Loading...
HomeMy WebLinkAboutCORRESPONDENCE - RFP - 7033 DISCOVERY MUSEUM FACILITY (2)Financial Services Purchasing Division 215 North Mason Street 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 - fax fcgov. com/purchasing July 29, 2009 JE Dunn Construction Attn: Mr. Bill McCarthy 2000 S. Colorado Boulevard, Suite 12000 Denver, CO 80222 RE: 7033 Discovery Museum Facility - Design Build Dear Mr. McCarthy: Your firm has been selected to advance to Step II in the selection process for the 7033 Discovery Museum Facility —Design Build Project. The other firms selected to advance in the selection process are: The Neenan Company. Hensel Phelps Construction Company You are scheduled for the Mini-Charrette August 13, 2009 at 1:00 pm to 5:00 pm. Please provide your team's charrette agenda to John Stephen, jstephen(a-fcgov.com, by August 10, 2009. Following is the proposed schedule for the STEP II selection process: STEP II DATE Submit Information to Three Design/Build Teams July 29, 2009 Pre -Proposal Meeting/Mini Design Charrette (1/2 Day) with Three Design/Build Teams August 13-14, 2009 Receive Design/Build Proposals October 26, 2009 Interviews with Three Design/Build Teams October 29, 2009 Select Final Design/Build Team October 30, 2009 Notice to Proceed D/B Team November 16, 2009 Include with the proposal the Construction cost factors. o Establish in detail the factors which will be used in determining the final prices of work on time and material projects OR on negotiated guaranteed maximum price construction contracts. These factors shall be comprehensive in establishing all costs to be applied to direct project labor and materials in determining the construction cost. Commitments shall include: ■ Overhead and profit (combined) margin for general office activities on the base bid cost. ■ Overhead and profit (combined) margin for field office activities on the base bid cost. ■ Markup on subcontractor work by the General Contractor. ■ Markup on materials and equipment on the base bid cost. ■ Markup on project labor or materials to determine the final contract price. ■ Change order markup, including supervision allowance, labor and material markups, and overhead and profit percentages, as a percent of labor and materials cost for any changes in the work following contract award. ■ You MUST submit the above requested information. The selection team will consider other methods of contract negotiations that the firm may have experience with. Firms are encouraged to submit basis for contract negotiation. ■ Your firm is expected and required to have a completely open book policy on all pricing of work. • Your firm must follow Chapter 6, Proposal Evaluation Criteria, #3, Step II instructions from the original proposal. Please go to_ftp://ns2.fcgov.com (see instructions attached) for the additional documents for this project and the documents will be available after 1:00 pm July 30, 2009. a. Conceptual Site Plan (SD1), prepared by Aller-Lingle Architects, P.C., dated 9/15/05. This plan provides pertinent information concerning the site, including: Site Area, Zoning, Allowable Buildable Footprint, Allowable Parking Coverage, Open Space Coverage and topography. b. A copy of the Preliminary Geotechnical Engineering and Limited Site Investigation Report, dated November 9, 2005, prepared by Terracon Consulting Engineers & Scientists. C. Phase I Environmental Site Assessment, Union Pacific Railroad — Parcel A Property by Walsh Environmental Scientists and Engineers, LLC, dated March 17, 2006 d. Limited Phase II Site Investigation, Union Pacific Railroad — Parcel A Property by Walsh Environmental Scientists and Engineers, LLC, dated May 4, 2006. e. Phase II Environmental Site Assessment, Lee Martinez Park by Walsh Environmental Scientists and Engineers, LLC, dated March 18, 2008. f. Fort Collins Museum and Discovery Science Center Economic Feasibility Analysis by Economic Research Associates, dated June 17, 2008. g. Exhibit Master Plan and Concept Phase Reports by Gyroscope. We appreciate the time you expended in preparing your proposal presentation and look forward to your oral presentation. Sincerely, V�) 311`4 ames . O'Neill II, CPPO, FNIGP rec of Purchasing and Risk Management JBO:jkb INSTRUCTIONS FOR ACCESSING FTP SITE: (1) CREATE a new folder on your desktop for the files (2) OPEN INTERNET EXPLORER (YOU MUST USE INTERNET EXPLORER TO ACCESS THE SITE) (3) Copy and paste this link into your browser address bar: ftp://ns2.fcgov.com Once site is open: From the upper tool bar • SELECT File Login As • ENTER User Name: pdocs • ENTER Password: pickup • CLICK Log on Files are listed by name in a folder entitled 7033 Discovery Museum Facility Double-click folder to see contents (3) SELECT desired files • DRAG AND DROP the files into the new folder on your desktop CLOSE out of ftp site.