Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1018 CONSULTING ENGINEERING SERVICES FOR HARMONY RD IMPROVEMENTS SENECA ST TO COLLEGE AVE (3)EXIM11T.."A" FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and INTERWEST CONSULTING GROUP -DATED: April 2,2009: Work Order Number: 400903208-09-02A 'Project Title: Mason Corridor BRT Project Commencement Date: F6bruary 11, 2009 Completion Date: May 31, 2009 M[aidrumn Fee: (time and reimbursable direct costs): Not to exceed $5,000.00 Project Description: Traffic control for utilities potholing Scope of Services: 'Per worker order 400903208-09-02. Additional traffic control needed for utilities potholing. Service Provider agrees to perform the services The attached forms consisting of thrlav-0) pages are Identified above'and on the attached. forms in hereby accepted and incorporated herein by this accordance oin rdance with the and conditions contained reference, and Notice to Proceed.is hereby given. herein andin the Services Agreement between the. parties. In the event of a conflict between o , r ambiguity in the terms of the Services Agreement. and this work order (including the attached forms), the Services Agreement shall control. Service Provider City of Fo Hin7si By: By15 B, Date; lD Date: Approved By: Purchasing I Agent over $60,000 Mason Corridor Surveying Project Description and Scope of Services Interwest Consulting Group Description: King Surveyors will locate and dip storm sewer junctions and sanitary manholes along the corridor. They will also provide additional topographic survey of areas identified by the City. Scone of Services Storm Sewer / Sanitary Sewer Invert Survey King will obtain the inverts of approximately 190 inlets/storm sewer manholes/sanitary sewer manholes. It is estimated that this will require 50 hours of crew time, 16 hours of Cad Tech I time and 8 hours of Project Manager time'. Estimated Fee: $9, 000 Additional Topographic Survey and Reduction King will provide topographic survey with one -foot contours of 12 red -boxed areas shown.on the sketch provided by the City. It is estimated that this will require 80 hours- of crew time, 48 hours of Cad Tech I time and 4 hours of Project Manager time. Estimated Fee: $1 S, 000 The information will be provided in AutoCAD drawings that can then be inserted into the overall base maps for the project. .