Loading...
HomeMy WebLinkAboutCHANGE ORDER - RFP - P1123 GENERAL CONTRACTOR FOR FIRE STATION EXPANSION AND RENOVATION PROJECT (3)PROJECT TITLE SECTION 00950 CHANGE ORDER NO. 4 Poudre Fire Authority Station #4 CONTRACTOR: Drahota Commercial, LLC BID NUMBER: P1123 DESCRIPTION: Construction of an approximately 15,380 square feet Fire Station, including sitework, utilities, landscaping, an underground irrigation system and off -site work. Exterior will be brick veneer and siding over metal stud or CMU back-up. Interior finishes will include painted gypsum board partitions; ceramic tile, carpet, VCT, sealed concrete, suspended acoustical ceiling, wood and hollow metal doors and frames. 1. Reason for change: Incorporation of various Proposed Change Orders (PCO's). 2. Description of change: PCO #33 — Trash Haul from Deconstruct — $1,421.02; #34 — PR#22 — Fill In Pond at Creek — $4,587.94; #35 — Add Painted 1 x4 Trim — $2,992.35; #36 — PR#25 Basement Access Panel - $1,085.00; #37 — Add Cord Reel in Truck Bay - $302.16; #38 — RFI#44 — Add Pressure Reducing Valve - $559.95; #39 — Delete Sixteen Seed Junipers and Add Three Austrian Pines - $(322.24); #40 — PR#28 - Add Cork Board for Maps — $637.66; #41 — PR# 24 — Flooring Revisions — ($3,522.63). 3. Change in Contract Cost: ($7,741.21) 4. Change in Contract Time: 0 Days ORIGINAL CONTRACT COST ` $3,042,872.00 TOTAL APPROVED CHANGE ORDERS $24,769.22 TOTAL PENDING CHANGE ORDERS 0.00 TOTAL THIS CHANGE ORDER $7,741.21 ADJUSTED CONTRACT COST' $3,075,382.43 (Assuming all change orders approved) ACCEPTED BY: REVIEWED BY: ntractor's ReVesentative Facilities Project Manager APPROVED BY:\/ 1' PFA Special Operations'Chief cc: Contractor Purchasing Architect Project File /z A U Date 1 0 Date LZ 3 Date