INVITATION TO BID
7088 Continental Control Panel Upgrades
BID OPENING: 2:30 P.M. (our clock), November 12, 2009
Sealed bids will be received and publicly opened at the office of the Director of Purchasing and Risk
Management, PO Box 580, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80522, at the
time and date noted on the bid proposal and/or contract documents. If delivered, they are to be
sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is
P.O. Box 580, Fort Collins, 80522-0580.
Bids must be received at the Purchasing Office prior to 2:30 p.m. (our clock), November 12,
2009.
Questions regarding bid submittal or process should be directed to
James R. Hume, CPPO, Senior Buyer (970) (970)221-6776.
A copy of the Bid may be obtained as follows:
Download the Bid from the Purchasing Webpage, Current Bids page, at:
http://fcgov.com/eprocurement
2. Come by Purchasing at 215 North Mason St., 2nd floor, Fort Collins, and request a
copy of the Bid.
Special Instructions
All bids must be properly signed by an authorized representative of the company with the legal
capacity to bind the company to the agreement. Bids may be withdrawn up to the date and hour set
for closing. Once bids have been accepted by the City and closing has occurred, failure to enter
into contract or honor the purchase order will be cause for removal of supplier's name from the City
of Fort Collins' bidders list for a period of twelve months from the date of the opening. The City may
also pursue any remedies available at law or in equity. Bid prices must be held firm for a period of
forty-five (45) days after bid openings.
Submission of a bid is deemed as acceptance of all terms, conditions and specifications contained
in the City's specifications initially provided to the bidder. Any proposed modification must be
accepted in writing by the City prior to award of the bid.
Only bids properly received by the Purchasing Office will be accepted. All bids should be clearly
identified by the bid number and bid name contained in the bid proposal.
No proposal will be accepted from, or any purchase order awarded, to any person, firm or
corporation in default on any obligation to the City.
Bids must be furnished exclusive of any federal excise tax, wherever applicable.
Bidders must be properly licensed and secure necessary permits wherever applicable.
Bidders not responding to this bid will be removed from our automated vendor listing for the subject
where renewal is a way of life
commodities.
The City may elect where applicable, to award bids on an individual item/group basis or on a total
bid basis, whichever is most beneficial to the City. The City reserves the right to accept or reject
any and all bids, and to waive any irregularities or informalities.
Sales prohibited/conflict of interest: no officer, employee, or member of City Council, shall have a
financial interest in the sale to the City of any real or personal property, equipment, material,
supplies or services where such officer or employee exercises directly or indirectly any decision -
making authority concerning such sale or any supervisory authority over the services to be
rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift,
gratuity, favor, entertainment, kickback or any items of monetary value from any person who has or
is seeking to do business with the City of Fort Collins is prohibited.
Freight terms: unless otherwise noted, all freight is F.O.B. Destination, Freight Prepaid. All freight
charges must be included in prices submitted on proposal.
Discounts: any discounts allowed for prompt payment, etc., must be reflected in bid figures and not
entered as separate pricing on the proposal form.
Purchasing restrictions: your authorized signature of this bid assures your firm's compliance with
the City's purchasing restrictions. A copy of the resolutions is available for review in the Purchasing
Office or the City Clerk's Office. Request Resolution 91-121 for cement restrictions.
Collusive or sham bids: any bid deemed to be collusive or a sham bid will be rejected and reported
to authorities as such. Your authorized signature of this bid assures that such bid is genuine and is
not a collusive or sham bid.
Bid results: for information regarding results for individual bids send a self-addressed, self -stamped
envelope and a bid tally will be mailed to you. Bid results will be posted in our office 7 days after
the bid opening.
James B. O'Neill Il, CPPO, FNIGP
Director of Purchasing and Risk Management
BID # 7088 Continental Control Panel Upgrades
BID OPENING:
We hereby enter our bid for the City of Fort Collins' requirements for City of Fort Collins
Continental Control Panel Upgrades, per the bid invitation and any referenced specifications:
SPECIFICATIONS FOR ACCESS CONTROL UPGRADE CITY BUILDINGS,
(List of Buildings Attached as Exhibit "A")
Objective: To Upgrade existing Continental Controls Mini, Micro, and Smart Terms to latest Super
and Turbo Superterm technology in various City buildings. See attached listing of units required.
Mandatory Pre -Bid: There will be a mandatory pre -bid walk through of the 215 North Mason —
Civic Center Office Building prior to awarding this job. This walk through will take place on October
29, at 9:30 a.m., at the job site of 215 North Mason St, Fort Collins, CO. We will meet in the
Lobby area. An existing floor plan showing door locations, current controller locations, and existing
field wiring will be provided at this time. This is only one of six buildings with new controller needs,
but it represents 75% of the actual controllers requiring updating. Questions about the walk through
should be directed to Steve Strickland at 221-6536.
Contractor Responsibilities:
Controllers.
• Furnish and install new Continental Turbo Superterm 4 or 8 door controllers, Super
two controllers, with chips to allow controllers to run on a CA3000 system and
have 6 access groups available to all controllers listed for replacement.
a) An attempt shall be made to relocate all panels mounted above the ceiling to an
accessible closet or consolidate panels to larger controller where permissible.
Contractor can provide a two cost approach to each panel. 1.) Cost to replace
panel at its current location. 2.) Cost to relocate/consolidate panels and
associated hardware to a better suited closet or storage area. The goal is to
consolidate any panels and relocate to areas that are better suited for
maintenance and access at an acceptable cost.
b) Panels and operations of doors are to be tested completely by cycling door and
reader responses with city staff verification as testing is done.
c) Existing wiring and any new wiring is to be labeled, bundled, and properly secured
to provide a clean installation. Splice points are to be designated on red -line
drawings. Initial drawings and layout will be provided by the City.
d) Fully remove any abandon controllers, wire, and hardware. Return abandon
controllers, power supplies, field hardware to the City of Fort Collins.
115 Vac UPS power shall be supplied to new controller when relocated. The City will
provide new 115 Vac power to any new Continental controllers that are located in areas
old controller did not exist.
Provide Autocad drawing of all locations and labeling of field devices (City will provide
base building drawing). Show wiring run between devices and all associated hardware.
2. If required, furnish, install and configure Lantronics UDS-10 micro serial server network
interface. Provide patch cord to City field termination at Rj45 receptacle (Location yet to be
determined).
3. Cutting, drilling and patching
• Other than described above as work provided or supplied by others, the Contractor shall
be responsible for all cutting, fitting and patching to complete the work.
• The contractor shall be aware these are occupied buildings and any noise, odors, dust
or debris creation above "normal' limits should be highlighted and discussed with project
manager before proceeding.
4. Cleaning
• The Contractor is responsible for any cleaning and/or disposal of waste products that is
necessary as a result of his operations related to the upgrade.
• The Contractor is to clean up the immediate work spaces for that day and each day.
Particular attention shall be paid to public and city worker areas. This means
vacuuming or sweeping floor, replacing ceiling tile, wiping off desks or other horizontal
surfaces and disposing of all trash.
5. Documentation
• Provide O&M manuals with all associated hardware, software and auxiliary equipment
used in the installation.
• Review with City staff an as -constructed AutoCAD drawing (basic drawing provided by
City staff) verifying location of field devices and wiring path at end of project.
• Upon completion there will be a walk-thru inspection by the Contractor and City staff to
show location and configuration of completed system. Full operation of the system shall
be verified by the designated City Representative before final pay application is
approved.
6. Warranty
• The Contractor shall warrant all materials associated with his work (including low
voltage wiring and connections) to be free of mechanical and electrical defects for a
period of one year.
City Responsibilities:
• The City will make every effort to provide the Contractor with daytime access to the
areas that will receive this work.
