HomeMy WebLinkAbout102630 AYRES ASSOCIATES INC - CONTRACT - RFP - 7084 CONSULTING ENGINEERING SERVICESPROFESSIONAL SERVICES AGREEMENT
WORK ORDER TYPE
THIS AGREEMENT made and entered into the day and year set forth below by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter
referred to as the "City" and Ayres Associates, a corporation, hereinafter referred to as
"Professional".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed
by and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance
with any project Work Orders for Water, Wastewater and Stormwater Facilities Capital
Improvements — RFP 7084 issued by the City. A blank sample of a work order is attached
hereto as Exhibit "A", consisting of one (1) page and is incorporated herein by this reference.
The City reserves the right to independently bid any project rather than issuing a Work Order to
the Professional for the same pursuant to this Agreement.
2. The Work Schedule. The services to be performed pursuant to this Agreement
shall be performed in accordance with the Work Schedule stated on each Work Order.
3. Time of Commencement and Completion of Services. The services to be
performed pursuant to this Agreement shall be initiated as specified on each Work Order. Time
is of the essence. Any extensions of any time limit must be agreed upon in writing by the
parties hereto.
4. Contract Period. This Agreement shall commence January 1, 2010, and shall
continue in full force and effect until December 31, 2010, unless sooner terminated as herein
provided. In addition, at the option of the City, the Agreement may be extended for additional
one year periods not to exceed four (4) additional one year periods. Renewals and pricing
changes shall be negotiated by and agreed to by both parties. If pricing changes, that amended
Utility PSA WO rev07/08
/.SIRES
ASSOCIATES REIMBURSABLE EXPENSES SCHEDULE (EFFECTIVE June 1, 2010)
Policy: It is the policy of Ayres Associates that costs associated with equipment and supplies identified as having been used on a
specific project be charged to that project and not to general overhead.
BOATS
Company Boats....................................................................... $205/Day
COPIES - Black & White (without labor)
Paper.................................................................................... $0.06 Each
Paper (EC high volume copies) ........................................Upon Request
Divider and Tab Sheets........................................................ $0.20 Each
Binding w/Cover & Back ......................................................... $1.00/Unit
Transparency or Sticky -Back ................................................ $0.50 Each
COPIES - Color (without labor)
Paper (multi -function copier) ................................................... $.16 Each
Paper (graphics copier).....................................................Upon Request
LARGE FORMAT PRINTS (without labor)
B & W Plotter: Bond Paper......................................................$0.18/SF
Vellum..............................................................
$0.20/S F
Mylar................................................................
$0.65/SF
Color Plotter: Bond Paper......................................................$0.23/SF
Vellum..............................................................
$0.25/SF
Mylar................................................................
$0.75/S F
TELEPHONE....................................................... Facsimile $1.50/Sheet
EXPENDABLES: Rebar, nails, stakes, flags, field books, etc. at cost.
MATERIALS TESTING
Concrete Air Meter .................................................. $15/Day or $10/Test
Nuclear Density......................................................................... $56/Day
Portable Drill and Accessories................................................... $45/Day
Vibration Monitoring ............................... $60/Day (Plus $42/Roll of Film)
PHOTOGRAMMETRIC
Stereo Plotter ........................... ............................................ $24.75/Hour
PERSONAL EXPENSES
PHOTOGRAPHIC
Camcorder................................................................................ $25/Day
SURVEY
GPS........................................................................................
$200/Day
Handheld Submeter GPS..........................................................
$75/Day
TotalStation.............................................................................
$11/Hour
High Precision Digital Level .......................................................
$42/Day
Laser/Automatic Level...............................................................
$15/Day
Driver/Hammer Drill (gas powered) ...........................................
$24/Hour
Fathometer..............................................................................
$250/Day
Stream Flow Gauge...................................................................
$50/Day
Traffic Counter...........................................................................
$50/Day
TESTS/SAMPLING
Wastewater Sampler.................................................................
