Loading...
HomeMy WebLinkAboutBID - 7002 IRRIGATION DESIGN AND DRAFTING SERVICES (4)ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of Bid: 7002 Irrigation Annual Design and Drafting Services OPENING DATE: 3:00 P.M. (Our Clock) January 20, 2009 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. Questions and Answers: ca Q: Does the consultant need to design central control systems? A: Not used on our neighborhood parks so do not see this as something we need at this time. Q: How much work does this entail? A: The amount could vary dramatically. We know for sure the consultant who succeeds with this proposal will be designing a neighborhood park of approximately 9 acres and will potentially be assisting in water feature renovation design if they have that expertise as well. Q: What insurance will be required? A: $500,000 Q: Is construction observation services required as part of this contract? A: It could be asked for on a project to project basis. Q: Will you short list? A: Yes, interviews will be sometime the week of February 9th. Q: What information is needed for the proposal as far as rates are concerned? A: Hourly rates for different people and perhaps for different services provided. Q: What certifications are required? A: Irrigation Association, Certified Irrigation Designer Landscape/Turf in any category, commercial, residential or golf course design – is preferred. Financial Services Purchasing Division 215 N. Mason St. 2nd Floor PO Box 580 Fort Collins, CO 80522 970.221.6775 970.221.6707 fcgov.com/purchasing Q: How does this process work and how does it work when other departments want to use this contract besides Parks Planning or Parks? A: Other departments typically call Purchasing to ask if we have a consultant on board that can handle their need. Then that department representative would contact the consultant directly to explain their need. The consultant would then prepare a proposal/work order based on the set hourly rates given in this RFP. The department representative would then have the consultant working directly with them upon receipt of a work order signed by both parties. Basically works the same way for the different managers in Parks and Parks Planning. Q: Will the pre-proposal attendance sheet be posted? A: Yes Q: Correction to the typo on page 4, Instructions to the Consultants, in the 1st bullet referring to resumes required, regarding “roadway” design and/or surveying? A: The word “roadway” should be replaced with “irrigation”. The words “and/or surveying” should be removed. Please contact at (970) with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED.