HomeMy WebLinkAboutPrebid - BID - 7020 DRAKE ROAD WIDENING PROJECT (2)DRAKE ROAD WIDENING PROJECT
PRE -BID CONFERENCE
March 10, 2009
10:00 A.M.
215 N. Mason Street
Training Room
City of Fort Collins
Engineering Dept.
Capital Projects
INTRODUCTIONS
Capital Projects Team
• Rick Richter
— Capital Projects Manager
• Kyle Lambrecht/Tim Kemp
— Project Engineer, 221-6605
• Craig Farver
— Senior Construction Inspector, 222-0854
INTRODUCTIONS
Additional Contacts
• John Stephen
- Purchasing Agent, 221.6M
• Helen Mgchelbrink
— City Engineer, 221-6605
• D.A Black
— Environmental Specialist, 224-6063
• Syl Wales ,
— Traffic Eng. Tech, 221-6815
i
HIGHLIGHTS FROM SPECIFICATIONS
203-03 Muck Excavation
203-04 Borrow
HIGHLIGHTS FROM SPECIFICATIONS
203-05 Topsoil (Stripping, Stockpiling, Replacing) 6" Depth
HIGHLIGHTS FROM SPECIFICATIONS
203-06 Imported Screened Topsoil— (Parkways) 6' Depth
10
HIGHLIGHTS FROM SPECIFICATIONS
208-01 Erosion Control
— Contractor will be responsible to obtain Storm Water
Management Plan (SW MP) permit
• Submit to Colorado Department of Public Health and
Environment (CDPHE) .
— Cost of permit included in 208-01
Current copy of approved permit kept on site
HIGHLIGHTS FROM SPECIFICATIONS
210-01 Remove and Relocate Mailboxes
HIGHLIGHTS FROM SPECIFICATIONS
210-02 Relocate Landscaping Boulders
11
HIGHLIGHTS FROM SPECIFICATIONS
210-03 Remove and Relocate Gate
HIGHLIGHTS FROM SPECIFICATIONS
210-04 Remove and Relocate Water Meter & Curb Stop (COFC & FCLWD)
HIGHLIGHTS FROM SPECIFICATIONS
210-05 Adjust Water Valve Box
12
HIGHLIGHTS FROM SPECIFICATIONS
304-01 Aggregate Base Course — 9"
HIGHLIGHTS FROM SPECIFICATIONS
403-01 Hot Bituminous Pavement
Grading SG — 4" Depth
403-02 Hot Bituminous Pavement
Grading SG — 4" Depth (Driveways)
13
HIGHLIGHTS FROM SPECIFICATIONS
603-01 18" RCP Class III
603-02 18" RCP FES Class III
603-03 12" SDR-35 Pipe (Irrigation Line)
HIGHLIGHTS FROM SPECIFICATIONS
604-01 2'X10' Metal Sidewalk Chase
604-02 4' Diameter Manhole
604-03 Concrete Headwall Per Detail
604-04 Concrete Collar
HIGHLIGHTS FROM SPECIFICATIONS
607-01 3-Wire Fence
607-02 3-Rail Wood Dowel Fence
607-03 Install 12' Metal Gate @ Irrigation Access
Road
14
HIGHLIGHTS FROM SPECIFICATIONS
608-01 Concrete Sidewalk — (6")
608-02 Concrete Drive Approach — (8")
608-03 Concrete Trickle Pan 2' wide w/6" Curbs
HIGHLIGHTS FROM SPECIFICATIONS
609-01 Vertical Curb and Gutter — (30")
609-02 Driveway Curb Cuts
HIGHLIGHTS FROM SPECIFICATIONS
2900-01 Dryland Seeding
2900-02 8'X8' landscape Timbers
2900-03 Relocate Irrigation Pipe and Spigot @ Kefts Property
2900-04 Rocky Mountain Junipers (15 gal)
2900-05 2' Ornamental Trees
15
Thanks For Attending!
• Any Questions or concerns can be addressed to:
— John Stephen
• Office: (970Y221-6777
• Email: jsteohen@fcgov.com
— Kyle Lambrecht
•-Office:(970)221-6605
• Email: klambrecht@fcgov.com
— Craig Farver
• Cell: (970) 222-0854
• Email: cfarver(a7fcgov.com
16
INTRODUCTIONS
• Design Engineers
— City of Fort Collins
• Mark Laken -Civil Eng. I
• kyle Lambrecht-Civil Eng. I
now€ s k
ATTENDANCE
Please be sure to reaister
• BID OPINING
When: March 25, 2009
3:00 P.M.