The Contractor shall submit a master schedule including his scope of work, and shall
coordinate this schedule with the designated City Project Representative.
Method of Award
Submitted bids will be evaluated based on price, quality of components, proposed configuration,
and personnel experience. The goal will be to obtain the best value for the City. Please submit
"alternative/consolidation panel location" option along with the baseline option matrix below. We
are very interested in the "alternative/consolidation panel location" option and will assist you with
any questions about logistics and access you may have.
Price Proposal (2 pages): Bid # 7088 Continental Control Panel Upgrade
Enter quantities, unit costs, if combining controller specify on separate sheet.
Item#
Oty
Description
Material
/Unit Cost
Labor Cost
/Unit
Ext. Cost
6
Replace 6 Micro Terms with 6 Super
Two Controllers
2
8
Replace 8 Mini Terms with 8 Super
Two Controllers
3
5
Replace 5 SmartTerms with 5 Turbo
Super Four Controllers
Startup / Test & verify
Documentation & drawings
Other (specify on a separate sheet)
Total:
$
Exhibit A: List of Buildings & Panels with upgrade recommendations
PH
Existing
New Panel
Comments
No
Description
Building
PanelType
Type
Turbo
SuperTerm
1
117 N. Mason
215 N. Mason
SmarTerm
Four
Turbo
SuperTerm
2
215 Tele. Room
215 N. Mason
SmarTerm
Four
Possibly combine panels
#3, #4 & #19 into Turbo
3
1 215 Excercise Room
215 N. Mason
MicroTerm
Su erTwo
8
215 Bike/Natural
4
Resources
215 N. Mason
MiniTerm
Su erTwo
215 2nd Flr. N.
7
Hallway HR
215 N. Mason
MiniTerm
Su erTwo
215 2nd Flr N. Lobby
8
HR
215 N. Mason
MicroTerm
Su erTwo
Possibly combine panels
215 2nd Flr S. Lobby
#9 and #10 into Turbo 4
9
Finance
215 N. Mason
MicroTerm
Su erTwo
215 2nd Fir Sales
10
Tax Hallway
215 N. Mason
MicroTerm
Su erTwo
215 2nd Fir
11
S.Hallwa Rsk Mgt)
215 N. Mason
MiniTerm
Su erTwo
215 3rd Fir
12
S.Hallwa MIS
215 N. Mason
MiniTerm
Su erTwo
215 3rd Fir N. Lobby
13
CRPE
215 N. Mason
MicroTerm
Su erTwo
215 3rd Fir N.
15
Hallway CIRPE)
215 N. Mason
MiniTerm
Su erTwo
215 1st Fir. S.
215 N. Mason
MicroTerm
19
Hallway Pkn
Su erTwo
Turbo
215 1st Fir. S. Lobby
SuperTerm
20
Pkn
215 N. Mason
SmarTerm
Four
Turbo
Park Shop
Downtown
SuperTerm
33
Downtown
ParkShop
SmarTerm
Four
EPIC - Concession
EPIC - 1801
41
Area
Riverside Dr
MiniTerm
Su erTwo
Turbo
Fossil Creek
SuperTerm
25
Fossil Creek Maint
Maint. Shop
SmarTerm
Four
38
Lincoln - Coat Closet
Lincoln Center
MiniTerm
Su erTwo
Museum - Boiler
43
Room
Museum
MiniTerm
Su erTwo
Additional Submittals:
Submit information detailing the relevant experience forthe lead technician who will be assigned to
this project, if awarded to your company.
Provide a brief narrative of the training and skills of other personnel who would be assigned to the
project.
Provide the name, title and phone number for the company employee primarily responsible for
coordination with the City on any issues involved in this project.
Name
Phone
Title
For technical questions, contact Steve Strickland, Operations Services, 970-221-6536
For questions concerning bid procedures, contact Jim Hume, Senior Buyer, phone: 970-221-6776
or email: jhume@fcgov.com