$50/Day
Turbidimeter..............................................................................
$40/Day
Sewer Smoke Machine............................................................
$100/Day
Sanitary Sewer Flow Meter ...................................................
$500/Week
UNDERWATER
Equipment (surface supplied air/diver).....................................
$110/Day
Equipment (scuba dive gear/diver)............................................
$25/Day
Exposure Suit/Diver...................................................................
$55/Day
Air.................................................... ........................................
$10/Tank
General Inspection Equipment ...................................................
$20/Day
ClimbingGear...........................................................................
$50/Day
NDT/Testing Equipment.. ............ ......................................
$75/Day
VEHICLES
All -Terrain Vehicle (ATV)......................................................... $100/Day
Company Trucks.................................................................... $0.88/Mile
Automobile.................................................................. Current IRS Rate
Lodging: Actual cost.
Meals: Meal allowance is dependent upon where the meal is purchased, not necessarily where the office is located.
Meal allowances are consistent with rates posted on the US government's Federal Travel Regulations web at www.gsa.gov/perdiem
The M&lE rates listed across correspond to specific cities/counties across the country. Lookup a specific city or county on the website to find the
respective M&lE rate, then use this table to get the appropriate daily meal breakdown. If a city or county is not listed, then use the Basic Rate
column.
Meal Allowance Chart
Rate Description
Explanation
Basic Rate
Continental U.S.
(CONUS)
' Specific Location Web Site Rates
(If location is not listed in the web site use
the Basic Rate)
M&IE
Meals and incidentals as listed
in the federal web site
$39
$44
$49
$54
$59
Less incidental expenses
not reimbursed
Company reimbursement
excludes incidentals
(3)
(3)
(3)
(3)
(3)
Ayres Associates' rates
Nei reimbursementsr -I
36"
46
Breakfast
Rates for meals segregated
by type
7
8
9
10
11
Lunch
11
12
13
15
16
Dinner
18
21
24
2529
Page 4 of 4
FEE
SCHEDULE
EFFECTIVE JANUARY 2010
CTL I THOMPS®N
Personnel
Includes analysis and preparation of reports, calculation time, travel, consultation, sample preparation and direct supervision of the
CTL project _ _ _______
_
Engineering Technician I —
—_ ___ $45 / hour
Engine erin Technician II 1 Secretarial
_ _ 50 / hour
Engineering Technician III / CADD / Drafts Person
_ 55 / hour
Senior Engineering Technician
80 / hour
Environmental Technician
601 hour
Industrial Hygienist Technician _
— 651 hour
Senior Industrial Hygienist / EnvironmentalTechnician —
— 80 / hour
Staff Engineer / Geologist 1 Scientist
------- --
85 / hour
- -
Project Engineer / Geologist / Scientist
951 hour
Project Manager
Associate
1051 hour
1201 hour
Prinrinni
145 I hour
Senior Principal _ —
190 / hour
Expert Consultation / Witness
Quote on Request
Field Drilling and Sampling with a 4-inch Auger
— _— $1351 hour
Investigation Drilling and Sampling with Hollow Auger _ _
_ 1601 hour
Services Drillling with Track-Mcunted_BN___—_—
— Add 651 hour
Drilling and Sampling with Rotary Drill —
Cost + 15%
Shelby Tube Sample __ _- -
__ 13 each
Drillino Rig Mobilization
Metro Area Hourly Rate
Outlying Areas (more than 1 hour, one-way)
Auto or Pickup Mileage (Out Of Town Mobilization
2.25 / mile
_ $ 0 55 ( mile
Labor, Out -Of -Town Living Expenses, Travel Costs, Equipment Rental
_ _ Cost + 15%
Coring (2 Hour Minimum)
115 / hour
Construction
Earthwork: Compaction Testing_—.__ __-_ - __
_ ___ $601 hour
Observation
Drilled Pier Installation
—_ 571 hour
and Testing
_
As hp alt Placement and Compaction
601 hour
Services
Concrete Strength Testinn
Testing & Cylinder Pick Up _
47 / hour
r vlin Varc
15 / cvl
Beams
35 / beam
_Flexural _
On Site Curing Service -_ _ - _.
