THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred
to as the "City" and Aller • Lingle • Massey Architects P.C., hereinafter referred to as "Professional".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by
and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance with
the scope of services attached hereto as Exhibit "A", consisting of eleven (11) pages, and
incorporated herein by this reference.
2. The Work Schedule. The services to be performed pursuant to this Agreement shall
be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of
one (1) page, and incorporated herein by this reference.
3. Contract Period. This Agreement shall commence September 1, 2009, and shall
continue in full force and effect until June 1, 2011, unless sooner terminated as herein provided.
4. Early Termination by City. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the
termination date contained in said notice unless otherwise agreed in writing by the parties.
All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent
to the following addresses:
Professional: City: With Copy to:
Aller Lingle Massey Architects P.C. City of Fort Collins City of Fort Collins, Purchasing
Attn: Mr. David Lingle, AIA, LEED AP Attn: Steve Seefeld PO Box 580
712 Whalers Way, Bldg. B, Suite 100 PO Box 580, Fort Collins, CO 80522
Fort Collins, CO 80525 Fort Collins, CO 80522
Standard Professional Services Agreement- rev07/09
completed and advance the following work
areas:
• Exterior entry and sculpture garden
redevelopment
• New and renovated conference facilities
• New interior lobby and public circulation
areas
• New gallery spaces
• New ticketing, bar and other service
functions
• New restrooms, elevator and other patron
amenities
• New dressing rooms, green room and
other "back of house" support spaces
• Construction systems and materials
• Mechanical and electrical systems design
parameters
• LEED and sustainable design goals
2.2 Outdoor Events Space Redesign
Russell + Mills Studios, the landscape
architecture/urban planning consultant, will
expand upon their Conceptual Design for the
reconstruction of the existing sculpture
garden, opening up the space to the adjacent
streets and creating a more welcoming
environment.
The size and configuration of the outdoor
performance/ event space will be confirmed,
incorporating a permanent stage and sound
wall to prevent excessive street noise from.
interfering with performances. Russell + Mills
Studios will work with APP staff to relocate all
existing sculptures into the new sculpture
garden at the northwest portion of the site,
and they will coordinate with the City's forester
to identify all existing trees to be retained
and/or mitigated.
2.3 Conceptual Review
The Conceptual Site Plan prepared by
Russell + Mills Studios will be submitted to the
City of Fort Collins for Conceptual Review.
2.4 Structural Systems Evaluation
The architect and Martin/Martin Consulting
Engineers, Inc., the structural engineer, will
evaluate alternative structural systems for the
facility's new upper deck, and floor and roof
framing.
2.5 Mechanical and Electrical Systems
Evaluation
EMC Engineers, the mechanical and
electrical engineering consultant, together
with our LEED consultant, will review and
evaluate the existing mechanical and
electrical systems in the Lincoln Center, as
well as alternative systems to serve the new
additions, as appropriate to maximize the
energy efficiency and cost-effectiveness of
the existing and proposed systems.
Our Scope of Basic Services includes
analysis of the existing systems, but does
not include any design of modifications to, or
replacement of, the existing equipment and
systems. This redesign is available as
Additional Services, if the analysis shows
that this should be done.
2.6 Utilities Coordination
The civil engineering consultant, North Star
Design, will evaluate and develop preliminary
utility infrastructure requirements for the
project, including domestic water, sanitary
sewer, natural gas, fire sprinkler, primary and
secondary electrical service, and fiber optics.
Options for relocation of the existing gas
meter and electrical transformer will be
evaluated and recommendations forwarded to
the City's project manager.
2.7 Code Review
We will initiate a preliminary building code
evaluation for the Conceptual Design,
considering the Lincoln Center's occupancy
types, construction types, exiting and life
safety, health department and handicapped
accessibility issues. We will meet with the
City's Building Inspection department as
necessary to verify our code interpretations.
2.8 Interior Architecture and Design
Ricca Newmark Design, our interior design
consultant, will initiate preliminary interior
design concepts and selection of materials,
with rendered illustrations developed for
review and approval of the Lincoln Center
staff and/or project design committee for the
new concepts. These spaces will include the
Canyon West and Columbine Rooms, gallery
and all lobbies and other public areas.
2.9 Catering Kitchen Design
Ricca Newmark Design will inventory the
existing catering kitchen equipment and
fixtures and produce concepts for the
redesign of the space, relocating the fixtures
as needed but retaining the existing
connections to plumbing or gas services.
Design and specifications for any new
equipment or fixtures are available as
Additional Services.
2.10 Health Department Review
Ricca Newmark Design will have preliminary
discussions with the Larimer County Health
Department to explore their requirements for
the kitchen and bar uses.
2.11 Design Development Documents
The design team will create and submit to the
City the following Design Development
documents:
• Preliminary site improvement plan
• Preliminary utility, grading and drainage
plans
• Preliminary landscape plan
• Preliminary architectural floor plans
• Preliminary exterior building elevations
• Preliminary building sections and wall
sections
• Preliminary interior design concepts for
the new lobbies, gallery,
conference/banquet rooms and other
public spaces
• Preliminary reflected ceiling plans
• Preliminary roof plan
• Preliminary room finish schedules
• Preliminary structural floor and roof
framing layout plans
• Preliminary plumbing, mechanical and
electrical plans
• Outline of technical specifications
2.12 Design Review
Upon review of our Design Development
submittal, we will attend a design review
meeting with the City's project manager and
project design committee.
2.13 Cost Estimate
A preliminary Estimate of Probable
Construction Cost will be prepared for the
City's review.
2.14 APP Review
We will initiate preliminary discussions with
the City's Arts in Public Places staff to
determine the budget for public art and to
assist in the selection of the consulting artist.
We will also engage the APP staff in
discussions related to the design of the new
gallery space, including opportunities for
diffused and controlled daylighting, artificial
lighting and controls, wall and ceiling
treatments and ways to open this space up to
the adjacent public lobbies.
2.15 CAD Renderings
Updated CAD -generated renderings will be
created using our in-house REVIT 2009
software to illustrate the design.
Deliverables:
• Site plan for Conceptual Review, 24" x 36"
• Preliminary.code analysis
• Design Development drawings, 24" x 36"
• Preliminary cost estimate
4
• Minutes of client meetings
• REVIT computer -generated renderings,
24" x 36"
Anticipated number of meetings:
• Weekly Design Development phase client
meetings
• In-house design team meetings, as
needed
• One (1) Conceptual Review meeting with
City's Development Review Team
• One (1) Design Development review
meeting
• One (1) Design Development interior
design concepts meeting
• One (1) site visit by mechanical and
electrical engineering consultants to verify
and assess the existing systems and
equipment.
One (1) preliminary meeting with Larimer
County Health Department
One (1) meeting with APP staff
PHASE 3 - PLANNING
APPROVAUENTITLE-MENT
3.1 Planning and Entitlement
Aller•Lingle•MasseyArchitects P.C., Russell +
Mills Studios and North Star Design shall
coordinate and prepare all documentation
required by the City of Fort Collins for site plan
review and approval of the project.
3.2 Traffic Impact Study
Matt Delich, the traffic engineer, will prepare a
traffic impact study memorandum, in
compliance with City of Fort Collins
requirements, evaluating the four street
intersections surrounding the facility and the
parking lots.
3.3 Basic Development Review Submittal
The required Basic Development Review
(B.D.R.) drawings and other documents will
be prepared and submitted to the City of Fort
Collins development review process. The
B.D.R. process is administratively reviewed,
and does not require a neighborhood meeting
or public hearing.
3.4 B.D.R. Resubmittal
Upon receipt of City staff s review comments,
we will meet and discuss concerns with the
affected departments and develop solutions.
The B.D.R. documents will then be revised
and resubmitted. This process will be
repeated through a second review if
necessary.
Upon approval of the B.D.R., we will submit
mylars of the Basic Development Review
documents. The project will now have
received planning approval, and the project
and design team will be ready to proceed into
the Final Design or Construction Documents
phase.
Deliverables:
• Planning submittal drawings, 24" x 36",
including site plan, landscape plan,
grading and drainage plans, utility plans
and proposed building elevations
• Planning submittal documents, including
design narrative, project design
objectives, submittal checklists, etc.
• Traffic impact study memorandum
• Storm drainage and erosion control
reports
• Written responses to City staff review
comments
• Final recordation mylars, 24" x 36"
Anticipated number of meetings:
• City Design Review Team (DRT)
meeting(s), assuming two (2) rounds of
staff review
PHASE 4 — FINAL DESIGN
4.1 Final Design
The design team will develop complete Final
Design documents, generally representing a
50% level of construction document
5
completion. Documents will include
complete architectural, civil, landscape
architecture, structural, mechanical and
electrical layouts, building elevations and
sections as appropriate for each component
of the project, and technical materials
specifications.
4.2 Design Reviews
We will assist the City and Lincoln Center
staff in making presentations of the project to
the Cultural Resources Board, Downtown
Development Authority Board, City Council
and/or other interested groups during the
Final Design phase of the project.
Upon review of our Final Design submittal, we
will attend a design review meeting with the
City's project manager and project design
committee.
4.3 Cost Estimate
We will refine the Estimate of Probable
Construction Cost to reflect the 50% Final
Design level construction documents.
4.4 Code Review
We will expand upon our initial in-house
building code review, with building and life -
safety code concerns coordinated with all
affected City agencies. This has proven very
valuable in providing a basis for discussion if
code concerns are interpreted differently by
the reviewing officials at the building permit
phase.
4.5 Interior Design
Ricca Newmark Design will further develop
the interior design concepts and selection of
materials, finishes and colors. Interior
materials and finishes will be selected to
enhance indoor air quality, using low VOC
adhesives, paints and finishes, and to
maximize recycled content and use of local
materials.
4.6 Acoustical, Sound and A/V System
Consulting
D. L. Adams Associates, Inc., the theater and
acoustical consultant, will evaluate the
acoustics and specialty systems needs of the
Canyon West Room, Columbine Room and
the Main Performance Hall, and design and
specify improvements to the extent their
services are added to the design contract by
Change Order.
Likewise, they will advise Aller•Ling le- Massey
Architects P.C. and Ricca Newmark Design
on the reconfiguration of the Mini -Theater,
including assistance in shaping the walls,
ceiling, light -lock entries, and other acoustical
aspects of the space, and evaluating the need
for upgraded sound system, stage rigging and
theatrical lighting.
4.7 Interior Signage Systems
Ricca Newmark Design will evaluate the
existing way-finding/interior directional
signage and graphics systems, then design
concepts for improving these signage
systems.
4.8 Furnishings and Equipment
Ricca Newmark Design will work with the
City's project manager and project design
committee to evaluate the need for new lobby
and public areas furnishings. If new lobby or
gallery furnishings and open office systems
are needed, Ricca Newmark will design and
specify these furnishings.
Deliverables:
• Final Design drawings, 24" x 36"
• 50% level technical specifications
• Updated code analysis, as necessary
• Color board for selected interior finishes
and colors
• Updated 50% cost estimate
• Minutes of client meetings
Anticipated number of meetings:
0 Weekly or bi-weekly Final Design phase
client meetings
• In-house design team meetings, as
needed
• One (1) Final Design review meeting
• One (1) Final Design materials/finishes
review meeting
• One (1) or two (2) Final Design acoustical
and specialty system review meetings
• Up to three (3) public presentations to City
Boards, the DDA and/or City Council
PHASE 5 — SUSTAINABILITY AND LEED
CERTIFICATION
While the following Sustainability and LEED
Certification tasks are grouped together,
these tasks are actually spread over the entire
design and construction process.
Note: While the Aller•Lingle•Massey
Architects P.C. design team will apply its
expertise to maximize the likelihood of the
project attaining the LEED certification goal
desired, decisions adverse to the potential
LEED score may be made by other parties,
such as the City of Fort Collins or the
Contractor. Therefore, Aller•Lingle• Massey
Architects P.C. cannot guarantee that the
project will be awarded the number of points
required for such certification level.
5.1 LEED Consulting
Design Balance, our LEED Consultant, will
coordinate the efforts of our design team to
identify, explore, develop and implement
sustainable strategies to the extent feasible
within the project's scope and budget.
5.2 LEED Scorecard
We will review the initial USGBC LEED
scorecard already created by our team to
confirm which sustainable strategies are
feasible and reasonable targets for the
project. The checklist will be periodically
reviewed and updated through each design
phase.
5.3 Establish Basis of Design
The design team will develop the basis of
design (B.O.D.) for the project, based upon
the City's project requirements, including
primary design assumptions, space use,
redundancy, climatic design conditions, space
zoning, operations, cost goals, and applicable
standards and codes.
5.4 Energy Modeling
EMC Engineers will create an ASHRAE 90.1-
2007 base model for the entire building,
including both existing and new equipment,
then model the Conceptual Design solution to
evaluate and determine the project design's
responsiveness to the sustainability goals and
the targeted LEED environmental and indoor
air quality credits.
Runs of the energy model beyond the initial
and one reiteration of the conceptual design
required by changes in the project design are
available as Additional Services.
5.5 Daylight Modeling
EMC Engineers will complete a daylighting
study of the Conceptual Design to determine
and enhance the effectiveness of the
daylighting strategy for the lobbies and
circulation corridors, and verify that any
targeted LEED daylighting credits will be
achieved.
5.6 Life -Cycle Cost Analysis
EMC Engineers will complete a life -cycle cost
analysis of each energy efficiency measure
proposed by comparing energy savings to
total capital and annual maintenance costs.
5.7 Sustainability Reviews
Design Balance will review the project design
at the completion of the Final Design and
Construction Documents phases to verify that
the drawings and specifications are consistent
with the project's sustainability goals and the
targeted LEED credits.
7
5.8 Construction Compliance
Design Balance and Aller•Lingle•Massey
Architects P.C. will assist the LEED
coordinator for the Contractor through the
Construction Administration phase to verify
that established targets for recycled content in
construction materials and construction waste
recycling are achieved.
Design Balance will review submittals for
compliance with requirements for construction
waste management, indoor air quality
management, recycled content, regional
materials, low -emitting materials, and water
and energy efficiency.
5.9 Commissioning
Aller•Lingle- Massey Architects P.C. and our
design team will coordinate with the City's
independent commissioning firm to
commission the building's mechanical and
control systems.
5.10 Project Certification
Design Balance, with the assistance of. the
design team and the Contractor, will complete
and submit all documentation to the USGBC
for LEED certification. Exhibits will be
created, as needed, to support each LEED
credit.
Responses and design support services
required for any challenged or audited credits
are available as Additional Services.
Deliverables:
• Updated LEED checklists, as appropriate
• LEED certification submittals during
design and construction phases
Anticipated number of meetings:
• Two (2) LEED design review meetings,
plus conference calls
• Bi-weekly coordination conference calls
with the Contractor's LEED coordinator,
project manager and site superintendent.
PHASE 6 — CONSTRUCTION
DOCUMENTS
6.1 Construction Documents
Upon approval of the Final Design submittal,
the design team will develop full construction
drawings and technical specifications to allow
the project to be competitively bid to General
Contractors. The drawings shall include all
necessary site and landscape plans, floor
plans, roof plan, reflected ceiling plans,
building elevations, building and wall sections,
schedules and details as necessary to
adequately illustrate and describe the full
scope of work. All drawings will be produced
with Computer —Aided Design and Drafting
(CAD) systems using Revit 2009 and/or
AutoCAD Version 2008 software.
Construction drawings and technical
specifications will also be included for work of
all subconsultants, including civil, structural,
mechanical and electrical engineering.
For purposes of this Project Approach it is
assumed that all construction documents
will be released in one bid package.
6.2 Design of Special Systems
Due to the scope of work, the following
special systems are included in our proposed
scope:
• Card key access system (rough -in design
only)
• Building security system (rough -in design
only)
6.3 Design Review
Upon review of our 90% Construction
Documents submittal, we will attend a design
review meeting with the City's project
manager and project design committee.
6.4 Cost Estimate
We will review and revise the Final Design
Estimate as required to reflect changes made
in the 90% Construction Documents phase.
9
Deliverables:
• Construction Document drawings, 24" x
36"
• Technical specifications in pdf electronic
format
• Updated 90% cost estimate
• Minutes of client meetings
Anticipated number of meetings:
• Weekly or bi-weekly Construction
Documents phase client meetings
• In-house design team meetings, as
needed
One (1) Construction Documents review
meeting
One (1) Construction Documents
materials/finishes review meeting
PHASE 7 — BIDDING, CONSTRUCTION
ADMINISTRATION AND POST
CONSTRUCTION
7.1 Bidding
Bidding phase services shall include
assistance to the City in distribution of
construction documents to prospective
bidders, facilitation of a Pre -Bid Meeting to
provide a project overview and to allow
prospective bidders to tour the site and ask
questions, issue addenda and participate in
the Bid Opening, negotiations and contract
award.
7.2 Building Permit Application
We will submit final construction drawings and
specifications to the City of Fort Collins for
building permits and plan review, concurrent
with the bidding process for the project.
7.3 Construction Administration
Construction phase services shall include
facilitation of a Pre -Construction Meeting,
regular weekly or bi-weekly on -site field
observations of the work in progress, review
of contractor pay requests and proposed
changes in the work, review change orders,
review of all submittals, shop drawings,
materials and color selections, and assistance
in acquiring all project close-out
documentation.
7.4 O/A/C Meetings
Aller•Lingle•Massey Architects P.C., in
conjunction with the General Contractor, will
attend regular weekly or bi-weekly jobsite
meetings, concurrent with our schedule of
construction observations, held to discuss the
project's progress, schedule, field problems
and any other construction -related issues.
The Contractor shall be responsible for
providing agendas and minutes of the O/A/C
meetings.
7.5 Record Drawings
The design team shall prepare a set of record
documents for the use of the City, based upon
redlined prints of the as -built conditions of the
project provided by the Contractor.
7.6 Warranty Observation
We will conduct an 11-month, post -
construction site observation of the project
prior to the expiration of warranties, if
desired.
Deliverables:
• Addenda, as needed
• Architect's Supplemental Instructions
(ASIs), as needed
• Field observation reports through
construction
• Punchlists at substantial completion
• One (1) set of record drawings, 24" x 36"
mylars
• One (1) CD of record drawings in
AutoCAD format
Anticipated number of meetings:
• One (1) Pre -Bid Conference
• One (1) Pre -Construction Conference
• Weekly or bi-weekly O/A/C meetings
through substantial completion of
construction
E
WORK NOT INCLUDED
2.
3.
4.
5.
6.
7.
8.
9.
10
11
Structural analysis or design of any
structural modifications as may be
needed to bring the current Lincoln
Center buildings into compliance with
current codes.
