HomeMy WebLinkAboutCORRESPONDENCE - AGREEMENT MISC - BISHOP-BROGDEN ASSOCIATES RESOURCE RECOVERY FARM GRAVEL PITMichael A. Sayler
Christopher J. Sanchez
Jeffrey A. Clark
Charles E. Stanzione
Robert E. Brogden
BISHOP-BROGDEN ASSOCIATES, INC.
December 9, 2009
Daylan Figgs
City of Ft. Collins
Natural Areas Program
P.O. Box 580
Fort Collins, CO 80522
RE: Proposal for Plan for Augmentation for Resource Recovery Farm Pit
Dear Daylan:
This letter presents our proposal to assist the City of Fort Collins (the "City") with an
analysis of water requirements and development of a plan for augmentation for the
Resource Recovery Farm Gravel Pit. We understand that the pit is currently augmented
with an SWSP. An extension for the SWSP was recently submitted which would
augment the pit through WY 2010; however that extension has not yet been approved.
As part of the SWSP approval process, the City is required to submit a water court
application for a permanent plan for augmentation. This proposal will outline the
necessary scope of work and cost estimate for our fees to assist in the preparation of an
engineering report and corresponding water court application for the plan for
augmentation. We have completed numerous other plans for augmentation for gravel
pits, including other pits in the Fort Collins area, and are very familiar with the
requirements of such plans.
This proposal was prepared based upon the information we learned on our field trip of
November 18, 2009, the information we have reviewed from the previous SWSP's, and
our discussions with you and City staff. We also relied on our experience with water
supply planning in Colorado, including development of similar plans for augmentation.
Our proposed scope of work is as follows.
1. Prepare for and attend a preliminary meeting with Fort Collins staff to view the
property and pit and discuss strategy for the plan for augmentation. This task was
already completed on November 18, 2009.
2. Review background information, including the previous SWSPs for the pit.
��y� � 3��wwrw btiba�vate��com �
Daylan Figgs
December 9, 2009
Page 2
3. Review monitoring well data, the site survey and GPS data for the wetlands and
exposed water surface, and nearby streamgage data to better understand the depth
to ground water at the site. This will help us determine how frequently there is
exposed ground water that needs augmented. We will send the City staff our
recommendations for the items to be surveyed in a separate letter. We are
currently coordinating with the City staff to obtain the monitoring well data.
4. Based upon the mapping already prepared by the City, and the data analyzed in
Task 3, we will determine the area of exposed ground water that needs to be
augmented.
5. Using local climate data, we will calculate the unit rate of evaporative loss from
the exposed ground water. This will allow us to determine the overall depletions,
or replacement requirements for the pit, on a monthly time -step.
6. Analyze the timing of the pit depletions to the river, using acceptable methods.
As we discussed in our field trip, it is quite possible that the depletion will be
considered instantaneous since the exposed groundwater will be contiguous to a
free -flowing stream that passes through the site.
7. Analyze replacement sources that the City will use to augment the pit. We
understand this will probably include the same sources listed in the Kingfisher
Pond decree. We will evaluate where the impacted water rights are with respect
to the pit to assist in determining where the replacement water needs to be made
available.
8. Prepare a concise letter report with tables and maps presenting the findings of our
analysis. We will provide a draft letter to City staff and legal counsel for review
make any necessary revisions and then follow up with a final letter. This letter
will support the City's water court application.
9. Assist in the preparation of a water court application. This will include an
additional follow-up meeting if necessary.
We charge for engineering and consulting services based on hourly rates for our
personnel assigned to your project. These rates include our employees' hourly salaries,
general and administrative overhead, and fee. Our rates are reflected in the attached
Standard Schedule of Compensation.
The expenses our personnel incur in direct connection with the project will be billed to
you at cost plus 10 percent. We will submit invoices monthly and terms of payment are
net thirty days; interest at the rate of 1 !/2 percent per month (annual rate 18 percent) will
be added to that part of the balance not paid within thirty days of the invoice date.
Engineering services are subject to be discontinued on the project if payment on an
invoice is not made within 45 days of the date of that invoice, unless prior arrangements
have been made.
We estimate the work described above can be accomplished for approximately $10,500.
We will not exceed this amount without obtaining the City's prior approval. We note that
this estimate is for our services up to and including the submittal of the water court
application and supporting documentation. Any work in negotiating with objectors and
Daylan Figgs
December 9, 2009
Page 3
getting a final decree will be dependent upon the number of objectors and magnitude of
their concerns. We can provide an estimate of those costs after completing this first
phase. To confirm our understanding of this assignment, and authorize us to proceed,
please sign the enclosed copy of this letter and return it to us for our files.
The terms of this proposal are offered for a period of thirty days from submittal only. To
the maximum extent permitted by law, the Client agrees to limit the Consultant's liability
for the Client's damages to the sum of $100,000. This limitation shall apply regardless of
the cause of action or legal theory pled or asserted.
We hope that this provides you with an indication of the engineering services that will
likely be involved in the preparation of a water requirement report for the project. If you
have any questions or comments, please do not hesitate to call. We appreciate the
opportunity to submit this proposal and look forward to working with you on the project.
Very truly yours,
BISHOP-BROGDEN ASSOCIATES, INC.
Michael A. Sayler, P. .
Principal
MAS/jeb
Enclosure
cc: Mike Shimmin
Carrie Daggett
Susan Smolnik
9625.03
For:
Contracting Agency
Authorized Signature
Date:
Title
Michael A. Sayler
_DBAChristopher J. Sanchez
_ Jeffrey A. Clark
'-I_"__*_'__
"I_"__*_' water consultants Charles E. Stanzione
Robert E. Brogden-
BISHOP-BROGDEN ASSOCIATES, INC.
STANDARD SCHEDULE OF COMPENSATION
Effective January 2009
Applicable to Services Furnished on a Per Hour Basis
Classification Billing Rate
PROFESSIONAL STAFF
Principal..........................................................................................
$135.00-$165.00
Associate........................................................................................
$115.004135.00
Project Manager..............................................................................
$110.00-$125.00
Senior Engineer/Hydrogeologist/Hydrologist.................................
$102.50-$115.00
Project Engineer/Hydrogeologist/Hydrologist ...............................
$92.504102.50
Engineer/Hydrogeologist/Hydrologist II ........................................
$80.00-$92.50
Engineer/Hydrogeologist/Hydrologist I .........................................
$70.00480.00
GISSpecialist..................................................................................
$72.50-$92.50
TECHNICAL SUPPORT STAFF
Drafting Technician........................................................................ $55-$65.00
Word Processing/Administration.................................................... $50-$60.00
Intern/Technician............................................................................. $40-$50.00
The above Standard Schedule of Compensation is subject to periodic revision. The schedule
includes salary costs, ordinary overhead and profit. Applicable expenses for travel and subsistence,
incidental out-of-pocket costs, communications, reports preparation, printing, outside services, etc.,
are reimbursable at invoice cost plus 10 percent. Mileage is reimbursed at fifty five ($0.55) cents
per mile. For services furnished by Senior Officers on direct assignments, such as special
consultation, expert witness, etc., per day or per hour compensation may be negotiated.
V NOR 00 MEN
���