REQUEST FOR PROPOSAL
CONSULTING ENGINEERING SERVICES
MAGNOLIA STREET STORMWATER OUTFALL PROJECT
AND
FUTURE WATER, WASTEWATER AND STORMWATER FACILITIES
CAPITAL IMPROVEMENTS
PROPOSAL NO. 7084
The City of Fort Collins is soliciting proposals from qualified consultants for a detailed
preliminary design of the Magnolia Street Stormwater Outfall Project. Tasks included but not
limited to surveying, mapping, geotechnical explorations and reports, detailed utility locates,
P&P sheets with photobase, hydraulic modeling, flood plain mapping, and design reports. See
section III for additional requirements.
Future Projects:
Possible design and construction services contracts for water, wastewater, and stormwater
improvement capital projects may be awarded. Future projects will generally be managed by the
City of Fort Collins Utilities and may involve a cooperative effort between other. City
Departments. The contract generated from this Request for Proposal may be renewed annually
for up to five years. The intent of the. City of Fort Collins Utilities is to award a contract to two
qualified consultants specifically for the purpose of Future Engineering Services as described
below.
The selected consultants may be retained by the City of Fort Collins Utilities annually for up to
five years to provide studies, engineering design, surveying and construction management
services for projects as they are required. Future projects may be related to water pipelines,
finished water storage, stormwater and sanitary sewer pipelines, sewer flow monitoring,
trenchless pipeline rehabilitation, drainage channels, detention ponds, water, wastewater and
stormwater modeling, minor improvements at the City's Water Treatment Facility and Water
Reclamation Facilities such as pump stations or lift stations, or other general engineering
services related to the Water Utilities' operations. Work will be on an as needed basis with the
scope of work to be defined and a contract negotiated prior to the time the work is commenced.
Written proposals, ten copies (10) will be received at the City of Fort Collins' Purchasing
Division , 215 North Mason St., 2nd floor, Fort Collins, CO 80524. Proposals will be received
before 3:00 p.m. (our clock), October 28, 2009. Proposal No. 7084. If delivered, they are to be.
sent to 215 North Mason Street, 2nd Floor, Fort Collins, CO 80524. If mailed, the address is
P.O. Box 580, Fort Collins, CO 80522-0580.
Questions concerning the scope of the project should be directed to the Project Manager, Dean
Saye (970) 217-8116.
PROFESSIONAL SERVICES AGREEMENT
WORK ORDER TYPE
THIS AGREEMENT made and entered into the day and year set forth below by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and , [insert either a corporation, a partnership or an individual,
doing business as , hereinafter referred to as "Professional'.
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance
with any project Work Orders for RFP issued by the City. A blank sample of a work order is
attached hereto as Exhibit "A", consisting of one (1) page and is incorporated herein by this
reference. No Work Order shall exceed $ The City reserves the right to independently
bid any project rather than issuing a Work Order to the Professional for the same pursuant to
this Agreement.
2. The Work Schedule. The services to be performed pursuant to this Agreement
shall be performed in accordance with the Work Schedule stated on each Work Order.
3. Time of Commencement and Completion of Services. The services to be
performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time
is of the essence. Any extensions of any time limit must be agreed upon in writing by the
parties hereto.
4. Contract Period. [Option 1] This Agreement shall commence January 1, 2010,
and shall continue in full force and effect until December 31, 2010, unless sooner terminated as
herein provided. In addition, at the option of the City, the Agreement may be extended for
additional one year periods not to exceed four (4) additional one year periods. Renewals and
pricing changes shall be negotiated by and agreed to by both parties. Pricing changes shall not
Utility PSA WO rev07/08
exceed the Denver Boulder Greeley CPIU published by the Colorado State Planning and
Budget Office. Written notice of renewal shall be provided to the Professional and mailed no
later than ninety (90) days prior to contract end.
5. Early Termination by City/Notice. Notwithstanding the time periods contained
herein, the City may terminate this Agreement at any time without cause by providing written
notice of termination to the Professional. Such notice shall be delivered at least fifteen (15)
days prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this agreement shall be effective when mailed, postage
prepaid and sent to the following address:
Professional: City With copy to
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination subject only to the satisfactory performance of the
Professional's obligations under this Agreement. Such payment shall be the Professional's sole
right and remedy for such termination.
