HomeMy WebLinkAbout193498 E-CUBE INC - CONTRACT - RFP - 7064 BUILDING COMMISSIONING ANNUALPROFESSIONAL SERVICES AGREEMENT WORK ORDER TYPE THIS AGREEMENT made and entered into the day and year set forth below by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and E-Cube, Inc., hereinafter referred to as "Professional". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with any project Work Orders for 7064 Building Commissioning Annual, issued by the City. A blank sample of a work order is attached hereto as Exhibit "A", consisting of one (1) page and is incorporated herein by this reference. The City reserves the right to independently bid any project rather than issuing a Work Order to the Professional for the same pursuant to this Agreement. 2. Time of Commencement and Completion of Services. The services to be performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time is of the essence. Any extensions of any time limit must be agreed upon in writing by the parties hereto. 3. Contract Period. This Agreement shall commence October 1, 2009, and shall continue in full force and effect until September 30, 20010, unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide. Written notice of renewal shall be provided to the Professional and mailed no later than ninety (90) days prior to contract end. 1 stdwopsa rev 07/09 EXHIBIT B FEESCHEDULE E-Cube staff and associates will be available for work on this project on either a negotiated or an hourly basis. In the case of hourly work, the following rates will apply: 2M 2010 (Contract term) _i Principals, Project Executives $169 $169 �j Senior Associates, Senior Project Managers $132 $132 _.- Associates, Senior Engineers, Project Managers $124 $124 i] Staff Engineers & Analyst, Level II $118 $118 rD Staff Engineers & Analyst, Level.1 $112 $112 D Senior Field Technicians $109 $109 f::i Field Technicians $ 76 $ 76 D Project Resource Manager $ 53 $ 53 Please note that this schedule is in effect for project work in 2009 and 201.0. Rates for remaining work and/or additional terms will be negotiated at the time of contract renewal. EXHIBIT C SCOPE OF SERVICES COMMISSIONING STATEMENT OF WORK The building commissioning services shall be provided during the design, construction, acceptance and warranty phases of the project as described below. These services shall be undertaken in cooperation with and in coordination with the building owner, the architectural and engineering design team, the general contractor, the involved subcontractors, various equipment suppliers and the building operation and maintenance staff. Building systems that may be commissioned include, but are not limited to, all mechanical systems, plumbing systems, HVAC, fans, motors, pumps, electrical systems, lighting, and building envelope. DESIGN PHASE COMMISSIONING ACTIVITIES The Professional shall consider all aspects of the design from the owner's (building operation and maintenance staff) perspective. The Professional, in cooperation with the design team, will undertake the following activities: n review of construction documents a. Design review at 50% design development The 50% design development review seeks to identify building system design issues and potential operation and maintenance issues that should be addressed during the design development phase of the project. At this point in the design phase, the building system designs are being defined and many decisions crucial to overall building performance, operation and maintenance are being made. This review is designed to adequately determine whether the targeted building systems are likely to meet the design goals. b. Design review at 65% construction documents The 65% construction documents review is undertaken to ensure that each building system to be commissioned can be commissioned, and that these systems will to meet the design goals, the customer's needs, operational and maintenance requirements, and various equipment and system controls criteria. c. Design review at 95% construction documents This review focuses on determining if the construction documents and related contract documents contain sufficient detail and are adequately specified to fully define the operational requirements of the project. The 95% construction document review is undertaken to ensure that the design achieves the major goals relative to functionality, energy performance, maintainability and indoor environmental quality. 2. Develop commissioning specifications In cooperation with the design team, the professional shall prepare and incorporate commissioning specifications into the construction documents. The commissioning specifications describe the scope and requirements for commissioning, as well as the roles and responsibilities of the general contractor, installing subcontractors, owner personnel and the commissioning agent. 3. Prepare preliminary Commissioning Plan and Schedule The Commissioning Plan describes the implementation of the commissioning process and provides a framework for integration of commissioning activities into the construction and acceptance process. The Commissioning Plan also provides an agenda for organizing and focusing the commissioning scoping meeting. The Commissioning Plan expands to incorporate more information as the design, construction and start-up phases of the facility are completed. The Commissioning Plan will be updated during the construction and warranty phases. The commissioning schedule will be generated by the professional and will include all project milestones and commissioning milestones. The schedule will clearly indicate the order of events that are required for proper execution of the commissioning process. CONSTRUCTION PHASE COMMISSIONING ACTIVITIES Conduct commissioninq scopinq meetinq The scoping meeting brings together all members of the design and construction team that will be involved in the commissioning process. Each building system to be commissioned is addressed, including its intended operation, commissioning requirements plus completion and start-up schedules. During the scoping meeting, all parties agree on the scope of work, tasks, schedules, deliverables and responsibilities for implementation of the Commissioning Plan. 2. Review submittals Submittals are reviewed prior to construction. The scope includes all submittals related to equipment and systems to be commissioned. The submittals are reviewed for compliance with construction documents and the design goals. Temperature control submittals are carefully reviewed to ensure that all information is provided for a fully functional and efficient system. 3. Create pre -functional inspection checklists and functional performance test plans Pre -Functional Inspection Checklists are developed for all major equipment and systems being commissioned. The checklists capture equipment nameplate and characteristics data and confirm the as -built status of the equipment or system. The checklists include equipment start-up requirements, either from the manufacturer or installing subcontractor. 4. Create functional performance test plans Functional performance plans are written to ensure that all systems are run through the complete sequence of operation. The functional testing plans are reviewed by the design team, owner and installing subcontractor(s) before they are implemented in the Acceptance Phase. 2 5. Verify pre -functional inspection checklists The pre -functional inspection checklists, completed by the installing subcontractors, are verified for completeness and accuracy. The verification step is one of several prerequisites to the start of functional performance testing during the acceptance phase. 6. Conduct construction observation On -site observations are conducted to verify compliance with manufacturer's installation and start-up instructions and recommendations, compliance with the design intent and meeting the requirements for efficient operation and maintenance. Testing, adjusting and balancing (TAB) observation will verify TAB methods and procedures on both airside and waterside systems. Commissioning will also include verification of the TAB as a prerequisite to substantial completion. The verification procedure will spot check air and water flow rates at locations selected by the commissioning engineer. Regularly scheduled meetings are held for site coordination, reporting on construction and commissioning progress and resolution of any identified issues or deficiencies. Construction observation activities will be coordinated with the owner's operation and maintenance staff to facilitate their participation in the commissioning process and familiarize them with the building systems that they ultimately will be required to operate and maintain. 7. Witness equipment startup Equipment start-up should always be performed by the manufacturer's representative, but also requires the attendance of the appropriate mechanical engineer and commissioning agent to verify that proper startup procedure has occurred and the equipment is operating per the specification requirements. ACCEPTANCE PHASE COMMISSIONING ACTIVITIES Complete functional performance testing Under the supervision of the professional commissioning staff, the installing contractor/subcontractor performs the hardware and/or software manipulations called for in the function performance test plan. The building owner's operation and maintenance staff should also be present in order to witness and/or assist in system manipulations and observations. The professional commissioning staff directs, witnesses and records the results of functional performance testing. Testing occurs on all systems being commissioned. 2. Document deficienci All deficiencies identified during the function performance test and other verification testing activities are documented and reported to the owner, the general contractor, and the installing subcontractor. The deficiency report includes all details of the components or systems found to be non -compliant with the parameters of the test plans and contract documents. The report details the adjustments or alterations required for correcting the system operation, and identifies the responsible party. 3 3. Review operation & maintenance manuals and training programs The Operation and Maintenance (O&M) manuals are reviewed for completeness, usefulness and for adherence to the requirements of the specifications. The contracting team is responsible for providing training in their specific areas. The Professional will help to organize and facilitate the training schedule with both the building owner's operation and maintenance staff and the contracting team. The agenda for staff training programs is reviewed. Materials may be added, or requested from the subcontractors, to stress and enhance the importance of system interactions, troubleshooting and long-term preventative maintenance and operation. Training sessions for commissioned systems will be attended and videotaped by the commissioning engineer, with careful coordination with the building's operation and maintenance staff. 4. Complete commissioning report and LEED documentation A final Commissioning Report is compiled which summarizes all of the tasks, findings and documentation of the commissioning process. The report addresses the actual performance of the building systems in reference to the design intent and construction documents. Documentation of Warranty Phase commissioning activities is added to the report after the warranty period is complete. The Commissioning Report includes: • An evaluation of the operating condition of the systems at the time of functional test completion • Deficiencies that were discovered and the measures taken to correct them • Functional test procedures and results • Reports that document all commissioning field activities as they progressed, and a description and estimated schedule of required deferred testing • LEED Documentation: Documentation will address and certify the LEED section on "Energy and Atmosphere" Pre -requisite 1.0 titled "Fundamental Building Systems Commissioning" and the LEED Credit 3 titled "Additional Commissioning" • Re -commissioning management manual (if LEED Additional Commissioning Credit 3 is desired) WARRANTY PHASE COMMISSIONING ACTIVITIES The Warranty Phase activities will be coordinated with the building owner's operation and maintenance staff to facilitate their participation in the commissioning process, and to provide a more robust understanding of the operation and performance of the commissioned building systems. Review as -built documentation The as -built documentation is reviewed to verify consistency with field conditions. The as -built documentation includes control schematics and sequences of operation. 2. Complete seasonal testing (LEED Additional Credit) Seasonal variation in operations or control strategies may require additional testing during the opposite season to verify performance of the HVAC system and controls. During the warranty period, seasonal testing and other deferred testing is completed as required to fully test all sequences of operation. 