Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9952864 PFA FIRE STATION 4SECTION 00950`•, Mini order # CHANGE ORDER NO. 3 Vendor/Supptfer# /S75"93 PROJECT TITLE: Poudre CAuthonty Station #4 / OV # Batch # CONTRACTAFJtPjahota Commercial, LLC 1��3 PV # Batch # BID NUMBE%R�j egoing prices shall include all labor shoring rpmov 1, dewate n erhe DESCRIPTI( �� ���t �qTagqro a �yo;, a ivaWfe f�atia'nt;"sit&�&k,,ut$111e,over landscaping, an under roun irriga ion sy em and o'�fff-s`ii a w$rek. nbe�and siding over metal stud orBl�a1EMINip isisvill igelu�,�teps m board partitions, ceramic tile, carpet, ,�## {ii e itemsin the VCT, sealedppgcrg c�iigquanticta eel twFiis so eodiser�letin without affecting the 1. ReasRp emenj &01Wnc ro a�tovef pe l�enitr8 #% �%Bffe (?dteotkaTl( Agreement or Price. does 2. Description of change LOv%Dead Door Revisions — ($4,584.24); #26 — PR#17 — Revised Landscaping & Added Stoop —M �1— P ff—Wkaceway — $206.03; #28 PR#20 — Added Ductwork in Bays for Future Expansion of Vehicle Exhaust SysTe n - $2, # — Credit for maller Eleal Boxes — ($91.92); #30 — ASI#19 — Electrical Revisions - $ 4.33; #32 —Added Shut Off Valves in Apparatus Bay — $ffACTOR 3. Change in Contract Cost: 1 .51) BY:��� 4. Change in Contract Ti 0 ay i igna ure Date ORIGINAL CONTRACT COST 'i�C' 1 $3,042,872.00 TOTAL APPROVED CHAN(TIztdRDERS 1 $25,582.73 TOTAL PENDING CHANGE ORDERS 0.00 License Number (If Applicable) TOTAL THIS CHANGE ORDER ($813.51) (Seal if Bid is by corporationfi ADJUSTED CONTRACTPOST $3,067,641.22 (Ass t hQ-%V;chan brf Sr mar ved)- ✓' <.: i; ACCEP.TEq By. "' REVIEWED Bl/ APPROVED BY: (Address ' H � Operations Chief cc: Contractor Purchasing Architect Project File Rev10/20/07 Section 00300 Page 4