HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9952864 PFA FIRE STATION 4SECTION 00950`•,
Mini order #
CHANGE ORDER NO. 3 Vendor/Supptfer# /S75"93
PROJECT TITLE: Poudre CAuthonty Station #4 /
OV # Batch #
CONTRACTAFJtPjahota Commercial, LLC
1��3 PV # Batch #
BID NUMBE%R�j
egoing prices shall include all labor
shoring rpmov 1, dewate n erhe
DESCRIPTI( �� ���t �qTagqro a �yo;, a ivaWfe f�atia'nt;"sit&�&k,,ut$111e,over
landscaping, an under roun irriga ion sy em and o'�fff-s`ii a w$rek. nbe�and siding over
metal stud orBl�a1EMINip
isisvill igelu�,�teps m board partitions, ceramic tile, carpet,
,�## {ii e itemsin the
VCT, sealedppgcrg c�iigquanticta eel twFiis so eodiser�letin without affecting the
1. ReasRp emenj &01Wnc ro a�tovef pe l�enitr8 #% �%Bffe (?dteotkaTl( Agreement or Price.
does
2. Description of change LOv%Dead Door Revisions — ($4,584.24); #26 — PR#17 — Revised
Landscaping & Added Stoop —M �1— P ff—Wkaceway — $206.03; #28 PR#20 — Added Ductwork
in Bays for Future Expansion of Vehicle Exhaust SysTe n - $2, # — Credit for maller Eleal Boxes
— ($91.92); #30 — ASI#19 — Electrical Revisions - $ 4.33;
#32 —Added Shut Off Valves in Apparatus Bay — $ffACTOR
3. Change in Contract Cost: 1 .51) BY:���
4. Change in Contract Ti 0 ay i
igna ure Date
ORIGINAL CONTRACT COST 'i�C' 1 $3,042,872.00
TOTAL APPROVED CHAN(TIztdRDERS 1 $25,582.73
TOTAL PENDING CHANGE ORDERS 0.00
License Number (If Applicable)
TOTAL THIS CHANGE ORDER ($813.51)
(Seal if Bid is by corporationfi
ADJUSTED CONTRACTPOST $3,067,641.22
(Ass t hQ-%V;chan brf Sr mar ved)- ✓' <.:
i;
ACCEP.TEq By. "'
REVIEWED Bl/
APPROVED BY:
(Address ' H �
Operations Chief
cc: Contractor Purchasing
Architect Project File
Rev10/20/07 Section 00300 Page 4