Mechanical design and engineering,
additional LEED consulting or energy
modeling as may be needed for
upgrades to the existing mechanical
system to bring the current Lincoln
Center buildings into compliance with
current codes, meet LEED prerequisites
or to enhance energy efficiency.
Design and engineering for fire sprinkler
system modifications. Our mechanical
engineering consultant will prepare a
performance specification for use by the
design/build fire protection
subcontractor.
Electrical design and engineering for
new or modified site or parking lot
lighting, beyond that required for the
redesigned courtyard spaces.
Electrical design and equipment
specifications for building security, card
key access systems, etc., beyond
rough -in of conduit.
Design or energy modeling for solar or
photovoltaic systems.
Destructive demolition to reveal hidden
or . concealed structural, plumbing,
mechanical or electrical conditions.
Excavation in order to expose
underground utility, foundation or
structural conditions.
Per Addendum No. 3, all acoustical,
sound system and A/V system consulting
and design are not included in the Basic
Scope of Work. These services will be
added by Change Order once a scope of
work is determined by the City and the
design team.
Commissioning of mechanical and
control systems. This should be a firm
contracted for by the Client,
independent of the design team or the
Contractor.
Release of construction documents in
multiple bid packages. If this is desired,
it is available as Additional Services.
12. Procurement and installation of new
furnishings and movable equipment.
13. Asbestos, lead paint or other hazardous
material discovery, testing or
abatement.
14. Responses and design support services
for any challenged or audited LEED
credits.
INFORMATION PROVIDED BY THE CITY
OF FORT COLLINS
1. CAD drawings created by the City or
others for the original Lincoln Center
building(s), and/or as -built blueprints of
the structural, mechanical, plumbing
and electrical systems.
2. Boundary survey or plat of the property.
3. Lead -based paint, asbestos or other
hazardous material testing and
abatement.
4. Design standards, technical
specifications or other information
required by the City of Fort Collins to be
incorporated into the facility design.
5. Development Agreement, as may be
required upon approval of the Basic
Development Review (B.D.R.) plans.
6. Data on the existing packaged rooftop
mechanical equipment, including
manufacturers, model numbers,
refrigerant type, cooling capacities,
ventilation ratings, etc.
REIMBURSABLE EXPENSES
General project expenses incurred during the
project shall be reimbursable as follows:
■ Printing/scanning
■ Plotting of CAD -generated drawings
■ Copying of drawings and specifications
for design review submittals, planning
submittals, SHF grant review submittals,
building permit applications, and bidding
and construction sets
■ Long distance telephone/FAX
■ Mileage and travel expenses
■ Postage, Federal Express/Express Mail
10
and other delivery services
Photography or other miscellaneous
expenses
Copying of design review, City of Fort Collins
planning review submittals are included in the
expenses listed under Design Fees elsewhere
in our Proposal. Costs for printing and
copying of the construction documents for
bidding, construction or building permit
applications are not included.
ADDITIONAL SERVICES
If the City of Fort Collins requests additional
services beyond those set forth in this
Proposal, such services shall be agreed to in
writing between the City and the Architect,
and the fees adjusted accordingly per our
current hourly rates, subject to annual
adjustment.
11
EXHIBIT B
WORK SCHEDULE
PROPOSED SCHEDULE
Aller.Lingle•Massey Architects P.C.
Scope of Basic Services for the Lincoln Center Additions and Renovation will be performed in accordance
with the following milestone schedule:
■ Design team interviews:
August 18, 2009
■ Design team selected:
August 19, 2009
• Contract approved:
September 1, 2009
■ Design Development Phase complete:
October 16, 2009
■ City review complete:
October 30, 2009
■ Final Design Phase complete:
December 11, 2009
• City review complete:
December 28, 2009
■ Construction Documents complete:
February 1, 2010
■ RFP advertised for Contractors:
February 1, 2010
• City review complete:
February 12, 2010
■ Construction Documents available to Contractors:
February 22, 2010
■ Construction bids received:
March 16, 2010
• Construction contract awarded:
April 1, 2010
■ Notice to proceed:
April 12, 2010
■ Formal construction start:
June 1, 2010
■ Construction substantially complete:
April 1, 2011
■ Building flush -out and punchlist complete:
May 1, 2011
■ Facility reopens to the public:
June 1, 2011
1 Alter- Lingle -Massey Architects P.C.
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination, subject only to the satisfactory performance of the
Professional's obligations under this Agreement. Such payment shall be the Professional's sole right
and remedy for such termination.
5. Design, Project Indemnity and Insurance Responsibility. The Professional shall be
responsible for the professional quality, technical accuracy, timely completion and the coordination
of all services rendered by the Professional, including but not limited to designs, plans, reports,
specifications, and drawings and shall, without additional compensation, promptly remedy and
correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold
harmless the City, its officers and employees in accordance with Colorado law, from all damages
whatsoever claimed by third parties against the City; and for the City's costs and reasonable
attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of
the services furnished under this Agreement. The Professional shall maintain commercial general
liability insurance in the amount of $500,000 combined single limits and errors and omissions
insurance in the amount of $1,000,000.
6. Compensation. In consideration of the services to be performed pursuant to this
Agreement, the City agrees to pay Professional a fixed fee in the amount of Five Hundred Fifteen
Thousand, Five Hundred Fifty Dollars ($515,550.00) plus reimbursable direct costs. All such fees
and costs shall not exceed Five Hundred Forty Four Thousand, Five Hundred Fifty Dollars
($544,550.00) per the attached Exhibit C, consisting of five (5) pages, and incorporated herein by
this reference. Monthly partial payments based upon the Professional's billings and itemized
statements are permissible. The amounts of all such partial payments shall be based upon the
Professional's City -verified progress in completing the services to be performed pursuant hereto and
upon the City's approval of the Professional's actual reimbursable expenses. The parties
acknowledge that North Star Design, Russell + Mills Studios, Martin/Martin Consulting Engineers,
Standard Professional Services Agreement- rev07/09
2
EXHIBIT C
FEE SCHEDULE
DESIGN FEES
Aller-Lingle-Massey Architects P.C.
Alter -Lingle -Massey Architects P.C. and our team of consultants propose to complete the Basic Scope of Work for the
following design fees, based upon our Conceptual Design work completed to date, your Request for Proposals and our
proposed Project Approach.
Our basic professional fees are based upon an assumed construction cost of $4,476,800.00, the approximate amount
currently funded by Building on Basics (BoB). We have listed certain aspects of the project separately, such as the rooftop
garden and south porte cochere, that may or may not become part of the design.
BASIC SERVICES
PHASE 1 - PROJECT START-UP AND CONCEPTUAL DESIGN VERIFICATION
Alter -Lingle -Massey Architects P.C.:
S 11,700.00
King Surveyors (Topographic Surveying):
5 5,150.00
Earth Engineering (Geotechnicai Engineering):
S 3,950.00
$ 20,800.00
PHASE 2 - DESIGN DEVELOPMENT
Alter -Lingle -Massey Architects P.C.:
S 21,450.00
Russell + Mitts Studios (Landscape Architecture):
$ 21,200.00
Martin/Martin (Structural Engineering):
$ 15,600.00
EMC Engineers (M/E/P Engineering):
$ 17,600.00
Ricca Newmark (Interior Design):
$ 18,500.00
Design Balance (LEED Consulting):
$ 5,000.00
Moore Construction Consulting (Cost Consultant):
5 1,000.0
$100,350.00
PHASE 3 - PLANNING APPROVAL/ENTITLEMENT
Alter -Lingle -Massey Architects P.C.:
$ 8,000.00
North Star Design (Civil Engineering):
5 7,100.00
Russell + Mitts Studios (Planning/Landscape Architecture):
$ 2,250.00
Russell + Mitts Studios (irrigation Design):
$ 4,500.00
Matt Detich (Traffic Consultant):
S 4,500.00
$ 26,350.00
PHASE 4 - FINAL DESIGN
Alter -Lingle -Massey Architects P.C.:
$ 26,400.00
Russell + Milts Studios (Landscape Architecture):
S 5,200.00
Martin/Martin (Structural Engineering):
$ 14,800.00
EMC Engineers (M/E/P Engineering):
$ 22,000.00
Ricca Newmark (Interior Design):
$ 27,500.00
Ricca Newmark (Kitchen/Bar Consulting):
$ 2,D00.00
Design Balance (LEED Consulting):
S 4,000.00
Moore Construction Consulting (Cost Consultant):
1 000.00
$102,900.00
PHASE 5 - SUSTAINABILITY AND LEED CERTIFICATION
Design Balance (LEED Consulting): In Design Phases
EMC Engineers (Energy Modeling): $ 21,000.00
EMC Engineers (Daylighting Modeling Allowance): $ 10,000.00
LEED Online Submittal - Design Phases: $ 4,300.00
LEED Online Submittal - Construction Phase: $ 3 300.00
5 38,600.00
PHASE 6 - CONSTRUCTION DOCUMENTS
Alter- Lingle -Massey Architects P.C.:
S 28,650.00
North Star Design (Civil Engineering):
S 12,300.00
Russell + Mills Studios (Landscape Architecture):
S 7,400.00
Martin/Martin (Structural Engineering):
$ 15,600.00
EMC Engineers (M/E/P Engineering):
S 35,200.00
Ricca Newmark (Interior Architecture/Design):
$ 37,500.00
Ricca Newmark (Kitchen/Bar Consulting):
$ 4,000.00
Ricca Newmark (Interior Signage Consulting):
S 5,000.00
Design Balance (LEED Consulting):
S 4,600.00
Moore Construction Consulting (Cost Consultant):
S 1,500.00
$151,750.00
PHASE 7 - BIDDING, CONSTRUCTION ADMINISTRATION AND POST CONSTRUCTION
A(ter.Lingle *Massey Architects P.C.:
$ 30,300.00
North Star Design (Civil Engineering):
$ 2,600.00
Russell + Mitts Studios (Landscape Architecture):
$ 2,950.00
Martin/Martin (Structural Engineering):
$ 6,000.00
EMC Engineers (Jul/VP Engineering):
$ 13,200.00
Ricca Newmark (Interior Architecture/Design):
$ 9,500.00
Design Balance (LEED Consulting):
10 250.00
$ 74,800.00
TOTAL PROFESSIONAL FEES, ALL PHASES: $5151*550.00
These fees represent approximately 11.5 0 of the $4,476,800 construction budget.
Basic Services Fees broken down by firm are as follows:
Alter. Lingle -Massey Architects P.C.:
$126,500.00
Russell + Mills Studios (landscape Architecture):
S 43,500.00
North Star Design (Civil Engineering):
S 2-2,000.00
King Surveyors (Topographic Surveying):
$ 5,150.00
Earth Engineering (Geotechnical Engineering):
$ 3,950.00
Matt Delich (Traffic Consultant):
S 4,500,00
Martin/Martin (Structural Engineering):
$ 52,000.00
EMC Engineers (M/E/P Engineering):
$ 88,000,00
Ricca Newmark (interior Architecture/Design):
$104,000.00
Design Balance (LEED Consulting):
S 31,450.()0
EMC Engineers (Energy and Daytighting Modeling):
$ 31,000.00
Moore Construction Consulting (Cost Consultant):
$ 3,500.00
S515,550.00
REIMBURSABLE EXPENSE ALLOWANCE:
Copying/ Printing I Scanning, $.15,000.00
Color and B1W Plotting: $ 3,500.00
Mileage Travel: $ 7,500.00
Postage/L.D. Telephone/Fax: $ 5W.00
LEED Registration: Already Completed
LEED Certification Fees: $ 2,500.00
$ 29, 000.00
2
REIMBURSABLE EXPENSES
In addition to Basic Services, the following expenses in connection with this Project shatt be reimbursable, as itemized
by the allowances above.
In -House Copying (8-1 /2" x 11" thru 11" x 17"):
In -House Large Format Scans:
In -House Large Format Prints:
In -House Vellum Plotting:
In -House Mylar Plotting:
In -House Laserjet Color Copying:
In -House Large Format Color Prints:
CAD Plotting of Drawings (Submittals and Client Reviews)
Outsourced Printing and Copying:
Long -Distance Telephone/Fax:
Shipping/Postat/Courier Services:
Photography/Digital Print Processing:
Mileage:
Travel Expenses:
$0.10 - .25/page
$5.00/sheet
51.00/sheet
55.00/sheet
$15.00/sheet
51.00/each
S25.00/each
55.00/sheet
Direct Cost x 1.1
Direct Cost x 1.1
Direct Cost x 1.1
Direct Cost x 1.1
50.55/mile
Direct Cost
Copying of design review, City of Fort Collins planning review submittals are included in the expenses listed in the
Reimbursable Expenses Allowance listed above. Costs for printing and copying of the construction documents for bidding,
construction or building permit applications are not included.
EXCLUSIONS
Refer to Project Approach.
3
HOURLY RATES
Aller•Lingle -Massey Architects P.C.
Principal:
$135/hour
Associate Architect:
$105/hour
Sr. Project Manager/Architect:
$1001hour
Project Architect:
$95/hour
LEER AP Consulting:
$80/hour
Interior Designer:
$75/hour
Architectural Intern/CAD Technician 2:
$72/hour
Architectural Intern/CAD Technician 1:
$65/hour
Clerical/Administrative:
$55/hour
North Star Design, Inc.
Project Manager. $87/hour
Project Engineer/Project Designer: S70/hour
Design Engineer/Technician: 554/hour
Clerical $38/hour
Russell + Mills Studios
Partners: $90/hour
Landscape Architect: $75/hour
Landscape Designer: S65/hour
CAD Draftsperson: S55/hour
Martin/Martin Consulting Engineers, Inc.
Principal:
S150/hour
Associate:
$135/hour
Senior Project Engineer:
$115/hour
Project Engineer:
$100/hour
Engineer EIT II:
$85/hour
Engineer EIT I:
$80/hour
Senior CAD Operator:
$85/hour
Project CAD Operator:
$70/hour
CAD Operator:
$65/hour
Administrative:
$55/hour
EMC Engineers, Inc.
Principal:
$197.79/hour
Advanced Senior EtectricaL Engineer 8:
5182.98/hour
Advanced Senior Mechanical Engineer 8:
$177.87/hour
Advanced Senior Electrical Engineer 7:
S171.82/hour
Advanced Senior Mechanical Engineer 7:
5166.55/hour
Senior Electrical Engineer 6:
$136.05/hour
Senior Mechanical Engineer 6:
$145.65/hour
Senior Electrical Engineer 5:
S118.61/hour
Senior Mechanical Engineer 5:
$124.69/hour
Staff Electrical Engineer 4:
$104.05/hour
Staff Mechanical Engineer 4:
5115.89/hour
Staff Electrical. Engineer 3:
$102.37/hour
Staff Mechanical Engineer 3:
S98.30/hour
Junior Electrical Engineer 2:
587.17/hour
Junior Mechanical Engineer 2.
S84.70/hour
Junior Electrical Engineer 1:
$80.76/hour
Junior Mechanical Engineer 1:
578.66/hour
Designer 4:
S96.76/hour
Designer 3:
$96.76/hour
Designer 2:
$83.16/hour
L1
Designer 1:
$71.06/hour
CADD Operator 4:
$98.48/hour
CADD Operator 3:
$71.36/hour
CADD Operator 2:
$57.89/hour
CADD Operator 1:
$50.23/hour
Technician 4:
582.28/hour
Technician 3:
$73.26/hour
Technician 2:
$ 65.16/hour
Clerical (inc. Word Processor Z7 Secretary):
5 58.69/hour
.Accounting:
5 80.11 /hour
Ricca Newmark Design
Partner/President:
$210/hour
Principal:
$150/ hour
Senior Project Director/Project Director.
$110/hour
Project Designer:
$1i0/hour
Sr. Designer/Sr. Job Captain:
$95/hour
,lob Captain/Project Manager:
$95/hour
Designer/Project Associate:
575/hour
Design Balance
Principal LEER Consultant: $150/hour
LEER Technical Assistant: $601hOUr
Moore Construction Consulting Services
Detailed Project Cost Estimating, including M/E/P: $651hour
Plan Interpretation and Consuttation Services: $551hour
Clerical: $351 hour
D. L. Adams Associates
Principal:
5195/hour
Associate Principal
$175/hour
Project Manager,
$145/hour
Senior Consultant:
5125/hour
Project Consultant:
$95/hour
Staff Consultant:
$80/hour
Technician:
$65/hour
iI
EXHIBIT D
INSURANCE REQUIREMENTS
1. The Professional will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work under
this bid, the Professional shall furnish the City with certificates of insurance showing the type,
amount, class of operations covered, effective dates and date of expiration of policies, and
containing substantially the following statement:
"The insurance evidenced by this Certificate will not be cancelled or materially altered,
except after ten (10) days written notice has been received by the City of Fort Collins."
In case of the breach of any provision of the Insurance Requirements, the City, at its option, may
take out and maintain, at the expense of the Professional, such insurance as the City may deem
proper and may deduct the cost of such insurance from any monies which may be due or
become due the Professional under this Agreement. The City, its officers, agents and
employees shall be named as additional insureds on the Professional's general liability and
automobile liability insurance policies for any claims arising out of work performed under this
Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Professional shall maintain
during the life of this Agreement for all of the Professional's employees engaged in work
performed under this agreement:
Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Professional shall maintain during
the life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury, including
accidental death, as well as for claims for property damage, which may arise directly or
indirectly from the performance of work under this Agreement. Coverage for property
damage shall be on a "broad form" basis. The amount of insurance for each coverage,
Commercial General and Vehicle, shall not be less than $500,000 combined single limits
for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Professional shall be
responsible for any liability directly or indirectly arising out of the work performed under
this Agreement by a subcontractor, which liability is not covered by the subcontractor's
insurance.
ACORD_ CERTIFICATE OF LIABILITY INSURANCE OP ID JA DATE(MWDWYYYY)
ALLSR-1 09 09 09
PRODUCER
Front Range Insurance Group
1100 Haxton Drive suite 100
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATIO
ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW
Fort Collins CO 80525
Phone: 970-223-1804
INSURERS AFFORDING COVERAGE
NAIC II
INSURED
INSURER a The Hartford
Alle
Architects, P.C.
712 Whalers Aay Suite 8-100
Ft. Collins CO a;0525
INSURER ca
SURER e: Beazlay X=mzame C, IW-Lingle-Massey
IMSURERC Pinnacol Assurance
�Ir
I+suRER E:
nnvcnw.�rc.
THE POL IMS OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REOUIREMENT. TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUR ENT WITH RESPECT TO WHICH THIS ATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
LTRmm
TYPE OF INSURANCE
POLICY NUMBER
PDOALTE"PMEW1E
LIMITS
A
GENERAL LIABILITY
X cOmmERaALGENERALLIAsam
CLAM MADE ®OCCUR
34SEA XJ7716 DX
04/09/09
04/09/10
EACH OCCURRENCE
$1,000,000
PREMLSFS our
$300,000
MED EXP (Any one person)
$10 , 000
PERSONAL a AM INJURY
S1,000,000
GENERAL AGGREGATE
s2,000,000
GENL AGGREGATE LIMIT APPLIES PER
POLICY j� LOC
PRODUCTS - COMPIOP AGG
$2 , 000 , 0 0 0
A
AUTOMOBILE
LIABILITY
ANYAUTO
34UEClQS390
04/09/09
04/09/10
COMERNM SINGLE UBUT
S1,000,000
X
BODILY INJURY
(Per person}
S
ALL OWNED AUTOS
SCHEDULED AUTOS
BODILY Id1URY
(Per aodeenq
s
HIRED AUTOS
NON GAMED AUTOS
(� VDAMAGE
s
GARAGE L IABUJTY
AUTO ONLY . EA ACCIDENT
S
ANY AUTO
OTHER THAN EA ACC
ALTO ONLY: AGG
s
S
A
EXCESSIUSIBRELLAUABILITY
X7 OCCUR CLAmmADE
34SEA XJ7716 DX
04/09/09
04/09/10
EACH OCCURRENCE
$1000000
AGGREGATE
s
s
DEDUCTIBLE
5
RETENTION $10000
$
C
WORItERS COMPENSATION AND
EMPLOYERS! LL404M ANy
OFFICERrwrIEAIeER OCCLUDED? jM4EL
s E PRO Sbokm
1951272
04/O1/09
04/01/10
X TORY LIA FU- I1 t
EL EACH ACCIDENT
s500000
DISEASE • EA EMPLOYEE
$ SOOOOO
EL.OLSEASE.POLICYUMrr I
s 500000
OTHER
H Pro. Liability V15Q3U08PNPA 12/14/08 12/14/10 E S O $2,000,000
DESCRIPTION GF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSMENT I SPECIAL PROVISWNS $2 000,000
City of Fort Collins, Lincoln Center is listed as Additional Insured with
regards to General Liability.
City of Fort Collins
Lincoln Center
300 Laporte Ave
Fort Collins CO 80521
CITY-01 I SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
DATE THEREOF. THE ISSU{NG INSURER WILL ENDEAVOR TO MAIL 10 DAYS WRITTEN
NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT. BUT FAILURE TO DO SO SMALL
IMPOSE NO OBLIGATION OR LWBIL ITY OF ANY IGND UPON THE INSURER, ITS AGENTS OR
REPRESENTATWES,
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
1Limits si,000,000/sl,000,000 � i2/la/os-oe/oi/o9 Limits Increased to - —��
$2,000,000/g2,000,000 on os/i/o9-12/la/lo.
Inc., EMC Engineers, Inc., Ricca Newmark Design, Design Balance, Moore Construction Consulting
Services, and D.L. Adams Associates are not parties to this agreement. However, the rates listed for
services to be provided by these subcontractors shall be the rate paid by the City to the Professional
for these services. If the amounts charged by these subcontractors exceed the rates listed in Exhibit
"C" the excess amount shall not be paid or owed by the City. The limitation on increases in prices
set forth in section 4 herein shall apply to all rates listed in Exhibit "C" including subcontractor rates.
7. Final payment shall be made following acceptance of the work by the City. Upon
final payment, all designs, plans, reports, specifications, drawings, and other services rendered by
the Professional shall become the sole property of the City.
8. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
9. Project Drawings. Upon conclusion of the project and before final payment, the
Professional shall provide the City with reproducible drawings of the project containing accurate
information on the project as constructed. Drawings shall be of archival, prepared on stable Mylar
base material using a non -fading process to provide for long storage and high quality reproduction.
"CD" disc of the as -built drawings shall also be submitted to the City in an AutoCAD version no older
then the established city standard.
10. Monthly Report. Commencing thirty (30) days after the date of execution of this
Agreement and every thirty (30) days thereafter, Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Scope of Services,
Work Schedule, and other material information. Failure to provide any required monthly report may,
at the option of the City, suspend the processing of any partial payment request.
Standard Professional Services Agreement- rev07/09
3
11. Independent Contractor. The services to be performed by Professional are those of
an independent contractor and not of an employee of the City of Fort Collins. The City shall not be
responsible for withholding any portion of Professional's compensation hereunder for the payment of
FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
12. Personal Services. It is understood that the City enters into this Agreement based on
the special abilities of the Professional and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
consent of the City.
13. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's
approval or acceptance of, or payment for, any of the services shall not be construed to operate as a
waiver of any rights or benefits provided to the City under this Agreement.
14. Default. Each and every term and condition hereof shall be deemed to be a material
element of this Agreement. In the event either party should fail or refuse to perform according to the
terms of this agreement, such party may be declared in default.
15. Remedies. In the event a party has been declared in default, such defaulting party
shall be allowed a period of ten (10) days within which to cure said default. In the event the default
remains uncorrected, the party declaring default may elect to (a) terminate the.Agreement and seek
damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail
himself of any other remedy at law or equity. If the non -defaulting party commences legal or
equitable actions against the defaulting party, the defaulting party shall be liable to the
non -defaulting party for the non -defaulting parry's reasonable attorney fees and costs incurred
because of the default.
Standard Professional Services Agreement- rev07/09
4
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers, employees,
agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal
representatives, successors and assigns of said parties.
17. Law/Severability. The laws of the State of Colorado shall govern the construction,
interpretation, execution and enforcement of this Agreement. In the event any provision of this
Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such
holding shall not invalidate or render unenforceable any other provision of this Agreement.
17. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101,
C.R.S., et. seq., Professional represents and agrees that:
a. As of the date of this Agreement:
1. Professional does not knowingly employ or contract with an illegal alien
who will perform work under this Agreement; and
2. Professional will participate in either the e-Verify program created in
Public Law 208, 104th Congress, as amended, and expanded in Public Law 156,
108th Congress, as amended, administered by the United States Department of
Homeland Security (the "e-Verify Program") or the Department Program (the
"Department Program"), an employment verification program established
pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment
eligibility of all newly hired employees to perform work under this Agreement.
b. Professional shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
C. Professional is prohibited from using the e-Verify Program or Department
Program procedures to undertake pre -employment screening of job applicants while this
Agreement is being performed.
d. If Professional obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Professional
shall:
Standard Professional Services Agreement- rev07/09
5
1. Notify such subcontractor and the City within three days that Professional
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien; except that Professional
shall not terminate the contract with the subcontractor if during such three days
the subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Professional shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the. "Department") made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17.5-102 (5), C.R.S.
f. If Professional violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this
Agreement is so terminated, Professional shall be liable for actual and consequential
damages to the City arising out of Professional's violation of Subsection 8-17.5-102,
C.R.S.
g. The City will notify the Office of the Secretary of State if Professional violates this
provision of this Agreement and the City terminates the Agreement for such breach.