6. Design, Project Insurance and Insurance Responsibility. The Professional shall
be responsible for the professional quality, technical accuracy, timely completion and the
coordination of all services rendered by the Professional, including but not limited to designs,
plans, reports, specifications, and drawings and shall, without additional compensation,
promptly remedy and correct any errors, omissions, or other deficiencies. The Professional
shall indemnify, save and hold harmless the City its officers and employees, in accordance with
Colorado law, from all damages whatsoever claimed by third parties against the City and for the
City's costs and reasonable attorneys fees arising directly or indirectly out of the Professional's
negligent performance of any of the services furnished under this Agreement. The Professional
Utility PSA WO rev07/08
shall maintain commercial general liability insurance in the amount of $500,000 combined single
limits, and errors and omissions insurance in the amount of
7. Compensation. In consideration of services to .be performed pursuant to this
Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis
•designated in Exhibit "B", consisting of ( ) page(s), attached hereto and
incorporated herein by this reference. At the election of the City, each Work Order may contain
a maximum fee, -which shall be negotiated by the parties hereto for each such Work Order.
Monthly partial payments based upon the Professional's billings and itemized statements are
permissible. The amounts of all such partial payments shall be based upon the Professional's
City -verified progress in completing the services to be performed pursuant to the Work Order
and upon approval of the Professional's direct reimbursable expenses. Final payment shall be
made following acceptance of the work by the City. Upon final payment, all designs, plans,
reports, specifications, drawings, and other services rendered by the Professional shall become
the sole property of the City.
8. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
9. Project Drawings. Upon conclusion of the project and before final payment, the
Professional shall provide the City with reproducible drawings of the project containing accurate
information on the project as constructed. Drawings shall be of archival, prepared on stable
mylar base material using a non -fading process to provide for long storage and high quality
reproduction. "CD" disc of the as -built drawings shall also be submitted to the owner in and
AutoCAD version no older then the established city standard.
10. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on
any Work Order and every thirty days thereafter, Professional is required to provide the City
Utility PSA WO rev07/08
Representative with a written report of the status of the work with respect to the Work Order,
Work Schedule and other material information. Failure to provide any required monthly report
may, at the option of the City, suspend the processing of any partial payment request.
11. Independent Contractor. The services to be performed by Professional are those
of an independent contractor and not of an employee of the City of Fort Collins. The City shall
not be responsible for withholding any portion of Professional's compensation hereunder for the
payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
12. Personal Services. It is understood that the City enters into this Agreement
based on the special abilities of the Professional and that this Agreement shall be considered as
an agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
consent of the City.
13. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The
City's approval or acceptance of, or payment for, any of the services shall not be construed to
operate as a waiver of any rights or benefits provided to the City under this Agreement.
14. Default. Each and every term and condition hereof shall be deemed to be a
material element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default.
15. Remedies. In the event a party has been declared in default, such defaulting
party shall be allowed a period of ten (10) days within which to cure said default. In the event
the default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting
party commences legal or equitable actions against the defaulting party, the defaulting party
Utility PSA WO rev07/08
shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees
and costs incurred because of the default.
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the
.entire agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs,
personal representatives, successors and assigns of said parties.
17. Law/Severability. The laws of the State of Colorado shall govern the
construction, interpretation, execution and enforcement of this Agreement. In the event any
provision of this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this
Agreement.
18. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101,
C.R.S., et. seq., Professional represents and agrees that:
a. As of the date of this Agreement:
1. Professional does not knowingly employ or contract with an illegal alien
who will perform work under this Agreement; and
2. Professional will participate in either the e-Verify program created in
Public Law 208, 104th Congress, as amended, and expanded in Public Law 156,
108th Congress, as amended, administered by the United States Department of
Homeland Security (the "e-Verify Program") or the Department Program (the
"Department Program"), an employment verification program established
pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment
eligibility of all newly hired employees to perform work under this Agreement.
b. Professional shall not knowingly employ or contract with an illegal alien to
perform work under this Agreement or knowingly enter into a contract with a
subcontractor that knowingly employs or contracts with an illegal alien to perform work
under this Agreement.
C. Professional is prohibited from using the e-Verify Program or Department
Program procedures to undertake pre -employment screening of job applicants while this
Agreement is being performed.
