Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1043 HALLIGAN RESERVOIR ENLARGEMENT PROJECTEXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND MWH DATED: May 1, 2009 Work Order Number: M-WRF-2009-6 Purchase Order Number: Project Title: 2009 DWRF Replacement Projects Commencement Date: May 15, 2009 Completion Date: December 31, 2009 Maximum Fee: (time and reimbursable direct costs): $196,125 Project Description: To provide engineering services for 2009 DWRF Replacement Projects consisting of Boiler/Heat Exchanger Replacement, UV conceptual design, and Digester Gas Conditioning System conceptual design. Additionally, input will be provided on the DW RF 2009 Risk Management Plan Update and an investigation of the implications of CDPHE's Regulation 38 will be included in the 2009 Wastewater Treatment Master Plan Update. Scope of Services: See attached Exhibit 'B" Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. The attached Exhibit "B" consisting of five (5) pages, plus figures and tables, is hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given. cc: Purchasing Professional MWH Americas, Inc. Vice President, Program Director Date: May 11, 2009 City of Fort Collins Subm�d Link Mueller, Projec Manager Date: r a Reviewed By: Kevin esources & Mngr Bri noni#, Utilities Executive Director Da e: s�71 A prove By: Ja e'NeiII,A' Purchasing &Risk Mgt Da EXHIBIT "B" WORK ORDER NO. M-WRF-2009-6 2009 DWRF REPLACEMENT PROJECTS SCOPE OF SERVICES CONTRACT DETAILS Commencement Date: May 15, 2009 Project Completion Date: December 31, 2009 Maximum Fee: (time and reimbursable direct cost): $196,125 • See Table B-1: Rate Schedule • See Table B-2: Fee Estimate PURPOSE The purpose of the 2009 DWRF Replacement Projects is to complete the following work for Fort Collins Utilities (FCU): • Task 1 - DWRF Digester Building- Boiler/Heat Exchanger • Task 2 - DWRF Risk Management Plan — 2009 Update • Task 3 - DWRF UV — Conceptual Design • Task 4 - DWRF Digester Gas Conditioning - Basis of Design • Task 5 - DWRF Regulation 38 — Add chapter in 2009 Master Plan Update • Task 6 - Project Administration and Meetings TASK 1 — DWRF DIGESTER BUILDING- BOILER/HEAT EXCHANGER Objectives A. The objective of this project is to replace the two existing Smith Boilers in the Drake Water Reclamation Facility (DWRF) Digester Building with a new Cleaver Brooks boiler that will be similar to the existing Cleaver Brooks boiler. This project was started under the existing Polymer Feed/Septage Work Order No. M-WRF-2007-15 with the understanding that a new work order would be used to finish the work, if needed. Additional scope was recently added to determine if a new building heat exchanger should be purchased or if the existing building heat exchanger should be refurbished. The work associated with this additional scope is listed below. Activities A. Complete tasks started under the Polymer/Septage Project contract associated with the Boiler Replacement Project MWH Page 1 of 5 5/1/09 C. FCU will maintain sole responsibility for the content of the 2009 RMP and its implementation. Deliverables A. Documentation from the Hazard Review session will be distributed via ProjectWise in both draft form, for comment, and then in final form with comments incorporated. TASK 3 — DWRF UV — CONCEPTUAL DESIGN Objectives A. Provide conceptual design information that will allow FCU's selected contractor and cost estimator, Hydro Construction, to produce a construction cost estimate for replacing the existing chlorine disinfection system with a new Ultraviolet (UV) disinfection system at DWRF. A design cost estimate will also be provided to allow FCU to identify all budget requirements for this future project. Activities A. Provide a conceptual flow diagram and preliminary hydraulic calculations. B. Prepare a DRAFT yard piping demolition/modifications drawing showing the necessary changes needed for the new system. C. Provide conceptual UV design information for sizing of the UV equipment. D. Identify potential grant money for new UV system from Homeland Security grant programs. Assumptions A. Hydro Construction to provide the construction cost estimate for the new DWRF UV system. B. The information to be supplied under this task should not be considered as Preliminary Design documentation. MWH to only provide enough information for Hydro Construction to prepare a cost estimate. C. WEDECO is the manufacturer of choice for DWRF in order to create the estimate and match FCU's UV system at the Mulberry Water Reclamation Facility (MWRF). Deliverables A. Conceptual DWRF UV system package provided to Hydro Construction for creation of a construction cost estimate. TASK 4 — DWRF DIGESTER GAS CONDITIONING - BASIS OF DESIGN Objectives A. Produce a digester gas conditioning design package that will allow Hydro Construction to produce a cost estimate for installing a digester gas conditioning system at DWRF. Activities A. Coordinate with Xcel Energy to determine gas quality and other requirements for selling conditioned biogas back to Xcel Energy. MWH Page 3 of 5 5/1/09 TASK 5 - CDPHE REGULATION 38 — ADD DISCUSSION IN 2009 MASTER PLAN UPDATE Objectives A. Determine improvements that may be required at MWRF and DWRF if Regulation 38, currently being considered by the Colorado Department of Public Health and Environment (CDPHE), is implemented. Activities A. Research Regulation 38 and identify improvements that may be required at MWRF and DWRF if this regulation is implemented. Assumptions A. None Deliverables A. Add sub -sections under the MWRF and DWRF sections of the 2009 Master Plan Update discussing improvements that may be required if Regulation 38 is implemented. TASK 6 — PROJECT ADMINISTRATION AND MEETINGS Objectives A. Daily oversight of progress, budget, schedule, and quality; provide coordination and communication with project team members - MWH, Carollo, Hydro Construction, and Fort Collins Utilities. Activities A. General Management and Coordination — Manage financials, schedule, design team, and subconsultants. B. Develop and maintain the following project control documents and systems: • Project Financial Status Monitoring • Invoicing C. Coordination of internal Quality Control Reviews with MWH technical experts D. Attend project team meetings, provide meeting agendas, and meeting minutes Assumptions A. Meeting time assumed to be four hours of the regularly scheduled WRF Project Meetings through December, 2009 (two meetings per month for a total of sixteen meetings). B. Meeting days will be concurrent with WRF Project Meetings, so travel times will be split with other Work Orders. Deliverables A. Meeting Agendas and Minutes B. Monthly Invoices MWH Page 5 of 5 5/1/09 TABLE B-1 WORK ORDER NO. M-WRF-2009-6 2009 DWRF REPLACEMENT PROJECTS MWH RATE SCHEDULE Personnel Classification Hourly Rate ($/hr) Principal Professional $195 Supervising Professional $155 Senior Professional $135 Professional $105 Associate Professional $85 Supervising Designer $130 Senior Designer $100 Designer $90 Senior Administrator $90 Administrative Assistant $80 Receptionist $60 Rates for Other Direct Charoes Other Direct Charges Associated Project Costs $9.50/labor hour Mileage Current Federal Rate CAD Computer Usage $18.00/hour ODC Markup 15% MWH May 1, 2009 d Xa E F F y o ay (�xc�,ii oo a� oo ma= ncp N R s q 5Yr pS aR ya o aA3� 48'^- .Tq pX3.$= SC gm„ "R_ 2Q1,yam s �+ a 28 3 '� e s,z m 0 3 ;'E&3RA 3RR iRRS 2.P sags.. aEs"a� R 3F 'j 4n vx �iPv Of R -oao a� cRj �R '? 'a 5 38N R�,s 8s O a s o e°$ 3 _ Q S 3 mR & gsmmm so°ees t :g5 55te85 e5m5g gets 3N° a o m R 25558 1555555 Muss mN mm Yd `g5� oy.. gm 8m5mmm 888 eggs 'g %n e55 a'o y� ppgt�Ci g%i go $oe000 'i^ m_m get�o e`$oiia o'$ 3 9 yra m oR x Is— m aoM tts 5 o5555e800 :gt55 o5es5 85 mm a 5S^ R. $:0.-To t 5518esss o555e ott55 ages 3n= m& e- a '5 st55 g 5eo5ge a e55gs e55s5 gets 34yn of a g ':$m02m2;8- 'smmve lwii g _ m �gx m g ce m xi� gg In x man gs R 8 n g S p g 4 E g £ E E C F S o gR 81 � e As �f O Aug ia191 A aq 3.3 3�� 65 .UP in e e M1 G 3Ea 8 a'�-".d� � e91bi VR an oq sa V m D $5u'l �3 C� e d8' 3°3 " a sit _ � e a 3 s nv m aU i g so ISO Asno �SSO :sTnE n %S omnME So'd �SSo -SEES I 1911$ 3No 25818 g 8 -88888543E MITI come come 1 8 v 81 Syr. S a $. 888 SEogoS s 80 =EEBS oESES g ,e y a'$eM m �8� �:EEEBS SEEESSS §808 55TV MISS o �� mm �8A % %8800 8888n8 ,nE SEES EEEES off. a5u � 8n55E 8 g8Sw2v2v8 ons -8858 kSE88 gy e& 8 $m'nmSEam 8ms8S aSmmm loans 's m n � mU �e�UP nv s�aa; x m sMt E82TI I -- oUs; s a ,som 1 F F X..Fa F OEo.'f a ,o F C o E D E '3R 0 t 9 e ! 8ES sm au �P