Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESPONSE - BID - 7034 COTTONWOOD GLEN OVERFLOW PARKING LOT LANDSCAPE & IRRIGATION
BID # 7034 Cottonwood Glen Overflow Parking Lot Landscape and Irrigation WE HEREBY ENTER OUR BID FOR THE CITY OF FORT COLLINS' REQUIREMENTS FOR CONSTRUCTION OF COTTONWOOD GLEN OVERFLOW PARKING LOT LANDSCAPE AND IRRIGATION LOCATED AT 3074 SOUTH OVERLAND TRAIL, FORT COLLINS, CO. PER THE BID INVITATION AND ANY REFERENCED SPECIFICATIONS AND DRAWINGS: Project must be substantially completed within 30 working days and final completion in 10 days after substantial. Ccntractor must enter into the attached Service Agreement and name the City of Fort Collins as an additional insured per Exhibit "B". BID SCHEDULE 1. Bid Form Abbreviation Legend a. LS = Lump Sum b. EA = Each c. LF = Linear Foot d. SF = Square Foot e. SY = Square Yard f. CY = Cubic Yard SCHEDULE 1 Provide materials and labor associated with installation, maintenance, start-up and Owner training, as indicated on the drawings and in the Specifications, for each of the following bid items. Owner is responsible for payment of Building Permit application fees. Bid Item #1 Mobilization To include all materials complete, in place (such as but not limited to the following: Mobilization), as indicated on the Drawings, and in the Specifications. Lump Sum Price $ In Writing irtc �� ���..� 04c_ Bid Item #2 Landscape To include all materials complete, in place (such as but not limited to the following: Sod, Shrubs, Perennials, and Seed), as indicated on the Drawings, and in the Specifications. Lump Sum Price $ ZE:,, 4,2a In Writing; SA rev07/08 1 Bid Item #3 Irrigation To include all materials complete, in place (such as but not limited to the following: Irrigation System) as indicated on the Drawings, and in the Specifications. Lump Sum Price $ =->A 1-I In Writing' -1.sc--y Mo"sAAA TOTAL BASE BID ITEMS 1 THROUGH 3 Base Bid $5A4-0 l In Writing W'VA-Y FIRM NAME `�` o\ �lcXs scram Nu�sr�t•l ��t-� Ar ou Corporation, �P�arrtnershii BA, r PC SIGNATURE 411r ADDRESS (o t Zi--avc'wlo�-l�f PHONE/FAX#moo./`�3�' E-MAIL-�� `\ e ADDITIONS/DELETIONS Add or subtract the following amounts for the items listed below. Alternate Bid Item #1. Replace seed with sod To include all materials complete, in place, as indicated on the Drawings, and in the Specifications. Lump Sum Price $_ ti, '5_ (add) In Writing L�Dvle--�-1�ous�v��i��`��°� UNIT PRICES For additions and deletions to the Contract, the following unit prices shall be applicable for the specific items listed. Unit Prices shall be complete, in place including required labor, materials, permits, equipment, implements, testing,parts and supplies necessary for, and incidental to proper installation, as indicated on the Drawings, and in the Specifications. SA rev07/08 1. The Contractor agrees that for requested andbr required changes in the scope of work, the Contract Sum shall be adjusted in accordance with the following unit prices, where the Owner elects to use this method of determining costs. 2. The Contractor is advised that the unit prices will enter into the determination of the successful bidder. Unreasonable prices may result in rejection of the entire bid proposal. 3. Unit prices for irrigation shall include pipe, fittings, valves, concrete thrust block and stablizers, and other items shown on the Drawings, as described in the Specifications or recommended by the manufacturer as part of the installation. EARTHWORK AND UTILITIES ITEM UNIT PRICE Topsoil Stripping and Stockpilingx5aw,__'__ �,,�„�k ar�1$ g.CY Topsoil Spreading and PlacementAysii v,5, $ «"" CY Erosion Control Fabric - NAG C350 x $ cam.—( C� SF Erosion Control Fabric - NAG 120-1����`��'`� "�' SF Erosion Control - Silt Fence $ 1. C�v LF Erosion Control - Bales Erosion Contol - Gutter Wattle' Erosion Control - Inlet Wattle Erosion Control - Ditch Wattle IRRIGATION $ 2 �� EA $ mod. ®' EA $ EA $ ��� EA- ITEM UNIT PRICE Pop -Up Spray Sprinkler with nozzle - MP Rotator $ 5, 2- i EA Drip Irrigation - per Shrub, Perennial or Grass in planting bed $ EA Sleeve Pipe - 2" $ o-S LF Remote Control Valve Assembly for Sprinkler Laterals - 1.5" $ Z23 'l`l EA Remote Control Valve Assembly for Drip Laterals - 1". $ 2�-a�d� EA Flush Cap Assembly Drip Pipe - 3/4" Lateral Pipe - 1" Lateral Pipe - 1.25" Lateral Pipe - 1.5' SA rev07/08 1 $ EA $ �• 'Z- LF LF $ b'3 LF $ l0`l3 LF LANDSCAPE ITEM Finish Grading Organic Amendment — Class 2 Fescue Sod Fescue Grass Seed Deciduous Shrub - #5 container Perennial - #1 container Ornamental Grass - #5 container Ornamental Grass - #1 container Weed Barrier Organic Mulch SA rev07/08 1 UNIT PRICE $ Z) . ozs SF $ o • �"-1 81 CY $ ©•:3b15 SF $ , C>n 1 SF $ o EA $ -1_ b`� EA $ 32 , i v EA $ 10 - `� EA $ d- 21 SF $ d- SC1 SF