A reserved block of time for Active Directory
consulting and integration services
Created for:
John Husted
Created by the Long View Team:
Eric Leftwich, Account Manager
Created:
August 17`", 2009
SOW Template Version. T&m
CONFIDENTIALITY AGREEMENT.
The contents of this document are private and for internal use and shall not be
disclosed to any person outside of Long View Systems or City of Ft Collins.
STATEMENT OF WORK
OVERVIEW
City of Fort Collins is looking to reserve a bulk of hours for consultative services involving
active directory expertise. These IT support services will be provided in compliance to the
defined project outline and billed against this reserved amount as completed.
Time used for this support can be provided on site as well as remote and will be billed on an
hourly basis at the appropriate rate.
OBJECTIVES AND SCOPE
Active Directory Project Augmentation
1) Augment areas of AD services as outlined in project plan defined by Nestor Ramirez
and the City of Ft Collins.
2) Provide additional technical support services in multi disciplines of IT management as
needed
3) Provide for Architectural discussion and professional design opinions as required
4) Bill only for time used
OUT OF SCOPE
Work that is not included in the Scope section is considered to be out of scope. Any out of
scope work must be verified and pre -authorized by City of Fort Collins prior to commencement
through the Change Request process. Out of scope work will be billed on a time and material
basis.
Out of Scope work includes the following
• Upgrades to any server or network component requiring engineering review and a written
SOW. Typically any work requiring more than 1 to 3 hours
• Implementation of net new applications
ASSUMPTIONS
The following assumptions have been made in order to proceed with this project in its current
state. Any deviation from these assumptions may add to the complexity of this project thus
adding work that is out of scope.
The assumptions for this project are:
• City of Fort Collins will provide the Software licenses required for all aspects of the project
in the assessment
• All necessary hardware for physical server and SAN storage functionality has been
acquired and is configured and ready for use at the beginning of the project.
• All necessary firmware updates have been applied to the systems
• Long View consultants will be granted access to all resources required to complete this
project (including physical and security access).
• City of Fort Collins employees are available and ready to assist in the project deployment
if required.
• City of Fort Collins has Executive commitment to undertake this project.
A reserved bulk of Active Directory consulting and intearation services hours
Page 1 1
STATEMENT OF WORK
• City of Fort Collins will communicate the implications of this project to any user who may
experience impact as a result of work performed by Long View Systems.
• City of Fort Collins will extend appropriate authority to Long View Systems to execute this
project as described in this document.
• City of Fort Collins will provide any necessary safety training to Long View consultants.
• Media, Licensing and documentation are available for the software in the scope of the
project.
• Unless otherwise stated, project hours are estimated to be contiguous.
• The project will take place within 65 miles of the Long View Denver office only. If travel to
any other office is required by City of Fort Collins, this will be considered out of scope and
charged accordingly (i.e. travel and time).
RISKS
Access to key project resources Low Hi h Low
g
Set regular meetings times and
within City of Fort Collins
use only if required
Scope changes
Low
i
Medium
Low
Delay implementation and
increase project costs
24 hour monitoring and
Hardware Failure Low
High High
emergency response through LVS
and hardware support contracts
can be purchased if desired.
Non -project related timing
Clearly define the availability of
delays:
internal City of Fort Collins
- Operational Requirements
Low
Medium
Low
resources and
communicate/define their roles in
- Vacation
- Training
the project. Assign secondary
- Sick
resources to assist should the
primary resource not be available
Have the project sponsor clearly
Availability of City of Fort Collins Medium Medium Low
state the responsibilities of IT
IT Operations Staff
personnel to the project for
I i
anolication testing.
A reserved bulk of Active Directory consultina and integration services hours
Page12
STATEMENT OF WORK
PRELIMINARY BUDGET AND EFFORT
The reserved amount of billable time will be no more than $9,975.00
Rates will be charged accordingly
Server Systems Administrator Senior Resource $175 / hr
This is equivalent to 57 hours of work
CONFIDENTIALITY AGREEMENT
All the information reviewed, gathered and the subsequent analyses are property of City of Fort Collins
and will not be used for any other purpose than that required for the completion of this project. Long
View Systems agrees not to reuse any of the data or analysis from this project without prior consent
from City of Fort Collins.
CONSULTANT NO -HIRE CLAUSE
City of Fort Collins agrees that former Long View employees or contractors shall not be allowed to work
indirectly or directly for City of Fort Collins until a period of six months after termination of this contract,
except where Long View has terminated the employment or contract of the individual. Without limiting
the generality of the foregoing, it shall include, but not be limited to, employment by City of Fort Collins,
employment by another party who contracts with City of Fort Collins, contracting, sub -contracting,
agency, partnership, or any other association - where City of Fort Collins or the party is contracting the
individual to City of Fort Collins in an IT role similar to the role previously contracted through Long View.
Should City of Fort Collins breach this covenant (which covenant shall survive the termination of the
Contract), City of Fort Collins shall pay to Long View as liquidated damages and not a penalty, an
amount equal to 50% of any fees or gross income earned by the individual during the six month period
following the termination of this contract, which amount shall be due and payable on demand.
Additionally, it is agreed that Long View may enforce this covenant by an injunction or otherwise.
REFERENCE AND SURVEY REQUESTS
Long View may ask City of Fort Collins to use this project as a reference. Long View creates practice
and project outline documents for prospective clients and is often requested to quote past project
experience in Request for Proposal (RFP) and Request for Information (RFI) inquiries responses. Also,
we are required to provide project information about completed projects in order for Long View to attain
and maintain certain manufacturer certifications. In some cases, clients are asked to complete a survey
on the success of a project. Manufacturer partners often follow up on these surveys to ensure accuracy
and customer satisfaction.
Long View will always request the use of the information when it is required and will not submit any
information on this project or City of Fort Collins without prior consent. By initialing here you are
indicating your agreement to allow Long View to contact you regarding use of this project as a reference
for any of the above noted reasons.
Initial Here:
Page 13
A reserved bulk of Active Directory consultina and intearation services hours
STATEMENT OF WORK
SIGNATURE AND ACCEPTANCE
The signatures below indicate that the undersigned have read and agreed to the contents of
this Statement of Work and have thus given approval to proceed with this project.
SOW Expiry and Timing
This Statement of Work is only valid if signatures of both parties are received within 10
business days of this documents creation date, unless otherwise noted and authorized below
by an authorized representative of Long View Systems. This SOW will no longer be valid as of
August 30"' 2009.
A Project Closure Report is used to document acceptance of the work being done under this
Statement of Work. City of Fort Collins shall indicate its acceptance of the service or
deliverable by signing the Project Closure Report within five business days from presentation
of the completed service or deliverable. Services and deliverables will be deemed accepted if
City of Fort Collins fails to respond within this five-day period.
This SOW will automatically expire if work under this agreement does not commence WthirY90 /
days of the SOW creation date. Projects not completing within 90 days of the estimated
completion date will require a change request. /f
Citv of Fort Collins
,/Signat e
S�
Name (Please Print)
Titl
i I .
Date
Long View
rajem0nt Signature
M, B,Anch Mgr, VP or P
Narrlel(Please Print)
Title
Date
A reserved bulk of Active Directory consultina and intearation services hours