0 3. Complete end-of-warrantv review (LEED Additional Credit At the end of the warranty period, the professional will conduct a review of system operation, including interviews with building occupants and the operation and maintenance staff. USGBC — LEED ACREDITATION Sustainable Design The City of Fort Collins goal is that each new construction project will be designed using the U. S. Green Building Council's (USGBC) LEED [tm] Green Building Rating System for new construction and major renovations to earn at least a "gold" level certification. The commissioning professional shall perform all services with the intent of achieving this standard. ANTICIPATION OF DELIVERABLES: Design Phase • 50% Design Development Phase Design Review • 65% Construction Documents Design Review • Commissioning Specifications • Preliminary Commissioning Plan with Schedule • 95% Construction Documents Design Review Construction Phase • Commissioning Scoping Meeting Minutes • Submittal Review Reports, as appropriate • Pre -functional Checklists for all equipment and systems to be commissioned • Construction Observation Reports • Deficiency Reports Acceptance Phase • Functional Performance Testing Reports • Deficiency Reports • Operation and Maintenance Review • Operation and Maintenance training agenda reviews • Preventive Maintenance Database • Commissioning Report • LEED Commissioning Certification Documents Warranty Phase As -built Documentation Review Report Seasonal Testing Reports End of Warranty Period Review 5 4. . Early Termination by City/Notice. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this agreement shall be effective when mailed, postage prepaid and sent to the following address: Professional: City: With Copy to: E-Cube, Inc. City of Fort Collins, City of Fort Collins, Attn: Mr. Leonard Rozek Operations Services Purchasing 1900 Folsom, Sutie 109 Attn: Steve Seefeld PO Box 580 Boulder, CO 80302 PO Box 580 Fort Collins, CO 80522 Fort Collins, CO 80522 In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 5. Design, Project Insurance and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City its officers and employees, in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City and for the City's costs and reasonable attorney's fees arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $500,000 combined single limits and errors and omissions insurance in the amount of 1,000,000. 2 stdwopsa rev 07/09 6. Compensation. In consideration of services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis designated in Exhibit "B", consisting of one (1) page, attached hereto and incorporated herein by this reference. At the election of the City, each Work Order may contain a maximum fee, which shall be negotiated by the parties hereto for each such Work Order. Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant to the Work Order and upon approval of the Professional's direct reimbursable expenses. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 7. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 8. Project Drawings. Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival, prepared on stable mylar base material using a non -fading process to provide for long storage and high quality reproduction. "CD" disc of the as -built drawings shall also be submitted to the owner in and AutoCAD version no older then the established city standard. 9. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on any .Work Order and every thirty days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Work Order, Work Schedule and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 3 stdwopsa rev 07/09 10. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into this Agreement based on the special abilities. of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 13. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 14. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period often (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 4 stdwopsa rev 07/09 15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 17. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Professional represents and agrees that: a. As of the date of this Agreement: 1. Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Professional will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the "e-Verify Program") or the Department Program (the "Department Program"), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. C. Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre -employment screening of job applicants while this Agreement is being performed. d. If Professional obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Professional shall: 5 stdwopsa rev 07/09 . Notify such subcontractor and the City within three days that Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the "Department") made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. If Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Professional shall be liable for actual and consequential damages to the City arising out of Professional's violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. 18. Amendment 54. To the extent that this Agreement may constitute a "sole source government contract" within the meaning of Section 2(14.4) of Article XXVIII of the constitution of the State of Colorado, about which the City makes no representation, Section 15 of said Article XXVIII, which reads as follows, is hereby incorporated into this Agreement and made a part hereof: a. Section 15. Because of a presumption of impropriety between contributions to any campaign and sole source government contracts, contract holders shall contractually agree, for the duration of the contract and for two years thereafter, to cease making, causing to be made, or inducing by any means, a contribution, directly or indirectly, on behalf of the contract holder or on behalf of his or her immediate family member and for the benefit of any political party or for the benefit of any candidate for any elected office of the state (of Colorado) or any of its political subdivisions. 6 stdwopsa rev 07/09 19. Special Provisions. Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit "C", consisting of five (5) page(s), attached hereto and incorporated herein by this reference. 7 stdwopsa rev 07/09 THE CITY OF FORT COLLINS, COLORADO By: T__ ames B. O'Neill II, CPPO, FNIGP Direetor of Purchasing & Risk Management Date: (Z>L?d G E-Cube, Inc CORPORATE PRESIDENT OR VICE PRESIDENT Date: Lo /02 ATTEST: (Corporate Seal) C per ate Secretary stdwopsa rev 07/09 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND E-Cube, Inc. DATED: Work Order Number: Purchase Order Number: Project Title: 7064 Building Commissioning Annual Commencement Date: Completion Date: Maximum Fee: (time and reimbursable direct costs): Project Description: Scope of Services: Acceptance Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of _ (_) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional By: Date: City of Fort Collins By: James B. O'Neill 11, CPPO, FNIGP Director of Purchasing and Risk Management (over $60,000.00) Date: User stdwopsa rev 07/09