Utility PSA WO rev07/08.
d. If Professional obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Professional
shall:
1. Notify such subcontractor and the City within three days that Professional
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien; except that Professional
shall not terminate the contract with the subcontractor if during such three days
the subcontractor provides information to establish, that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Professional shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the "Department") made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17.5-102 (5), C.R.S.
f. If Professional violates any provision of this. Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this
Agreement is so terminated, Professional shall be liable for actual and consequential
damages to the City arising out of Professional's violation of Subsection 8-17.5-102,
C.R.S.
g. The City will notify the Office of the Secretary of State if Professional violates this
provision of this Agreement and the City terminates the Agreement for such breach.
19. Special Provisions. Special provisions or conditions relating to the services to
be performed pursuant to this Agreement are set forth in Exhibit "C", consisting of
( ) page(s), attached hereto and incorporated herein by this reference.
Utility PSA WO rev07/08
THE CITY OF FORT COLLINS, COLORADO
By:
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
Date:
[Insert Professional's name] or
[Insert Partnership Name] or
[Insert individual's name]
Doing business as [insert name of business]
ATTEST:
City Clerk
APPROVED AS TO FORM:
Assistant City Attorney
By:
Title:.
CORPORATE PRESIDENT OR VICE PRESIDENT
Date:
ATTEST:
Corporate Secretary
Utility PSA WO rev07/08
(Corporate Seal)
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
-THE CITY OF FORT COLLINS
AND
DATED:
Work Order Number:
Purchase Order Number:
Project Title:
Commencement Date:
Completion Date:
Maximum Fee: (time and reimbursable direct costs):
Project Description:
Scope of Services:
Professional agrees to perform the services
Professional:
identified above and on the attached forms in
accordance with the terms and conditions
By:
contained herein and in the Professional Services
Agreement between the parties. In the event of a
Date:
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
City of Fort Collins
order (including the attached forms) the
Professional Services Agreement shall control.
Submitted By:
Project Manager
The attached forms consisting of Exhibits
Date:
consisting of _ (_) pages are hereby accepted
and incorporated herein, by this reference, and
Reviewed by:
Notice to Proceed is hereby given.
Senior Utility Engineer
Date:
Approved by:
Water Engineering & Field
Services Operations Manager
Date:
Approved by:
Utilities General Manager
(over$1,000,000)
Date:
Approved by:
Director of Purchasing & Risk Management
(if over $60,000.)
Date:
Questions regarding proposals submittal or process should be directed to Opal Dick, CPPO,
Senior Buyer (970)221-6778.
A copy of the Proposal may be obtained as follows:
Download the Proposal/Bid from the BuySpeed Webpage,
www.fcgov.com/eprocurement
2. Come by Purchasing at 215 North Mason St., 2"d floor, Fort Collins, and request
a copy of the Bid.
The City of Fort Collins is subject to public information laws, which permit access to most
records and documents. Proprietary information in your response must be clearly identified and
will be protected to the extent legally permissible. Proposals may not be marked 'Proprietary' in
their entirety. Information considered proprietary is limited to material treated as confidential in
the normal conduct of business, trade secrets, discount information, and individual product or
service pricing. Summary price information may not be designated as proprietary as such
information may be carried forward into other public documents. All provisions of any contract
resulting from this request for proposal will be public information.
Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have
a financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision -
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity favor, entertainment, kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited.
Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be
rejected and reported to authorities as such. Your authorized signature of this proposal assures
that such proposal is genuine and is not a collusive or sham proposal.
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
irregularities or informalities.
Sincerely,
James B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
Request for
Proposal
Fort Collins Utilities
Consulting Engineering Services
Magnolia Street Stormwater Outfall Project
and
Future Water, Wastewater, and Stormwater Facilities
Capital Improvements
RFP #7084
PROPOSAL DUE DATE: 3:00 p.m. (our clock) October 28, 2009
Request for Proposals
for
Consulting Engineering Services
Magnolia Street Stormwater Outfall Project
and
Future Water, Wastewater, and Stormwater Facilities
Capital Improvements
RFP # 7084
I. Purpose
A. Magnolia Street Stormwater Outfall Project
The City of Fort Collins is soliciting proposals from qualified consultants for a detailed
preliminary design of the Magnolia Street Stormwater Outfall Project. Tasks included but
not limited to surveying, mapping, geotechnical explorations and reports, detailed utility
locates, P&P sheets with photobase, hydraulic modeling, flood plain mapping, and
design reports. See section III for additional requirements.
B. Future Projects
Possible design and construction services contracts for water, wastewater, and
stormwater improvement capital projects may be awarded. Future projects will generally
be managed by the City of Fort Collins Utilities and may involve a cooperative effort
between other City Departments. The contract generated from this Request for
Proposal may be renewed annually for up to five years. The intent of the City of Fort
Collins Utilities is to award a contract to two qualified consultants specifically for the.
purpose of Future Engineering Services as described below.
