Loading...
HomeMy WebLinkAboutRESPONSE - RFP - P1153 INDEPENDENT COST ESTIMATINGTRANSMITTAL LETTER October 28, 2008 City of Ft Collins Utilities 215 North Mason Street 2nd Floor Ft. Collins, CO 80524 Subject: Request for Proposal No. P1153, Independent Cost Estimating Dear Sir or Madam, We want to thank the City of Ft. Collins Utilities for the opportunity to present our qualifications. Please find enclosed (8) copies of our proposal. Capstone works very closely as a team player with its client's administration, management and staff. Based on our client relationships we are confident that we can provide the City with accurate and timely estimating services. We look forward to the response from the City of Ft. Collins Utilities and we thank them for their time and consideration. Sincerely, Helen Roe Executive Vice President 11001 West 1200 Avenue, Suite 120 Broomfield, Colorado Hui CPI: I[umi.9191 or OK100.0)44 iOk 1cu.um.7L7L "to. City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 cnPsIE (ommived to Project Smos _ - -.__ Proposed Organizational for Independent Cost Estimation Services I City of Fort Collins Utilities i Management Team Capstone I PmtiPol.m.�nmao��lln Executive Vice President "'1.,.,�<. Helen Roc .,,-e,,.ol...nx,,.•. Prgm rnnn�tmtnvannn• conva who „ Senior Project Manager Outside Contractor -- -'-- �a n Frank Humbert I Estimators I „o i Capstone Capstone Capstone j Senior Estimator Project Manager Senior Estimator Phil Sikorski Specialties Estimator Don Polla Jim Rolhr IESllmvlo lfttnvnl[al Elttllitnl8 Eallmvly lntluTnnl FvtllitleSnM Welv�Td PlumNig ECIlmnla einl vnn PeeNlMuml PppnitPl�nli of"Aw, no llW plWm4 o�cloM tsy �. nJPu aw r (AIv 1..IYLimevGnla, an Demonstrated Experience City of Fort Collins Utilities Department (Current) Project Range - $400,000 to nearly $6 Million Capstone is providing independent cost estimating services for ongoing utility projects at the City of Fort Collins Utilities Department. Capstone has completed estimates for a number of different projects including, construction of a new pump station, addition of a storage and feed system, development of West Prospect new retaining ponds, odor control improvements to the Drake Water Reclamation Facility, and water, sewer, and storm drain pipeline projects Los Angeles Unified School District (LAUSD), Los Angeles, California (Current) Project Range - $250,000 to nearly $4 million The LAUSD contains approximately 900 schools spread out over an area of 708 square miles. LAUSD is managed through 8 administrative units called Local Districts (Local District 1 through 8). Capstone is currently providing 12 consultants City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 cnPSIE (ommiwd to Pioya swess to perform project management, construction management, project control and cost estimating services as a sub consultant through HNTB/Yang Construction Management (CM) Group to LAUSD, Local District 1 and LAUSD Central. Capstone's personnel lead the District 1 and Central staff in the key leadership positions overseeing construction management and controls and as direct LAUSD team members on the management of existing facilities projects. Capstone has been providing these services to LAUSD since July, 2002. Current and recent projects include: Safety and technology installation and retrofit projects, paving, piping, HVAC, fencing, etc. In addition, this same team (HNTB/Yang/Capstone) was recently awarded additional facilities management work in District 1 as well as the New Construction Project Management contract for Central. Capstone was also awarded an on -call Cost Estimating contract in June of 2006 for the New Facilities Division of LAUSD. Denver International Airport (DIA) -Various Projects (Completed) Capstone Planning and Control provided DIA, various independent cost estimating services on a continued on -call basis. Capstone has also provided other professional services for DIA, including project management, scheduling and negotiating. A project example at DIA: Roadway Expansion Project, Approximate Construction Cost: $33 Million, Client: Leo A Daly Architects Working with Denver International Airport and various Car Rental Agencies, the architect and their design team prepared preliminary plans to add 75,600 SF of new elevated roadway and 66,600 SF of steel framed glass canopy to levels five and six on both the East and West Terminals. This work included demolition of existing lighting, barriers and pedestrian ramps; construction of new elevated roadways using pre -cast concrete columns, beams and double T's; new topping slabs and pedestrian ramps; and new canopies with curved and tapered steel framing with a glass cover. Capstone provided conceptual statements of probable cost for the design team. U.S. Department of State, Overseas Building Operations (OBO) (Completed) Capstone provided cost estimating services directly to the Department of State for U.S Embassies and Consulates worldwide. This staff augmentation contract included two Capstone personnel on staff with the Department of State to provide costing support for new facility construction, annexes and upgrades. Capstone provided independent estimating for a number of Embassy and Consulate projects, 9 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 k (nPSIE (ommitted to Project Success including those located in Beirut, Mexico (Tijuana and Ciudad Juarez), Jerusalem, Quatar, New Delhi, Afghanistan and Baghdad. References 1) Boyle Engineering Point of Contact: Donna Hoke, P.E. / dhokedb_oyleei iineerin�,com (303) 987-3443 ext. 538 Address: 215 Union Blvd. Suite 500 Lakewood, CO 80228 Services provided: Cost estimating services Work performed: Provided five cost estimates for the $50MM remodel of the Atoka Rehabilitation Project, which involved preparation of conceptual estimates as well as the, 50%, 90% and 100% design stages. The rehabilitation project consisted of constructing new pumping stations and pipeline to supplement the existing pipeline which supplies water to the city of Oklahoma City. Fee Structure of contract: Lump Sum Original Contract amount: $42,000 Ending Contract amount: $47,625 2) Los Angles Unified School District (LAUSD) Point of Contact: Roger Henry / Roger.Henry@LAUSD.net (818)482-4200 Address: 8550 Balboa Boulevard Suite 150 Northridge, CA 91325 Services provided: Cost estimating services Work performed: Provide project cost estimates for all of the formal project and Job Order projects. These include conceptual cost estimates, review of change order proposals, and review of job order contract proposals. Capstone also is in charge of procurement on new Job Order projects and Modifications to these projects. Region 1 within LAUSD has completed several underground utility projects dealing with re -piping gas and water lines. Above ground utilities are involved in almost all of the estimated projects, including high voltage electrical work. Fee Structure of contract: Time and Material Original Contract amount: Staff Augmentation, 3 full time estimating FTE's from 2002 to 2007, one full time estimating FTE from 2007 to present. The beginning contract amount was $7.6 MIL (includes other Capstone disciplines) with option years. Ending Contract amount: Ongoing 10 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 A cnpsI1 (omm i I I H to Piojen Smess 3) Denver International Airport Point of Contact: Larry (L.T.) McCoy / tarry, mccov dia.net (303)342-4437 Address: Maintenance and Engineering Division Airport Office Building, 71" Floor 8500 Pena Boulevard Denver, CO 80249-6340 Services provided: Cost estimating services Work performed: Capstone contracted with DIA to provide various on -call estimating services as needed. Capstone also provided other professional services for DIA including project management, scheduling and contract negotiation. A recent project example is as follows: Roadway Expansion Project (Approx. Construction Cost: $33 Million) Client: Leo A Daly Architects - Capstone worked with Denver International Airport and various Car Rental Agencies, the architect and their design team to prepare preliminary plans to add 75,600 SF of new elevated roadway and 66,600 SF of steel framed glass canopy to levels five and six on both the East and West Terminals. This work included demolition of existing lighting, barriers and pedestrian ramps; construction of new elevated roadways using pre -cast concrete columns, beams and double T's; new topping slabs and pedestrian ramps; and new canopies with curved and tapered steel framing with a glass cover. Capstone provided conceptual statements of probable cost for the design team. Fee Structure of contract: Time and Material with not -to -exceed task orders Original Contract amount: First task was for $120K Ending Contract amount: 40 total tasks, ending amount $140K 4) U.S. Department of State Point of Contact: Christopher Mawdsley / mawdsleycj@state,aov (703)516-1826 Address: Overseas Building Operations Department of State Washington, DC 20522-0611 Services provided: Cost estimating services Work performed: Capstone provided costing support for new U.S. Embassy and Consulate construction, annexes, and upgrades. This included generating conceptual, budgetary and/or cost estimates and life cycle analysis. In addition, Capstone provided independent estimating for U.S. Embassy projects, which included embassies in Beirut, Mexico (Tijuana and Ciudad Juarez), Jerusalem, New Delhi, Afghanistan and Baghdad. Fee Structure of contract: Time and Material with not -to -exceed task orders Original Contract amount: First task $100,520 Ending Contract amount: Last task $749,563 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Bid Schedule - CAPSIONE taami0rd to vlalw smm Item Description Unit Estimated Quantity Unit Price Item Total Item Sub -Total 1 Mobilization and Demobilization Maximum 5% of Bid Total LS 1 9,118 9,120 9,120 2 Erosion and Sediment Control LS 1 3,611 3.610 3,616 3 Traffic Control (by the City) LS 0 0 0 0 4 Remove and Re lace and Structures and Obstructions a Remove 6" and Install D.E. Overland Trail & Skimmerhorn LS 1 1,985 1,990 b lRelocate Storm Sewer Box, Install New 8' Segment 36" RCP, Ste 6+95 LS 1 8,353 8,350 10,340 5 Cleanup and Restoration LS 1 4,125 4.120 4,120 6 Construction Surveying LS 1 1 5,8241 5,820 5,820 7 Pi It a 20-inch DR 25, Class 165 AW WA C 905, Remove and Replace in Same Trench, Ste 0+00 to 1+29 LF 129 136.25 17,580 b 20-inch DR 25, Class 165 AW WA C 905 LF 2,568 77.07 197,915 c 20-inch DR 25, Class 165 AW WA C 905, Restrained Joint LF 179 114.07 20,420 235,910 9 Concrete Thrust Blocks for 20" Water Line EA 6 851 5.110 5,110 10 Imported PI a Bedding CY 0 0 11 Imported Trench Backfill TON 200 15.00 3.000 3,000 12 Asphalt Replacement a As halt Pavement e lacement, CrossingRoadway- SF 5,500 6.54 35,950 b Replacement, As halt Pavement Parallel to Roadway SF 4,500 6.52 29,360 65,310 13 Patterned Concrete Pavement Replacement SF 775 9.85 7,630 7,635 14 Valves and Fittings a Valves 1 20" Butterfly Valve, MJ, CL 250 w/Vault, Sla 0+00 EA 1 9,743 9.740 2 20" Butterfly Valve, MJ, CL 250 w[Vault, Ste 28+73 EA 1 10,250 10,255 b Bends 1 20" x 90 Elbow, MJ, DI EA 2 2.520 5.040 2 20" x 22.5 Elbow, MJ, DI EA 2 2,293 4,590 3 20" x 11.25 Elbow, MJ, DI EA 1 2.327 2.330 c Reducers 1 20" x 12" Reducer MIN x PE, DI EA 1 1,796 1,800 d Tees 1 0"x20"x20" MJ, DI EA 1 3,724 3.720 522 20"x20x20" FL, DI EA 1 5,57312,870 43,040 15 UtilityCrossings a 18" Water District Waterline - (crossingbelow EA 1 811 b 60"Cil Waterline- (crossingabove EA 1 379 c 60"Cit Waterline -crossin above - Flow Fill Re. EA 1 1,185 d Buried Vent Pie for 60" W.L. - (crossingbelow EA 2 404 e 48"Storm Sewer- (crossingbelow EA 1 2,875f Power- crossin below EA 2 379Power- Conduit Onl - crossin below EA 1 379 h Phone - (crossingbelow EA 1 379 380 e Gas -(crossing below EA 2 379 760 CTV -(crossing below EA 1 379 380 8,710 16 Blow Off AssemblyEA 2 10,091 20,180 20,180 17 Combination Air Release Valve Assembl EA 3 8,843 26,530 26,530 18 Connect to ExistingMains a Tie to 20" Waterline at ExistingTee, Sta 0+00 LS 1 2,262 2,260 b Tie to 12" Waterline South of New 20' Tee, Sta 1+29 LS 1 1,685 1,690 c Tie to 20" Waterline, Ste 28+76 LS 1 3.529 3,530 7,480 Total 455,900 455,900 1 of 18 Client: Existing Client Project: Waterline Project ��� Date: July 23, 2007 (ammitted to Project Success Independent Cost Estimate - Estimate Summary - Cost Breakdown Labor 51,400 Material 185,852 Unit Cost Mobilization Water Control/Dewatering Shoring/Trench Support Utility Support 9,120 5,500 20,100 2,500 Subcontract Survey Paving 5,200 64,552 Equipment 40,100 Other 0 Subtotal 384,324 Small Tool Allowance 2,600 Labor Burden 16,500 Sales Tax 0 Subtotal 403,424 Overhead & Profit 52,445 Total 455,900 2of18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - i CAPSTONE !oanntu .�'T,w Saws Description QuantiTy Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost 1 Mobilization & Demobilization 1 Is Mobilization 1 Is 0.00 37074.00 3T0J4.00 0.00 0,00 37074.00 9,118 Project Supervisor wk 2600000 0.00 0.00 0.00 0.00 0.00 2600.00 0 Pro ect Manager wk 2800.00 0.00 0.00 0.00 0.00 0.00 2800.00 0 0.00 0.00 0,00 0.00 0.00 -0.00 0 Subtotal 9 t18 2 Erosion and Sediment Control 1 Is Earthwork Maintenance 0 Is 1000,00 0.00 000 0.00 0.00 0.00 0.00 1000.00 0 Straw Wattle 120 If 0.49 58.80 1.07 128A0 0.00 0.00 0.00 0.00 1.56 187 Silt Fence 2926 If 0,55 1609,301 0.62 1814,12 0.001 000 0,001 0.00 1.17 3,423 3,611 3611 3 Traffic Control (by the Ci 1 Is 4 Remove and Replace Structures and Obstructions I 1 Its 401 Remove 6"Waterline and Install D.E. Overland Trail &Skimmerhorn Demolition Saw Cut Pavement if 2019 0.00 0.64 0.00 0.00 0.00 1.10 0.00 000 303 0 Demo DI Pipe 6" 29 If 11.20 324.80 0.00 0.00 0.00 0,00 4,68 135.72 0.00 ISM 461 Demo Bituminous Pave>3" a 4.95 0.00 0,00 0.00 000 0.60 2.80 0.06 0.00 7.75 0 Load and Haul Bituminous to Recycle 7.19 0.00 0.00 0.00 000 0.00 1229 0.00 0.00 17.75 0 Load and Haul Debris to OH -Site Disposal, 8 mile Roun 1 c 5.80 5.60 0.00 000 0.00 0,00 8.50 8.50 0.00 14,30 14 Dewaterin 475 Dewaterin Allowance Is 0.00 0.00 000 450,00 0.00 0.00 0.00 450.00 0 0 Earthwork Trench Excavation to Stockpile. 8' Depth Ave, Clay44 1.66 73.04 U00 0.00 0.00 0.00 1.70 74.80 0.00 336 148 Trench Backfll, Native 44 3.30 145.20 0.00 0.00 0.00 I.W 5148 0.00 4A7 197 Trench Compaction of Native 44 c 3.30 145.20 0,00 0.00 0.00 0.00 0.72 31S8 000 4.02 177 [Temporary Pavement s 0.56 0.00 7.18 000 000 000 0.38 0.00 0.00 8.14 0 Trench Sharing 521 Trench ShoringRi Is 0.00 0.00 0.00 379.00 000 0.00 0.00 379.00 0 0 Pipe & FiHin s DI MJ Caps 6" ea 62.381214M 44.75 44.75 0.00 0,00 0.00 0.00 107.13107 Restraint Cou fin PVC/DI-6" ea 89.5531.64 31.64 0.00f129A7 0.00 0.00 121.19 121 UfiII Su rt228 Hand Di Utilities c J.94 0.00 0.00 0.000.00 0.00 7.94 40 Hand Backfll-Utilities c 8.25 0.00 000 0,00 1695 0.00 11.64 58 Utifi Suppod & Encasement, 12" antl Smaller ea 0.00 0.00 284,260.00 0.00 284.26 284503 Thrust BlockThrust Block ee 214.80 151.42 151.42 12.15 0.00 378.37 378 378 1,985 1985.07 402 Relocate Storm Sewer Box, Install New 8' Se ment 3 1 Is Earthwork 1 Is Demo Catch Basin 1 ea 71.84 71.84 0.00 0.00 0.00 129.47 0.00 201.31 201 3 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - J, CAPSTONE Is N,, Sucna Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost Trench Excavation to Stockpile, 8' Depth Ave, Clay 40 c 1.27 50.80 0.00 0,00 0.00 0.00 1,32 52.80 0.00 2.59 104 Trench BackFll, 12" Above & Up, N ative Materal Stockpi 27 c 3.30 890i0 0.00 0.00 0.00 0.00 1.18 31.86 0.0D 4.48 121 Trench BacMill, Initial Fill 12 dy 3.30 39.60 16.82 189.84 0.00 0.00 1A8 14.16 0,00 20.30 244 Trench Compaction of Native Material 27 CY 3.13 84.51 0.00 0.00 0.00 0,00 0.72 19.44 0.00 3.85 104 Trench Compaction of Initial Fill 12 cy 3.13 37.56 0.00 0.00 0.00 0.00 0.72 8.64 0.00 3.85 46 Load and Haul Debris to Off -Site Disposal 20 ey 5.80 116.00 0.00 0.00 o.n0 0,00 8,50 170.00 0.00 14.30 286 Trench Sharing 1 Is 1,106 Trench Shoring 0 Is 0.00 0.00 0.00 126.00 0.00 0.00 0.00 126.00 0 0 Pipe & Fittin s t Is 0.00 Gaon 000 Warnin Ta a Detectable 20 If 0.631 12.521 0.13 2.62 0.00 0.00 0.00 0.00 0.]6 15 PVC Pipe, 6" 70 If 3.05 30.50 3.15 31.50 0.00 0.00 0.00 0,00 6.20 62 RCP Class II Pipe, 36" 8 If 38.37 306.96 103.11 824.88 0.0o 000 11.58 92.64 0.00 153,06 1,224 Seal, Pipe at Manhole, 36" 0 ea 64.81 n.00 471.69 0.00 0,00 0.00 0.00 0.00 536.50 0 Tie In to Existing 42" Storm Sewer 1 on 236.81 238.81 282.50 262.50 0.00 0.00 56.50 56.50 0.00 577.81 578 Utili Sup ort 1 ea 0.00 1,879 Hand Dig Utilities 5 ev 794 39.70 0.00 0.00 0.00 0.00 0.00 000 7.94 40 Hand Backfill- Utilities 5 q 8.25 41.25 0.00 0.00 0.00 0.00 3.39 16.95 000 11.64 58 Utility Support & Encasement, 12" and Smaller 1 ea 0.00 0.00 0,00 284.26 284,26 0.00 0.00 284.26 284 Storm Inlet 1 ea -0 OD 0.00 0.00 382 Frame&Grate - Sin le 1 as 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 Catch Basin 6' Base 1 ea 650.28 650.28 3995.57 9995.57 0.00 0.00 340.00 340.00 0.00 4985.85 4,986 Catch Basin 6' Riser 6 of 0.00 0.00 0.00 0.00 0,00 om 0.00 0.00 0 Catch Basin 6' Flat Cover 1 ea 0.00 0.00 000 0.00 0.00 0.00 0.00 0.00 0 4,986 8,353 8353.06 5 Cleanu and Restoration 1 Is Cleanu and Restoration Maintenance 0 Is 2462.26 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2462.26 0 Remove Straw Wattle 120 If 0.23 27.60 0.00 0.00 0,00 0.00 0.00 000 0.23 28 Remove Silt Fence 2926 If 0.23 672,98 0.00 0.00 0.00 0A0 0.00 0.00 0.23 673 Spread Topsoil 0 c 2.10 0.00 0.00 0.00 000 0.00 1.44 0.00 000 354 0 H tlroseed 1.3 acre 896.66 1165.66 904.00 1175.20 0.00 0.00 833.38 1083.39 0.00 2634.04 3,424 4,125 4124,8255 6 Construction Surveying General Construction Surveying 1 Is 0.00 0.00 000 5200.00 5200.00 0.00 0,00 5200.00 5,200 Overhead. Subcontractor Markup 312 Profit, Subcontractor Markup S12 5,824 7 Pipeline 701 20-inch DR 25, Class 165 AWWA C 905, Remove and Replace Demolition 129 If Saw Cut Pavement 0 If o.OD 0.00 0.00 0.00 1 0.00 0,00 0 Demo Pipe Reducer. 20" x 16,, t ea 97.93 97.931 0.00 0,00 45.47 45A7 0.00 143,40 143 Demo DI Pipe 16" 129 If 15.07 1944.03 O.oO 0.00 6.82 879.91 0.00 21.89 2.824 Demo Bituminous Pave >3" 0 s 000 000 i0.00 0.00 0.00 0.00 0 Load and Haul Bituminous to Recycle 0 c 0.00 0.00 0.00 0.00 0.001 0.00 0 Load and Haul Debris to Off -Site Disposal, 10 mile Rou 28 c 5.59 156.52 0.00I I 0 00 8.55 239.40 0.001 14.14 396 4 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - L CAPSTONE (or rsad m Pmjat Sous Description Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost Dewaterin Dewaterin Allowance t129 N 0.00 0.00 0.00 5.68 733,24 0.00 0.00 568 733 Earthwork Trench Excavation to Stock ile, 8'De th Ave, Sand 0.00 0,00 0.00 0.00 0.00 000 0 Trench Backfill, Beddin 0.00 18,30 183.02 0,00 0,00 0.00 18.30 183 Trench Backfill. Imort CY 0.00 18.30 970,01 0,00 0.00 000 18.30 970 Trench Backfill, Import Structural Fill CY 0.01) 0.00 0,00 0.00 0.00 0,00 0 Trench Backfill. 12" Above & Up. Native Material Stockpile cy 0.00 0.00 0.00 0.00 0,00 0.00 0 Trench Compaction of Bedding 10 CY 0,001 0.00 1 0.00 0.00 0.00 000 0 Trench Compaction of Import 53 CY opol 0.00 0.00 0.00 0.00 0.00 0 Trench Compaction of Import Structural Fill CY 0.00 0.00 0.00 0.00 0.00 0,00 0 Trench Compaction of Native Material cy 0.00 0.00 0.00 0.00 0.00 0.00 0 Trench Excav, Lay Pipe, & Backfill 129 If 10.73 138417 0.00 0.00 T68 990.72 0.00 1841 2,375 Load and Haul Excess to Off -Site Disposal 76 c 5,59 436.02 0.00 0.00 8.55 666.90 0.01) 14.14 1,103 Trench Shorin Trench Shoring 140 If 0.00 0.00 0,00 1171 1639A0 000 0.00 11.71 1,639 Pavement Temporary Asphalt Patch sy 0.00 0,00 0.00 0,00 ODD 0.00 0 Pipe & Fittfn s Warning Tape Detectable 140 If 0.00 0.36 50.961 0.00 1 0.00l 0.00 0.36 51 PVC C-900 Pipe 20" 140 If 0.00 31.94 4472,02 1 0.00 0.00 0.00 31.94 4,472 Restraint Coupling PVC. 20" 5 ea 1 0,001 518.37 2591.85 1 0.00 0,00 0.00 618.37 2,592 Utility Support Hand Dig Utilities 5 cy 7.64 38.20 0.00 000 0.00 0.00 7.64 38 Hand Backfill- Utilities 1 5 c 7.94 39.71 0.00 0.00 3.41 1T05 0.00 11,35 57 Utilitysupport & Encasement, 12" and Smaller 0 ea 0.00 0.00 000 0.00 0.00 0.00 0 17,577 136,252101 702 20-inch DR 25, Class 165 AWWA C 905 6.81260504 Demolition 571 If Saw Cut Pavement 0 If 0,00 0.00 0.00 0.00 0.00 0.03 0 Demo Pipe Reducer, 20" x 16" 0 ea 0,00 0.00 0.00 1 0.00 0.00 000, 0 Demo DI Pipe 16" 0 If 0.00 0.00 0.00 0.00 0,00 0.00 0 Demo Bituminous Pave, 3" 0 lay 1 0,001 0,001 0A0 0.00 0.00 0.00 0 Load and Haul Bituminous to Recycle 0 cy 0,00 0.00 0,00 0.00 000 0.00 0 Load and Had Debris to Off -Site Disposal, 10 mile Four 0 CY 0,00 0.00 000 0.00 0.00 0 Dewaterin De.atering Allowance 671 If 0.00 0.00 5.68 3245,56 0.00 0.00 5.68 3,246 Earthwork Strip Topsoil to Stockpile 0 ry 0.00 0.00 0.00 0,00 0.00 0.00 0 Trench Excavation to Stockpile. 8' Depth Ave, Clay 0 CY 0.00 000 0.00 0,00 0.00 0.00 0 Trench Backfill, Bedding 39 CY 0.00 18.30 713.78 0.00 0.00 0.00 18.30 714 Trench Backfill, Import 225 cy 0.00 18.30 411T95 0.00 0,00 0.03 18.30 4,118 Trench Backfill, import Structural Fill 0 CY 000 0.00 0.00 0.00 0 Trench Backfill, 12" Above & Up, Native Material Stock 0 c 0.00 0.00 0.00 0.00 1 0.00 0,00 0 Trench Compaction of Bedding0 c 0.00 0.00 0.00 0.00 0.00 0.00 0 Trench Compaction of Import 0 c 0.00 0.06 0.00 0,00 0.00 0.00 0 Trench Compaction ro Ito ort SVuctcml Pill 0 0.00 0.00 0.00 0.00 0.00 0.00 0 Trench Compaction of Native Material 0 0.00 0.00 0.00 0,00 0.00 0.00 0 5 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - nl tn ' (on¢Iuxl:o Pmlm Sems Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost Trench Excav, Lay Pipe, & Backfill 571 If 10.73 6126.83 0.00 0.00 7.68 4385.28 0.00 18.41 10.512 Load and Haul Excess to Off -Site Disposal 326 5.59 1822.34 0.00 0.00 8.55 2787.30 0.00 14A4 4,610 Trench Shorin Trench Shoring 571 If 000 000 1171 6686.41 0.00 0.00 11,71 6,686 Pavement Tempora Asphalt Patch 0 sy 0.00 0.00 0.00 0.00 0 Pi e & Firin s Warning Tape Detectable 571 If 0.00 0.36 207,84 0.00 0.00 0.00 0.36 208 Splice Kit 4 as I OV001 4.00 16.00 0.00 0.00 0.00 4,00 16 PVC C-900 Pipe 20" 571 If 1 0.001 3194 18239.45 0.00 0.00 0.00 31 S41 18,239 Restraint Couplin PVC, 20" 5 ea 0.00 518.37 5591.85 0.00 0,00 0.00 518.37 2,592 Utili Su ort Hand Di2 Utilities 0 CY 0.001 0.00 0.00 0.00 0.00 0.00 0 Hand Backfill- Utilities 0 c 000 0.00 0.00 0.00 0.00 0.00 0 Ufili Support &Encasement, 12" and Smaller 0 as 0.00 0.00 0.00 0.00 0.00 0.00 0 50,941 89.212958 703 20-inch DR 25, Class 165 AWWA C 905, Restrained Joint Demolition Soo If Saw Cut Pavement 0 If 0,00 0,00 0,00 1 0.001 0.00 0.00 0 Demo Pipe Reducer, 20" x 16" 0 ea 0.00 0.00 0.00 1 0,001 0,00 0.00 0 Demo DI Pie 16" 0 If 0.00 0,00 0,00 0.00 0,00 0,00 0 Deno Bituminous Pave > 3" 0 sy 0.00 0.00 0.00 0.00 0.00 0.00 0 Had and Haul Bituminous to Recycle 0 c 0.00 0.00 0,00 0,00 0.00 0.00 0 Load and Haul Debris to Off -Site Disposal, 10 mile Roo 0 cy 0.00 0.00 0.00 0.00 0.00 0.00 0 Dewaterin 0 Dewatering Allowance 400 If 0.00 0.00 5.68 227360 0.00 0.00 5,681 2,274 2,274 Earthwork Strip Topsoil to Stockpile 0 CY 0.00 0,00 0.00 0.00 0.00 0.00 0 Trench Excavation to Stockpile, S Depth Ave, Clay 0 of 0.00 0.00 0.00 0.00 0 00 0.00 0 Trench Backfill, Betltlin 54 Gil 0,00 18.30 988.31 0.00 0.00 0.00 18.30 988 Trench Backfill, Import 316 0.00 18.30 578343 0.00 0.00 0.00 18.30 5.783 Trench Backfill, Import Structural Fill 0 cy 0.00 0.00 0.00 0.00 0.00 0.00 0 Trench Backfill, 12" Above & Up, Native Material Stockp 0 cy 0.00 0.00 0.00 1 0.001 0.00 0.00 0 Trench Compaction of Bedding 0 000 0.0D 0.00 0.00 0,00 0.00 0 Trench Compaction of Import 0 CY 0.00 0.00 0.00 0,00 0.00 0 Trench Compaction of Import Structural Fill 0 ny 0,00 000 0.00 0.00 0.00 0 Trench Com action of Native Material 0 cy Ho 0,00 0.00 0.00 0.00 0 Trench Excav, Lay Pipe. & Backfill 800 if 10.73 8584.00 0.00 0,00 7.68 6144,00 000 18A1 14,728 Loatl and Haul Excess to Off -Site Dis osal 457 CY 559 2554.63 0,00 0.00 8.55 3907.35 0.00 14al,iF 6,462 Trench Shoring 27,962 Trench Shorin 600 If 0.00 0.00 853 6824.00 0.00 0.00 8.53 6,824 6 Pavement ,824 34,786786 Temporary halt Patch 0 sy 0.00 000 0.00 0,00 0.00 0.00 01 0 Pi e & Fittin in s Warning Tape Detectable 800 If 0.00 0.351 291.20 0.00 0.00 0,00 E36 291 Pipe Disinfection 1 Is 000 240.93 240.93 0.00 0.00 0,00 240.93 241 Northtow Polywrap 1 440 lea 0.00 1,151 506v001 0.00 0.00 0.00 t15 506 Splice Kit 4 -Fee 000 4.001 16,00 0.00 0.00 D.OD 4.00 16 6 of 18 A CAPSIONE (ommitted to Project Success Client Oriented. ,solutions Driven. Proposal for Independent Cost Estimating Services, RFP No.: P1153 Prepared for: The City of Fort Collins Utilities 215 North Mason Street, 2"d Floor Fort Collins, Colorado 80522 Submitted by: Capstone, Inc. Ms. Helen Roe, hroe@capstone.com 11001 West 120t" Avenue, Suite 220 Broomfield, Colorado 80021 Tel: 720.887.9191 / 800.788.8544 Fax: 720.887.9292 www.ca sp tone.com Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - j [ �APST((yyVNL :oranned r, ru,, Sums Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost PVC C-900 Pie 20" 800 If 0.00 31,94 25554.40 0.00 0.00 0.00 31.94 25,554 RestraintCouplingPVC, 20" 0 ea 0.00 0.00 0.00 0.00 0.00 0.00 0 Support 26,609 Han Hand Di 0 0.00 0.00 0.00 0.00 0.00 0.00 0 tfiff-i Ut Hand BackFll- Utilities 0 CY 0,00 0.00 0.00 0.00 0.00 0.00 0 Utility Support & Encasement, 12"antl Smaller 0 as 0.00 0.00 0.00 0.00 000 0.00 0 0 63,668 79.5848125 704 Demolition 800 If Saw Cut Pavement 0 If 0.00 0.00 0.00 0,00 0,00 0.00 0 Demo Pipe Reducer, 20" x 16" 0 ea 0.00 0.00 0.00 0.00 0.00 0.00 0 Demo DIP 16" 0 If 0.00 0.00 0.00 0.00 0OD 0.00 0 Demo Bituminous Pave, 3" 0 s 0.00 0.00 0.00 0.00 0.00 0.00 0 Load antl Haul Bituminous to Recycle 0 c 0.00 0.00 0,00 0.00 0.00 0.00 0 Load and Haul Debris to Off -Site Disposal, 10 mile Rour 0 cy 0.00 0,00 0.00 0.00 0 Dewaterin Dewatering Allowance 0 If 0.00 0.00 0.00 0.00 0.00 0.00 0 Earthwork Strip Topsoil to Stockpile 0 CV 0.00 0.00 0.00 0.0010.00 0.00 0 Trench Excavation to Stockpile, 8' Depth Ave, Clay0 0.00 0.00 0.00 0,00 0,001 0.00 0 f I Trench Excavation to Stockpile, Overexcavation 0 0.00 0.00 0.00 0.00 0.001 0.00 0 Trench Backfill, Bedding 54 CY 0.00 18.30 988.31 0.00 000 0.001 18,30 988 Trench Backfill, Import 316 c 0.00 18.30 5783.43 0.00 0.00 0.001 18.30 5,783 Trench Backfill, Stuctural Fill Overexcavation 0 CY 0.00 0.00 0.00 0.00 0.00 0.00 0 Trench Backfill, 12" Above & Up, Native Material Stockpi 0 c 0.00 0.00 0.00 0.00 000 . 0.00 0 Trench Compaction of Bedding 0 c 0.00 0.00 D.00 0.00 0,00 0.00 0 Trench Compaction of Import 0 c 0.00 0.00 0.00 0.00 0.00 0.06 0 Trench Compaction of Structural Fill 0 ry 0.00 0.00 0.00 0.00 0.00 0 Trench Compaction of Native Material 0 c 0.00 0.00 0.00 0.00 0.00 0.00 D Ripping,Hydraulic Hoe Ram 0.00 0.00 0.00 000 0.00 0.00 0 Trench Excav, La Pipe, & Backfill 10.73 8584.00 0.00 0.00 7.68 6144,00 0.00 18A1 14,728 Load and Haul Excess to Off -Site Disposal 5.59 2554S3 0.00 0,00 8.55 3907.35 0.00 14.14 6.462 Trench Shoring27,962 Trench Shonn 0.00 0.00 5.68 4547.20 0,00 0.00 5.68 4,547 4.547 Pipe & Fittin s 1800ff Warnin Tape Detectable 0.00 0.36 29120 0.00 0.00 0.00 0.36 291 S lice Kit 0.00 4.00 16.00 0,00 0.00 0.00 4.00 16 PVC C-900 Pipe 20" 0.00 31.94 25554.40 0.00 000 000 31.94 25,554 Restraint Cou tin PVC, 20" 0.00 O.OD 0.00 0.00 0.00 e(A) 0 Utility Support 25,862 Hand Dig Utilities 0 CY 0.00 0.00 0.00 0.00 0.00 0.00 0 Hand Backfill- Utilities 0 c 0.00 000 0.00 0.00 0.00 0.00 0 Utili Support &Encasement, 12" and Smaller 0 as 0.00 0 00 000 0,00 0.0D 0.00 0 0 58,371 72.96315 705 Demolition 5l6 If Saw Cut Pavement 0 If 0.00 0.00 0.00 0.00 0.00 0.00 09 7 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - d CAPSIONE (4mr nrei !s ru,[ sums Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total I Cost Demo Pi a Reducer, 20" x 16" 0 as 0.00 0.00 0,001 0.00 0.00 0.00 0 Demo DI Pie 16" 0 If 0.00 0.00 0.00 0.00 0.00 ROT 0 Demo Bituminous Pave> 3" 0 sy 0.00 0 00 0,00 0,00 0.00 0.00 0 Load and Haul Bituminous to Rec cle 0 c 0 00 0.00 000 0.00 O.OD 0.00 0 Load and Haul Debris to Off -Site Disposal, 10 mile Rou 0 c 0.00 0.00 0.00 0.00 0.00 0.00 0 Dewaterin Dewaterinq Allowance 0 If 0.00 0.00 0.00 0.00 0.00 0.00 0 Earthwork ---- Strip Topsoil to Stockpile 0 ('y 1 0.00 0.00 0.00 0.00 0.00 0.00 0 Trench Excavation to Stockpile, B' De th Ave. Clay0 c 000 0.00 0.00 0,00 0.00 0,00 0 Trench Excavation to Stockpile, Overexcavation 0 c 0.00 0.00 000 0,00 0.00 0,00 0 Trench Backfill, Bedding39 c O.00 18.30 713.78 0.00 0.00 000 18.30 714 Trench Backfill, Import 227 c 0 00 18.30 4154.55 0.00 0.00 0.00 18.30 4,155 Trench Backfill, Structural Fill Overexcavation 0 c 0.00 0.00 000 0,00 0,00 0.00 0 irenoh Backfill, 12" Above & Up, Native Material Stockpi 0 c 0.00 0.00 0.00 0.00 0,00 0.00 0 Trench Compaction of Bedding0 c 0,00 0.00 0.00 D.OD 0.00 0.00 0 Trench Compaction of Im ort 0 0.00 0.00 0.00 0,00 0.00 0.00 0 Trench Compaction of Structural Fill 0 0.00 0.00 0.00 0.00 0.00 0,00 0 Trench Com action of Native Material 0.00 0.00 0.00 0.00 0.00 0.00 0 Rippin , Hydraulic Hoe Ram 0.00 0.00 0.00 D.DO 0 00 0.00 0 Trench Excav, La Pipe, & Backfil 10'73 6319.97 0,00 0,00 7.68 4523.52 TOO 18,41 10,843 Load and Haul Excess to Off -Site Disposal 5,59 1839.11 0.00 0.00 8.55 2812.95 0.00 14.14 4,652 Trench Shorin 23,364 Trench Shoring J5891f 0.00 0.00 5.68 3347.68 0.00 0.00 5.68 3,346 48 3,348 Pi e 8 Fittings Warnin Tape Detectable 0.00 0.36 214.40 0.00 0.00 0.00 0.36 214 PVC C-900 Pipe 20" 0.00 31.94 18814.43 0.00 0.00 0.00 31.94 18.814 S lice Kit 0.00 4.00 16.00 0.00 0.00 0,00 4.00 16 Restraint Couplin PVC, 20" 0.00 518.37 2591,85 0.00 0.00 0.00 518.37 2,592 Utifirysupp.rr 21,637 Hand Dig Utilities 0 CY 0.00 0.00 0.00 0.00 0.00 0,00 0 Hand Backfill- Utilities 0 CY I Oroor 0.001 1 0.00 0,00F 0.00 0,001 0 Utility Support & Encasement, 12" and Smaller 0 ea 0.00 0.00 0.00 0,00 ODD 0.00 0 0 45,348 787295149 35,904 9 Concrete Thrust Blocks for 20" Water Line 6 ea Thrust Blocks Thrust Blocks, 6" 0 as 0.00 0,00 0.00 0.00 0.00 0.00 0 Thrust Blocks. 20" 6 ea 453S1 2721,06 371.20 2227,20 0.00 26,29 167.74 0.00 851,00 5.106 5,106 851 10 Imported Pipe Bedding Earthwork Trench Backfill, Delivered, Bedding at 6" Depth c 0.00 0001 0001 000 0.00 0.00 O.ODI 0,001 0 Trench Compaction of Beddingc 0.00 0.00 0.00 0.00 000 0.00 0.00 0.00 0 Trench Backfill, Initial Fill to 12" Above Pie c 0.00 0.00 0.00 0.00 000 0.00 0.001 0.00 0 Trench Compaction of Initial Fill 0.00 0.00 0.00 0.00 0.00 0.00 1 0,001 0.001 0 D 8 of18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - nn I CAPSTONE ,can9 is hip, Serass Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost 1t Imported Trench Backfill 200 ton Earthwork Trench Backfill, Delivered, Trench Backfill 200 ton 2.31 462B0 8.99 1798.80 0,00 0.00 1,00 200.00 0.00 12.30 2,461 Trench Compaction of Trench Backfill 200 ton 1.94 388.00 0.00 0,00 0.00 0.00 0,76 152.00 0.00 2.70 540 3,001 15.004 12 Asphalt Replacement 1 Is Lafar a Subcontract 1 Is Asphalt Pavement Replacement, Crossing Roadway 5500 sf 0.00 0.00 0.00 6.54 35950.15 0.00 0.00 6.54 35.950 Asphalt Pavement Replacement, Parallel to Roadway 4500 sf 0.00 0.00 O.OD 6,52 29361,67 0,00 D 00 6.52 29,362 sf 0.00 0.00 0.00 0.00 0.00 000 0,00 0 Mobilization 1 Is 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0 Overhead Subcontractor Markup 1 Is Profit Subcontractor Markup 1 Is 65,312 65312 13 Patterned Concrete Pavement Replacement 775 at Demolition Demo Cone SOG wilh Rebar sf 0.00 0.00 0.00 0.00 0,00 0.00 0 Load and Haul Debris to Off -Site Disposal cy 0.00 0,00 0.00 0.00 0.00 0.00 0 Concrete Paving Concrete Paving 768 sf 0.00 0.00 9.94 7632.09 0.00 0.00 994 7,632 Road Base sy 0.00 0.00 0.00 0.00 0.00 0 7,632 9.85 14 Valves and Fittings t Is 1411 20" Bufterfly Vavle, MJ, CL250 wNsolt, Ste. 0+00 1 ea Butterfiv Valve, 20" 1 ea 193.92 193.92 4331.10 4331.10 0.00 46.23 46.23 0.00 4571,25 4,571 Pipe Support, 20" 1 as 229.75 229.75 227.35 227.35 0.00 0.00 0.00 457.10 457 Restraint Coupling PVCIDI, 20" 2 ea 145.44 290.88 397.87 795.74 0,00 0.00 0,00 543.31 1.087 Precast Manhole t Is 841.33 841.33 2387.22 2387.22 0.00 399.55 399.55 0.00 3628.10 3,628 9,743 974307 1412 20"Buffertly Valve, MJ, CL 250 wNault, Sta 28+73 1 as Bufferfly Valve, 20" 1 ea 193.90 193.90 4331,10 4331.10 0.00 46.24 46.24 0,00 4571.24 4,571 Pi a Support, 20" 2 ea 229,76 459,52 227.36 454.72 0.00 0.00 0.00 457.12 914 DI FI xPE Pi a20"x 6'CL-53 1 as 1 186.37 186.37 838.17 838A7 0.001 28,42 28.42 0.0D 1052.96 1,053 Flange Kits. Nuts, & Bolts 2 ea 96.96 19392 58,36 116.72 0.00 0.00 O.OD 155.32 31 t Restraint CouplingPVCIDI, 20" 0 ea 0.00 0.00 0,00 0,00 0.00 0.00 0.00 0 Precast Manhole 1 Is 641.32 84132 2159.87 2159.87 000 399.56 399.56 0.00 3400.75 3,401 10,250 10249,83 1421 20"x 90 Elbow, MJ, DI 2 ea 9 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - d CAPSTONE (emmmd m dcat Swart Description Quantity Unit Unit Cost Labor15817t6 aterial Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost Dl Mech-Joint 90 ell 20" 2 ea 149.1139823 2796.46 0.00 0.00 0.00 1547.34 3,095 Restraint CouplingPVC/DI, 20" 4 as 145.44341.03 1364,13 0.00 0,00 000 486.47 1,946 5,041 2520.286 1422 20"x 22.5 Elbow, MJ, Of 2 ea Dl Mech-Joint 22-1/2 ell 20" 2 ea 149.11170.88 2341.76 0.00 0,00 0.00 1319.99 2,640 Restraint Cou tin PVC/DI, 20" 4 as 146.44341,03 1364.13 000 0.00 0.00 486A7 1,946 4,586 2292.936 1423 20"x 11.25 Elbow, MJ, DI 1 sa DI Mech-Joint 22-112 ell 20" 1 ea 149.09 149.09 1204.98 1204.98 0,00 0.00 0.00 1354.07 1,354 Restraint Coupling PVC/DI, 20" 2 ea 145.45 290,90 341.03 682.06 0.00 0.00 0,00 486.48 973 2,327 2327.03 1431 20"x 12"Reducer MHx PE, DI 1 ea DI MechJoinl Can Red 20x12" t ea 149,09 149.09 943.53 943.53 0,00 0.00 0.00 1092.62 1,093 Restraint Coupling PVC/DI-12" t ea 114.88 114.88 102,31 102.31 0,00 0.00 0.00 217,19 217 Restraint Coupling PVC/DI, 20" t as 145,43 145.43 341.04 341.04 0.00 0.00 0.00 486A7 486 1,796 1796.28 1441 20"x20"x20" MJ, DI 1 lea DI Mech-Joint Tee 20" 1 ea 223.66 223.66 2012.09 2012.09 0.00 28AI 28.41 0.00 2264.16 2,264 Restraint Coupling PVC/D1, 20" 3 ea 14544 436.32 341.03 102309 0.00 0.00 0.00 48647 1459 3,724 3723.57 1442 20"x20"x20"FL, DI 1 ea Bolt, Nut & Gasket Set, 20" 1 ea 114.88 114.88 62.52 62.52 0.00 0.00 0.0D 177.40 177 DI FI xPE Pipe 20" x 6' CL-53 1 as 189.37 189.37 838J7 838.17 0.00 28.42 28.42 0.00 1055.96 1,056 DI Flat Blind Flange 20" 0 ea 0.00 0,00 0,00 0.00 0.00 0.00 0 Restraint Coupling PVG/DI, 20" 2 ea 145.44 290.88 341.03 682.06 0.00 0.00 000 486A7 973 DI Mech-Joint Tee 20" 1 ea 223.66 223.66 3114.76 3114.76 0.00 28.41 28,41 1 0.00 3366,83 3.367 5,573 5573.13 43039 15 Utility Sup oWEncasementiProtection i Is 1501 18" Water District Waterline -(crossing below 1 ea Hand Dig Utilities 5 cy 7,64 38.20 0.00 0.00 0,00 0.00 7.64 38 Hand Backfill- Utilities 5 cy 7094 39.70 0.00 0.00 3.41 17.05 0,00 11.35 57 Utili Su orllEncasement/Proteciion 1 Is 402.80 402.80 - 289.76 289.76 0.00 2388 23.88 0,00 716.44 716 Bit 811.39 1502 60" Ciy Waterline -(crossing above 1 ea Hand D2 Utilities 5 CY 7.64 38.21 1 0.00 0.001 0.00 0,00 7.64 38 Hand Bacfill- Utilities 5 SY 7.94 39,70 0,00 0.00 3,411 17.051 0.00 11.35 57 Utility Sup ort/Ermsement/Protection 1 Is 0.00 01001 284.191 284.19 0,00 0.00 284.19 284 3]9 379.15 1503 60' Ci Waterline- crossin above -Flow Fill Re 1 ea Hand Dig Utilities 8 7.64 61.12 0.00 0.00 0.00 0,00 7.64 61 Hard Backfill- Utilities 8 c 7.94 63.52 0.00 0.00 3.41 27.28 0.00 tt35 91 10 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - i CAPSTONE (onolne�:e Pmjul Smrrss Description quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost Flow Fill 10 OY 5.24 52,43 98.05 980,50 0,00 0.00 0.00 103.29 1,033 1,185 1184,85 1504 Buried Vent Pipe for 60"W.L. -crossin below 2 ea CS Sch 40 A53 BW Pipe 6" 12 If 28.72 344.64 38.65 463.80 0.00 0.00 0.00 6737 808 CS Sch 40 BW 9D Elf 6 0 as 0.00 0.00 0.00 0.00 0.00 000 0 Bird Screen 0 ea 0.00 0,00 0.00 0.00 0.00 0.00 0 Hand Dig Utilities 0 Ov 0.00 0,00 0.00 0.00 0.00 0.00 0 Hard Backfrll- Utilities 0 Icy I 0.00 0.001 0.00 0.00 0,00 0.00 0 Utility Support/ErimsemenUProaclion 0 Is 1 0.00 000 0.00 0.00 0.00 0.00 0 808 404.22 1505 48"Storm Sewer -(crossing below 1 ea Hand Dig Utilities 5 CY 7.64 38.20 0.00 0.00 0.00 0.00 7,64 38 Hand Backfill - Utilities 5 Z94 39.70 0.00 0.00 3.41 17.05 0.00 11 35 57 Utility SupponiEricasementtiProtectlen 1 Is 1332.04 1332.04 1374.58 1374.58 0,00 73.33 73.33 0.00 2779.95 2.780 2,875 2874.9 1506 Power- crossing below 2 ea Hand Dig Utilities 10 Cv 7.64 7640 0.00 1 0.00 1 0,00 0.00 7,641 76 Hand Backfill- Utilities 10 Icy 7.94 79.411 0,00 0.00 341 34.10 0.00 11.35 114 Utility Support/Encasemem,Protectim 2 Its 1 0.001 0.00 284.19 568,38 0,00 0.00 284.19 568 758 379.145 1507 Power- Conduit Only] -(crossing below 1 ea Hand Dig Utilities 5 cy 7.64 38,20 0.00 0.00 0.00 0,00 7.64 38 Hand Backfll- Utilities 5 CY 7.94 3931 0.00 0.00 3.41 17.05 0.00 11.35 57 Utility Sup ort/Enoasement/Prolection 1 Is 0.00 0.00 284.19 284.19 0.00 0,00 284.19 284 379 379.15 1508 Phone -(crossing below 1 ea Hand Dig Utilities 5 CY 7.64 38.20 0.00 0.00 1 0.00 0.00 T641 38 Hard Backfill- Utilities 5 CY 7.94 39.70 0.00 0.00 341 1T05 OB01 11.35 57 Utility Su ort/Enoasement/Protection 1 Is 0,00 0.00 284.20 284.20 0.00 0.00 284.20 284 379 3]915 1509 Gas -(crossing below 2 ea Hand Ng Utilities 10 c 7.64 76.40 0.00 0.00 0.00 0.00 7,64 76 Hand Backfll- Utilities 10 CY 7.94 7940 0.00 0.00 3,41 34.13 0.00 11.35 114 Uttily Support/Encasement/Protection 2 Is 0.00 0.00 284.20 568.40 0.00 0,00 284.20 568 758 379.15 1510 CTV-(crossing below 1 as Hand DO Utilities 5 ('y Z64 38.20 0.00 0.00 0.00 000 7.64 38 Hand Backfill- Utilities 5 7494 39.71 0.00 0.00 3,41 17.05 000 1135 57 UtilitySu orVEneasement/Proteclion 1 Is 0,00 0.00 284,191i284.19 0.00 0.00 284.19 284 379 379.15 8,]13 11 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - d CAPSTON1 (ennr,od ¢D ",cim Sw m Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost 16 BlowOffAssombly 2 ea 1601 Blow OffAssembly 1 ea Dewaterin Dewatering Allowance 1 Is 0.00 0.00 0.00 0.00 0.00 0.00 0 0 Earthwork Trench Excavation to Stockpile. 8' Depth Ave, Sand ] cy 1.33 9.31 0.00 0.00 1.28 8.96 0,00 2.61 18 Trench Backfill, Import 5 ey 3,18 15,90 2836 143.80 000 1.18 5,90 0.00 33,12 166 Trench Backfill, Native Material Stockpile 5 3.18 15,91 0.00 0,00 1.20 6,01 0.00 4.36 22 Trench Compaction of import 5 3.01 16.051 0.00 0.00 0131 3.651 0.00 3,74 19 Trench Compaction of Native Material 5 a 3.01 15.05 0.00 0.00 0.74 3.701 0.00 3.75 19 Load and Haul Excess to Off -Site Disposal 2 eY 5.59 11.18 0,00 0.00 8.55 17,101 0.00 14.14 28 Shoring 2] Trench Shoring, 10' Dee 1 Is 0.00 0.00 0.00 0.00 0.00 0.00 0 0 0 Pipe & Fittings Gate Valve and Box, 6" 1 ea 96.96 96.96 87597 875.97 0.00 45.47 45.47 0.00 1018.40 1.018 Corporation Valve 3" 0 ea 0.00 327.71 0,00 0.00 0.00 0.00 327.71 0 Bolt, Nut & Gasket Set, 6" 1 ea 28.72 28.72 44S9 44.89 0.00 om 0,00 73.61 74 Bolt, Nut&Gasket Set. 12" 3 ea 57,44 172.32 122,87 36862 0.00 0,00 0,00 180.31 541 DI Fig x Fig Pie 6"x 10' CL-53 0 as 0.00 249.06 0.00 0,00 0.00 0.00 249.06 0 DI Fig x FIJ. Pipe 12" x 10' CL-53 1 lea 93.20 93.20 792,42 792.42 0.00 66.84 56.84 0.00 942.46 942 DI Fig x PE Pipe 6" x 6' CL-53 1 lea 55.91 55.91 234.58 234.58 0.00 0.00 0.00 290,49 290 DI Flanged Reducer Tee 12x6" 1 Is. 111.83 111.83 803.75 803.75 0.00 0.00 0.00 916.58 916 DI Flat Blind Flange 12" 2 as 37.28 74.56 171.06 342.12 0,00 0.00 0.00 208.34 417 DI Mech,lomt Pipe, 6" 9 If 5.12 46.08 12.97 116.73 0.00 1 0,00 0.00 18.09 163 Dl Mech-Joint 45 ell 6" 1 se 46.60 46.60 77.99 77.99 0.00 0.00 0,00 124.59 125 DI Mech-Joint Reducer Tee 20x6" 1 ea 186.39 186,39 1313.16 1313.16 0.00 28.42 28.42 0.00 1527.97 1,528 Restraint Coupling PVC/DI-6" 3 se 43.08 129.24 35.22 105.66 0.00 0.00 0.00 78.30 235 Restraint Coupling PVCIDI, 20" 2 ea 145,44 290,88 340,24 680.48 0.00 000 0.00 485.68 971 Precast Manhole ,220 Precast Manhole 1 Is 1007.17 1007.17 966.26 966.26 0.00 507.23 5O7,23 0.00 2480,66 2,481 2,481 9,972 1602 Blow OffAssembly 1 ea Dewaterin De.atenni, Allowance 1 Is 1 0.00 0.00 0.00 0.00 0,00 0.00 0 0 Earthwork Trench Excavation to Stockpile, 8' Depth Ave, Sand 7 cy 1.59 11,13 0,00 0.00 1.60 11.20 0,00 3.19 22 Trench Backfill, Import 5 CY 3.18 15.91 28.76 143.80 0.00 1.18 5.90 0.00 33.12 166 Trench Backfill, Native Material Stockpile 5 CY 3.18 15.91 0.00 0.00 1.20 6.00 0.00 4.38 22 Trench Com action of Import 5 CY 3.01 15.05 0.00 0A0 0,73 3.65 0.00 3.74 19 Trench Compaction of Native Material 5 CY 3.01 15.05 0.00 0.00 0,73 3.67 000 3.74 19 Load and Haul Excess to Off -Site Disposal 2 c 5.59 11.16 0.00 0.00 8.55 17.10 0.00 14.14 28 Shorin 2]6 Trench Shorin 10' Dee 1 Is 0.00 0.00 0.00 0.00 0 00 0.00 0 0 Pi e Fittin s Gate Valve and Box, 6" 1 ea 96.96 96.96 875,97 875.97 0.00 45.47 45.47 0.00 1018.40 1,018 Corporation Valve 3" 0 ea 23.25 0,00 327.71 0.00 0.00 0.00 0.00 350.96 0 4 Bolt, Nut & Gasket Set, 6" t ea 28.72 28.72 44S9 44,89 0.00 0.00 0,00 73,61 74 Bolt, Nut & Gasket Set, 12" 3 ea 5].44 1]232 122.87 368.62 0.00 0.00 0.00 180.31 541 12 of 18 Client: Existing Client Project: Waterline Project S T Date: July 23, 2007 /ARt{ ONI (can:Ivd a 1a1.n Smug Independent Cost Estimate - Estimate Detail - Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost DI Fig x Fig Pie 6" x 3' CL-53 0 ea 55.91 0.00 249.06 0.00 0.00 0.00 0.00 304.97 0 DI F12 x F12 Pipe 12" x 10' CL-53 1 ea 93.20 93,20 792.42 792.42 0,00 28.42 28.42 0.00 914.04 914 DI Fig x PE Pie 6" x 6' CL-53 1 ea 55,92 55.92 234.58 234,58 0.00 0.00 0.00 290.50 291 DI Flan ed Reducer Tee 12x6" 1 ea 111.84 111 84 803.75 803.75 000 0.00 0.00 915.59 916 DI Flat Blind Flange 12" 2 ea 37,28 74.56 171.06 342.12 0.00 0.00 0.00 208.34 417 DI Mech-Joint Pipe, 6" 9 If 5.12 46.08 12.97 116.73 0.00 0,00 0,00 18.09 163 DI Mech-Joint 45 ell 6" 1 ea 46,60 46.60 77.99 77.99 0.00 0.00 0,00 124.69 125 DI Mech-Joint Reducer Tee 20x6" 1 ea 186.39 186.39 1313.16 1313.16 0.00 28.42 28.42 0.00 1527.97 1,528 Restraint Coupling PVCIDI-6" 3 1.. 43.08 129.24 36.22 105.66 0.00 0.00 0.00 78.301 235" Restraint Coupling PVC/DI, 20" 2 ea 145.44 290s8 340.24 680.48 000 0.00 0.00 485.68 971 Thrust Block 7,191 Thrust Block 1 Is 151.59 151.59 101.33 101.33 000 9.17 9.17 0.00 262.09 262 262 262 Precast Manhole Precast Manhole 1 Is 1007.18 1007.18 966.25 966.25 0.00 507.23 607.23 0,00 2480.66 2,481 2.481 10,210 20,182 10090.829 17 Combination Air Release Valve Assembly 3 ea 1701 Combination Air Release Valve Assembly 1 ea Earthwork Trench Backfll, Delivered Washed Gravel 1 Is 18.69 18.69 100,66 100.66 1 uol 5.67 5.671 1 000 125.02 125 125 Pipe 8 Fittings Corporation Valve 2" 2 as 24.24 48.48 150.94 301.88 0.00 0.00 0.00 175A8 350 Tapping Saddle 20 x 2" 2 ea 48,48 96.96 654,06 1308,12 0.00 0.00 0.00 702.54 1,405 Manhole Boot, 8" 1 ea 57.44 57,44 62.89 62.89 0.00 0.00 0.00 120.33 120 2" Combination Air ReleaseNacuum 2 as 229.75 469.60 352.19 704.38 0.00 0.00 0,00 581,94 1.164 PVC Pipe Sch 40 6 28 If 5.34 149.58 4,57. 127.96 0.00 0.00 0,00 9.91 278 PVC 40 90 Ell SxS 6 1 as 57.43 57.43 45.28 45.28 0.00 0.00 0.00 102.71 103 PVC 40 Adapter SxF 6 1 as 28.72 28.72 37.74 37.74 0.00 0,00 0.00 66A6 66 CS Sch 40 A53 BW Pipe 6" 2 If 28.72 57.44 42.77 85,54 0.00 0.00 0.00 71.49 143 CS Sch 40 BW 90 Ell 2 as 143,60 287.20 163.52 327.04 0.00 15.92 31.84 0.00 323,04 646 Bird Screen 1 ea 28,73 28,731 440.23 440.23 0,00 0.00 0,00 468,96 469 Precast Manhole 4,44 Precast Manhole 1 lap 115415 1154.75 2524.57 252457 000 36&611 368.61 0.00 4047.93 4,048 4,048 8,917 8917.326 1702 Combination Air Release Valve Assembly 1 as Earthwork Trench Backfill, Delivered, Washed Gravel 1 Is 18.68 18.68 100.66 100,66 000 5,67 567 0.00 125.01 125 125 Pi e 8 Fittings Corporation Valve 2" 2 ea 24.24 48.48 150.94 301,88 0.00 0.00 0.00 175.18 350 Taepiaq Saddle 20x 2" 2 ea 48.49 96.98 65406 1308,12 0.00 0.00 000 70255 1405 Manhole Boot, 8" 1 as 5743 57.43 62.89 62.89 0.00 000 0.00 120.32 120 2" Combination Air ReleaseNacuum 2 an 229.75 459.50 352,19 704.38 0.00 0.00 0.00 581.94 1,164 PVC Pipe Sch 40 6 28 If 5.34 14965 4.57 UTM 000 0.00 0.00 9.91 278 PVC 40 90 Ell SxS 6 1 ea 57,44 57.44 45.29 45.29 0.00 0.00 0.00 102.73 103 PVC 40 Adapter SxF 6 1 ea 28.73 28]3 37.741 37.741 0.00 1 0.001 66A71 66 CS Sch 40 A53 BW Pie 6" 2 If 28.721 57.44 42771 85.541 1 0.00 0.00 1 0,001 71A91 143 CS Sch 40 BW 90 Ell 6 2 ea 143.60 287.20 163,521 327.041 0.00 15.921i31.84 1 0.001 323,041 646 Bind Screen 1 ea 2892 28J2 440.231 440.231 1 0.00 1 0,00 1 O.001 468.95 469 13 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Detail - L CAPSTONE m P;oPn S':ma Description Quantity Unit Labor Unit Cost Labor Amount Material Unit Cost Material Amount Unit Cost Unit Amount Equip Unit Cost Equip Amount Other Unit Cost Other Amount Total Unit Cost Total Cost Precast Manhole 4,744 Precast Manhole 1 ea 1154]5 115475 2167.84 2167.84 0.00 368.61 368.61 0.00 3691.20 3,691 3,69191 8,561 8560.586 1703 Combination Air Release Valve Assembly 1 ea Earthwork Trench Backfill, Delivered, Washed Gravel 1 Is 18.68 18.68 100.67 0067 0.00 5.66 5,66 0.00 125.01 125 125 Pipe 6 FiHin s Corporation Valve 2" 2 ea 24.24 48.48 150.94 301.88 0.00 0.00 0.00 0.00 175.18 350 Tapping Saddle 20 x 2" 2 ea 48.48 96.96 654.07 1308.14 0.00 0,00 0.00 0.00 702,55 1,405 Manhole Boot, 8" 1 ea 57.43 57.43 62.89 62.89 0.00 0.00 0.00 0,00 120.32 120 2" Combination Air Release/Vacuum 2 ea 229.75 459.50 352.19 704.38 0,00 0,00 0.00 0.00 581.94 1,164 PVC Pipe Sch 40 6 28 If 5.34 149.58 4,57 12T96 0,00 0.00 0,00 0.00 9.91 278 PVC 40 90 Ell SxS 6 1 ea 57.44 57.44 45.28 45.28 0.00 0 00 0.00 0.00 102.72 103 PVC 40 Adapter SxF 6 1 ea 287.18 287.18 37,74 3T74 0.00 0.00 0.00 0,00 324.92 325 CS Sch 40 A53 BW Pipe 6" 2 If 28.72 57.44 42.77 85.54 0,00 0.00 0.00 0,00 71.49 143 CS Sch 40 SW 90 Ell 2 ea 143.60 28T20 163,52 32T04 0.00 0.00 15.92 31,84 0,00 323.04 646 Bird Screen 1 ea 28.72 28.72 440.23 440.23 0,00 000 0.00 0,00 468,95 469 Precast Manhole I 1 1 5.003 Precast Manhole 1 ea 1 1165.291 1165.29 2396.80 239&801 000 36&601 368.60 0.00 3922.69 3,923 3.923 9,051 9060.546 26,528 8842.61933 18 Connect to Existing Mains 3 ea 1801 Tie to 20" Waterline at Existing Tee, Sm 0 00 1 ea Tie In to Existing 20" x 20" Tee 1 ea 459.50 459,50 1688.08 1688,08 0.00 114.00 114.00 0.00 226158 2,262 2,262 2261.58 1802 Tie to 12" Waterline South of New 20" Tee, Ste 1+29 1 ea Tie In to Existing 12" Waterline 1 ea 469.50 459.50 1111.91 1111.91 0.00 114,00 114.00 0.00 1685.41 1,685 1,685 1686.41 1803 Tie to 20" Waterline, Sta 28+76 1 ea Tie In to Existing 20" Waterline 1 ea 459.51 459.51 2955.87 2955.87 0,00 114,00 114.00 0,00 3529.38 3,529 3,529 3529.38 7,476 77,063 214.302 147,357 44,518 TOTAL 455,915 235.910 218,333 218.327 $ 3.9]3924 2747 It 14 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate -Vendor Quotes - lid Item Remove and Relocate Structures and Obstructions a. HD Supply Waterworks 1 Is b. Colorado Precast 1 Is b. Precast Concepts, 36" RCP by 8' 1 Is Pipeline a. HD Supply Waterworks 1 Is b. HD Supply Waterworks 1 Is c. HD Supply Waterworks 1 Is 4 Valves and Fittings a. HD Supply Waterworks 1 Is b. HD Supply Waterworks 1 Is c. HD Supply Waterworks 1 Is d. HD Supply Waterworks 1 Is Manhole, Colorado Precast 1 Is Blow Off Assembly Valve, HD Supply Waterworks 2 as Manhole, Colorado Precast 2 as Combination Air Release Valve Assembly CAPSTONE (nnv6v8 to ho"a smm 67.30 67.30 2.49 13.96 83.75 3,535,90 3,535.90 130.83 733.35 4,400.07 730.00 730.00 27.01 151.40 908.41 6,201.20 6,201.20 229.44 1,286.13 7,716.77 73,856.39 73,856.39 2,732.69 15,317.82 91,906.89 9,774.12 9,774.12 361.64 2,027.15 12,162.91 71 9,088.76 9,088.76 336.28 1,885.01 11,310.05 8,249.10 8,249.10 305.22 1,710.86 10,265.18 1,182.35 1,182.35 43.75 245.22 1,471.32 8.600.76 8,600.75 318.23 1,783.80 10,702.77 3,923.23 3,923.23 145.16 813.68 4.882.07 38,631 4,436.03 8,872.06 328.27 1,840.07 11,040.39 840.40 1,680.80 62.19 348.60 2,091.59 1 Valve 3 ea 2,663.51 7.990.52 295.65 1,657,23 9,943.40 Manhole, Colorado Precast 1 Is 5,427.21 5,427.21 200.81 1,125.60 6,753.62 1 Connect to Existing Mains a. HD Supply Waterworks 1 Is 1,341.92 1,341.92 49.65 278.31 1,669.89 b. HD Supply Waterworks 1 is 883.97 883.97 32.71 183.34 1,100.01 c. HD Supply Waterworks 1Is 2,349.71 2,349.71 86.94 487.33 2,923.98 153,755.29 F_ Subcontractor Quotes Bid Item 6 Construction Survey, RJL Surveys 1 Is 6,200.00 5,200.00 624.00 5,824.00 12 Asphalt Replacement LaFarge 5500 sf 5,65 31,075.00 3,729.00 34,804.00 LaFarge 4500 sf 5.64 25,380.00 3,045.60 28,425.60 LaFarge 768 sf 8.59 6,597.12 791.65 7,388.77 LaFarge 1Is 1,500.00 1,500.00 180.00 1,680.00 69,752.12 15 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Assumptions - 'cnPsI[ (Orimned to Noylt Sumo Item Description Unit Estimated Quantity Unit Price Item Total 1 Mobilization and Demobilization LS 1 9,118 9,120 Included 5%of Total 2 Erosion and Sediment Control LS 1 3,611 3,611 Silt fence along one side full length of pipeline $200 for straw wattles 3 Traffic Control (by the City) LS 0 0 0 4 Remove and Replace Structures and Obstructions a Remove 6" Waterline and Install D.E. Overland Trail & Skimmerhorn LS 1 1,985 1,985 Includes pipe demo ikons Excavation, shoring, and backfill Import Structural Fill Disposal of Excavated Material Utility support b Relocate Storm Sewer Box, Install New S Se ment 36" RCP, Sta 6+95 LS 1 8,353 8,353 Excavation, shoring, and backfill New pipe and tie ins Utility support 5 1Cfeanup and Restoration LS 1 4,125 4,125 Removal of erosion control and cleanup H droseedin 6 Construction Surveying LS 1 5,200 5,200 RJL Surveys subcontractor quote Overhead, Subcontractor Markup 312 Profit, Subcontractor Markup 312 7 Pipeline a 20-inch DR 25, Class 165 AW WA C 905, Remove and Replace in Same Trench, Ste 0+00 to 1+29 LF 129 140,001 17,577 Includes demolition, dewatering, earthwork, shoring, pipe, & fittings Disposal of excavated material & debris b 20-inch DR 25, Class 165 AW WA C 905 LF 2,568 140.00 197,915 Includes demolition, dewatering, earthwork, shoring, pipe, & fittings Disposal of excess material & debris c 20-inch DR 25, Class 165 AW WA C 905, Restrained Joint LF 179 220.00 20,420 Includes demolition, dewatering, earthwork, shoring, pipe, & fittings Included overexcavation of rock 9 Concrete Thrust Blocks for 20" Water Line EA 1 6 851 5,106 Excavation and backfill with pipeline work Concrete at $93Icy Protect fitting, form, and place 10 Imported Pipe Badding CY 11 Imported Trench Backfill TON 200 15.00 3,000 Purchase and delivery of imported backfill Placement in trench Compaction Assumed Quantity 12 Asphalt Replacement a Asphalt Pavement Replacement, Crossing Roadway SF 5,500 6.54 35,956 Per LaFar a Quote b Asphalt Pavement Replacement, Parallel to Roadway SF 4,500 6.52 29,362 Per LaFarge Quote Place Speed Hump, 32'x24'x3" SF 768 0.00 0 Mobilization -ts-1 1 0.00 0 16 of 18 City of Fort Collins Utilities ti Independent Cost Estimating Services CAPS E RFP No.: P1153 (ommitted to Project Success Table of Contents 1 GENERAL INFORMATION • Capstone's Qualifications................................................ Page 2 2 WORK PLAN AND IMPLEMENTATION • Understanding of the Project ........................................... Page 2 • Proposed Work Plan ......................................................... Page 3 • Design and Construction Cost Estimating Practices......... Page 6 • Construction Cost Estimating System Expertise ............... Page 6 3 PERSONNEL AND EXPERIENCE . Key Personnel................................................................. Page 7 . Demonstrated Experience ............................................... Page 8 • References...................................................................... Page 10 • Ability to Respond........................................................... Page 12 4 APPENDIX . Example of Previously Completed Cost Estimate . Letters of Commendation for Past Performance . Rate Schedule for Professional Services . Resumes Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Assumptions - nPSIE (omm u d to 7mjen s mss Item Description Unit Estimated Quantity Unit Price Item Total Overhead Subcontractor Markup LS 1 0 Profit Subcontractor Markup LS 1 0 13 Patterned Concrete Pavement Replacement SF 775 9.85 7,632 Per LaFar a Quote 14 Valves and Fittings a Valves 1 20" Butterfly Valve, MJ, CL 250 wNault, Sta 0+00 EA 1 9,743 9,743 Includes precast manhole, valve, and fittings Earthwork & backfill with pipeline earthwork 2 20" Butterfly Valve, MJ, CL 250 wNault, Sta 28+73 EA 1 10,250 10,250 Includes precast manhole, valve, and fittings Earthwork & backfill with pipeline earthwork b Bends 1 20" x 90 Elbow, MJ, DI Includes fitting and restraint couplings Earthwork & backfill with pipeline earthwork EA 2 2,520 5,041 2 20" x 22.5 Elbow, MJ, DI EA 2 2,293 4,586 Includes fitting and restraint couplings Earthwork & backfill with pipeline earthwork 3 20" x 11.25 Elbow, MJ, DI EA 1 2,327 2,327 Includes fitting and restraint couplings Earthwork & backfill with pipeline earthwork c Reducers 1 20" x 12" Reducer MH x PE, DI EA 1 1,796 1.796 Includes fitting and restraint couplings Earthwork & backfill with pipeline earthwork d Tees 1 20"x20"x2O" MJ, DI EA 1 3,724 3,724 Includes fitting and restraint couplings Earthwork & backfill with pipeline earthwork 2 20"x2o"x20" FL, DI EA 1 5,573 5,573 Includes fitting and restraint couplings Earthwork & backfill with pipeline earthwork 15 Utilitv Crossin s a 18" Fort Collins -Loveland Water District Waterline -(crossing below EA 1 811 811 Includes hand excavation and backfill around utility Concrete encasement at crossing b 60" City of Fort Collins Waterline -(crossing above EA 1 379 379 Includes hand excavation and backfill around utility Concrete support at crossing c 60" City of Fort Collins Waterline -(crossing above - Flow Fill Re EA 1 1,185 1,185 Includes hand excavation and backfill around utility Flow fill over top of 60" Waterline, Assumed $75/c d Buried Vent Pie for 60" W.L. -(crossing below EA 2 404 808 Includes hand excavation and backfill around utility New 6" steel pipe at crossing Found one only on drawings e 48" Storm Sewer -(crossing below EA 1 2,875 2,875 Includes hand excavation and backfill around utility Concrete encasement at crossing f Power -(crossing below EA 2 379 758 17 of 18 Client: Existing Client Project: Waterline Project Date: July 23, 2007 Independent Cost Estimate - Estimate Assumptions - CAPSIO E biro ed to Pmjw smm Item Description Unit Estimated Quantity Unit Price Item Total Includes hand excavation and backfill around utility Concrete encasement at crossing Found 5 additional electrical crossings Power- Conduit Only) -(crossing below EA 1 379 379 Includes hand excavation and backfill around utility Concrete encasement at crossing h Phone -(crossing below EA 1 379 379 Includes hand excavation and backfill around utility Concrete encasement at crossing e Gas -(crossing below EA 2 379 758 Includes hand excavation and backfill around utility Concrete encasement at crossing CTV -(crossing below EA 1 379 379 Includes hand excavation and backfill around utility Concrete encasement at crossing 16 Blow Off Assembly EA 2 10,091 20,182 Includes excavation & backfill to valve and curb box Valve, pipe, fittings, thrust block, & curb box 17 Combination Air Release Valve Assembly EA 31 8,843 26,528 Excavation and backfill with pipeline work Includes valves, fittings, pipe, & precast manhole 18 Connect to Existing Mains a Tie to 20" Waterline at Existing Tee, Sta 0+00 LS 1 2,262 2,262 Excavation and backfill with pipeline work Includes fittings & existing pipe preparation b Tie to 20" Waterline South of New 20" Tee, Sta 1+29 LS 1 1,685 1,685 Excavation and backfill with pipeline work Includes fittings & existing pipe preparation c Tie to 20" Waterline, Sta 28+76 LS 1 3,529 3,529 Excavation and backfill with pipeline work Includes fittin s & existing pipe preparation Total 455,900 18 of 18 '... ct 1C aI. { 3_ I LITTLETON ADVENTIST HOSPITAL August 14, 2000 7700 Suwh Brood"¢' Littleton, Colorado 80132 ?fi_>8 Tel 303.730.8900 To Whom It May Concern: . I am pleased to recommend Capstone Planning & Control, LLC. Although we have not used their services in the project and construction management arena, we have relied on them for estimating services. Theirjob performance, qualifications and experience in the construction field are above reproach. Capstone Planning and Control has provided estimating services for Littleton and Porter Adventist Hospital projects from $250,000 to over $38, 000, 000. 1 heartily recommend Capstone Planning & Control. I Sincerely, I Jesse Mock Director Facilities Management pmk Page I of I Helen Roe From: Mawdsley, Christopher J [MawdsleyCJ@state.gov] Sent: Thursday, November 01, 2007 6:17 AM To: Helen Roe Cc: mawdsleyl@cox.net Subject: RE: Dean Miller Helen, I appreciate your comments. Working with Capstone has been a very constructive and valuable business relationship, I appreciated the excellent support provided during my incumbency as Director of Cost Management. I wish Capstone success with your current and new business ventures. If I should venture west, I will of course contact Capstone. Sincerely, Chris From: Helen Roe [mailto:hroe@capstone.com] Sent: Wednesday, October 31, 2007 5:11 PM To: Mawdsley, Christopher J Subject: Dean Miller Chris, I just wished Dean Miller all the best as his last day with Capstone was today. He continues at OBO tomorrow under US Cost. Full circle... More importantly, I wanted to thank you for using us as a contractor these past couple of years. We appreciated working with Rogers Cofield and Dean Miller. Both were a pleasure to have onboard. I will especially miss Dean If you ever choose to venture west, please do not hesitate to contact us It was a pleasure supporting you. Sincerely, Helen Helen Roe Executive Vice President Capstone, Inc. 720-887-9191 x107 (office) 720-810-0412 (cell) 720-887-9292 (fax) hroe@capstone.com www.capstone.com 10/28/2008 a Jennifer Berumen Manager Facilities, Environmentol Health &Safety 64G/Sl l To technology solutions GE Access Distribution T 303 415 2823 T 8004884223.x2.823 F 303 415 3823 jenniferberumen@ge.com W deaccess.com 11300 Weslmoor Circle Westminster,C080021 United States awl V AM k&t Wet axpl ate Access Division • 11300 Westmoor Circle • Westminster, CO 80021 No Text City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 cnsIe (ommittod to piojm h(ass The following rates are all inclusive rates for the labor categories proposed in the proposal. Capstone has assumed the following in preparation of our rates: 1. A labor rate for the base year has been provided and an escalated rate for each option year thereafter. 2. The proposed escalation rate is 2.7% for the option year labor rates. 3. The proposed hourly labor rates are valid for one year upon award date (base year). 4. Travel time will be billed at 80% of labor rate. 5. Timesheets will be provided on request. 6. Reimbursable expenses will be billed at cost. Overnight FedEx, any additional copies of an estimate will be billed at cost (Kinko's), and any overnight travel is billed per GSA. 7. Mileage is billed per the Internal Revenue Service Standard Mileage Rate, 8. Capstone accepts General Services Administration Joint Travel Regulation Rates. Hourly Billing Rates for Professional Services Labor Category Rate Senior Project Manager $105.00 Frank Humbert Specialties Estimator $105.00 Jim Bolin Senior Estimator (10+ years) $100.00 Phil Sikorski and Don Polla Estimator (5 to 10 years) $90.00 Junior Estimator (less than 5 years) $70.00 FRANK W. HUMBUR'r. CON'r. BAJ Construction Corp./Dun-Rite Home Improvements, Denver, Colorado 1996 to 1998 Managed multiple diverse projects with responsibility for project planning, coordination and implementation. Estimator /Project Manger • Accountable for meeting the overall scope, schedule, budget, quality, performance and profitability of the projects • Responsible for the preparation of material and labor quantity takeoffs • Negotiated, issued and administered subcontracts and major purchase orders; as well as, monitoring their progress, schedule and conducted subcontractor buyouts • Worked diligently to maintain excellent relationships with owners, architects, engineers, subcontractors, suppliers and the public to ensure the project schedule was not impacted • Acts as liaison between the General Contractor and building department authorities for permit acquisition • Responsible for business development activities including preparation and negotiation of project proposals EG&G, Inc. / Rocky Mountain Remediation Services, LLC, Golden, Colorado 1990 to 1996 Rocky Flats Closure Project Responsible for managing the development and implementation of treatment systems to treat low-level radioactive/hazardous waste. Managed and coordinated the development of strategic planning documents for the Environmental Restoration & Waste Management organization. Coordinated, researched, and compiled all required information to prepare cost estimates for capital and expense projects. Treatment System Manager (Environmental and Waste Management) • Responsible for defining project requirements and establishing project objectives • Developed project plans, capital and expense budgets, secured project funding, and developed project schedules • Maintained project cost controls and performance reporting • Responsible for overall coordination of treatment technology development, system design, quality assurance, waste shipping requirements, waste disposal acceptance criteria, waste sampling and characterization, and vendor subcontracts Technical administrator (Environmental and Waste Management) • Responsible for directing subcontractor support and coordinating personnel in collecting, compiling, and reviewing strategic planning data • Managed the development of a Federal and State environmental regulations reference book to support environmental and waste management strategic planning activities Cost Engineer (Facilities Engineering) • Provided design input and value engineering on various types of projects including, office, manufacturing, and