ADDENDUM No. 1
SPECIFICATIONS AND CONTRACT DOCUMENTS
Description of Bid: 6128 Riparian Fence at Soapstone
OPENING DATE: 3:00 P.M. (Our Clock) December 12, 2008
To all prospective bidders under the specifications and contract documents described
above, the following changes are hereby made.
CHANGE:
REVISIONS:
Clarification on energizer: Energizer should have a minimum output of 5 Joules (on
the fence, not stored energy). Battery should be a Group 27 deep cycle battery.
Solar panel should be a minimum 40 Watts. Panel must have voltage regulation
consistent with battery requirements. Solar panel should be set on a post in a frame
and set at least 6 feet above ground level. Wire connecting solar panel to battery
must be protected. Energizer should be located internal to fence; energizer and solar
panel locations must be approved by City prior to placement.
Grounding rods: Lightning arrest location/ grounding rods should be placed at
energizer and in 4 additional locations along the fence at stream access points (2 on
east side, 2 on west side of fence)
Wood posts must be ACQ pressure treated. The City will not allow CCA pressure
treated wood posts. In areas of high water table, contractor may be required to
substitute untreated hardwood posts (redwood, cedar) approved by City.
Change tensile strength of wire to 200,000 psi minimum
Revised Bid Schedule attached
Please contact at (970) with any questions regarding this addendum.
RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN
STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM
HAS BEEN RECEIVED.
Bid Schedule
Addendum 1
Contractor to furnish all labor, materials, equipment, supervision and incidentals necessary to
complete the work per attached specifications. Brace and corner assemblies and gates are
complete per specifications. Riparian fence will include all line post and all other materials
including electrical energizers for a complete turnkey project. Contract will be awarded on Grand
Total.
Riparian fence $_______per linear ft X 20,000 ft = $______________________total
H Braces complete $___________ each X 15 = $______________________total
12 foot gate complete $___________each X 2 = $______________________each
16 foot gate complete $___________each X 2 = $______________________each
GRAND TOTAL $________________________
Corner and End/ Gate Post complete $______________________each
Untreated hardwood posts (redwood, cedar) $______________________each
FIRM NAME____________________________________________
Are you a Corporation, Partnership, DBA, LLC, or PC
BY:_______________________________/____________________________________
Signature Printed
ADDRESS______________________________________________
______________________________________________
PHONE/FAX # __________________________________________
EMAIL: _________________________________________________