WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
THE CITY OF FORT COLLINS
AND
EXPRESS CONCRETE
DATED: MAY 1, 2005
Work Order Number: CR 08-2008
Purchase order Number:
Project Title: Secondary fuel storage containment at 835 Wood St.
Commencement Date: February 15, 2009
Completion Date: April 30,2009
Maximum Fee (time and reimbursable direct costs) : $24,508.90
Project Description: Secondary fuel storage containment at 835 Wood St.
Scope of Services: Form and pour concrete walls and flat work per proposal.
Service Provider agrees to perform
the services identified above and on
the attached forms in accordance
with the terms and conditions
contained herein and in the services
Agreement between the parties. In
the event of a conflict between or
ambiguity in the terms of the
Services Agreement and this work
order (including the attached forms)
the Services Agreement shall
control.
SERVICE PROVIDER
By
Date:
CC: Purchasing
ACCEPTANCE
USER
The attached forms consisting
of U pages are hereby
accepted and incorporated
herein by this reference, and
Notice to Proceed is hereby
given -
CITY OF FORT COLLINS
i By:
Date:
Director of Purchasing and Risk Management over
$60,000.
PROPOSAL
y�
Date: 13-Feb-09
To: Bruce Byrne
RE: 835 Wood Street
Item #
Descrl tlon
Est. Qty.
Unit
Unit Price
Cost
608.31
Flatwork 4"
2,867.00
SF
$2.87
$8,228.29
608.31
Flatwork 4" Additional for thickened edge
505.00
SF
$2.36
$1 191.80
608.17
Barrier Curb 13N24")
289.00
LF
$21.31
$6,158.59
608.44
Fibermesh
52.00
CY
$5.26
$273.52
602,01
Reinforcing Steel
1,232.00
LBS.
$0.47
$579.04
MA1
6"x3/16"Waterstop
1.00
LS
$550.00
$550.00
FA1
Laborer Additional labor for waterstop installation
12.00
HR
$22.32
$267.84
FA2
Foreman Additional labor for waterstop Installation
4.00
HR
$37.20
$148.80
608.54
Joint Sealant
474.00
LF
$2.35
$1,113.90
Pump
Concrete Pump 2 mobilizations
1.00
LS
$900.00
$900.00
MA2
9" Steel Pipe, 2 Steel Flanges, Bolts and Butterfly
Valve Estimate is based on 10 LF of 9" steel pipe)
1.00
LS
$1,049.76
$1,049.76
FA1
Laborer (install 9" steel pipe and valve)
4.00
HR
$22.32
$89.28
FA2
Foreman install 9" steel i e and valve
4.00
HR
$37.20
$148.80
FAII
FA2 lbetween
Laborer (Additional labor for handwork prep underan
between fuel tanks and pipes)
Foreman (Additional labor for handwork prep underand
fuel tanks and pipes)
144.00
16.00
HR
HR 1
$22.32
$37.20
$3,214.08
$595.20
Total 1 $24,508.90
Express Concrete proposes to pour the slab including the thickened edge in one monothlithic pour with self leveling
and consolidating concrete, which meets the specifications set forth by the city of Fort Collins. Express Concrete
intends to utalize existing material to accomplish the required subgrade specifications. If the owner requests the
Importation of new base material to the site, Express Concrete will charge $26.477TN for base per its contract with the
city of Fort Collins. The maximum billable tonnage for base, if requested, will be 53. If Express Concrete is required to
export and dispose of the existing base material a charge of $50.00 will apply to each load removed from the site. The
maximum billable removal cost will be $400.00. The above quotation assumes the owner will remove and replace a
section of fence to allow for equipment to be used for subgrade prep.
1 Unless otherwise agreed to, QUANTITIES are ESTIMATED and billings will be made from measured
field quantities.
2 This proposal does not include winterweather protection.
3 This proposal does nol include: , Damage to unlocated Utilities, any Engineering,
Staking of Grades, Testing (Concrete or Soils), Inbeds or Fixtures (except rebar as required),
Licensing, Permits, Fees, Dewatering or Frost Removal,
4 This proposal does not include any sawcutting or asphalt and concrete removal, unless speclfied above.
5 This proposal to be attached or made part of any contract made or agreement reached arising from
Express Concrete, Inc. 5305 Ziegler Rd., Fort Collins, Co 80528-9539 Phn: 970-225-1287 FAX: 970-229.0846
www. expresscon crete.com
Work Order
City of Fort Collins - Operations Services
OP-429854
Page 1 of 1
Location ID: 835WS-300 Scheduled Work Type: Corrective Maintenance
Department: Fleet Services Priority: Routine
Agency Or Area: City of Fort Collins
Building: 835 Wood St Requested: 02/10/2009 08:04
Description: Fuel Island Closed:
Ph: Est. Start: 02/02/2009 08:00
Requester: Armfield, Shane Ph: 221-6290 Est. End: 03/31/2009 00:00.
NC Account: Est. Cost:
Last Mod user: BB Printed On: 02/19/2009 14:26 Hours: 1.00
Ref #: 425322 User Ref: Est. Hours: 1.00
Signature:
Tech Report:
Approved By:
Inspected By: