HomeMy WebLinkAbout465137 ELS ARCHITECTURE AND URBAN DESIGN - CONTRACT - RFP - 7051 MIDTOWN COMMERCIAL REDEVELOPMENT STUDYPROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below, by and
between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred
to as the "City" and ELS Architecture and Urban Design, hereinafter referred to as "Professional".
WITNESSETH:
In consideration of the mutual covenants and obligations herein expressed, it is agreed by
and between the parties hereto as follows:
1. Scope of Services. The Professional agrees to provide services in accordance with
the scope of services attached hereto as Exhibit "A", consisting of six (6) pages, and incorporated
herein by this reference.
2. Contract Period. This Agreement shall commence November 2, 2009, and shall
continue in full force and effect until April 30, 2010, unless sooner terminated as herein provided.
3. Early Termination by City. Notwithstanding the time periods contained herein, the
City may terminate this Agreement at any time without cause by providing written notice of
termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the
termination date contained in said notice unless otherwise agreed in writing by the parties.
All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent
to the following addresses:
Professional: City: With Copy to:
ELS Architecture and Urban Design City of Fort Collins City of Fort Collins, Purchasing
Attn: Mr. Jamie Rusin Attn:Josh Birks PO Box 580
2040 Addison Street PO Box 580 Fort Collins, CO 80522
Berkeley, CA 94704 Fort Collins, CO 80522
{
In the event of any such early termination by the City, the Professional shall be paid for services
rendered prior to the date of termination, subject only to the satisfactory performance of the
Standard Professional Services Agreement- rev07/09�.
1
Stakeholder and Public Meetings
The public involvement program elaborates on the August 12, 2009 Proposal by clarifying the extent and
nature of stakeholder meetings and public presentations:
• During the first month, the Professional team will interview City staff and elected officials. In
conjunction with City staff, the Professional team will also identify key stakeholders among
landowners, tenants, and neighbors for later contact.
• During the second month, stakeholder meetings will be conducted to review Study objectives and
identify key stakeholder issues. Professional and EPS will conduct meetings together during a
focused two-day period; EPS will also conduct additional one-on-one interviews as needed
between milestone meetings.
• During the third month (or other appropriate time), EPS may attend a public City Plan meeting to
present the Study vision, work plan, and key redevelopment issues in the context of City-wide long
range plans.
• During month four, and after internal review by City "staff, the completed market analysis,
development potentials, and the draft urban design plan will be prepared for presentation to
stakeholders and at a public open house. At this stage, the study will be substantially outlined but
sufficiently open-ended to benefit from stakeholder and public input. Prior to the open house,
Professional and EPS will present the same material to members of the Planning and Zoning
Board, Transportation Board, and the Economic Advisory Council for discussion and comment.
• The fifth month of the study will be devoted to final drafting and completion of the study with an
internal effort by the Professional team and City staff.
• The final report will be presented in the sixth month to appropriate bodies such as the City
Council.
• A written summary of stakeholder and public input will be maintained and included in the final
report.
Month One (November 2009)
Tasks
• Before the initial kick-off meeting prepare a list of possible background material for the City to
assemble and up -load to an Professional provided ftp site.
• Consider the format, schedule and possible content of a City managed page on the City web -
site to support stakeholder and public outreach for the Study.
• Data collection and review including Mason Corridor design plans, land ownership, major
tenants, previous studies, and other relevant material.
• Base map compilation.
• Identify core working group and lines of communication.
• Interview key City staff and elected officials
• Identify key stakeholders among land and building owners, key tenants, and neighborhood
representatives.
• Conduct a tour of the Study Area with City staff.
• Review and refine this work plan and schedule.
• Initiate retail/office market analyses for Foothills Mall and the College Corridor.
Meetings
• EPS and Professional, two consecutive and.complete days (two night Professional stay)
including extensive meetings with City staff to apprise Professional and EPS to the greatest
extent possible on background pertaining to the Month One tasks above (agenda and
schedule to be prepared by the City).
• EPS, follow-up one -day trip for interviews and field research as needed.
• Conference calls and web -based meetings as needed.
3
Deliverables
• Preliminary base map(s).
• Organization chart and team directory.
• Initial vision statement.
• Initial stakeholder directory.
• Revised and refined work plan.
Month Two (December 2009)
Tasks
• Key stakeholder interviews.
• Contact the Mall owner and department stores with WWW assistance.
• Substantially complete retail/office market analysis.
• Update and refine Mason Corridor residential market analysis and apply to College Corridor
and sites.
• Land use opportunities and constraints analysis.
• Concept site analysis (considering traffic, transit, access, planned projects, micro climate,
etc.).
• Thematic planning concepts with broad consideration of uses, identity, and character that
build upon the initial vision statement for the Study area with WWW assistance.
Meetings
• EPS and Professional, two consecutive days including working sessions with City staff and
review of City staff comments on Month One deliverables.
• EPS, additional field work on potential opportunity sites.
• Conference calls and web -based meetings as needed.
Deliverables
• Draft market analysis.
• Presentation of broad planning concepts to City staff.
• Sketch book in hard copy and electronic format.
• Summary of stakeholder interviews.
Month Three (January 2010)
Tasks
• Define Foothills Mall redevelopment concepts with WWW assistance.
• Identify Mason -College Corridor development potentials and opportunity site catalyst projects.
• . Prepare redevelopment and urban design concepts for Foothills Mall and Mason -College
Corridor sites with WWW assistance.
• Prepare initial College "Boulevard" design concepts.
Meetings
• EPS, Professional, and WWW, two consecutive days including working sessions with City
staff and review of City staff comments on Month Two deliverables.
• Presentation of initial planning concepts to City staff.
• Conference calls and web -based meetings as needed.
Deliverables
• Three preliminary alternative plans for Foothills Mall.
• Two or three initial prototype concepts for Mason -College opportunity sites.
• Initial College "Boulevard" concept.
Summary sketch book in hard copy and electronic format.
• Complete market analysis.
4
Month Four (February 2010)
Tasks
• Develop land -based pro forma financial model.
• Financial feasibility analysis of Foothills Mall redevelopment concepts with WWW assistance.
• Planning level financial analysis of Mason -College Corridor catalyst projects.
• Solicit feedback on initial concepts from key stakeholders.
• Conduct a public open house.
• City review of initial planning concepts.
• Identify refinements to be made to initial planning concepts.
• Update the vision statement for Midtown.
• City review of Month Three deliverables during Month Four and sufficiently prior to the open
house is critical.
• If not sooner, City to launch page on City web site to make information about the project and
the open house available.
Meetings
• EPS and Professional, two consecutive and complete days (two night Professional stay)
allowing for Study material to be presented to key Board and Commission members and
others as appropriate prior to the open house.
• Presentation to and work session with members of the Planning and Zoning Board,
Transportation Board, and Economic Advisory Council.
• Public open house.
• Conference calls and web -based meetings as needed.
Deliverables
• Summary of stakeholder and public feedback.
• Summary of refinements to be made to the initial planning concepts.
• Foothills Mall redevelopment feasibility analysis.
• Foothills Mall redevelopment and financing strategy.
Month Five (March 2010)
Tasks
• Preparation of Final Report.
• Core team review and subsequent refinements to the Study.
Meetings
• Conference calls and web -based meetings as needed.
Deliverables
• Final Report, authored by Professional and EPS with assistance from WWW.
The Final Report will summarize Study activities and findings and will include:
• Executive summary, a section of which will be formatted as a handout suitable for initial
contact with interested parties including at ICSC.
• Market and development potentials.
• Foothills Mall redevelopment strategy.
• Foothills Mall urban design framework.
• Foothills Mall preliminary tenanting strategy.
• Foothills Mall economic development/public financing strategy
• Mason -College Corridor opportunity site feasibility analysis.
• Mason -College Corridor prototype site concept plans.
• Preliminary development/disposition strategy.
• Urban design including:
5
- Study area site analysis.
- Overall district identity, character, and circulation.
- Prototype development for College -Mason sites.
- Strategic alternatives for Foothills Mall.
- College Avenue "Boulevard" Improvements.
Urban design illustrative material will include:
- Color plans at planning -level drawing scale (such as 1" = 100' for Foothills Mall). - Two
overall aerial sketch perspectives.
- Character sketches and massing studies.
- Photographs of applicable reference projects and places.