production support facilities • Developed comprehensive cost estimates through all stages of design • Responsible for the preparation of material and labor quantity takeoffs and material and labor pricing • Interfaced and coordinated with end user, project manager, engineering/design team, technology development, operations, procurement quality engineering, and procurement The Corcoran Company, Fort Collins, Colorado 1987 to 1989 Managed diverse client needs for multiple projects with responsibility for project planning, coordination and implementation. Estimator / Project Manager • Prepared material and labor quantity takeoffs PAGE 2 of 3 FRANK W. HUMBERT, CONT. • Obtained and developed material and labor pricing • Prepared negotiated and hard bid proposals • Responsible for performing project buy-out and preparing project administration package for field Personnel • Prepared and monitored labor and material budgets • Performed contract and change order administration, prepared project invoices and processed monthly billings • Coordinated and supervised field personnel • huplemented and maintained project management control systems, including project status and cost reporting Osprey Development Corporation, Fort Collins Colorado 1983 to 1987 Managed multiple diverse projects for a commercial and residential developer with responsibility for project planning, coordination and implementation. Assnt Superintendent, Land Development Superintendent, Project Coordinator, Project Mngr • Researched and compiled all required information for project star[ -up • Coordinated with project architects, engineers, owners, and various departments within the cities of Fort Collins, Loveland, and Thornton, Colorado • Prepared quantity takeoffs, cost estimates, and project schedules • Performed project buy-out, developed and managed labor/material subcontracts • Prepared and processed monthly subcontractor invoices and construction draws • Performed contract and change order administration • Supervised subcontractors and field personnel • Developed, implemented, and maintained project management control systems, including project status and cost reporting EDUCATION Bachelor of Science, Construction Management, Colorado State University, Fort Collins, Colorado ADDITIONAL TRAINING & SKILLS • Ethics and Standards of Business Conduct • Resource Conservation and Recovery Act (RCRA) • Department of Transportation (DOT) Regulations • National Environmental Protection Act (NEPA) • Uniform Building Code (UBC) • Environmental Laws/Regulations SOFTWARE & APPLICATIONS • MS Office — Word, Excel, PowerPoint, Access, Outlook • MS Project • Expedition • Primavera P3 • Oracle • PeopleSoft SECURITY CLEARANCE DOE Q clearance PAGe 3 or 3 (APSIONE (ommitted to Project Soaess JAME,S M. BOLIN TECHNICAL EXPERIENCE Independent Consultant (2006 to Present) Currently provide assistance and diversified services to a number of client companies. These services include claims analysis, arbitration and litigation support, claims preparation, cost estimating, schedule development, and project controls. MWH Constructors, Inc. Broomfield, Colorado (2005 to 2006) As the Contracts Administrator, was responsible for subcontract procurement for a construction program with a $1.2 billion awarded project backlog. Assisted the project teams with identifying the breakdown and content of the subcontract work packages. Developed and issued to bidders, the subcontract scopes of work and the Requests for Proposal (RFP) document packages for design -build and CM at risk types of water and waste water treatment plant projects, ranging in value from $65 million to $140 million, Assisted in the review and evaluation of bidders proposals. Prepared and finalized the Subcontract Agreements to selected bidders. Capstone Planning and Control, Inc. (formerly Project Controls Associates, Inc.) Broomfield, Colorado (2000 to 2005) As Principal of the Construction Management Division, supervised and coordinated a staff comprised of eight professionals involved in providing construction management, cost estimating, scheduling, and project controls consultant services. Responsible for staffing, project planning, employee development, identification of standards and practices, client relations, market and business development, budgeting, establishing and attaining measurable goals, and profitability. Provided guidance, assistance, and oversight on projects to ensure that client and internal corporate expectations were met. As Senior Project Manager, provided construction and project management services for commercial and institutional projects. Assisted companies with developing pre -construction estimates, budget plans and schedules, and with problem mitigation. Developed and maintained program schedules, based upon individual client requirements. Generated, analyzed and reported performance measurement to management in order to facilitate decision -making functions. Provided guidance to the Project Control Specialists through a comprehensive QA/QC program to ensure product quality. Represented clients' interests in evaluating and negotiating contractor change orders. Responsible for the management and coordination of work required under a specific task or contract, including the monitoring of project budgets and deliverables, meeting contractual requirements, and ensuring client satisfaction. CH2M HILL Constructors, Inc. Englewood, Colorado (1999 to 2000) As Senior Construction Engineer, responsible for providing and managing a variety of planning and control functions on design -build projects. Pre - construction and startup activities included conducting design constructability reviews, preparation of cost estimates and schedules, contract and subcontract administration and management, material procurement, and the setup of project Page 1 of 3 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 GENERAL INFORMATION d cnSIE (ommitted to hojea Success Capstone's Qualifications Capstone, Inc. (Capstone) is a woman minority -owned small business providing solutions in project management and construction management. Founded in 1994, Capstone is organized into two service sectors: Project Management/Systems Integration and Construction Management. Our expertise includes providing both project specific solutions and staff augmentation services in the following areas: • Full Turnkey Project and Construction Management Services • Owner's Representation Services • Project Controls - Implementation, Methods, Procedures and Training • Scheduling - Development, Analysis and Reporting • Cost Estimating/Cost Management • Project Management Systems Implementation and Integration Capstone's cross -industry experience provides a superior foundation that allows us to offer a "best -in -class" application of industry project and construction management knowledge and principles. Capstone's services incorporate contemporary methodologies and applications tailored to the particular need of each client and project. Our consultants bring an average of 18 years of experience per consultant to a project. This extensive expertise gives us an unparalleled capability as a company, which results in tremendous value and benefit to our clients. Our high quality of service is demonstrated by our successful longevity and reflects our commitment to the integrity, accuracy, and value we provide to every project. Prominent owners, contractors, architects, engineers, major government agencies, and others continue to benefit from Capstone's professional expertise by achieving positive outcomes on their projects. Capstone clients and markets include: Department of Energy; Department of State; K-12 and University Education; Federal Lands - Highways Division; biotechnology; health care; transportation; municipalities; home builders; developers and many others. Please see the Appendix for commendation letters. WORK PLAN AND IMPLEMENTATION Understanding of the Proiect The City of Fort Collins Utilities (City) has issued a request for proposal (RFP) for independent cost estimating services. Capstone is an independent cost estimating consulting firm with no ties to contractors or designers thus insuring that the client receives an unbiased opinion of cost for their project. Our multi -disciplined staff has many years of diverse experience developing cost estimates for municipal, 2 JAWS M. BOLIN, CONT. administration and management, material procurement, and the setup of project and task charge numbers. During the construction phase, became involved in the overall management of the project, including the execution and coordination of the work activities, resolving and mitigating problems and conflicts, profit/loss and change order management. Project Controls Associates, Inc. Boulder, Colorado (1996 to 1998) As Senior Project Control Specialist, tasked to Safe Sites of Colorado, LLC's (SSOC's) Schedule Management and Integration Division as the Schedule Integrator. Assisted with managing and coordinating approximately 20 schedulers whose efforts supported a $200 million/year decommissioning and dismantlement program for the U.S, Department of Energy's Rocky Plats Environmental Technology Site. Primary responsibilities included the development of the architecture for the SSOC integrated master project schedule, maintaining the integrity of this schedule, preparation of standardized scheduling procedures and guidelines that enhanced the levels of accuracy, consistency and overall efficiency of the schedule system, and the formation of summary reporting to corporate management. Provided project controls services to the Kaiser -Hill Company in support of the site capital projects, including the Criticality Alarms & Safeguards Systems, Site Infrastructure, and the Master Safeguards and Security Agreement Projects. Responsible for schedule development, fiscal budget planning, performance and cost statusing. Evaluated internal and Construction Contractor's change orders. Prepared conceptual level estimates for 17 different alternatives that address the draining, dismantling and disposing of the process systems located in Building 771. Independent Consultant (1994 to 1996) As an Independent Consultant, provided claims analysis, project management and controls services to a number of clients, including; Pacific Northwest Sugar Company (Inperial-Holly and Columbia River Sugar Co..I.V.), Moses Lake, Washington - Responsible for developing a 1,200-activity master schedule for the construction of a $98 million sugar beet refinery. Met with client and consulting firms to accurately define the scopes of work for the project. Established the work breakdown structure for the project. Developed the cost code of accounts. Prepared graphics and summary schedules for presentations at public and Board of Directors' meetings. Fischbach & Moore, Inc., Denver, Colorado - Assisted in the development of construction claims for the work completed on the Alaska Native Medical Center Replacement Hospital and the Detroit Veterans Hospital Projects. Ilanjin Engineering & Construction Co., Ltd., Seoul, South Korea - Through Hill International, developed the craft labor manhours by construction trade and by task, required to complete the A. B. Won International Airport Terminal expansion located in Guam. Assisted Hill's consultants in preparing a resource loaded master schedule. Peterson Consulting L.P., Denver, Colorado - Evaluated tine outstanding change orders in support of the general contractor's $25 million claim on the Hoover Dam Visitors Center. Developed narratives, tables, graphs and schedules that summarized and demonstrated the levels of issue caused impacts on construction. Assisted with evaluating the variances between the project adjusted as -planned schedule and the as -built schedule. Conducted damages analysis and prepared the concrete supplier's claim. Montgomery Watson Constructors, Inc., Boulder, Colorado - Developed cost estimates and construction schedules for various private industrial and DOD environmental remediation projects, including those for the George and Mather AFCEE base closure contracts. Served as Project Manager for the construction of groundwater treatment systems for Iowa DOT and Williams Pipeline Company, Kellogg Corporation Littleton, Colorado (1993 to 1994) As Senior Claims Analyst, Prepared litigation documentation and analysis support for