utilities, insurance
and warranties and guarantees. Unless OWNER and
CONTRACTOR agree otherwise in writing and so inform
FNGINEER in writing prior to FNGIN6FR's issuing the
definitive certificate of Substantial Completion,
ENGINEER's aforesaid recommemkiition will be binding
on OWNER and CONTRACTOR until final payment
14.9. OWNER shrill have the right to exclude
CONTRACTOR from the Work after the date of
Substantial Completion but OWNER shall allow
CONTRACTOR reasonable access to complete or correct
items on the tentative list.
Partial Udlizadon:
14.1 f1. Use by OVNER at OWNF,R's option of any
substantially completed part of the Work, which: (i) has
specifically been identi fed in the Contract Documents, or
(ii) OWNER, ENGINEER and CONTRACTOR agree
constitutes a separately functioning and usable part of the
Work that can be used by OWNER for its intended
purpose without significant interference with
CONTRACTOR's performance of the remainder of the
Work, may be accomplished prior to Substantial
Completion of all the Work subject to the following:
14.I0.I.0WWNER at any time may request
CONTRACTOR in writing to permit OkWINER to use
any such part of the Work which OWNER befieves to
be ready for its intended use and substantially
complete. if CON"TRACTOR agrees that such part of
the Work is substantially complete, CONTRACTOR
will cettifv to OWNER and. ENGINEER that such
part of the Work is substantially complete and request
ENGINEER to issue a certificate of Substantial
Completion for that pan of the Work.
CONTRACTOR at any time may notify OWNER and
OqG DMER in writing that CONTRACTOR considers
any such part of the Work ready for its intended use
and substantially complete and requestL`iTGL\TEER to
issue a certificate of Substantial Completion for that
part of the Work. Within a reasonable time after either
such request, OWNER, CONTRACTOR and
LNGI'i IEGR shall make an inspection of that pit of
the Work to determine its status of completion If
ENGLNEER.does not consider that part of the Work to
be substantially complete, ENGINEER will notifi%
OWNER and CONTRACTOR in writing giving the.
reason% therefor. If ENGINEER considers that part of
the Work to be substantially complete, the provisions
of paragraphs 14,8 and 149will apply with respect to
certification of Substantial Completion of that part of
the Work and the division of responsibility in respect
thereof and access thereto.
14.10.2. No occupancy or separate operation of part
of the Work will be accomplished prior to compliance
with the requirements of parnm. ph 5.15 in respect of
property insurance,
final bi.yrecdon:
14.11. Upon written notice from CONTRACTOR that the
entire Work or an agreed portion thereof is complete,
LNGINEER will make a final inspection with OWNER
and CONTRACTOR. and will notify CONTRACTOR in
writing of all particulars in which this inspection reveals
that the Work is incomplete or defective. CONTRACTOR
shall immediately take such measures as are necessary to
complete such work or remedy such deficiencies.
Final: application for Pgrnient:
14.12. After CONTRACTOR has completed all such
corrections to the satisfaction of ENGINEER and delivered
in accordance with the Contract Documents all
maintenance and operating instructions, schedules,
guarantees, Bonds, certificates or other evidence of
insurance required by piaragmph -5A, certificates of
inspection, marked -up record documents (as provided in
paragraph G.19) and cxher documents, CONTRACTOR
may make application for final payment following the
procedure for progress payments. The final Application for
Payment shall be accompanied (except as previously
delivered) by: (i) all documentation called for in the
Contract Documents, including but not limited to the
evidence of insurance required by subparagraph 5.4.13,
(u) consent of the surely, if any, to final payment, and
(iii) complete and legally effective releases or waivers
(satisfactory to OWNER) of all Liens arising out of or filed
in connection with the Work. In lieu of such releases or
waivers of Liens and as approved by OWNER,
CONTRACTOR may furnish receipts or releases in full
and affidavit of CONTRACTOR that: (i) the releases and
receipts include all labor, services, material and equipment
for which a Lien could be filed, and (ii) all payrolls,
material and equipment bills, and other indebtedness
connected with the Work for which OWNTER or OWNER's
property might in.any way be responsible have been paid or
otherwise satisfied, If any Subcontractor or Supplier fails
FJCDC GENERAL CONDITIONS 191" (1990 Edition)
e/ CITY OF FORT COLLI NS hIODIFICA'rIONS tREV dP000)
to furnish such a release or receipt in full,
CONTRACTOR may furnish a Bond or other collateral
satisfactory to OIV14ER to indemnify OWNER against
any Lien Releases or waivers of liens and the consent of
the surety to finalize payment are to be submitted on
forms conforming to the format of the OWNER'S standard
forms bound in the Project manual.
Final Payment and: acceptance:
14.1'3. If, on the basis of EN GINEERs observation of
the Work during construction and final inspection, and
ENGINEER's review of the final Application for Payment
and accompanying, documentation as required by the
Contract Documents, ENGINEER is satisfied that the
Work has, been completed and CONfRACTOR's other
obligations under the Contract Documents have been
fulfilled, ENGINEER will, within ten days after receipt of
the final Application for Payment, indicate in writing
i-NGINEER's recommendation of paymient and present
the Application to OWNER for payment. At the same
time ENGINEER will also give written notice to OWNER
and CONi'RACI'OR that the Work is acceptable subject
to the provisions of paragraph 14.15. Otherwise,
ENGINEER will recur the Application to
CONTRACTOR, indicating in writing the reasons for
refusing to recommend final payment, in which case
CONTRACTOR shall make the necessary corrections and
resubmit the Application. Thirty days after presentation to
OWNER of the Application and accompanying
documentation, in appropriate form and substance and
with ENGINEER's recommendation and notice of
acceptability, the amount recommended by ENGINEER
will become due and will be paid by OWNER to
CONTRACTOR subject to Mggraph 17.6.2 of these
General Conditions.
14.14. If; through no fault of CONTRACTOR final
completion of the Work is significantly delayed and if
ENGINEER so confirms, OWNER shall, upon receipt of
CONTRACTOR's final Application for Payment and
recommendation of ENGN MR. and without terminating
the Agreement, make payment of the balance due for that
portion of the Work fully completed and accepted. if the
remaining balance to be held by OWNER for Work not
fully completed or corrected is less than the retainage
stipulated in the Agreement, and if Bonds have been
furnished as required in paragraph 5.1, the written consent
of the surety to the payment of the balance due for that
portion of the Work fully completed and accepted shall be
submitted by CONTRACTOR to ENGMER with the
Application fur such payment Such payment shall be
made under the terns and conditions governing final
payment, except that it shall not constitute a waiver of
claims.
Waiver of Claims:
14.15. The making and acceptance of final payment will
constitute:
14.15.1.a waiver of all claims by OWNER against
CONTRACTOR, except claims arising from
unsettled Lien-, from defecrive Work appearing after
final `inspection pursuant to paragraph 14.11, from
failure to comply with the Contract Documents or the
terms of any special guarantees specified therein, or
from CO\TTRACTOR's continuing obligations under
the Contract Documents; and
14.15.2. A waiver of all claims by CONTRACTOR
against OWNER other than those previously made in
writing and still unsettled.
ARTICLE 1S-SUSPEti'SION OF 1VORk AND
TEWMINATION
0M ER Mqv Suspend IVurk:
15. L At any time and without cause. OWNER may
su end the Work or any portion thereof for a period of not.
more than ninety days by notice in writing to
CONTRACTOR and ENGINEER which will fix the date
on which Work will he resumed. CONTRACTOR shall
resume the Work on the date so fixed CONTRACTOR
shall be allowed an adjustment in the Contract Price or an
extension of the Contract 'finks 'or both, directly
attributable to any such suspension if CONTRACTOR
makes an approved claim therefor as provided in
Articles 11 and 12.