Quote on Request
Maturity Meter Method
50 / Month
_ _ — _ _--__
Concrete Test Report _ _—_
------- ---
_ 40 / set
-----
Moisture Emissions Testing _ _—_-- —.
_ 60l hour
Moisture Kit
30 / each
Shotcrete includes Preparation and Report set of ) —
2851 set
Floor Flatness (F F.and F L and/or 10 Foot Straighted e _
_-80 / hour
Reinforcement Placement Observation
57 I hour
Masonry Special Inspection _
_.-- 571 hour
M_asoDy Shear _
170 / test
Proof Load of Anchor or Dowels
80 I hour
_Weld_& Bolt Ins ection _—_
70 / hour
Post Tension:
Strand Observation
57 / hour
_
Elongation Measurements
571 hour
Sprayed orffireproofing includes, when required:
57 I hour
Thickness Measurements, Density Per Sample, Bond Per Test
—
Report Review / Supervision for Construction Observation and Testing Services (excluding
40 / report
Overtime Charge Increase for work done on Saturday, Sunday and Holidays 15 / hour
Note Time is charged for travel, testing and inspection and field report preparation:
2 hour minimum trip charge
JANUARY 2010 Page 1 of 2
FEE
SCHEDULE
EFFECTIVE JANUARY 2010
CTL I THOMPS®N
Soils
Grain Size Analysis, 1-inch to #200 sieve
_ _ $47
Laboratory
—
Grain Size Analysis, #200 sieve only
-- 32
Services
Hydrometer Malysis __--
_.. _ 75
Atterberg Limits L.L. & P.I. , per set _—_
68
Natural Moisture and Density
_ 12
_
S ecip fic Gravity—._ __
_- 47
Unconfined Compression _
37
--
Unconfined Compression with Stress / Strain Curve
-- 47
One -Dimensional Swell Test
— 42
One -Dimensional Swell Test with Load Back for Swell Pressure
52
- --
— ------ --
Soil Suction, per point _
_ _ __— 47
One -Dimensional Time Consolidation Test
Set up and Initial Load
_ 135
Increments
_ _ _ 37
_Additional --
Triaxial or Direct Shear
Unconsolidated-Undrained
105
Consolidated-Undrained __.
—_ 360
Con solidated-Undrained with Pore Pressure
— 385
Standard Proctor Compaction Test (ASTM D 69�_ _—_
_---__ 100
Modified Proctor Compaction Test (ASTM D 1557� —
_ — 110
Relative Density ASTM D 4253 and D 4254
155
California Bearing Ratio (3 Points — _— —__-_
420
Hveem Stabilometer 3 Points
420
Permeability
Flexible Membrane Triaxial Cell — —
375
Remolded Sample Falling_or Constant Head —_
230
Back Pressure Odeometer
— 230
_
Water Soluble Sulfates
43
pH -- -- -
37
Resistivity per Specimen Natural Moisture and Saturated __- _—
—_.—_ _- 90
Rock Testing
Specific Gravity -------------—------------
—
42
------- --- ---
-_Two -Cycle Slake -Durability, per point_________
85
Unconfined Com rp ession, per point
Peak Load Only_ _ — _.
95
With Stress / Strain Curve, Static E and Poisson's Ratio _
160
_
Triaxial Compression-NX per point_ _ —
— 120
With Stress / Strain Curve, Static E and Poisson's Ratio
240
_
Point Load Test
45
Specialized Environmental Services
Testing and Environmental Assessment , Remediation Desi n, UnderTround Storage Tanks,_ _
Services Environmental Drilling and Sampling, Methane Hazard
Quote on Re uest
—
_ Environmental Sampling, Compliance Assistance, Site Audits, Hazmat Surveys —
— _Quote on Request
Industrial H� ieng e and Safety Services
Indoor Air _Quality, Asbestos Services, Lead Services, Exposure Assessments, --
Compliance Assistance, Training, Sampling, Program Development
— Quote on Request
Biological Services
_ Endangered Species Review, Wetlands Delineation, Environmental Assessments
Quote on Request
Geophysical Services
Pier Integrity, Profiles b Ry eflection or Refraction, Resistivity Surveys,
— Dynamic Soil Properties _
_Quote on Request
Specialized Testing Egulpment Char es Portable Drill Rig, Pressuremeter, Resistivity,
Photoionization Device, Field Permeability, Down Hole Moisture / Density___
---
Quote on Request
—
----- ----
Benkelman Beam Testing_ _._ _......... _ .
Benkelman Beam and Operator _ _
_._..
— $130/ hour
_ Truck - 18 kip axle load
105 / hour
Transverse Profilograph Testing- _— —.
--_ 95 / hour
Longitudinal Profilograph Testing
NOT Equipment (Pulse -Velocity, Windsor Probe Test System, Pachometer, Half -Cell)
Quote on Request
35 / hour,
JANUARY 2010 Page 2 of 2
;t AlpineEco
y .
Aziptne°Ecoto "c- Rescurccs LAC
Vatefilnnd`Wildlifea.Vegtatiun SPeualists-"
Rate: $100.00 per hour
INC.
916 Willshire Ave • Fort Collins, Colorado 80521 • (970) 493-4394
STANDARD COMMERCIAL TERMS
(Effective January 1, 2009)
SERVICE BILLING RATES
Charges for project work include office, field, and travel time.
Service/Billing Category
Rate
Specialized Technical, Permitting, or Consulting $75/hour
Technician $25-55/hour
OTHER FEES
Computer Charges $15/hour
Cedar Creek Regular Vehicle Mileage $0.65/mile
Cedar Creek All -Terrain Vehicle (ATV) Rental $75/day
Per Diem (meals only) $40/day
(Per diem for large metropolitan areas is billed at actual cost)
Subcontractor management and Other Direct Costs (ODCs) such as lodging, airfare, etc. are billed at
actual cost plus a 10 % handling fee (to cover bookkeeping fees, interest, etc.).
NOTE: Expert Witness and/or Legal Testimony is billed at a 2 X the hourly rate.
Standard Fee Schedule
Fees for Services
Fees for services will be based on the time worked on the
project by staff personnel plus reimbursable expenses. The fee
will be computed as follows:
1. Labor related fees will be computed based on personnel
billing rates in effect at the time the services are performed.
Personnel billing rates are subject to revision on, or about,
1 January and l July of each year. The hourly rates are filly
inclusive of fringe benefits, burden and fee. Current rates
are as follows:
Classification Hourly Rate($)
Principal 11
233.00
Sr. Consultant 11
233.00
Sr. Associate 10
188.00
Consultant 10
188.00
Associate 9
170.00
Consultant 9
170.00
Sr. Professional 8
151.00
Sr. Professional 7
135.00
Sr. Professional 6
122.00
Professional 5
105.00
Professional 4
95.00
Staff Professional 3
85.00
Staff Professional 2
80.00
Staff Professional 1
71.00
Engineering Technician
66.00
Sr. Construction Insp.
151.00
Construction Insp. 2
122.00
Construction Insp. 1
66.00
Office Support
66.00
Lyman Henn, a division of Brierley Associates, LLC
January 2010
10-32
b) Reproduction and printing costs for reports, drawings, and
other project records.
c) Shipping charges for water, soil and rock samples, field
testing equipment, etc. Express mail, overnight delivery
or other charges for special handling of reports, letters and
other project related materials.
d) Disposal costs for soil, rock, waste and/or water samples
at $0.30 per ounce (fluid measure, sample container size),
$1.50 per soil sample, and/or $5.00 per box of rock core.
e) Expendable personal protective equipment required for
work on the project site.
fl Purchase of specialized equipment and rental of
equipment from outside vendors.
g) Other project related expenses.
4. A standard reimbursable fee will be billed at 3.5% of the total
labor invoiced amount. The fee is for project cell phone, long
distance phone calls, faxes, electronic communications and
standard postage.
5. Subcontractors engaged to perform test borings or other field
explorations, analytical chemical laboratory services, or other
services required by the project will be billed at our cost plus
fifteen (15) percent.
6. Specialized geotechnical, geophysical and environmental
instrumentation and field supplies required by the project scope
will be billed at BA standard usage rates.
2. Overtime hours will be charged at straight time rates. 7. Computer usage associated with CAD/CADD, specialized
Fees for pretrial conferences, depositions and expert database management systems, specialized analyses and other
testimony will be billed at one and one-half(1.5) times the project specific technical applications will be billed at BA
rates quoted above. standard usage rates for supporting systems.
3. Direct non -salary expenses will be billed at our cost plus
fifteen (15) percent or at Lyman Henn, a division of
Brierley Associates, LLC (BA) standard usage rates
including:
a) Transportation and subsistence expenses incurred for
necessary travel, such as:
(1) Use of personal or company vehicle will be
billed at 50.75 per mile;
(2) Use of public carriers, airplanes, rental cars,
trucks, boats, or other means of transportation;
8. Invoices will generally be submitted once a month for services
performed during the previous month. Payment will be due and
payable upon receipt of invoice. Interest may be added to
accounts in arrears at the rate of one and one-half (1.5) percent
per month on the outstanding balance. In the event BA must
engage counsel to enforce overdue payments, Client will
reimburse BA for all reasonable attorney's fees and court costs.
End of Standard Fee Schedule
Iwo
change shall be the Denver Boulder Greeley CPIU published by the Colorado State Planning
and Budget Office. Written notice of renewal shall be provided to the Professional and mailed no
later than ninety (90) days prior to contract end.
5. Early Termination by City/Notice. Notwithstanding the time periods contained
herein, the City may terminate this Agreement at any time without cause by providing written
notice of termination to the Professional. Such notice shall be delivered at least fifteen (15)
days prior to the termination date contained in said notice unless otherwise agreed in writing by
the parties. All notices provided under this agreement shall be effective when mailed, postage
prepaid and sent to the following address:
Professional: City: With copy to:
Ayres and Associates City of Fort Collins, Utilities City of Fort Collins
Attn: James D. Schall, PhD, PE Attn: Dean Saye Purchasing
3665 JFK Pky Bid 2 Ste. 200 P.O. Box 580 P.O. Box 580
Fort Collins, CO 80525 Fort Collins, CO 80522 Fort Collins, CO 80522
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination subject only to the satisfactory performance of the
Professional's obligations under this Agreement. Such payment shall be the Professional's sole
right and remedy for such termination.
6. Design, Protect Insurance and Insurance Responsibility. The Professional shall
be responsible for the professional quality, technical accuracy, timely completion and the
coordination of all services rendered by the Professional, including but not limited to designs,
plans, reports, specifications, and drawings and shall, without additional compensation,
promptly remedy and correct any errors, omissions, or other deficiencies. The Professional
shall indemnify, save and hold harmless the City its officers and employees, in accordance with
Colorado law, from all damages whatsoever claimed by third parties against the City and for the
City's costs and reasonable attorneys fees arising directly or indirectly out of the Professional's
Utility PSA WO rev07/08
negligent performance of any of the services furnished under this Agreement. The Professional
shall maintain commercial general liability insurance in the amount of $500,000 combined single
limits, and errors and omissions insurance in the amount of $1,000,000.
7. Compensation. In consideration of services to be performed pursuant to this
Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis
designated in Exhibit "B", consisting of seven (7) page(s), attached hereto and incorporated
herein by this reference. At the election of the City, each Work Order may contain a maximum
fee, which shall be negotiated by the parties hereto for each such Work Order. The parties
acknowledge that the sub -contractors: Cedar Creek Associates, Alpine Ecological Resources,
Lyman Henn, Inc., and CTL/Thompson are not parties to this agreement. However, the rates
listed for services to be provided by these subcontractors shall be the rate paid by the City to
the Professional for these services. If the amount charged by these subcontractors exceed the
rates listed in Exhibit "B" the excess amount shall not be paid or owed by the City. The
limitation on increases in prices set forth in section 4 herein shall apply to all rates listed in
Exhibit "B" including subcontractor rates. Monthly partial payments based upon the
Professional's billings and itemized statements are permissible. The amounts of all such partial
payments shall be based upon the Professional's City -verified progress in completing the
services to be performed pursuant to the Work Order and upon approval of the Professional's
direct reimbursable expenses. Final payment shall be made following. acceptance of the work
by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other
services rendered by the Professional shall become the sole property of the City.
8. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
Utility PSA WO rev07/08
9. Project Drawings. Upon conclusion of the project and before final payment, the
Professional shall provide the City with reproducible drawings of the project containing accurate
information on the project as constructed. Drawings shall be of archival, prepared on stable
mylar base material using a non -fading process to provide for long storage and high quality
reproduction. "CD" disc of the as -built drawings shall also be submitted to the owner in and
AutoCAD version no older then the established city standard.
10. Monthly Report. Commencing thirty (30) days after Notice to Proceed is given on
any Work Order and every thirty days thereafter, Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Work Order,
Work Schedule and other material information. Failure to provide any required monthly report
may, at the option of the City, suspend the processing of any partial payment request.
11. Independent Contractor. The services to be performed by Professional are those
of an independent contractor and not of an employee of the City of Fort Collins. The City shall
not be responsible for withholding any portion of Professional's compensation hereunder for the
payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
12. Personal Services. It is understood that the City enters into this Agreement
based on the special abilities of the Professional and that this Agreement shall be considered as
an agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
consent of the City.
13. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The
City's approval or acceptance of, or payment for, any of the services shall not be construed to
operate as a waiver of any rights or benefits provided to the City under this Agreement.
Utility PSA WO rev07/08
14. Default. Each and every term and condition hereof shall be deemed to be a
material element of this Agreement. In the event either party should fail or refuse to perform
according to the terms of this agreement, such party may be declared in default.
15. Remedies. In the event a party has been declared in default, such defaulting
party shall be allowed a period of ten (10) days within which to cure said default. In the event
the default remains uncorrected, the party declaring default may elect to (a) terminate the
Agreement and seek damages; (b) treat the Agreement as continuing and require specific
performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting
party commences legal or equitable actions against the defaulting party, the defaulting party
shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees
and costs incurred because of the default.
16. Binding Effect. This writing, together with the exhibits hereto, constitutes the
entire agreement between the parties and shall be binding upon said parties, their officers,
employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs,
personal representatives, successors and assigns of said parties.
17. Law/Severability. The laws of the State of Colorado shall govern the
construction, interpretation, execution and enforcement of this Agreement. In the event any
provision of this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this
Agreement.
18. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101,
C.R.S., et. seq., Professional represents and agrees that:
a. As of the date of this Agreement:
1. Professional does not knowingly employ or contract with an illegal alien
who will perform work under this Agreement; and
2. Professional will participate in either the e-Verify program created in
Public Law 208, 104th Congress, as amended, and expanded in Public Law 156,
Utility PSA WO rev07/08
108th Congress, as amended, administered by the United States Department of
Homeland Security (the "e-Verify Program") or the Department Program (the
"Department Program"), an employment verification program established
pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment
eligibility of all newly hired employees to perform work under this Agreement.
b. Professional shall not knowingly employ or contract with an illegal alien to
perform work under this Agreement or knowingly enter into a contract with a
subcontractor that knowingly employs or contracts with an illegal alien to perform work
under this Agreement.
C. Professional is prohibited from using the e-Verify Program or Department
Program procedures to undertake pre -employment screening of job applicants while this
Agreement is being performed.
d. If Professional obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Professional
shall:
1. Notify such subcontractor and the City within three days that Professional
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien; except that Professional
shall not terminate the contract with the subcontractor if during such three days
the subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Professional shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the "Department") made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17.5-102 (5), C.R.S.
f. If Professional violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this
Agreement is so terminated, Professional shall be liable for actual and consequential
damages to the City arising out of Professional's violation of Subsection 8-17.5-102,
C.R.S.
Utility PSA WO rev07/08
g. The City will notify the Office of the Secretary of State if Professional violates this
provision of this Agreement and the City terminates the Agreement for such breach.
SEAL
ST:
City Clerk
APPROVED AS
ATT
�i
Corporate Secretary
Utility PSA WO rev07/08
THE CITY OF FORT COLLINS, COLORADO
By:-'/
,a s B. O'Neill II, CPPO, FNIGP
Director of Purchasing & Risk Management
Date:
Ayres Associates
By:
James D. Schall, PhD, PE
Title:
CORPORATE VICE PRESIDENT
Date: I I ZS ) /,0
(Corporate Seal)
tq
r•}
f•"r„
1
.) a
.. e.a £
EXHIBIT "A"
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
DATED:
Work Order Number:
Purchase Order Number:
Project Title:
Commencement Date:
Completion Date:
Maximum Fee: (time and reimbursable direct costs):
Project Description:
Scope of Services
Professional agrees to perform the services
Professional:
identified above and on the attached forms in
accordance with the terms and conditions
By:
contained herein and in the Professional Services
Agreement between the parties. In the event of a
Date:
conflict between or ambiguity in the terms of the
Professional Services Agreement and this work
City of Fort Collins
order (including the attached forms) the
Professional Services Agreement shall control.
Submitted By:
Project Manager
The attached forms consisting of Exhibits _, _
Date:
consisting of _ (_) pages are hereby accepted
and incorporated herein, by this reference, and
Reviewed by:
Notice to Proceed is hereby given.
Senior Utility Engineer
Date:
Approved by:
Water Engineering & Field
Services Operations Manager
Date:
Approved by:
Utilities General Manager
(over $1,000,000)
Date:
Approved by:
Director of Purchasing & Risk Management
(if over $60,000.)
Date:
A&RES
ASSOCIATES
AYRES ASSOCIATES INC
PROFESSIONAL SERVICES RATE
January 2010 — December 2010
PERSONNEL
2010
Senior Vice President/Principal Engineer
185.00
Senior Associate
185.00
Division Manager
165.00
Senior Project Manager
150.00
Project Manager
130.00
Senior Scientist
130.00
Senior Project Engineer
135.00
Project Engineer II
125.00
Project Engineer 1
110.00
Engineer'`/Scientist
90.00
Engineering Technician
65.00
Construction Resident
65.00
Survey Manager
120.00
Licensed Surveyor
85.00
Party Chief
70.00
Survey Technician
55.00
Two -Man Survey Crew
125.00
Senior CADD Technician
85.00
CADD Technician
70.00
Word Processor/Technical Editor/Contract Administrator
75.00
Clerical/Billing Clerk
55.00
*Graduate Engineer without P.E. license
"Deposition and Litigation - 50% surcharge on hourly rates
*College graduate in engineering, but not yet licensed
Direct charges including, travel costs, rental costs, and other direct project costs, will be invoiced at actual cost or
based on rates set forth in the attached standard rate schedule. All rates are subject to revision on an annual basis.
3665 JFK Parkway, Building 2, Suite 200, Fort Collins, Colorado 80525
(970) 223-5556, (970) 223-5578 FAX
www. AyresA s soc iat es. co m
1 ORATE-CO.DOC
Page 3 of 4