Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1124 CIVIL ENGINEERING ANNUALEXIIII31T "A„ WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and Interwest Collsuiting Group DATED: April 20, 2009 Worl( Order Number: 2.902210-09 Project Title: StreelOversizing,College/wilioxRoadway lmprovements—PolholingCoordination Couuneucemelt Date: April 20, 2009 Completion Date: May 29, 2609 Maximum Fee: (time and reimbursable direct costs): not to exceed 25,260.00 Project Description; Please see attached: Scope of Services: Please see attached Service Provider agrees to perform the services identified above and on the attached forms in. accordance with the terms and conditions contained bereiir and in' the Services Agreement betivcuu tite Parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work ot'de• (incinding fire attached forms), the ServicesAgreeinent shall control. Date:__Apri120.200$ Approved By; Purchasing Agent over %60,000 The attached forms consisting of two (2) pages are hereby accepted and iac61porated herein by this I eference, and p'etice to PCOCee(IIS hereby given. :uCity:ori120IlyteAp09 Willox and College Pothole Coordination Project Description and Scope of Setti•ices Interwest Consalting'Croup Description: fntMvest.has been the design engineer for the prelfmfn:u'y design of the Collegc and Willox Intersection. The City is currently processing a request to sole source the remaining design to hnerwest. In the interest of time; it is necessary to stall the pothole operation and the coordination and recordkeeping necessary to get as much existing utility information as possible. Additionally, design niodif cations have been proceeding to keep communication lines open with the property owners adjacent to the project. Scope of Services Pothole Coor(iination — the biterwest ]'Cain will Coordinate the pothole operation, and work with the pothole contractor and the City Traffic department to get the potholes in the streets. The preliminary design of the curb will be staked as a part of this operation. Trtitnrrtedtee: S6,600 Pothole Recording. — the Team will record information related to the potholes including siuroeying in the locations and reduoiog, photographing and creatinga log of the infomation, and meetings with the utility companies to clarify the existing configuration ofutilitics. L'sdnrafedFec: $10,980 Plans, Exhibits and Meetings with Adjacent owners— the team will. continue to keep the Project moving as it relates to the adjacent property, owner coordination. 154inrafed f'ee: S7.480 Ref nbursables— for prints, mileage, and deliveries, etc.. L•.mMafed Fec: $200