Standard Professional Services Agreement- rev07/09
6
,C� • w
SCI 1,
.,
ATT S O►Cbl*._, A
City Clerk
v
i
... - MUMMA IN
THE CITY OF FORT COLLINS, COLORADO
By:
,(olz James 13. O'Neill II, CPP , FNIGP
der; yDirector of Purchasing & Risk Management
DATE:
Aller Lingle Massey t P.C.
By:
Title: V I a — fr-e% L7
CORPORATE PRESIDENT OR VICE PRESIDENT
(Corporate Seal)
Standard Professional Services Agreement- rev07/09
7
EXHIBIT "A"
SCOPE OF SERVICES
PROJECT APPROACH
Aller•Lingle -Massey Architects P.C.
Aller•Ling le- Massey Architects P.C.
approaches the design of each project as a
unique and compelling challenge, and an
opportunity to pursue new and creative
solutions. We have earned a reputation for
creating sensitive and cost-effective designs,
incorporating elements of both function and
beauty, but remaining responsive to the
balance between program and budget,
permanence and flexibility. Our goal is to
bring a blend of creative design, professional
integrity and client service to all of our
projects.
Our approach to the Lincoln Center project
will build upon the Conceptual Design work
already created by our design team,
prioritizing and enhancing the programmatic
requirements for the project. These will be
balanced against maintenance and
operational considerations, budget and
scheduling, sustainability, future flexibility and
expansion, life -cycle cost-effectiveness and
the revenue- generating aspects of the facility.
In response to your Request for Proposals,
we have prepared the following Project
Approach describing the basic steps. in our
proposed design process:
PHASE 1 — PROJECT START-UP AND
CONCEPTUAL DESIGN VERIFICATION
1.1 Initial Scope Meeting
Aller•Lingle•Massey Architects P.C. will meet
with the City of Fort Collins Operations
Services project manager and Lincoln Center
staff to confirm the scope of work for the
design contract. Our proposal will be revised
and resubmitted, if necessary.
1.2 Base Data Acquisition
Base site data will be obtained and confirmed,
including a base map of the site, aerial maps,
and any existing boundary and topographic
survey data of the immediate project area.
Any previous work that has been completed
for the site, such as flood plain reviews, shall
be obtained and reviewed.
1.3 Geotechnical Data
Earth Engineering, the geotechnical
engineering consultant, will take soils boring
samples at the locations of the proposed new
building additions on all sides of the facility,
with a soils report prepared with foundation
design recommendations. Nine (9) borings
are anticipated and included in our Basic
Scope of Work.
1.4 Topographic Survey
King Surveyors, the surveying consultant,
shall prepare a complete topographic survey
for the immediate site around the entire
building, to the flowline of Mulberry, Magnolia
and Meldrum Streets, and 50' into the parking
lot on the west. The survey will include
property boundaries, existing buildings,
streets, drives, alleys, parking areas, rights -of -
way and easements, underground and
overhead utilities, trees, landscaping and the
existing fountain within this area. The existing
sculpture court walls, fences, sculpture
pedestals, stage, etc. will not be surveyed
since they are scheduled for demolition or
relocation.
1.5 Review Regulations
The design team will research issues related
to development of the project, including traffic
and parking, drainage and flood plain issues,
availability and capacity of site utilities, and
levels of the current site's compliance with the
City of Fort Collins' Land Use Code, as
appropriate. We will initiate meetings or
discussions with the City of Fort Collins to
determine their requirements for further
development of the site, including street
infrastructure, utility services, fire protection,
landscaping and tree mitigation.
1.6 Schedule
We will prepare and periodically update a
design and construction schedule to assure
the project progresses efficiently toward
completion.
1.7 Field Measurements and Base
Drawings
Since some as -built drawings of the Lincoln
Center exist, we will visit the site and measure
critical elements of the building as it relates to
the proposed new work, to verify that the
existing drawings are accurate and to verify
that the building was substantially constructed
in accordance with these drawings.
Aller•Lingle•Massey Architects P.C. will then
create updated base drawings for use by the
balance of the design team based upon these
field measurements.
1.8 Program Verification
Aller•Lingle•Massey Architects P.C. will
meet with the City's project manager and the
Lincoln Center staff to confirm the vision for
the project, the basic programmatic
requirements and the major design
components to ensure meeting the Lincoln
Center's goals, including:
Creating a new exterior design image for
the Lincoln Center with- more clearly
defined and identifiable entrances.
Enlarging and enhancing the lobbies,
corridors and other public gathering areas,
creating a fresh, new interior design with
improved acoustics, lighting and way -
finding signage and graphics.
• Redesigning the sculpture garden,
reorganizing the space to be more open
and inviting from the street, improving
access to the Lincoln Center's primary
entrances, and creating an exterior space
that allows flexibility of use and enhances
the design image of the Lincoln Center.
• Redesigning the Mini -Theater, with a
reconfigured seating layout for improved
sight lines, improved patron comfort and
better circulation through the theater.
• Redesigning the Canyon West and
Columbine Rooms and adding badly
needed storage and user amenities to
help reposition these important revenue
spaces for increased use.
• Adding exciting new venues for the
Lincoln Center, such as the upper level
roof garden, if funding allows.
1.9 Establish Project Design Committee
A project design committee may be formed
from this group to work with the architect
and design team through the balance of the
project.
Deliverables:
• Project schedule
• Geotechnical report
• Topographic survey
• Base floor plan(s), 24" x 36"
• Updated outline of programming needs
and goals
Anticipated number of meetings:
• One (1) project start-up meeting
• One (1) program enhancement meeting
with Lincoln Center staff
• Site visit(s) for field verification or
measurements
PHASE 2 —DESIGN DEVELOPMENT
2.1 Design Development
The Design Development process will build
upon the Conceptual Design already
2