The selected consultants may be retained by the City of Fort Collins Utilities annually for
up to five years to provide studies, engineering design, surveying and construction
management services for projects as they are required. Future projects may be related
to water pipelines, finished water storage, stormwater and sanitary sewer pipelines,
sewer flow monitoring, trenchless pipeline rehabilitation, drainage channels, detention
ponds, water, wastewater and stormwater modeling, minor improvements at the City's
Water Treatment Facility and Water Reclamation Facilities such as pump stations or lift
stations, or other general engineering services related to the Water Utilities' operations.
Work will be on an as needed basis with the scope of work to be defined and a contract
negotiated prior to the time the work is commenced.
Filling traditional adversarial roles between the Owner, Engineer and Contractor is not
an acceptable way of doing business for the City of Fort Collins Utilities. The project(s)
require working in an atmosphere of trust with all parties working toward the same goals
utilizing the City of Fort Collins' Alternative Product Delivery System (APDS) process
(working with the Owner, a selected Engineer and Contractor through the design and
construction phases of a project). You are strongly encouraged to call and discuss the
possible project(s) and to ask questions. Contact the Utilities' Project Manager, Dean
Saye at (970) 217-8116, to discuss in more detail.
Particular emphasis should be placed on your firm's experience with stormwater
hydraulics, hydrology, modeling, FEMA floodplain map and flood insurance study
revision processes and procedures, stream assessment, rehabilitation and enhancement
measures, stormwater best management practices for water quality, Low Impact
Development techniques, triple bottom line of social, economical and environmental
application to water, wastewater and stormwater programs, masterplanning, as well as
existing infrastructure rehabilitation.
Scope of Services
A. General Description — Magnolia Street Stormwater Outfall Project
A design for a stormwater sewer system to primarily serve to reduce flooding along
Magnolia and Mulberry Streets, and along all cross streets between Magnolia and
Mulberry, west of College Avenue. The Old Town Basin Masterplan describes the
Magnolia Street Stormwater Outfall as the construction of a major storm sewer outfall
from the Poudre River west along Magnolia Street, ending at the intersection of Shields
Street and Myrtle Street. The stormsewer system is planned to include a diversion pipe
that would direct water quality flows to the existing Udall Natural Area detention ponds
constructed as part of the Oak Street Outfall project. This project will identify a cost
effective solution to the drainage problem and possibly result in the completion of the
final design and construction related services.
B. Project Schedule
Project Notice to Proceed is expected to be in spring 2014 (exact date to be
determined). Construction is not planned until 2015 at the earliest.
III. General Project Requirements for Future Work
• All drawings will be AutoCAD (Version 2008 or newer) generated, ink on mylar.
"As -Constructed drawings" will be provided to the City on CD's at the completion
of each project. Provide "As -Constructed" stamped, original mylars at the
completion of the project to become the property of the City of Fort Collins.
• Prepare construction contract documents and specifications using the City of Fort
Collins Utilities' Standard Technical Specifications in CSI format and City of Fort
Collins modified EJCDC General Conditions and standard front end documents.
• Identify all easements or properties required for construction of the project and
prepare all legal descriptions and exhibits needed by City staff in acquiring these
easements and/or properties. .
• All known existing utilities and structures will be identified, located and shown
horizontally and vertically, in relationship to the proposed improvements.
• All applications for permits will be prepared by the consultant.
• Provide construction administration, submittal review and continuous full time
field inspection of most projects, to be determined at the time of contract
negotiations. Resident Project Representative duties must be performed with
experienced and qualified personnel approved by the Utilities.
• Provide all surveying required for the design of the project and baseline control
for contractor use during construction.
• Provide all geotechnical services required for the design process and for testing
during construction of the project with the City's on -call geotechnical consultant
or a mutually agreed to geotechnical consultant.
• Provide detailed written monthly progress reports throughout the duration of the
design and construction of all work detailing project progress, hours used,
percent complete, schedule, and any out of contract scope items. These
progress reports will be part of the billing submitted monthly.
• Provide detailed estimate of construction cost at the 50% and 90% levels of
design or work in conjunction with Alternative Product Delivery System (APDS)
contractor to provide cost estimates.
IV. Instructions to Consultants
A. Submittal Requirements
Qualified consultants interested in performing the work described in this request for
proposals should submit the following information to the City.
