Loading...
HomeMy WebLinkAboutCHANGE ORDER - PURCHASE ORDER - 9951377 (2)0 Planning, DwMs opment tar TI'anspo-a-opt ctt%iT _o Engineering 281 North College Avenue i P.O. Box 580 ti Fort Collins, CO 80522.0580 .r �970.221.6605 970.221.6378 -fax fcgov. com/engineedng Change Order Form PROJECT TITLE: W. Harmony Widening, Project PROJECT NUMBER: 400901707.6 (Bid #7004) CONTRACTOR: Coulson Excavating Co., Inc. (PO #9951377) CHANGE ORDER NUMBER: 9 n preparing cnange orders snow In order as separate numoerea paragraphs the Tollowing: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1&2. See attached sheet for detail. 3. The contract cost will increase by $18.639.57 4. There will be no change in contract time. ORIGINAL CONTRACT COST $2,158,301.45 TOTAL APPROVED CHANGE ORDERS $191.735.37 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $18,639.57 TOTAL % OF THIS CHANGE ORDER 0.86% TOTAL C.O. % OF -ORIGINAL CONTRACT 9.75% ADJUSTED CONTRACT COST $2,368,676.39 (Assuming all change orders approved) ACCEPTED BY: �O`�.eLt��. DATE: O (Contractor's Representative) REVIEWED BY: DATE: C% (Engi eer- i min ( r SUBMITTED BY: ' n -� 63 DATE: (Pr ject Manager - C it Projects) APPROVE BY- 4 DATE: //(Dtypartmerit Head - Engineering) APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File West Harmony Widening Project 0 -�- xn Coulson Excavating Item # Item Quantity Unit $ / Unit Total 1 JAsphalt Cost Adjustment 1 11 LS 1 $ 27, 04.971 $ 18,639.57 Harmony Widening Project Cost: 1 $ 18,639.57 TOTAL 1 See Attached CDOT Form Posted to Pay App #5 MONTHLY ASPHALT CEMENT COST ADJUSTMENT WORKSHEET Est Date: 108114109 Price index for the month In which bids were opened BP $/Ton $142.57 Price index for current month (EP, $Iron 1 $302.12 Quantities paid on current month estimate 403 - Hot Mix Asphalt Item Code Item Description % AC (PA) (decimal)** HMAISIVIA ons Placed this pay period AC Cost Adjustment 403-32821 Hot Mix Asphalt (Grading SG) (100) (PG 58-28) (6" Depth) 0.0440 2.779.31 $18,639.57 $0.00 $0.00 $0.00 $0.00 $0.00 Total Cost Adjustment for Pay Period $18,639.67 403 - Stone Matrix Asphalt Item Code Item Description AC (PA) (decimal)** Tons Placed this pay period (Q) AC Cost Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Cost Adjustment for Pay Period $0.00 411- Asphalt Cement Item Code Item Description ASphaltuement placed this pay period (Tons) (Q) AC Cost Adjustment $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Cost Adjustment for Pay Period $0.00 Total HMA Cost Adjustment (FA) for Estimate $18,639.57 Prepared by: Date: Reference # Instructions: Enter data in the yellow cells to calculate the Asphalt Cement cost adjustment This spreadsheet calculates adjustments for Asphalt Cement cost changes only Enter the estimate cutoff date and estimate number Enter the price index for the month in which bids were opened (BP). - Enter the price index for the month of the estimate cutoff date (EP). - Enter the item code, description and the quantity paid for each item on the current estimate that is included in the Asphalt Cement Cost Adjustment Project Special Provision . **(Follow instructions for "PA" in specification if RAP is used) This form automatically calculates the +/- 5% "trigger" shown in the specification. - If the total fuel cost adjustment is positive or negative, enter the amount shown as an asphalt cement cost adjustment pay item on the estimate (negative numbers are red and in parentheses). Use Plan Force Account 700-70019. Enter the Date Prepared and the Reference # (The reference number is determined by the Project Engineer to reference the report). Print this form, sign it, or save it electronically and include it in your project documentation. 0-0 FROM Qtk Planning, Developirnent Z. Transportation of Engineering t t W SO . %0041 28'1 North College Avenue ;u if Ib P.O. Box 580 For¢ ,. Fort Collins, CO 80522.0580 w• 970.221.6605 970.221.6378 - fax fcgov. com/engineering Change Order Form PROJECT TITLE: W. Harmony Widening, Project PROJECT NUMBER: 400901707.6 (Bid #7004) CONTRACTOR: Coulson Excavating Co., Inc. (PO #9951377) CHANGE ORDER NUMBER: 10 n preparing change oraers snow In oraer as separate numoerea paragrapns the rollowing 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1 &2. See attached sheet for detail. 3. The contract cost will increase by $11,220.25 4. There will be no change in contract time. ORIGINAL CONTRACT COST $2,158,301.45 TOTAL APPROVED CHANGE ORDERS $191,735.37 TOTAL PENDING CHANGE ORDERS $18,639.57 TOTAL THIS CHANGE ORDER $11,220.25 TOTAL % OF THIS CHANGE ORDER 0.52% TOTAL C.O. % OF ORIGINAL CONTRACT 10.27% ADJUSTED CONTRACT COST $2,379,896.64 (Assuming all change orders approved) �/7—l/0,9 ACCEPTED BY: r!.��t—/��L�C_— DATE: REVIEWED I SUBMITTED APPROVED APPROVED BY: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File TE: g �Q rE: V `?%� 01 DATE: � .4 ' >;a «�. � CH NG�.Q,RDER, 0 T �� 4 ,. •�a�"��„ x � ��' }� West Harmony Widening Project Coulson Excavating Item # Item Quantitv unit $ i unit Total Temporary asphalt sidewalk adjacent to 1 Safeway site 1 LS $ 7,422.00 $ 7,422.00 Additional cost for thickened edge 2 sidewalk 265 LF $ 7.85 $ 2,080.25 Reset manhole adjacent to FRCC to 3 match sidewalk elevation 1 LS $ 1,718.00 $ 1,718.00 Substantial completion contract time extension due to weather days moved from July 20th to August 15th. Final 41 completion August 29th. 26 Days $ - $ - Harmony Widening Project Cost: $ 11,220.25 TOTAL 1 A temporary sidewalk adjacent to the future Safeway site was added to the project since the Safeway project has not yet been formally submitted for development review. 2 No line item was provided on the bid tab for a thickened edge sidewalk constructed near the NE corner of Harmony and Shields 3 M.H. built per plan did not match new sidewalk elevation. M.H. needed to be adjusted to match sidewalk grade later. 4 Request by Coulson to formally extend substantial completion date to August 15 due to bad weather. Laar. 2 3 3 «« 374 y j/p ^ �y,,.R.«r� �°�'...S: R<SV •. FII o- E 53: u+fx P69.m».-..:A.. R.�.. 9,.3'•` � Posted to Pay App #5