OWNER b/ay Terminate:
15.2. Upon the occurrence; of any one or more of the
following events:
15.2.1. if CONTRACTOR persistently tails to perform
the Work in accordance with the Contract Documents
(including, but not limited to, failure to supply sufficient
skilled workers or suitable materials or equipment or
failure to adhere to the progress schedule established
under paragraph 2.9 as adjusted from time to time
pursuant to paragraph 6.6);
15.2.2. if CONTRACTOR disregards, Laws or
Regulations of any public body havingjurisdictiom
I5.2.3. if CONTRACTOR disregards the authority of
ENGINEER, or
15.2.4. if CONTRACTOR otherwise violates in any
substantial way any provisions of the Contract
Documents;
OWNER may, after giving CONTRACTOR (and the
surety, if any) seven days written notice and to the extent
permitted by Laws and Regulations, terminate the services
of CONTRACTOR, exclude CONTRACTOR front the site
and take possession of the Work and of all
CONTRAC'rOR's took appliances, construction
exluipment and machinery at the site and use the same to
the full extern they could be used by CONTRACTOR
(without liability to CONI'RAC'fOR for trespass or
conversion), incorporate in the Work all materials and
equipment stored at the site or for which OWNER has paid
EXI)C OENMAL CONDI,rioNs 19 t" (1990 Editim)
32 W1 CITY OF FORT COLLINS MODIFICATIONS (REV 4R000)
CONTRACTOR but which are 'stored elsewhere, and
finish the Work as OI\ri\IERmay deem expedient.. In such
rase CONTRACTOR shall not be entitled to receive any
further payment until the Work is finished If the unpaid
balance of the Contract Price exceeds all claims, costs.
losses and damages sustained by OWNER arising out of
or resulting from completing* the Work such excess will be
paid to CONTRACTOR If such claims, costs, losses and
damages exceed such unpaid balance, CONTRACTOR
shall pay the difference to OWNER. Such claims, costs,
losses and damages incurred by OWNER will be reviewed
by ENGINEER as to their reasunableness and when so
approved by ENGINEER incorporated in a Change Order,
provided that when exercising any rights or remedies
tinder this paragraph OWNER shall not be required to
obtain the lowest price for the Work performed.
15.3. Where CONTRACTOR's services have been so
terminated by OWNER the termination will not affect
any rights or' remedies of OWNER against
CONTRACTOR then existing or which may thereafter
accrue. Any retention or payment of moneys due
CONTRACTOR by OWNER will not release
CONTRACTOR from liability.
15.4. Upon seven days' written notice to
CON"fRACfOR and ENGINEER, OWNER may,
without cause and without prejudice to any other right or
remedy of OWNER elect to terminate the Agreement. In
such cast:, CONTRACTOR. shall he maid (without
duplication of any items):
15.4.1. for completed and acceptable Work executed
in accordance with the Contract Documents prior to
the effective date of tenuination, including fair and
reasonable sums for overhead and profit on such
Work;
15.4.2. for expenses sustained prior to the effective
(late of termination in perforating services and
furnishing labor, materials or equipment as required
by the Contract Documents in connection with
uncompleted Work, plus fair and reasonable sums for
overhead and profit on such expenses;
15.4.3. for all claims, costs, losses and (Homages
incurred in settlement of terminated contracts with
Subcontmctors, Suppliers and others; and
15.4A. for reasonable expenses directly attributable
to termination.
CONTRACTOR shall not be paid on account of loss of
anticipated profits or revenue or other economic loss
arising out of or resulting from such termination.
CONTRACTOR Mi y Stop Ihbrk or Terminate.
15.5. IC through no act or fault of CONTRACTOR, the
Work is suspended for a period of more than ninety (lays
by OWNER or under an order of (curt or other public
authority, or ENGINEER fails to act on any Application
for Payment within thirty days after it is submitted or
OWNER fails for thirty days to ply CONfRACI'OR any