Loading...
HomeMy WebLinkAboutAddenda - BID - 7045 POWER TRAIL FENCING KEENLAND DRIVE TO TRILBY ROADCity of Fort Collins �Purc�ha9 ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/Purchasing Description of Bid 7045: Power Trail Fencing Keenland Drive to Trilby Road OPENING DATE: 3:00 P.M. (Our Clock) July 7, 2009 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. CHANGES/CLARIFICATIONS: Contractor will be responsible to mow tall grass in the areas that the fence will be constructed. 2. Bid Item #2 — Field Fabric Fence Bracing Section has increased in quantity from 9 to 18 due to stopping and starting the fence through the wetland area. (See BID SCHEDULE attached) 3. City will stake the alignment for the fence including where the fence will stop and start through the wetlands. 4. City will provide concrete testing for the Golf Barrier footings. 5. Contractor to provide overflow ditch crossing with 3 smooth strand wires for a span of approx. 20' in place of field fabric material. 6. City will allow contractor to install posts for field fabric fence using a post driver. 7. Contractor will have construction and concrete trucks access, south of #7 green at Southridge Golf Course, along dirt path for the construction of the Golf Barrier and field fabric trail fence. SPECIFICATIONS SECTION 02820 — GOLF BARRIER, PART 2: MATERIALS Replace 2.01 Poles, A. with Wood: Pressure treated southern pine, No. 2 grade or equal, shall meet or exceed the following requirements: Bending (Fb) — 850 psi, Shear (Fv) — 165 psi, Moe — 1, 200, 000 PSI. DRAWING S1.1 — STRUCTURAL NOTES & DETAILS Replace Structural Notes with Wood: Pressure treated southern pine, No. 2 grade or equal, shall meet or exceed the following requirements: Bending (Fb) — 850 psi, Shear (Fv) — 165 psi, Moe — 1, 200, 000 PSI. 2. Detail Drawing 5' FIELD FABRIC FENCE revised to exclude NON - CLIMB HORSE FABRIC to FIELD FABRIC FENCE and reduced post size from 5" to 4" post. (See attachments) 3. Detail Drawing 5' FIELD FABRIC FENCE BRACE SECTION revised to exclude NON -CLIMB HORSE FABRIC to FIELD FABRIC FENCE and added a note specifying 4" posts. (See attachments) ATTACHMENTS Please contact John D. Stephen, CPPO, LEED AP, Senior Buyer at (970) 221-6777 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. where renewal is a way of life 7045 Power Trail Fencing Keenland Drive to Trilby Road BID SCHEDULE (BASE BID) ADDENDUM1 Bid items are described in Section 01800 BID ITEM # DESCRIPTION 1 Field Fabric Fence with 48" Field Fabric 2 Field Fabric Fence Bracing Section 3 Golf Barrier Firm Name Signature Title Date Address Phone/Fax Email ESTIMATED QUANTITY UNIT 7,040 LF 18 EA 400 LF TOTAL IN WORDS UNIT ITEM PRICE TOTAL TOTAL BASE BID $ Section 00300 Page 3 5' 3' MIN. l 4" DIA. PRESSURE TREATED WOOD POST, ROUND UNDISTURBED EARTH COMPACTED SUBGRADE CONCRETE AGGREGATE BASE 48" HIGH, GALVANIZED, 2" x 4" TWISTED JOINTS (NOT WELDED) FIELD FABRIC FENCE, STAPLES: 1i" LONG, #9 GA. GALV. NOTE: ALL LUMBER TO BE CEDAR OR TREATED WOOD WITH PRODUCT APPROVED BY THE CITY I.E. ACQ. 3" MAX. 8'-0" V:4"DIA. PRESSURE TREATED D POST, ROUND 12'MIN. DIA, MORTISE W/2-20D SPIKES rl - I�I I � II I�II I , II1 �i 48' -- 1 3" MAX. L - UNDISTURBED EARTH 3' MIN. III III= COMPACTED SUBGRADE _ CONCRETE III 11= 1 = =11' 1=11I- AGGREGATE BASE 48" HIGH, GALVANIZED JOINTS (NOT WELDED) FENCE, STAPLES: 12" 2" x 4" TWISTED' FIELD FABRIC LONG, #9 GA. GALV. 2 STRANDS #9 GA. GALV. WIRE, TWISTED TIGHT. ALL WIRE ENDS SHALL GO AROUND POST, BE STAPLED TO THE POST, AND WRAP AROUND ITSELF A MIN. OF 2 TIMES. NOTE: ALL LUMBER TO BE CEDAR OR TREATED WOOD WITH PRODUCT APPROVED BY THE CITY I.E. ACQ. NOTE: MAXIMUM LENGTH OF FENCE WITHOUT A CORNER SECTION, END SECTION, GATE SECTION OR BRACE SECTION SHALL BE 1,000 FT.