Where: 215 North Mason
Street (2"d Floor)
IMPORTANT MILESTONES
AWARD CONTRACT
Appro—atNy April 0, 2000 _
PRE -CONSTRUCTION MEETING
— Mendetorymeerinq prior to starting of construction
— Data to be determir W after contract is awarded
• CONSTRUCTION START DATE
— App..dm.taty Apra 1 J. 2000
• SUBTANTIAL COMPLETION
— 00 Calendar Day. from Conmction Start Data
• FINAL COMPLETION
— Maximum allotted time is 10 w *ft days following completion
2
SUMMARY OF WORK
Improvements shall include:
• Reconstructing and Widening Two Sections of West Drake
Road (south side of street)
— West Section from Sta. 6+00 to Sta. 10+79
— Fast Section from Sta.17+76 to Sta. 25+15
• Gearing and Grubbing
• Removals of existing improvements
• Addition of vertical curb and gutter
• Addition of sidewalk
• Addition of Sidewalk chase
• Resetting existing water meters (COFC & FCLWD)
• Paving new asphalt pavement
PROJECT COORDINATION
• Pavement Management Work
— Concrete Rehab
• Potentially occurring at the same time
• Traffic Control Coordination
— Hot -In -Place Recycling
• This project's improvements will need to be
completed prior to this work
CONSTRUCTION DOCUMENTS
• Drake Road Widening Project
— Bid No. 7020
— Project Specifications
— Planet
• Designed by: City of Fort Collins
• Sheet Vs 1-14
3
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REG'S
• Calendar Days
. - hlumhh Anticµow C.L-W Wye Leas Ad— R'-0-foediid6.
JAN . F6 mi APR. . am JUN Jlil. AUG sFY . a('f Nc), . r&c.
f%J W .let. . (1) . lei .r31. tli (:l. (3) . tk/ r31 .lei
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REG'S
• SUPERINTENDENTS:
— The General Contractor SHALL emDby a tu0 time Sups' tenaent whose §9b
reaponsbxty b to monibr an coordbate aA facets of lM Work.
• LIQUIDATED DAMAGES:
— Substantial Ccmpi d-:
Ths eantrecbrwN he given EO -lender dayyss b substantially—Vts dle
poject Subetanttal compbtnn eheA be defned as the compbtion opfuall
ramaata Wewa6~, spiitl pewmenntundm kd in and n�othar�'
Y Da fnanl
En.
as rap - i for Ihb project M dra Contractor goes .at
the d0 -0.00)
days, d Isnp a the amount of Four Hundred and Thity DoAen (i430.00) for
each -lender day vAI be assessed.
• FINAL ACCEPTANCE: p
-bndaair d y wi11 hsad�le pad N of
Auk M eed Dol (SB00.00) Der
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S
• WARRANTY:
— The Contractor will be required to warranty their work for 2
years after date of final acceptance.
• CONSTRUCTION HOURS:
— The operation of all machinery and vehicles must take place
between the hours of 7:00 A.M thru 7:00 P.M.
• Traffic Control on Drake — 8:30 A.M. to 3:30 A.M.
— Verify with City during development of plan
— The Contractor may request extended hours
• The request must be approved by the City of Fort
Collins 3 days prior to any work
— Weekends or Holidays
4
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S
• CONSTRUCTION SURVEYING
— Provided by. City of Fort Collins
• 48 hour survey request
• TRAFFIC CONTROL
— Provided by the City of Fort Collins
• Approved traffic control plans prior to construction
• Arterial Work: 8:30 to 3:30
• GEOTECHNICAL AND MATERIAL TESTING
— Provided by the Owner. It will be the Contractor's'
HIGHLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S
• PROJECT MEETINGS
— Once a week on site, time to be determined
• PROGRESS AND SCHEDULE REVISIONS
— Schedules shall be updated weekly. The Contractor may be
required to submit additional schedules depending on the
progress of the project
• HAUL ROUTES
— Arterial and Collector streets only. Contractor will not be
allowed to use residential streets to access the site with
trucks hauling material.
HIGHLLIGHTS FROM GENERAL
CONDITIONS AND GENERAL REQ'S
• SITE CLEAN-UP
— The construction work and progress shall be kept and
accomplished in a neat dean and orderly fashion
— Gty can have streets swept and bill to Contractor
5
TRAFFIC CONTROL AND WORK AREA SAFETY
• TRAFFIC CONTROL
— The traffic control for this project will be supplied by the City
and will include all costs for the traffic control associated
with this project
• Anticipate coordination
• Approved traffic control plans prior to starting
• Arterial Road — 8:30 to 3:30
TRAFFIC CONTROL AND WORK AREA SAFETY
• WORK AREA SAFETY
— The Contractor shall coordinate with the City all work area
safety control devises, such as barricades and safety fence
around all excavations, trenches and drop-offs.
i
HIGHLIGHTS FROM SPECIFICATIONS
202-02 Remove Asphalt Drive
HIGHLIGHTS FROM SPECIFICATIONS
202-03 Remove Gravel Drive
HIGHLIGHTS FROM SPECIFICATIONS
202-04 Remove Full Depth Asphalt Pavement to Subgrade
7
HIGHLIGHTS FROM SPECIFICATIONS
202-06 Remove 12" RCP
HIGHLIGHTS FROM SPECIFICATIONS
202-07 Remove Type III Barricades
i
HIGHLIGHTS FROM SPECIFICATIONS
202-08 Remove Vertical Curb and Gutter
HIGHLIGHTS FROM SPECIFICATIONS
203-01unclassMed Excavation