Qualifications of your firm and staff proposed to perform the work on this
project. This should include resumes of staff and any recommendation or
commendation letters received for past projects.
2. A list of similar projects completed in the last five years.
3. Provide a scope of work and engineering cost estimate for the Magnolia
Street Stormwater Outfall Project design effort as envisioned by your firm.
Include a cost break down of hourly rates and number of hours assigned
for each task of work for all personnel and sub consultants. Final scope of
work and cost to be negotiated after the selection is completed.
4. References from at least three other projects with similar requirements
that have been completed within the past five years and that have
involved the staff proposed to work on this project.
5. Detail any experience your proposed team has with the City of Fort
Collins' Alternative Product Delivery System (APDS) process (working
with a selected contractor and engineer through the design and
construction phases of a project) or other innovative design/construction
processes.
6. Detail any experience your firm has in using a formal partnering process
on design and construction projects.
7. Limit the total length of your proposal to a maximum of 40 pages
(excluding covers and dividers). The Director of Purchasing and Risk
Management may reject proposals received that are longer than 40
pages in length.
8. 'Submit a total of ten 10 copies of your proposal.
9. Proposals must be received no later than 3:00 pm (our clock), October
28, 2009 to:
City of Fort Collins — Purchasing and Risk Management Division
215 North Mason Street
P.O. Box 580
Fort Collins, CO 80522
B. Contacts
Questions related to procedures should be directed to:
Opal Dick, CPPO — Senior Buyer
City of Fort Collins Utilities
700 Wood Street
P.O. Box 580
Fort Collins, CO 80522
(970) 221-6778
You are encouraged to contact the project manager with any questions related to the
scope of work or project in general.
MAIN CONTACT:
Dean Saye — Special Projects Manager
City of Fort Collins Utilities
700 Wood Street
P.O. Box 580
Fort Collins, CO 80522
970-217-8116
V. Selection Criteria and Method
The City of Fort Collins' Capital Project Management Control System Manual prescribes
the consultant selection criteria and method. This document is available for review at
the Purchasing and Risk Management Office.
VI. Award
At the option of the City, a second firm may be chosen to provide described services.
VII. Terms and Conditions
The payment for services, as described under the Scope of Services, shall be based
upon hourly rates as outlined in the submitted cost schedule/estimate. The submitted
cost estimate shall establish a "not to exceed" amount for the contract. Any changes in
scope to the original contract will be treated as a negotiated change order to the
contract.
VIII. Review and Assessment
Professional firms will be evaluated on the following criteria. These criteria will be the
basis for review of the written proposals and interview session.
The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average
rating, and 5 being an outstanding rating.
WEIGHTING
QUALIFICATION
STANDARD
FACTOR
2.0
Scope of
Does the proposal show an understanding of the
Proposal
project objective, methodology to be used and
results that are desired from the project?
2.0
Assigned
Do the persons who will be working on the project
Personnel
have the necessary skills? Are sufficient people
of the requisite skills assigned to the project?
1.0
Availability
Can the work be completed in the necessary
time? Can the target start and completion dates
be met? Are other qualified personnel available
to assist in meeting the project schedule if
required? Is the project team available to attend
meetings as required by the Scope of Work?
1.0
Motivation
Is the firm interested and are they capable of
doing the work in the required time frame?
2.0
Cost and
Do the proposed cost and work hours compare
Work Hours
favorably, with the project Manager's estimate?
Are the work hours presented reasonable for the
effort required in each project task or phase?
2.0
Firm Capability
Does the firm have the support capabilities the
assigned personnel require? Has the firm done
previous pro'ects of this type and scope?
Reference evaluation (Top Ranked Firm)
The project Manager will check references using the following criteria. The evaluation
rankings will be labeled Satisfactory/Unsatisfactory.
QUALIFICATION
STANDARD
Overall Performance
Would you hire this Professional again? Did.they show
the skills required by this project?
Timetable
Was the original Scope of Work completed within the
specified time? Were interim deadlines met in a timely
manner?
Completeness
Was the Professional responsive to client needs; did the
Professional anticipate problems? Were problems
solved quickly and effectively?
Budget
Was the original Scope of Work completed within the
project budget?
Job Knowledge
a) If a study, did it meet the Scope of Work?
b) If Professional administered a construction contract,
was the project functional upon completion and did it
operate properly? Were problems corrected quickly
and effectively?