construction claims. Evaluated claims issues and entitlements. Provided cost estimate analysis and change order evaluation services. Assisted management in developing proposals as part of the corporate marketing effort. PAGE 2 OF 3 JAMES M. BOLIN, CONT. Metropolitan Water District of Southern California Los Angeles, California (1992 to 1993) As Senior Estimator (Consultant) Responsible for the development and implementation of estimating procedures for the $1.8 billion Eastside Reservoir project located in Hemet, California. Prepared conceptual and preliminary estimates for design engineering and construction, analyzed subcontractor bid proposals, and interfaced with project personnel in developing a PC -based performance measurement system. James M. Montgomery Consulting Engineers, Inc. Pasadena, California (1988 to 1992) As Supervising Estimator, provided estimating services to various company divisions and outside clientele. Prepared conceptual, preliminary and detailed final budget estimates for the construction of domestic and overseas public works and municipal projects. Supported projects under construction, providing an independent analysis of claims and change orders. Responsible for training staff, scheduling and assigning work activities, and the review of estimates. As Senior Construction Manager, provided construction supervision and inspection services on a number of public works projects having values from between $250 thousand and $36.0 million. Responsible for establishing project and quality controls, including all aspects of progress updating and reporting. Reviewed monthly progress payment and schedule submittals. Evaluated and resolved the costs and time impact associated with contactors' change orders and claims. Schmueser & Associates, Inc. Rifle, Colorado (1987 to 1988) As Chief Estimator, responsible for the preparation of estimates for a small general contractor specializing in heavy industrial, petrochemical and mine development projects. Developed project schedules and established cost controls. Managed the purchasing and expediting efforts. Prepared monthly progress billings. Supervised craft personnel and directed construction activities. Harrison Western Corporation Golden, Colorado (1986 to 1987) As the Manager of Project Support for a joint venture with Fluor Constructors, supervised the coordination of overseas and home office project support activities for a USAID waste water project in Egypt. Engaged in purchasing, expediting, and the processing and approval of vendor invoices. Managed project files and records. Scheduled and monitored overseas shipments. Assisted legal staff in supporting project claims that lead to an agreement for the termination ofthe project. As an Estimator for the Mechanical Division, prepared fixed -cost estimates for the civil and structural portions of hydro- electric and EPA Superfund projects. Developed preliminary construction schedules. Stearns Catalytic World Corporation Denver, Colorado (1983 to 1986) As a Project Estimator for the Petrochemical Division, involved in the preparation of preliminary and definitive budget estimates for Lower 48 module fabrication and North Slope module tie-ins and interconnects on ARCO's Kuparuk project. Evaluated change orders in support of the 1985 and 1986 Seali$'s Lower 48 and North Slope construction efforts. Assigned to the project team involved in preparing the lump sum bid for constructing the 1986 Sealift's process modules. Jasper Construction Company Wheat Ridge, Colorado (1982 to 1983) As an Office Engineer, estimated material quantities and direct costs for lump sum bids. The types of projects included earthen dams, hydro -electric plants, water and wastewater plants, pump stations and pipelines. Stearns Roger Engineering Corporation Denver, Colorado (1982) As a Project Systems Analyst for the company's Mining Division, prepared conceptual cost estimates and estimating standards while assigned to Exxon's Colony Oil Shale Project. PAGE 3OF3 A CAPSTONE (ommitted to Project Success PHH.IP J SIKORSKI, PE CONSTRUCTION MANAGEMENT, ESTIMATING, SCHEDULING, CLAIMS, CONSTRUCTABILITY REVIEws • Capstone Planning and Control, Regional Director of Construction Management • O'Connor Construction Management, Inc., Senior Construction Manager • Sikorski Construction Services, Principal CIVIL AND STRUCTURAL ENGINEERING • The Austin Company, Civil Engineei GENERAL CONTRACTING • Sikorski Constructions Services, Principal • Breton Construction Inc., Vice President, Operations • The Koll Company, Project Manager • Fluor E & C, Senior Field Engineer RELEVANT PROJECT EXPERIENCE • Denver Housing Authority/Aurora Housing Corporation, Cost Estimating • Pasadena City Hall, Constructability Review and Construction Management • San Bernardino County Courthouse Seismic Retrofit, Cost Estimating, Value Engineering • County of Riverside Various Projects, Cost Estimating • Coronado Civic Center, Cost Estimating, Value Engineering • City of Santa Barbara Various Projects, Cost Estimating EDUCATION Bachelor of Science in Civil Engineering, 1974; University of California, Davis, California LICENSES Registered Civil Engineer, State of California #C032189 General Building Contractor License #580416 DON S. POLLA, PE SUMMARY OF QUALIFICATIONS Over 15 years of experience in 1) design, cost estimating, engineering, project management, construction, startup, and operation & maintenance of mining/metals process facilities, industrial facilities, and water treatment plants; and 2) environmental engineering including environmental sampling, compliance monitoring, acid rock drainage treatment, and soil remediation. Experience includes mechanical design, process design, equipment sizing, equipment selection, cost estimating, and startup for gold/copper recovery facilities, water treatment plants, and cement plants. Areas of work include: • Preparation and review of conceptual studies, feasibility studies, reports, and proposals • Cost estimating, scheduling, and engineering on projects involving 1) environmental remediation and 2) copper, gold, silver, water, coal, diamonds, cement, and water & soil remediation systems • Startup, construction oversight, field engineering, and field scheduling at process facilities for copper, gold, silver, & cement, at water treatment facilities, and at environmental remediation projects • Development of PFDs and P&IDs • Design parameter specification, sizing, and selection of equipment including material handling systems, crushers/mills, dust collectors, pumps, compressors, IIVAC, overhead cranes, small boilers, clarifiers/thickeners, small furnaces, fans/blowers, SX/EW equipment, pressure leaf filters, plate & frame filters, reagent mix systems, and piping/valve systems • Operation & maintenance management roles at zinc/lead/silver mines, water treatment plants, and open pit copper mine • Environmental investigations, Monitoring plans — soil, water, & air, Corrective action plans, Environmental site assessment, SPCC plans, and Technical writing • Hazardous materials management • Computer skills —Timberline, Microsoft Office, Microsoft Project, Primavera P3, and limited AutoCAD & MicroStation RELEVANT PROJECT EXPERIENCE Estimator, Durham Facility Phase 4, Clean Water Services, Tigard, Oregon Yard Piping, Process Mechanical Piping and Equipment Estimator for the Durham Facility Phase 4 Expansion project for Clean Water Services. Major elements of work included Sitework, Yard Piping, Dewatering, Structural Concrete, Process Mechanical Piping, Pump, and Equipment Installation, Building Construction, and Electrical Systems. The total estimated project value was $22.1 M. Estimator, Point of the Mountain Water Treatment Plant, Cities of Salt Lake and Sandy, Salt Lake City, Utah Yard Piping Estimator for the Point of the Mountain Water Treatment Plant project for the Cities of Salt Lake and Sandy. Major elements of work included construction of Yard Piping, Operations Building, Chemical Feed Facilities, Flocculation and Sedimentation Basins, Ozonation Facilities, UV Disinfection, Maintenance Building, Solids Handling Facilities, and Electrical Systems. The total project value was $81M. Estimator, Possum Kingdorn Fish Hatchery, Texas Parks and Wildlife Department, Possum Kingdom, Texas Yard Piping and Equipment Estimator for the Possum Kingdom Fish Hatchery project for the Texas Parks and Wildlife Department. Major elements of work included Sitework, Yard Piping, DON S. POLLA, PE CONT. Re -use Pond Contruction, Air Compressor Station Construction, and Electrical System Construction. The total estimated project value was $2.6M. Estimator, San Vicente Pipeline and Sorge Control, San Diego County Water Authority, San Diego, California Yard Piping and Sitework Estimator for the San Vicente Pipeline and Surge Control project for the San Diego County Water Authority. Major elements of work included Sitework, Access Road Construction, Tank Site Preparation, and Tank Construction. The total estimated project value was $4.7M. Estimator, Nitrification and Denitrification Upgrades, City of Simi Valley, Simi Valley, California Yard Piping Estimator for the Nitrification and Denitrification Upgrades project for the City of Simi Valley. Major elements of work included Sitework, Yard Piping, Selective Demolition, Booster Pump Station, and Electrical System Modifications. The total estimated project value was $2.1 M. Estimator, River Mountains Water Treatment Plant, Southern Nevada Water Authority, Las Vegas, Nevada Yard Piping Estimator for the River Mountains Water Treatment Plant for the Southern Nevada Water Authority. Major elements of work included Sitework, Yard Piping, and Construction of the Raw Water Metering Station, Oxygen/Ozone Protection Building, Ozone Contactors, Chemical Feed Facilities, Blower/MCC Building, Ozone Destruct System, Flocculation and Sedimentation, Gravity Filters, Residuals Management, Equalization Basin, Thickeners, and Electrical Systems. The total estimated project value was $54.7M. Estimator, Fish Screen and Pumping Plant Project, Reclamation District 2035, Sacramento, California Yard Piping and Sitework Estimator for the Fish Screen and Pumping Plant Project for Reclamation District 2035. Major Elements of work included Sitework, Yard Piping, and the Construction of an Intake Structure, Screening Structure, Pump Station, and Shore Protection. The total estimated project cost was $11.2M. WORK EXPERIENCE Capstone Planning and Control, Inc. Senior Cost Estimator, 2007 — Current MWH Constructors Senior Estimator, 2002 — Current Stoller Corporation Contract Environmental Work, May 2002 — September 2002 Bechtel Corporation Engineering Group Supervisor/Senior Mechanical Engineer, 1998 — 2002 Lyntek, Incorporated, Senior Mechanical/Environmental Engineer, 1993 —1998 ASARCO, Incoporated Water Treatment Plant Manager, Senior Environmental Engineer, Maintenance Foreman, 1987-1993 Colorado Mountain College Vocational Instructor, Spring 1991 PAGE 2 0> 3 DON S. POLLA, PE CONT. EDUCATION BS/BSc, Mechanical Engineering, University of Idaho MS/MSc, Environmental Engineering and Science, Colorado School of Mines PROFESSIONAL ENGINEERING REGISTRATIONS General - Colorado #29879 Mechanical - Alaska 49525, California #M30139, Idaho 48353, Nevada 4012867 Environmental - Idaho, 48353 OTHER CERTIFICATIONS Class "A" Industrial Waste Water Operator, State of Colorado, #1068 Class "A" Water Works Operator, State of Colorado, #1926 ACTIvE REGISTRATION Professional Engineer — CO Professional Engineer (Mechanical) — ID, AIC, NV, CA Professional Engineer (Environmental) — ID Certified Cost Engineer — AACE International Industrial Waste Water Operator— CO Water Plant Operator — CO PAGE 3 of 3 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 cnSI[ (ommiued to pmjeu Success public utilities, heavy industrial, civil, commercial, institutional and environmental projects. Our cost management services include: cost plans; project/program estimating; conceptual, schematic, design development and construction document design estimating; change order evaluation and negotiation; value engineering; and life cycle costing. Many of our staff have cost estimating certifications, have published cost estimating publications in the AACE Journal and have been actively involved in special projects sponsored by AACE. Our strong construction background coupled with