The urban design will consider:
- The mix, location, and density of retail, commercial, and residential uses.
- Vertical and horizontal mixed -use.
- Existing zoning, height limits, and developer incentives.
- Phasing and long-term build -out.
- Alternative key anchor tenants and district -defining leasing concepts.
- Phasing and structured parking strategies.
- Minimum initial development to achieve critical mass.
- The look, feel, and character of Midtown - the "postcard" you send home.
- Planning concepts that address development options and Midtown character.
- Defining public realm elements that create a unique identity for Midtown.
- Flexible plan elements and elements that should be fixed, moving forward.
- Public rights -of -way and developer -controlled streets and public space.
- A vigorous overall vision that can support a market -responsive strategy.
The Final Report will be made available in hard copy, electronic, and PowerPoint formats.
Month Six (April 2010)
Tasks
• Public Presentation of the Study at a City Council work session.
Meetings
• EPS, Professional, and WWW, two consecutive days.
Deliverables
• Presentation in hard copy and electronic format.
0
EXHIBIT B
FEE SCHEDULE
Fees
Fees for services are a lump sum of $200,000.00 with an additional estimated budget of $15,000.00 for
reimbursable expenses to be billed at cost. Billing for services will be monthly and based on the percent of
services completed. Budgets for each consultant are:
Professional: $100,000.00
Urban design.
EPS: $80,000.00
Market and Financial Analysis.
W W W : $20,000.00
Development Advisor and Liaison,
2 trips plus approximately 35 hours of consultation.
These budgets for individual consultants may vary based on the actual allocation of effort.
Expenses
Reimbursable expenses shall be billed at cost and shall include actual expenditures made in the interest
of the project, in the following categories:
- Transportation and living expenses in connection with out-of-town travel.
- Long distance communications and facsimiles.
- Reproduction and photography.
- Postage, shipping, and delivery.
- Professional renderings and models.
Houriv Rates (as needed for additional services
Professional
Principal $215.00
Associate Principals $145.00 - 190.00
,Associates $100.00 - 180.00
Professional Staff $100.00 - 180.00
Technical Support Staff $ 60.00 - 145.00
EPS
Managing Principal
Principals
Senior Associates
Associates
Technical Support Staff
'Warren W. Wilson
$295.00
$210.00
$140.00
$115.00
$75.00 - $90.00
$300.00
Rates are subject to revision on January 1, 2010 in accordance with cost of living adjustments. Individual
billing rates and/or classifications may change during the year to reflect a change in status and/or merit
salary adjustments.
EXHIBIT C
INSURANCE REQUIREMENTS
1. The Professional will provide, from insurance companies acceptable to the City, the
insurance coverage designated hereinafter and pay all costs. Before commencing work under
this bid, the Professional shall furnish the City with certificates of insurance showing the type,
amount, class of operations covered, effective dates and date of expiration of policies, and
containing substantially the following statement:
"The insurance evidenced by this Certificate will not be cancelled, except after ten (10)
days written notice has been received by the City of Fort Collins."
In case of the breach of any provision of the Insurance Requirements, the City, at its option, may
take out and maintain, at the expense of the Professional, such insurance as the City may deem
proper and may deduct the. cost of such insurance from any monies which may be due or
become due the Professional under this Agreement. The City, its officers, agents and
employees shall be named as additional insureds on the Professional's general liability and
automobile liability insurance policies for any claims arising out of work performed under this
Agreement.
2. Insurance coverages shall be as follows:
A. Workers' Compensation & Employer's Liability. The Professional shall maintain
during the life of this Agreement for all of the Professional's employees engaged in work
performed under this agreement:
Workers' Compensation insurance with statutory limits as required by
Colorado law.
2. Employer's Liability insurance with limits of $100,000 per accident,
$500,000 disease aggregate, and $100,000 disease each employee.
B. Commercial General & Vehicle Liability. The Professional shall maintain during
the life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury, including
accidental death, as well as forclaims for property damage, which may arise directly or
indirectly from the performance of work under this Agreement. Coverage for property
damage shall be on a "broad form" basis. The amount of insurance for each coverage,
Commercial General and Vehicle, shall not be less than $500,000 combined single limits
for bodily injury and property damage.
In the event any work is performed by a subcontractor, the Professional shall be
responsible for any liability directly or indirectly arising out of the work performed under
this Agreement by a subcontractor, which liability is not covered by the subcontractor's
insurance.
Professional's obligations under this Agreement. Such payment shall be the Professional's sole right
and remedy for such termination
4. Design, Project Indemnity and Insurance Responsibility. The Professional shall be
responsible for the professional quality, technical accuracy, timely completion and the coordination
of all services rendered by the Professional, including but not limited to designs, plans, reports,
specifications, and drawings and shall, without additional compensation, promptly remedy and
correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold
harmless the City, its officers and employees in accordance with Colorado law, from all damages
whatsoever claimed by third parties against the City; and for the City's costs and reasonable
attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of
the services furnished under this Agreement. The Professional shall maintain commercial general
liability insurance in the amount of $500,000 combined single limits and errors and omissions
insurance in the amount of $1,000,000.
5. Compensation. In consideration of the services to be performed pursuant to this
Agreement, the City agrees to pay Professional a fixed fee in the amount of Two Hundred Thousand
Dollars ($200,000.00) plus reimbursable direct costs in the amount of Fifteen Thousand Dollars
($15,000.00). All such fees and costs shall not exceed Two Hundred Fifteen Thousand Dollars
($215,000.00) in accordance with the Fee Schedule attached hereto as Exhibit "B", consisting of
one (1) page, and incorporated herein by this reference. Monthly partial payments based upon the
Professional's billings and itemized statements are permissible. The amounts of all such partial
payments shall be based upon the Professional's City -verified progress in completing the services to
be performed pursuant hereto and upon the City's approval of the Professional's actual
reimbursable expenses. The parties acknowledge that the sub -contractors, Economic & Planning
Systems (EPS) and Warren W. Wilson (WWW) are not parties to this agreement. However, the
rates listed for services to be provided by these subcontractors shall be the rate paid by the City to
the Professional for these services. If the amount charged by these subcontractors exceed the
Standard Professional Services Agreement- rev07/09
2
rates listed in Exhibit "B" the excess amount shall not be paid or owed by the City. The limitation on
increases in prices set forth in section 4 herein shall apply to all rates listed in Exhibit "B" including
subcontractor rates. Final payment shall be made following acceptance of the work by the City.
Upon final payment, all designs, plans, reports, specifications, drawings, and other services
rendered by the Professional shall become the sole property of the City.
6. City Representative. The City will designate, prior to commencement of work, its
project representative who shall make, within the scope of his or her authority, all necessary and
proper decisions with reference to the project. All requests for contract interpretations, change
orders, and other clarification or instruction shall be directed to the City Representative.
7. Monthly Report. Commencing thirty (30) days after the date of execution of this
Agreement and every thirty (30) days thereafter, Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Scope of Services,
Work Schedule, and other material information. Failure to provide any required monthly report may,
at the option of the City, suspend the processing of any partial payment request.
8. Independent Contractor. The services to be performed by Professional are those of
an independent contractor and not of an employee of the City of Fort Collins. The City shall not be
responsible for withholding any portion of Professional's compensation hereunder for the payment of
FICA, Workers' Compensation, other taxes or benefits or for any other purpose.
9. Personal Services. It is understood that the City enters into this Agreement based on
the special abilities of the Professional and that this Agreement shall be considered as an
agreement for personal services. Accordingly, the Professional shall neither assign any
responsibilities nor delegate any duties arising under this Agreement without the prior written
consent of the City.
10. Acceptance Not Waiver. The City's approval of drawings, designs, plans,
specifications, reports, and incidental work or materials furnished hereunder shall not in any way
relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's
Standard Professional Services Agreement- rev07/09
3
approval or acceptance of, or payment for, any of the services shall not be construed to operate as a
waiver of any rights or benefits provided to the City under this Agreement.
11. Default. Each and every term and condition hereof shall be deemed to be a material
element of this Agreement. In the event either party should fail or refuse to perform according to the
terms of this agreement, such party may be declared in default.
12. Remedies. In the event a party has been declared in default, such defaulting party
shall be allowed a period of ten (10) days within which to cure said default. In the event the default
remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek
damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail
himself of any other remedy at law or equity. If the non -defaulting party commences legal or
equitable actions against the defaulting party, the defaulting party shall be liable to the
non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred
because of the default.
13. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire
agreement between the parties and shall be binding upon said parties, their officers, employees,
agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal
representatives, successors and assigns of said parties.
14. Law/Severability. The laws of the State of Colorado shall govern the construction,
interpretation, execution and enforcement of this Agreement. In the event any provision of this
Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such
holding shall not invalidate or render unenforceable any other provision of this Agreement.
15. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101,
C.R.S., et. seq., Professional represents and agrees that:
a. As of the date of this Agreement:
1. Professional does not knowingly employ or contract with an illegal alien
who will perform work under this Agreement; and
Standard Professional Services Agreement- rev07/09
4
2. Professional will participate in either the e-Verify program created in
Public Law 208, 104th Congress, as amended, and expanded in. Public Law 156,
108th Congress, as amended, administered by the United States Department of
Homeland Security (the "e-Verify Program") or the Department Program (the
"Department Program"), an employment verification program established
pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment
eligibility of all newly hired employees to perform work under this Agreement.
b. Professional shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement.
C. Professional is prohibited from using the e-Verify Program or Department
Program procedures to undertake pre -employment screening of job applicants while this
Agreement is being performed.
d. If Professional obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien, Professional
shall:
1. Notify such subcontractor and the City within three days that Professional
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien; and
2. Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien; except that Professional
shall not terminate the contract with the subcontractor if during such three days
the subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien.
e. Professional shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the "Department") made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17.5-102 (5), C.R.S.
If Professional violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this
Standard Professional Services Agreement- rev07/09
Agreement is so terminated, Professional shall be liable for actual and consequential
damages to the City arising out of Professional's violation of Subsection 8-17.5-102,
C.R.S.
g. The City will notify the Office of the Secretary of State if Professional violates this
provision of this Agreement and the City terminates the Agreement for such breach.
16. Amendment 54. To the extent that this Agreement may constitute a "sole
source government contract" within the meaning of Section 2(14.4) of Article XXVIII of the
constitution of the State of Colorado, about which the City makes no representation, Section 15
of said Article XXVIII, which reads as follows, is hereby incorporated into this Agreement and
made a part hereof:
a. Section 15. Because of a presumption of impropriety between contributions to
any campaign and sole source government contracts, contract holders shall contractually agree,
for the duration of the contract and for two years thereafter, to cease making, causing to be
made, or inducing by any means, a contribution, directly or indirectly, on behalf of the contract
holder or on behalf of his or her immediate family member and for the benefit of any political
party or for the benefit of any candidate for any elected office of the state (of Colorado) or any of
its political subdivisions.
Standard Professional Services Agreement- rev07/09
6
-�O� FORT c0<<i
Ci:• :N
SEAL
ATTEST: '•
Na A
City Clerk
APPRyWW PAS
Assistant Oit)/A
=Aveee
Corporate Secretary
THE CITY OF FORT COLLINS, COLORADO
By.
#rjbs B. O'Neill II, CPPO, FNIG
Director of urchasing & Risk. Management
DATE:
itectureJrban Design
In
Title:
CORPORATE PRESIDENT OR VICE PRESIDENT
Date: Gl, `3- r1l
c
Standard Professional Services Agreement- rev07/09
7
EXHIBIT A
SCOPE OF SERVICES
Project Summary
The Professional team, led by Professional with sub -consultants Economic & Planning Systems (EPS)
and Warren W. Wilson (WWW), will complete services for the Midtown Commercial Redevelopment
Study (the Study) over a period of approximately six months. Generally, the services will include:
• Land -use analysis of the Mason -College Corridor and Foothills Mall site environs.
• Market analysis for retail, office, and multifamily residential uses for the Mason -College Corridor
and the Foothills Mall site environs.
• Associated study of potential development options.
• Public involvement program, including two public meetings and outreach to stakeholders such as
City staff and elected officials, and study area tenants, neighbors, and landowners.
• Preparation of a development framework and urban design plan for the Mason -College Corridor
and Foothills Mall.
• Financial analysis and redevelopment strategy for the Foothills Mall properties and other key
opportunity sites.
• Identification of economic development and public financing incentives to help achieve the desired
development.
• A final report that documents the study results, illustrates potential development, and identifies
additional and next steps.
Overall, the goal of the Study is to collaboratively identify a compelling, realistic, and vigorous vision for the
character and development of the Midtown District and to provide a financially viable and feasible
development and urban design.framework to achieve that vision.
The Study area is generally comprised of the College Avenue commercial corridor bordered by the Mason
Bus Rapid Transit on the west, residential neighborhoods on the east, Prospect Road on the north, and
the former Wal-Mart store site south of Harmony Road. The Study area includes Foothills Mall and its
associated adjacent properties as a key development parcel.
Additional Notes
The scope and fees for the Study are based on the following conditions and assumptions:
The Study is strategic in nature with a focus on positioning the Foothills Mall properties for reinvestment
and redevelopment. Plans and feasibility analysis for other Mason -College Corridor opportunity sites will
be more conceptual and illustrative of the type and quality of possible development. The Study will
conclude with a Final Report identifying next steps for implementation. The Study may recommend but
does not include the following potential services:
• Detailed parcel -level analysis along the College -Mason Corridor (site concepts and feasibility
analysis for Foothills Mall, as well as selected or prototype opportunity sites for the College -Mason
Corridor are included in,the Study).
• Business Improvement District creation and,other similar merchant -and landowner -based
initiatives.
• Detailed merchandizing plans, lease plans, and individual tenant identification (market demand,
site opportunities, and potential general tenant mix for the study area will be provided; significant
large retailers, such as department stores, will be contacted).
• Revisions to zoning or other City ordinances and adopted plans (zoning and adopted plans will be
reviewed and possible revisions associated with the Study will be identified; the Study will be
informational and not intended for formal adoption or approval).
• Formation of urban renewal district plans or other districts for the purpose of providing public
financing assistance to public -private development projects.
It is assumed that the City has extensive base maps, landowner and tenant information, background
reports, and other similar information that will be available in electronic format. This information will be
compiled and formatted to suit the Study; original research for this type of information is not included.
Foothills Mall is owned and controlled by GGP, Macy's and Sears. The extent to which these stakeholders
will share proprietary information concerning the mall and its performance is unknown and will be a factor
in the precision of the financial model provided as a part of the Study.
Noticing and scheduling of stakeholder interviews and public meetings will be completed by the City.
Planning services will be conducted at a conceptual level and working assumptions will be made for
certain technical aspects of the Study such as for traffic, civil, environmental, and other similar disciplines.
These assumptions will be made based on the understanding that these issues will be addressed as
needed in subsequent planning and design.
The work effort will be continuous. Suspensions of service or the extension of the schedule may result in
additional services.
Meetings in Fort Collins for Professional and WWW will be conducted on consecutive days, allowing for a
single overnight stay for each trip unless otherwise noted in the work plan. Based on currently available
flights, Professional and WWW can be available beginning with lunch the first day, through evening public
meetings, and for the entire second day.
Construction cost estimates are not included.
Limited copies of progress and report materials are included in the budget for expenses. High -quantity
printings for broad distribution are not included.
If the City, or others through the City, request copies of electronic data files ("CAD Data") prepared by
Architect or its Consultants for the Project, the parties agree to execute Professional' CAD Agreement
prior to the transfer of such CAD Data.
Unless otherwise provided, Professional and Professional' sub -consultants shall have no responsibility for
the discovery, presence, handling, removal, or disposal of or exposure of persons to hazardous materials
in any form, including but not limited to asbestos, asbestos products, polychlorinated biphenyl (PCB), or
other toxic substances.
Work Plan
The Work Plan is generally organized around five milestone meetings that will each occur over two days
and will be led by Professional and EPS. The meetings will include the presentation of progress material
and working sessions with the core team, as well as a variety of stakeholder and public outreach efforts.
WWW will assist Professional and EPS as an advisor on development matters and as a liaison to
department stores, key tenants and the mall owner. Meetings will be collaborative with the City Staff Team
participating in the Study, preparing background, contributing to Study content and results, and reviewing
material as it is drafted. Consultant and City Staff Team member roles are initially identified in the
following work plan.