HomeMy WebLinkAboutWORK ORDER - RFP - P1018 CONSULTING ENGINEERING SERVICES FOR HARMONY RD IMPROVEMENTS SENECA ST TO COLLEGE AVE (4).---._.._._............_-- ................._ . .-._.-----.-------._..-.--.__._......... .._.......... .--- ......._.._............._.-..._._.............. _ _......_.._..........-.... _...__................
__.._........�
(4/28J2049) Craig Kisling - Microsoft Word - 24 Stanton Trail Work Order, pdf
Page 2._..................._._..._._..... ..........._.--- ._......_...._......._............. -_-.___- ...... ----..._._......_.,.__._...............-..... .._...... .,:._........:_._....__....._..,.._......__........._............... _..... ................__................
.._..._.._.........._I
1-14
EXHIBIT'A'
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
INTERWEST CONSULTING GROUP
DATED: July 15, 2008
Work Order Number.
Purchase Order Number:
Project Title; Stanton creek Trait
Commencement Date: 4-22•09
Completion Date: 10-1.09
Maximum Fee: (time and reimbursable direct costs): S.400
Project Description: _ ScoAndc d 4
Scope of Services: See Description
Acceptance
Professional agrees to perform the services
identified above and on the attached forms in
accordance with the terms and .conditions
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity In the
terms of the Professional Services Agreement
and this work order (including the attached
forms) the Professional Services Agreement
shall control. -
Protesa at
BY:
9
The attached forms consisting oft- (j pages
are hereby.accepted and incorporated herein, by
this reference, and Notice to Proceed Is hereby
given.
City of Fort Coffins.
By:
James B.O'Neitl II, CPPO; FNIGP
Director of Purchasing and Risk Management
(over $30,000.W)
Date:
_.__._....__.._........__...._—._—'--'.M.:............................... .... .._..__...__._._............ ..... ...._.,......_......__......._._�_...._...._..........,.....:....._......_..._..-_...__...._.__.._�..____...._............. ._....................
..,._..........__.........--t
(4/28/2009) Craig Kisling - Microsoft Word - 24 Stanton Trail Work Order.pdf Page 1
Stanton CreekTrall
Project Description and Scope of Services
Interwest Consulting Group
Description•
Interwest and King Surveyors will provide engineering and surveying services necessary to create construction
plans for approximately 3;000 linear feet of recreation trail from Carpenter Road to Stanton Creek Subdivision
One pedestrian crossing (bridge) over Stanton Creek will be required
_Scope of Services
Surveying - Topographic survey - King Surveyors will provide topographic survey along the proposed trail
alignment. The survey will be 30' either side of the centerline of the proposed trail. King will also set pin flags
(bluetops) every 50' along the alignment
Estimated Fee: $2,700
Surveying - legal Descriptions - King Surveyors will provide 3legal descriptions required for the project.
Estimated Fee: $1,500
Surveying - Construction Staking - King Surveyors will stake the trail for the contractor at 25' intervals in 2
trips to the site.
Estimated Fee. $3,200
Surveying - Form Check - King Surveyors will survey the farms for the trail in 3 trips to the site and will alert
the City of any deviation from the design.
Estimated Fee: $2,000
Surveying - As Built - King Surveyors will survey the completed trail and provide as built drawings of the trail
after construction is completed
Estimated Fee: $1,900
Trail plan, profile and grading - Interwest will prepare plan, profile, grading cross section, and detail drawings
for the 3,000' trail in a form similar to other trail projects recently completed for Park Planning.
Estimated Fee. $7,500
Bridge plan and profile - Interwest will prepare a plan and profile sheet,forthe bridge crossing.
Estimated Fee: $1,000
Floodplaln process assistance - Interwest will assist the City with the ftoodplain documentation necessary to
construct the project.
Estimated Fee: $2,000
SWMP - Interwest will prepare an erosion control plan and a stormwater management plan for the initial
application to the State for the project.
Estimated Fee. $1,200
Reimbursabies-for prints, mileage, and deliveries; etc..
Estimated Fee: $400
Assumptions - Structural engineering provided by others. Specifications, quantities, and contract documents
provided by others. Environmental and geotech provided by others. No CA or CM work is included