our in depth cost estimating system knowledge (both off the shelf systems such as Success, Timberline, MCACES, WinEst, etc. as well as custom client systems) differentiate us from our competition. Capstone understands that independent cost estimates are a necessary requirement for capital projects that utilize the City's "Alternative Product Delivery" process and which are forecasted to exceed $300,000 in construction costs. Our process for projects that require an independent cost estimate is as follows: the City's Project Manager will notify Capstone of the need for independent cost estimating services. Upon receipt of a notice to proceed, the City will provide all pertinent documentation to Capstone to develop a cost estimate for the project. Upon receipt of design documents, which generally include the construction schedule, bid item schedule, and an overview of the project, Capstone will prepare and submit a "not -to -exceed" budget for services. In addition, this budget will address the expected duration of time required to develop and complete the independent cost estimate for the project. Capstone's budget will also include the estimated labor hours for staff to attend a project overview meeting(s) in order to better understand the scope of the project, labor hours to develop the independent cost estimate, and labor hours to research and reconcile line item discrepancies identified between the independent cost estimate and the Contractor's estimate. Any anticipated travel expenses which are incurred by Capstone's staff and directly associated with the project will also be included. Following the completion of an estimate, Capstone will have the necessary staff members who prepared the estimate available to explain details of the submittal. Capstone will work with the City to compare and reconcile the independent cost estimates and Contractor prepared estimates. Capstone will effectively communicate with the City Management Team throughout the independent cost estimate development process. At the request of the City's Project Manager, our staff will travel to the project site or the City's offices as necessary. The City will be copied on all email correspondence that occurs between Capstone and the Contractor to ensure an auditable trail of documentation exists. Typical correspondence includes the request and receipt of material and equipment vendors, and subcontractor price quotations, clarification or discussion of existing conditions, and/or proposed means and methods for performing the work. 3 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 n IONI (ommitted to hojen Sums Proposed Work Plan Relative to this proposal, Capstone's objective is to provide the City with superior service and value in the delivery of the independent estimates. The scope of services that we anticipate as being required to support this effort is explained as follows: Capstone provides cost estimating services from the initial programming through the final construction document stages of design. We understand the importance of accurate, traceable and auditable cost estimates. Therefore we provide a structured and timely approach for developing, reviewing and implementing approved budgets and/or estimates into the construction management life cycle process. In order to accurately address the dynamics that are particular to each project, including geographic location and market economics, we routinely solicit real time quotations from trades and manufacturers for comparison with our existing library of historical cost data. In addition, we periodically review current industry recognized cost databases and publications to ensure the accuracy of our estimates. Capstone's staff has collectively provided construction cost management services on thousands of projects totaling several billion dollars in value at locations around the world. To ensure that our estimates consistently maintain a high standard of accuracy and quality, Capstone personnel strictly adhere to the following seven steps for the development of cost estimates: Definition of Project Scope ➢ Quantity Measurement Research Local Market Conditions ➢ Final Development of the Estimate ➢ Review/Check Estimate ➢ Publish Estimate ➢ Comparison and Evaluation of Estimates Prepared by Others These steps are identified as follows: ➢ Definition of Project Scope In order to provide a complete and accurate project estimate, the estimating team must first identify and fully understand the scope, parameters and constraints that are directly associated and unique to each project. Capstone's team utilizes the design plans, specifications, and other documents to fully understand the scope of the work on which to base the estimates. From this review, Capstone shares with the Owner, any project constraints and non-standard issues that may have an impact on the project's construction and costs. M City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 ➢ Quantity Measurement i; cnpSIE (ommiaed to Pmjea Sums An accurate and complete quantity take -off (QTO, also known as a quantity survey) is a key element to a successful cost estimate. Capstone adheres to strict principles of precise measurement. For each project, Capstone estimators prepare detailed quantity take -offs in all trades for the scope items identified. All QTOs are prepared on quantity takeoff sheets and identify the document locations from which measurements are taken. All calculations are clearly shown and crosschecked. Capstone's experience in preparing cost estimates allows us to ask key questions to identify items that are undefined in the project documents but are potentially required in the successful construction. Reasonable allowances are included in the estimate for these items. ➢ Research Local Market Conditions Identifying the key current local market conditions in the project is an important factor in developing an accurate estimate. Capstone recognizes that every project is unique and requires special consideration. Capstone obtains pricing information from vendors, local subcontractors, in-house historical and current project databases, and recognized publications and databases. However, when preparing a project estimate, we do not rely on database information alone. Local site conditions, market factors (competing work, volume, timing, etc.), location factors, and escalation factors are considered in the determination of project costs. ➢ Final Development of the Estimate Upon completion of the quantity take -off, reviews and checks, and the collection of local pricing data, Capstone estimators input data into the estimating system. Capstone sets up the estimate work breakdown structure (WBS) to best accommodate the needs and requirements of the project and the Owner. General condition's costs are clearly broken out and all markups are distinctly identified within the estimate. ➢ Review/Check Estimate Once the estimate has been input into the estimating system, the project manager and an independent reviewer evaluate the estimate. Checks are conducted for consistency, integrity, calculation accuracy and spelling. In addition, parametric tests such as comparisons of areas, comparisons with similar projects or similar scopes of work, and against previous estimates, are made to ensure the overall reasonableness of the estimated costs. 5 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 Publish Estimate k cnsIE (ommiued to Voya Smm Upon completion of the final estimate review/check and modifications as required, the estimate is published and reviewed with the Owner. Other Party Estimate Comparison Capstone will review and provide a detailed comparison between our estimate and estimates prepared by others (design team, contractors or other independent estimators). We identify areas of difference and evaluate the causes for variance. Following the completion of the reconciliation, we will revise our estimate accordingly (if necessary) and report the changes. Design and Construction Cost Estimating Practices Capstone provides cost estimating services from programming through final construction documents. We provide a structured and timely approach to develop, review and implement approved estimates into the construction management process. We routinely solicit real-time quotations from trades and manufacturers for comparison with our existing library of historical cost data, current project information, and industry recognized cost databases and publications, thereby ensuring that our estimates are current and reflect the dynamic nature of the industry. For example, design issued by architects and engineers may be issued at varying stages of completion. Capstone uses established processes to provide ranges of cost based on the completion of design. The accuracy of those estimates will allow Capstone to provide a range of probable costs. As designs evolve and the exact dimensions, quantities and specifications are issued, Capstone will analyze the updated design to refine probable cost estimates for construction. As contractors are requested to bid on construction projects, we compare their estimates with ours to determine the accuracy and identify bid differences, omissions and scope deviations, and provide recommendations to the City relative to contractor selection. In the event that addendums or amendments are issued during the design and bid phase or change orders are issued during the construction phase, Capstone will provide cost estimates in order to identify the reasonable and probable cost for these changes. If the costs are excessively high or low, Capstone will work with the City project management team to arrive at a fair cost estimate. Construction Cost Estimating System Expertise Capstone is versed in the leading cost estimating software packages including Success; Timberline; MCACES; Win Est; and internally developed spreadsheet - estimating systems utilizing Microsoft Excel and Access. Prior to proceeding with our scope of services Capstone's Project Manager will work with the City's 6 City of Fort Collins Utilities Independent Cost Estimating Services RFP No.: P1153 cnSIE Committed to hojeu Success management team to determine the preferred software or format that will seamlessly interface with the MS Excel and MS Word systems utilized by the City. Capstone recognizes that cost estimating services must offer experienced staff, measurable benefit, provide effective solutions, meet commitments, and at the same time be cost effective. Given these parameters, the approach that we have taken for this proposal is to establish an organization that complements the City management team with experienced professionals that will be utilized as their expertise is required. The intent of the staffing plan is to have the resources immediately available when the project volume and workloads dictate the need. PERSONNEL AND EXPERIENCE Key Personnel Capstone's construction professionals are generally multi -disciplined, having experience in project and construction management, project engineering, project controls, contract administration, estimating and scheduling. For Capstone and our Clients, this provides a more effective approach in successfully undertaking and completing project engagements. With the overlap of individual experience, our professionals complement one another. Following is a listing of Capstone's proposed staff (See Org Chart below): Frank Humbert Senior Project Manager Jim Bolin Project Manager/ Specialties Estimator Phil Sikorski Senior Estimator Don Polla Senior Estimator Our Senior Project Manager will serve as the single point of accountability for all aspects of Capstone contractual and administered services. Specifically, the Project Manager will provide: • Development and presentation of work plans and budget. • Task status reporting to the City Project Management Team. • Identification of problem items. • Assessment of task priorities as needed. • Work with design consultants and construction contractors to communicate City's estimating requirements. • Coordination and supervision of Capstone's cost estimating staff. Resumes for the individuals proposed for this RFP are included in the Appendix. In order to provide the City with the best service and flexibility at a competitive fee, the majority of the individuals listed above will be staffed by the Senior Project Manager on an as needed basis. 7