No preview available
HomeMy WebLinkAboutWORK ORDER - BID - CONCRETE (6). EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND EXPRESS CONCRETE DATED: MAY 1, 2005 Work Order Number: CR 08-2008 Purchase order Number: Project Title: Secondary fuel storage containment at 835 Wood St. Commencement Date: February 15, 2009 Completion Date: April 30,2009 Maximum Fee (time and reimbursable direct costs) : $24,508.90 Project Description: Secondary fuel storage containment at 835 Wood St. Scope of Services: Form and pour concrete walls and flat work per proposal. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. SERVICE PROVIDER By Date: CC: Purchasing ACCEPTANCE USER The attached forms consisting of U pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given - CITY OF FORT COLLINS i By: Date: Director of Purchasing and Risk Management over $60,000. PROPOSAL y� Date: 13-Feb-09 To: Bruce Byrne RE: 835 Wood Street Item # Descrl tlon Est. Qty. Unit Unit Price Cost 608.31 Flatwork 4" 2,867.00 SF $2.87 $8,228.29 608.31 Flatwork 4" Additional for thickened edge 505.00 SF $2.36 $1 191.80 608.17 Barrier Curb 13N24") 289.00 LF $21.31 $6,158.59 608.44 Fibermesh 52.00 CY $5.26 $273.52 602,01 Reinforcing Steel 1,232.00 LBS. $0.47 $579.04 MA1 6"x3/16"Waterstop 1.00 LS $550.00 $550.00 FA1 Laborer Additional labor for waterstop installation 12.00 HR $22.32 $267.84 FA2 Foreman Additional labor for waterstop Installation 4.00 HR $37.20 $148.80 608.54 Joint Sealant 474.00 LF $2.35 $1,113.90 Pump Concrete Pump 2 mobilizations 1.00 LS $900.00 $900.00 MA2 9" Steel Pipe, 2 Steel Flanges, Bolts and Butterfly Valve Estimate is based on 10 LF of 9" steel pipe) 1.00 LS $1,049.76 $1,049.76 FA1 Laborer (install 9" steel pipe and valve) 4.00 HR $22.32 $89.28 FA2 Foreman install 9" steel i e and valve 4.00 HR $37.20 $148.80 FAII FA2 lbetween Laborer (Additional labor for handwork prep underan between fuel tanks and pipes) Foreman (Additional labor for handwork prep underand fuel tanks and pipes) 144.00 16.00 HR HR 1 $22.32 $37.20 $3,214.08 $595.20 Total 1 $24,508.90 Express Concrete proposes to pour the slab including the thickened edge in one monothlithic pour with self leveling and consolidating concrete, which meets the specifications set forth by the city of Fort Collins. Express Concrete intends to utalize existing material to accomplish the required subgrade specifications. If the owner requests the Importation of new base material to the site, Express Concrete will charge $26.477TN for base per its contract with the city of Fort Collins. The maximum billable tonnage for base, if requested, will be 53. If Express Concrete is required to export and dispose of the existing base material a charge of $50.00 will apply to each load removed from the site. The maximum billable removal cost will be $400.00. The above quotation assumes the owner will remove and replace a section of fence to allow for equipment to be used for subgrade prep. 1 Unless otherwise agreed to, QUANTITIES are ESTIMATED and billings will be made from measured field quantities. 2 This proposal does not include winterweather protection. 3 This proposal does nol include: , Damage to unlocated Utilities, any Engineering, Staking of Grades, Testing (Concrete or Soils), Inbeds or Fixtures (except rebar as required), Licensing, Permits, Fees, Dewatering or Frost Removal, 4 This proposal does not include any sawcutting or asphalt and concrete removal, unless speclfied above. 5 This proposal to be attached or made part of any contract made or agreement reached arising from Express Concrete, Inc. 5305 Ziegler Rd., Fort Collins, Co 80528-9539 Phn: 970-225-1287 FAX: 970-229.0846 www. expresscon crete.com Work Order City of Fort Collins - Operations Services OP-429854 Page 1 of 1 Location ID: 835WS-300 Scheduled Work Type: Corrective Maintenance Department: Fleet Services Priority: Routine Agency Or Area: City of Fort Collins Building: 835 Wood St Requested: 02/10/2009 08:04 Description: Fuel Island Closed: Ph: Est. Start: 02/02/2009 08:00 Requester: Armfield, Shane Ph: 221-6290 Est. End: 03/31/2009 00:00. NC Account: Est. Cost: Last Mod user: BB Printed On: 02/19/2009 14:26 Hours: 1.00 Ref #: 425322 User Ref: Est. Hours: 1.00 Signature: Tech Report: Approved By: Inspected By: