Loading...
HomeMy WebLinkAboutRFP - P1144 MASON CORRIDOR PROJECT MANAGEMENT SERVICESityyy Financial Services MM Purchasing Division 215 N. Mason St. 2i' Floor F6rt Collins PO Box 580 Fort Collins, CO 80522 970.221.6775 P u rc h a s i n 970.221.6707 9 rcgov.c01711purchas;„g ADDENDUM No. 1 SPECIFICATIONS AND CONTRACT DOCUMENTS Description of RFP: P1144 Mason Corridor Project Management Services OPENING DATE: 3:00 p.m. (Our Clock) September 5, 2008 To all prospective bidders under the specifications and contract documents described above, the following changes are hereby made. ADDITIONAL INFORMATION 01. How does the city handle the yearly rate increases for consultants on projects which carry on from year to year? Are increases allowed and is there a cap on the amount? For cost estimating and considering the "Not to Exceed amount", we are proposing an estimate of cost for the PM position for about 2 1/2 years and an estimate of costs which will include other team members. These team member's costs will be based upon assumptions for the amount of involvement for their technical expertise and the associated hours. Since we are not sure how involved or how much work will be required, we can make assumptions and have them stated clearly so the NTE amount will some reference. Does this sound reasonable and is this the intent of the RFP? Any suggestions? Al. Consultants should include their costing methodology for their services. The City has used the Denver Boulder CPI yearly increase in hourly rates on other contracts. Q2. Are federal funds being used to fund the Project Management Team contract? If so, why is there a cost submittal with this RFP? Is it safe to assume that this could be negotiated after selection? A2. Federal requirements do apply; however, this is not a design contract so cost and pricing can be considered. Cost is only one of the rating criteria. Proposer should return the Certification on Lobbying with their proposals. 03. Are you expecting the Project Management Team to be on the ground in Fort Collins for the duration of the project (10/08 to the end of 2011)? A3. Yes - we need the PM to have a local presence either housed in our office or in their own local office. The City is providing office space, desk, computer, phone, internet connection for one/two primary members of the Project Management Team. Q4. Is the Real Estate Management Plan (RAMP) consultant part of this team or will they be hired separately? As such, what role will this team play in ROW acquisitions/negotiations? 14. The project manager or team must have experience with Federal Transit Administration and/or Colorado Department of Transportation/Federal Highway Administration capital projects including all procedural requirements, regulations, guidelines, and project reporting requirements. 15. The project management team must have experience with cost estimating related to complex urban corridor and building projects. This experience should extend to labor, material and production schedules to certify construction contractor estimates. The project management team must be experienced with construction price trends that affect urban infrastructure projects. 16. It is highly desirable for the project manager or consultant team to have relationships with local organizations and authorities including Colorado State University, Downtown Development Authority, and other community stakeholders. 17. It is highly desirable for the project manager or consultant team to have established relationships working with the City of Fort Collins and/or Colorado Department of Transportation and/or the Federal Transit Administration 18. It is highly desirable for the consultant team to have experience with the City of Fort Collins development review and approval process. 19. It is highly desirable for the consultant project manager to have experience with the City of Fort Collins standard General Conditions of the construction contract and have demonstrated experience managing projects using these conditions. 20. It is highly desirable for the consultant project manager to have experience with local, state, and federal governmental procurement rules, process and limitations. 21. The consultant team must follow the City of Fort Collins Capital Projects Manual. The manual may be accessed electronically at: http://citydocs.fcgov.com/?vid=10&cmd=search&scope=doctype&dt=CORRESPON D ENCE&q=CAPITAL+PROJECTS Project Schedule The overall Mason Corridor project schedule calls for project manager selection to be complete by October 2008. Design and/or design/build selection will occur in 4'" quarter 2008 with design and right-of-way acquisition complete by 2010. Construction is planned to begin in 2009-10 and the BRT service is scheduled to be completed by the end of 2011. (See Project Management Plan for more detailed schedule). lll. Instructions to Consultants A. Submittal Requirements Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 (0 LAPORTEAVE F 'N MOUNTAIN OUNTAIAtN As Iliwaa�a W MULBERRY ST WLAUREL ST Figure 1. Project Area Map Legend MAX BRT MAX Station MAX Stop Transit Center P Park & Ride E VINE DR I t __i...../_..__S�'w....... ^ t Y J Y t A004 � y J r 6 r-4ureERRY ST Project Location ` E PROSPECT Fort Collins W E DRAKE RD i r 3 w N O 7 p E NORSETOOTH RD i U W J m `L N E CONNTY r'\ r Maintenance Facility Ki w IN N 0 25 5 wi Miles D City of Fort Collins a d y f 1 VI i �a`x NI Exhibit A b Mason Corridor MAX Bus Rapid Transit Project Management Plan `' August 11, 2008 PROJECT SCHEDULE Environmental clearance for the project is expected in the fall of 2008. Right-of-way acquisition will occur in 2009 and 2010, with a design build process to complete construction in 2010 and 2011. The MAX BRT service would begin operation later in 2011. The Project Summary Schedule is depicted in Figure 2. Figure 2. Project Summary Schedule BEGIN OPERATION I I I CFGA LEGEND = RR Negotiation Consultant Hired - - -. - = Critical Path PROJECT BUDGET AND FINANCING .. 4TH QTR 2011 The total capital cost of the MAX BRT project is estimated at $74.19 million in Year of Expenditure/2010 dollars ($69.39 million in 2007 dollars). To clarify previous concerns from FTA staff, this cost estimate does not include any costs associated with the Mason bicycle/pedestrian trail elements of the corridor, the Troutman Parkway bicycle/pedestrian grade -separation, nor does it include any transit service operating outside of the MAX BRT corridor. The following discussion about capital requirements is based on the completed Preliminary Engineering work to the 30 percent level (July 2007). This cost estimate information will be refined at each design/construction review level. Implementation of the MAX BRT will be confirmed in the Development Agreement\Construction Grant Agreement between the City and FTA. The costs in Table 1 are based upon updated Exhibit A Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (V cost estimates resulting from the completion of preliminary engineering in 2007 and include a 30% contingency level. Table 1. Project Budget, Year of Expenditure (Millions of Dollars) MAX BRT Project Cost 2008 2009 2010 Total Final Design $3.27 $6.08 $9.35 Real Estate Acquisition, Permitting $32.21 $26.95 $59.16 & Construction Rolling Stock $5.68 $5.68 Total Cost $8.95 $38.29 $26.95 $74.19 Financing The City is seeking capital funding for the project from several sources. Non-federal sponsors will provide 20 percent of capital funds for the project; the City is seeking the remaining 80 percent from FTA's new Small Starts transit funding program. Capital funding sources are described below and shown in Table 2 below. 1. Non -Federal Sources It is important to note that the City of Fort Collins has already funded significant local monies for the Mason Corridor from local Building Community Choices capital improvements funds. This funding has been used to develop the Master Plan vision for the Mason Corridor, as well as the Alternative Analysis report for the FTA New Starts/Small Starts program application process, and to complete the PE phase of the project to the 30 percent level as requested by FTA. The City is also using this existing local funding to develop the EA document for the MAX BRT project. A portion of this local funding has also been used to purchase the land for the future South Transit Center for the MAX BRT service. In addition, these local funds have been leveraged with funds from the Colorado Department of Transportation and Great Outdoors Colorado, to construct the new Mason bicycle/pedestrian trail. The financial information included in this Charter demonstrates that the local matching dollars needed for the MAX BRT project will be provided by the City as well as by committed funding from the Fort Collins' Downtown Development Authority. The City will fund the completion of the MAX BRT utilizing one of two options: 1. The City will identify a short-term re -purchasing agreement within it's internal investment portfolio that will not fall beneath the outstanding balance of the project. Exhibit A Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 __ (0 2. The City will fund a flexible repurchasing agreement with a third party financial institution that will not fall below the outstanding balance of the project. The City intends to supplement these existing local funds with state capital transit funding approved by the Colorado Transportation Commission from Senate Bill 97-1 (SB-1) specifically for the MAX BRT project. The combination of the local (City & DDA) and state funding provides the necessary 20% non- federal share of funding for the MAX BRT project. 2. Federal Government Sources To supplement local sources, the City is seeking funding from the Federal Transit Administration's new Small Starts transit program to implement the MAX BRT project. Table 2 Sources of Capital Funds, Year of Expenditure Dollars (Millions) Funding Sources Funding Amount FundingShare FTA Small Starts $59.35 80% State SB-1 Transit Funds $ 8.56 11.5% Local Funds(City & DDA $ 6.28 8.5% Total $74.19 100% The State SB-1 and local funds are committed to the MAX BRT project, thereby confirming the full 20% local funding requirement. Funding sources for operations will remain unchanged from current funding sources, and will consist of fares and fees, City General funds, and FTA formula funding. PROJECT COMMUNICATION The Planning, Development & Transportation Director, City Transportation Director, and the Program Manager are responsible for briefing the Executive Management Team on a regular basis on key matters related to the successful completion of the project. This will be accomplished through quarterly meetings with the EMT. The City Manager, on behalf of the EMT, will be responsible for all briefings to City Council on the project. The Executive Management Team emphasizes the critical importance of proactive planning by Planning, Development & Transportation Director, City Transportation Director, and the Program Manager working with the EMT to successfully complete this project. The Project Manager will be responsible for project organization necessary to sustain clear communication among City Staff sub -teams, consultants, contractors and stakeholders necessary to successfully complete the project. PROJECT STAFFING The Executive Management Team hereby commits the following staffing resources to the successful completion of this project: Planning, Development & Transportation Director Planning, Development & Transportation Director Exhibit A Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 Mr. Jeff Scheick serves as the City's Director of Planning, Development & Transportation and he is responsible for executive level oversight of the MAX BRT project, including the MAX BRT Project Team. Mr. Scheick will provide leadership to the Project Team, serve as a liaison to all City Department Directors whose staffs are involved with the MAX BRT project, and serve as a member of the Executive Management Team. Transportation Group Director Mr. Mark Jackson serves as the Transportation Group Director, which is comparable to a Public Works Director role, for the City of Fort Collins. Mr. Jackson will be responsible for direct oversight of the MAX BRT Project Manager and Management Team and assure effective collaboration and resources are available throughout the various Transportation departments involved with delivering the MAX BRT project, and serve as the liaison to the Executive Management Team. Program Manager Ms. Kathleen Bracke serves as the Program Manager (PM) for oversight of the development of the MAX BRT project, including the Preliminary Design and Environmental Assessment phases as well as providing guidance for future phases of the project. Ms. Bracke is responsible for project leadership and direction, including administration of schedules and budgets, coordinating with other agencies on management and policy issues, representing the City at public outreach activities for the project, coordinating with the Project Manager, and serving as the liaison to the Transportation Group Director and Planning, Development, & Transportation Director. Project Manager The Project Manager is responsible for all project control measures and the full implementation of the MAX BRT project, including Real Estate Acquisition, Vehicle Acquisition and Operations, Design and Construction, Public Relations and initiation of BRT service operations. The Project Manager is responsible for direct management and operation of the project, including compliance with schedules and budgets, coordinating with other agencies on management and technical issues, establishing and coordinating public outreach activities for the project, managing project consultants, compiling & distributing project technical and financial reports per City, State, and Federal requirements, and directing all activities for successful completion of the project. The Program and Project Managers shall have full authority to engage City Staff and the consultants/contractors as needed to successfully complete the project according to the scope, budget and schedule for the project, identified herein and as amended. Project Staff Organization The MAX BRT Project Design Team includes representatives from almost every City department or division. The MAX BRT project is organized as a matrix — staff reports to the Project Manager through the project chain of command to receive direction on project work assignments (what work has to be done) and to their functional supervisors for direction on their technical performance (how their work is done). Exhibit A Mason Corridor MAX Bus Rapid Transit Project Management Plan Auqust 11, 2008 The following City staff is organized by sub -teams to complete the major work elements of the MAX BRT Project: Sub -Team I Project Staff Executive Management Team (EMT) (Long -Term Financial Planning ROW Acquisition (RAMP) and Railroad Planning, Design and Construction Operations Public Relations* Mark Jackson Polly Bennett Jeff Scheick Diane Jones Darin Atteberry Mike Freeman Wendy Williams Marlys Sittner Kathleen Bracke Kurt Ravenschlag Kathleen Bracke Helen Matson Pat Rowe Paul Eckman Carrie Daggett Helen Migchelbrink Helen Migchelbrink Dean Erickson Nicole Hahn Steve Catanach Denise Weston Randy Hensley Joe Olson Ward Stanford Dan Holland Britney Sorensen Rich Brewbaker Kurt Ravenschlag Kathleen Bracke Marlys Sittner Kurt Ravenschlag Dean Erickson Larry Schneider Ken Mannon Dave Leicester Tracy Ochsner Ryan Burke Kim Newcomer Claire Thomas Helen Migchelbrink Ken Mannon Jim O'Neill Chuck Seest Steve Roy Brian Janonis Tom Vosburg Chuck Seest Wally Muscott Kraig Ecton Ingrid Decker Jim O'Neill Lance Murray Jin Wang Rick Richter Wally Muscott Brian Janonis Marlys Sittner Cameron Gloss Ellen Martin Anne Aspen Joe Frank Pete Wray Timothy Wilder Tom Vosburg Joe Olson Ward Stanford Britney Sorenson Nicole Hahn Rich Brewbaker Dan Holland Carle Dann Lance Murray Kelly DiMartino Kathleen Bracke Judith Lavelle John Stokes Jim Hibbard Roger Buffington Glen Schlueter Wes Lamarque Susan Hayes Anne Bossert Janet Mctague Craig Foreman Carle Dann Larry Schneider Dana Leavitt Jim O'Neill John Stephen Carol Thomas Kathleen Walker Denise Weston Karl Gannon Craig Dubin Jim Hume Exhibit A Mason Corridor MAX Bus Rapid Transit Project Management Plan DISPUTE RESOLUTION The Executive Management Team authorizes the Project Manager to resolve any and all disputes among project staff participants and stakeholders as necessary to maintain the project scope, schedule and budget commitments. Exceptions that are not resolvable by the Pro shall be brought forward to the Project Director, and if necessary, on to the Executive Management Team for resolution. Mason Corridor "MAX" Bus Rapid Transit Project Executive Management Team Darin Atteberry City Manager Diane Jones Deputy City Manager Jeff Scheick Kathleen Bracke Planning, Development & Transportation Director Transportation Planning & Special Projects Dir. Mark Jackson Transportation Group Director Mike Freeman Chief Finance Officer & Economic Development Director Marlys Sittner Transfort General Manager Helen Mighelbrink City Engineer Jim O'Neill Purchasing & Risk Management Director Steve Roy City Attorney New Position Mason Corridor/MAX Project Manager Chuck Seest Accounting & Finance Manager Kurt Ravenschlag Transfort Assistant General Manager Ken Mannon RE VP & Maintenance Director Brian Janonis Utilities General Manager Tom Vosburg Chief Information Officer Exhibit A No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan _... 96 a i PROJECT ORGANIZATION CHART ,a. Exhibit B No Text Qualified consultants interested in performing the work described in this request for proposal should submit the following information to the City. 1. Qualifications of your firm/staff or team proposed to perform the work on this project. This should include resumes and any recommendation/commendation letters received for past projects. 2. Provide a profile listing of similar projects completed in the past 5 years. Highlight project management roles/responsibilities and personnel assigned to the Mason Corridor/MAX BRT project. Include tasks completed as noted in the Project Requirements section above. 3. Describe how your firm would assist the City with this project and what unique traits your project manager or team brings to the project. 4. Provide a scope of work and fee estimate for project management services. Include a cost break down of hourly rates and number of hours assigned for each task of work for all personnel and sub -consultants. 5. References from at least three other projects with similar requirements that have been completed within the past five years and that have involved the staff proposed to work on this project. As part of the reference check process, the City may choose to visit one or more of the listed projects and/or request a copy of the plans and documentation completed. 6. Detail experience your firm or team has with design/build delivery models and formal partnering processes. Highlight any other innovative delivery methods used on other projects that may be applicable to this project. 7. Detail experience your firm or team has working on projects where public/private partnerships have been a key to success. 8. Provide examples of vertical building projects managed by your proposed team during the past 5 years. 9. Detail any specific experience your firm or team has with Federal Transit Administration and/or Federal Highway Administration projects. 10. Detail any specific experience your firm or team has with the BNSF Railway Company, Federal Railroad Administration, and Colorado Public Utilities Commission. 11. Limit the total length of your proposal to a maximum of 50 pages (excluding covers and dividers). The Director of Purchasing and Risk Management may reject proposals received that are longer than 50 pages in length. 12. Submit a total of ei ht 8 copies of your proposal. ............. . . .. M a s 0 n C o r r i d o r M A X B U S R a p i d T r a n s i t EXHIBIT B Project Steve Greene & Associates 0 .j(,(.l Organization Chart r No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 EXHIBIT C ENVIRONMENTAL ASSESSMENT EXECUTIVE SUMMARY Introduction The City of Fort Collins, as a grantee of the Federal Transit Administration (FTA), has prepared an Environmental Assessment (EA) under the National Environmental Policy Act (NEPA) for the proposed Bus Rapid Transit (BRT) component of the Mason Corridor project in Fort Collins, Colorado. The EA was prepared to disclose potential environmental effects of the proposed project, to provide opportunity for comment and input, and to identify mitigation measures to address impacts. The EA contains the results of the environmental analyses completed on the proposed project and is used as a decision -making document to determine if the Mason Corridor/Mason Express (MAX) BRT Project will result in significant impacts to social, economic, environmental, and transportation factors and identify mitigation measures to address these impacts, if necessary. The Mason Corridor/MAX BRT Project is a proposed north -south BRT system, in the central area of Fort Collins. As shown in Figure 1-1, the project corridor extends from Cherry Street on the north, to approximately 1/4 mile south of Harmony Road, with a total length of five miles. The BRT system is proposed within an exclusive guideway for 3.6 miles with the remaining 1.4 miles intermixed with street traffic on portions of McClelland Drive and Mason Street. Along the entire length of the corridor the BRT system runs parallel to the existing Burlington Northern Santa Fe (BNSF) railroad tracks; however, at varying locations, the BRT system is proposed within a combination of property owned by the BNSF, City of Fort Collins', Colorado State University, and private land owners. In addition, the Mason Corridor/MAX BRT Project is proposed just west of and parallel to College Avenue (US 287); one of the busiest arterials within the City and the entire North Front Range region. The idea of the Mason Corridor/MAX BRT Project emerged in response to the existing and projected congestion along College Avenue as well as an opportunity to provide alternative modes of travel to the automobile. Throughout project conception, the purpose and need for the MAX BRT Project have been strongly maintained and are based on the following deficiencies within the project corridor: ► Congestion on College Avenue ► Low Transit Ridership ► Lack of Transit Facilities ► Need for Economic Growth Opportunities ► Support for Local and Regional Development Plans ► Safety Concerns ► Inadequate Inter -Modal Connectivity Exhibit C Mason Corridor MAX Bus Rapid Transit Project Management Plan ".-,.: August 11, 2008 ____ Mason Corridor MAX Bus Rapid Transit Project Vicinity Map Legend Prcjed Corridor if v � "I,LL.. EVIKE OR z � i 0 LAPORTE qVE a Nl MOUNTAIN AVE R, $'414( '\ '•....I _. Q O A 1NNULBERHYSI '. �q'S Mui (pq eZ i n OF 'e)yCUgERRy ST 4- 'II-AURELSIC, 1 WPROSPECT RO EPROSPECTRO Fort Collins i 'l:OHAKE RO `c CRAKE RO i oi3 uui rcl w UL, EHORSETCOTHRO f° in '6 z Id 1° dHARMONY RD EfHARMOIJY RC r r- I 0 2.5 5 1 .J EcajNTY RtlPos City of Fort Collins Y n T a „- _r l e_...�.. E TRI�BY RO I ~ 1 l 1 Figure 1-1 Vicinity Map Exhibit C Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (a Traffic congestion along College Avenue slows transit service, increasing travel time for riders, and affecting timed connections with other routes at transfer points. College Avenue traffic volumes are projected to significantly increase over the next 20 years, resulting in continued adverse impacts to transit travel times, service quality, and ultimately ridership volumes within the area. The current Transfort system does not have any Park-N-Ride lots or a South Transit Center, rendering it inadequate to expand and serve future patrons of the City's transit system. The City Plan emphasizes the need to structure future urban growth "in a compact pattern that facilitates pedestrian, bicycle, and transit travel." Specific actions, including zoning changes to support transit -oriented development (TOD) at station sites proposed in the Mason Corridor/MAX BRT Project, have been implemented by the City in support of this strategic land use concept for the project corridor. The North Front Range Metropolitan Planning Organization (NFR MPO) 2035 Regional Transportation Plan (RTP) has established goals to increase safety, improve region -wide infrastructure, and coordinate transportation and land -use decisions. The Mason Corridor/MAX BRT Project will help meet these goals as well as support the vision to reduce dependency on single occupancy vehicles. Alternatives Considered The selection of the planning -level Locally Preferred Alternative (LPA), defining the conceptual design of the Mason Corridor/MAX BRT Project was a result of the Mason Street Transportation Corridor Master Plan completed in October of 2000. Further evaluation of the LPA resulted in a number of alternatives with various travel mode and alignment options. Based on the LPA produced during the planning -level Alternative Analysis process, a further refined Build Alternative was determined for additional analysis under this EA. Alternatives that have been considered for the Mason Corridor/ MAX BRT Project include: No Action Alternative, Transportation System Management (TSM) Alternative, and the Build Alternative. The No Action Alternative serves as a baseline against which to evaluate the effects of the TSM and the Build alternatives on transportation, social, economic and environmental factors. The No Action Alternative undertakes no major transit system investments within the Mason Corridor study area, but rather maintains the existing system on College Avenue with approximately 20 minute headways. All transportation network improvements, transit elements, and bus service enhancements described under the No Action Alternative are assumed to be implemented with the TSM Alternative. Therefore, transit service options proposed for the TSM Alternative are similar to those proposed for the Build Alternative, including the 10-minute headways. The one major difference being that transit service under the TSM Alternative will remain on College Avenue, within mixed traffic, and not within an exclusive guideway. The Build Alternative includes a busway from the proposed South Transit Center, approximately 1/4 mile south of Harmony Road, north to the existing Downtown Transit Center. The proposed busway includes one new transit center, seven Park-N-Ride lots, eight stations, eight curb -side stops, and the expansion of the existing maintenance facility. Beginning at the South Transit Exhibit C Mason Corridor MAX Bus Rapid Transit u ` Project Management Plan August11,2008 Center, an exclusive BRT guideway is proposed north to University Avenue. Between University and the existing Downtown Transit Center, BRT operation will join vehicular traffic on an enhanced roadway network. The Build Alternative proposes the following facility improvements: ► New South Transit Center including a Park-N-Ride lot ► Bus -only guideway between the South Transit Center and University Avenue ► Two-way conversion of N. Mason Street and Howes Street ► Shared Park-N-Ride lot at Troutman Parkway ► Shared Park-N-Ride lot at Horsetooth Road ► Shared Park-N-Ride lot at Swallow Road ► Shared Park-N-Ride lot at Drake Road ► Shared Park-N-Ride lot at University Mall ► Park-N-Ride lot at the existing Downtown Transit Center ► Expansion of existing maintenance facility at Trilby The Build Alternative would use low -floor, BRT vehicles. The BRT vehicles would be clearly differentiated from conventional buses. The Build Alternative proposes 10-minute headways in the peak, mid -day, and evening periods with 15-minute headways in the late evening period. Financial Considerations The total cost of constructing the Mason Corridor/MAX BRT Project is estimated at $74.20 million in Year of Expenditure (YOE) dollars. These current cost figures are based on the recently completed Preliminary Engineering plans to the 30-percent level, including refined horizontal & vertical design, systems costs, utilities, rights -of -way, and environmental mitigation. The City has secured capital funding for the project from several sources. The non-federal sources include the CDOT State Transit Funding Program Senate Bill (SB) 97-1 Transit Funds, the Downtown Development Authority (DDA), and local funding from the City of Fort Collins. These currently available funding sources total $14.84 million, or 20% of the estimated $74.20 million total cost of construction. The primary Federal funding for the Mason Corridor/MAX BRT Project is Section 5309 New Starts/Small Starts Funds. Based on the FTA funding policy of 80 percent Federal and 20 percent local match, up to $59.36 million of Section 5309 New Starts/Small Starts funds is being requested for the Build Alternative. Environmental Consequences and Mitigation The EA reports on the potential environmental, social, and economic impacts associated with the No -Action and the Build Alternative. All of the areas of concern analyzed under the EA process are presented below with a summary of anticipated impacts and potential mitigation measures associated with them for the Build Alternative. The No -Action Alternative was not included in the summary, as the impacts are minimal. More detailed information on impacts and mitigation measures can be found in the EA. Exhibit C Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11 2008 (8 Area of Potential Impacts Concern Proposed Mitigation Build None Support for recently approved TOD None required Alternative overlay zone. Build Residents adjacent to proposed Enhanced transit accessibility. Park- Coordination with the local Alternative stations and expanded N-Ride lots providing approximately community and emergency maintenance facility would 200 additional parking spaces along service providers during the experience a slight increase in the corridor. construction phase to maintain traffic related impacts. access. Economic Conditions' Build The Build Alternative would not Development of Park-N-Ride lots Develop Park-N-Ride lots with Alternative result in the displacement of any providing approximately 200 approximately 470 parking businesses. Permanent impacts additional parking spaces along the spaces. Coordination with CSU include the relocation of vacuums corridor. and local businesses to minimize at Casey's Carwash (4315 S. disruptions and preserve access Mason) and the loss of during construction. approximately 235 parking spaces serving primarily CSU. Environmental Justice Build None Alternative Build Construction of the Build Alternative Alternative would require the relocation of one building, the Public Service Company of Colorado substation building located at 128 Prospect Street. The Build Alternative would require acquisition of a total of approximately 17 acres of new right-of-way and/or permanent easements for the proposed alignment and stations. In addition temporary construction easements would be required for an additional 15 acres. Build Project level carbon monoxide Alternative analyses resulted in no exceedances of the National Ambient Air Quality Standards, Build None Alternative w " c Expected to reduce vehicle miles traveled resulting in reduction of air pollution emissions. For those property owners affected by acquisition of private land, the acquisition process will be in full compliance with all federal and state requirements, including the Uniform Relocation /assistance and Real Property Acquisition Policies Act of 1970 Construction related mitigation measures proposed to reduce air pollution during construction. Construction related mitigatior measures proposed to reduce noise impacts during construction. Exhibit C Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 Area of Potential Impacts Proposed Mitigation Concern Adverse Beneficial Build Construction of the Build Water quality mitigation will Alternative Alternative will result in the addition adhere to the Municipal Separate of 19.5 acres of impervious Storm Sewer System (MS4) surfaces which could lead to more permit requirements. The City of runoff and increased Fort Collins will develop, sedimentation. implement, and enforce a Stormwater Management Potential for nonpoint source Program as well as comply with pollution to surface water from all local, state, and federal storm water runoff related to permitting requirements, transportation activities. Wetlands and Other Waters of the U.S. Build It is expected that 0.3 acres of Coordination with the USACE Alternative jurisdictional wetlands and 0.14 has been initiated and all acres of non -jurisdictional wetlands appropriate permits will be may be impacted. obtained. Build Construction of the Build Best management practices will Alternative Alternative would result in 0.11 be followed to reduce temporary acres of encroachment in to the and permanent impacts. "FEMA-designated" 100-year fioodplain and floodway associated with Spring Creek. Build Minimal All disturbed areas will be Alternative replanted as soon as possible following construction with drought tolerant, native Build Soil disturbance caused by Best management practices will Alternative construction equipment and the be utilized during construction to removal of native vegetation would reduce the potential for contribute to the spread of noxious introduction and spread of weeds in the study area. noxious weed species. Build Construction of the proposed All disturbed areas will be Alternative Mason Corridor/MAX BRT line will replanted as soon as possible result in the removal of following construction with vegetationlriparian habitat within drought tolerant, native the study area. vegetation. A nesting survey for active migratory bird nests is recommended prior to start of construction and during the breeding season (approximately mid -April through August) to ensure no active nesting locations are disturbed. If required, appropriate permits will be obtained through U.S. Fish and Wildlife Services, Exhibit C Mason Corridor MAX Bus Rapid Transit Project Management Plan (0 Area of ( Potential Impacts Proposed Mitigation Concern I Adverse Beneficial Alternative Build Minimal due to E Alternative railway corridor. Build An "adverse" impact has been Alternative determined for the Public Service Company of Colorado (PSCO) substation building as its removal would be required for construction of the project. The PSCO building is eligible for the National Register of Historic Places. Build A retaining wall would be built at Alternative the western boundary of Creekside Park. Build None Alternative Alternative Build None Alternative Build Two impacted properties are Alternative protected under Section 4(f) of the Department of Transportation Act: the PSCO building and Creekside Park. Required actions include removal of the PSCO building and construction of a retaining wall at Creekside Park. None Retaining wall colors and textures will be chosen to fit into the landscape visually and aesthetically. Native and indigenous species will be used for revegetation. All new structures, signing, and lighting would be consistent with local SHPO concurred with the "adverse" finding. Two mitigation measures have been proposed: relocation and demolition. A Memorandum of Agreement with FTA, SHPO, and the City will be prepared prior to final environmental clearance. Choice of colors and textures for the retaining wall to minimize visual impact. required None required Enhanced safety features are proposed on the buses and at the stations. Avoidance alternatives for the PSCO building were developed and reviewed by FTA, all of which proved to be not "prudent and feasible" and were thus dismissed from further consideration. Impacts to Creekside Park were determined to be de minimus. Exhibit C No Text B. Contacts Questions related to procurement procedures should be directed to James B. O'Neill, CPPO, FNIGP Director of Purchasing and Risk Management City of Fort Collins 215 North Mason Street- 2nd Floor Fort Collins, CO 80524 (970)221-6775 ioneill@fcgov.com Questions related to the scope of work should be directed to: Kathleen Bracke Transportation Planning and Special Projects Director 250 North Mason Street P.O. Box 580 Fort Collins, CO 80522 (970)224-6140 kbracke@fcgov.com IV. Selection Criteria and Method The City of Fort Collins' Capital Project Management Control System Manual prescribes the consultant selection criteria and method. This document is available for review at the Purchasing and Risk Management Office. V. Terms and Conditions The payment for services, as described under the Scope of Services, shall be based upon hourly rates as outlined in the submitted cost schedule/estimate. The submitted cost estimate shall establish a "not to exceed" amount for the contract. Any changes in scope to the original contract will be treated as a negotiated change order to the contract. Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 EXHIBIT D PROJECT SCHEDULE WORK BREAKDOWN STRUCTURE Exhibit D No Text Mason Corridor MAX BRT Project Schedule August 11, 2008 !D !Task Name WBS Start Finish Duration 2008 I 2009 1 Mason Corridor MAX BRT Project { Tue 5/6/08 _ Fri 9130111 i Q1 889 days? _ _ i Q2 Q3 Q4 Q1TQ2 Q3 Q4 2 Planning &Preliminary Design 1.A Tue 516108 Wed 6130110 561 days? I ' - 3 -. Environmental Assessment 1.A.A Tue 5/6/08 Fri 8/29/08 84 days? 4 Final Document Revisions t.A.A1 Tue 5/6/08 Fri 5l30/08 -19 days? 1 � � � � �� ............. :. . _.....'..._... .....__. ❑ 5 Final Review 1.A.A.2 Mon 612108 Mon 6116/08 11 days? 6 Public Comment Period 1.A.A.3 Mon 6/16f08 Wed 7/30/08 33 days? El. 7 EA Public Meeting '.. 1.A.A.4 Wed 7/9108 Wed 7/9/08 6 days? 8 � Compile Comments t.A.A.5 Fri 8/1l08 Tue 8/5/O8 _. _ __..�__..--------------- 3 days? ; ...._.. _............_. _...... 9 Final Revisions 1.A.A.6 Tue 8/5/08 Fri 8/8/08 4 days? 10 FTA Submittal -Final Approval 1,A.A.7 Mon 81111O8 Fri 8/151O8 5 days? 11 Route for Signatures 1.A.A.8 Mon 8/18/08 Fri 8/29/O8 -- days?j 12 FONSI 1AA9 ... Fri 8/29/08 Fri 8/29/08 Oda s'__--------_-------��----------- y .---- . 8129 13 Project Management Plan (PMP) 1.A.B Tue 516108 Thu 10/16/08 118 days? 1 14 : Project Initiation Meeting tA.B.t Tue 516/O8 Tue 5/6/08 1 day? 15 __—_—i Research PMP Content 1.A.B.2 Wed 5f7108 Thu 5/22108 12 days? I Team Meeting -Identify Sub-Teams\Scoping Discussion 1.A.6.3 Fri 5/23/08 Fri 5/23/OS _ 1 day? _.'_.... J_. 17 Collect Existing PMP Information 1.A.8.4 Mon 5/26/08 Fri 6120/O8 20 days? I , 0 18 EMT Meeting -Draft Charter - i to B 5 6/23/08 6/23/08 ......._I i tlYy? _--- _._..._._._...._..... .. lect 9 —__ _ -_... Ex---- PMP_Informatlon _ _ 7 -Mon ue6124168- _Mon ---Mon 7MO8­ 10 20 J Dralft BasediWOBns 1.A B Tue 6/24/08 - Mon 7/7/08 10 tla sv 21 Sub -Team Meetings -WBS &Task Assistance ! - 1 .A B 8 Fri 7/11/08 Fri7/11/08 1 day? : 22 Complete Chapter\Subection Work Tasks - 1 A 8 9 Mon 7/14/08 I'd 7125/O8 ... 10 days? _ - 23 :, Compile & Publish Draft PMP Update 1 A.1310 Mon 7128108 Thu 7/31/08 4 days? 24 Review Draft PMP Update - 1.A.f3 11 Fn 8/1/08 Mon 8/4/08 2 days? , @,, 25 Draft Review Sub -Team Meetings 1.A.B 12 Mon 814108 Mon 8/4108 Q days g/q 26 Final Revisions -PMP Update 1.A.8 13 Tue 8/5/081 ­ Fn 8/8/08. 4 days?' - 27 ...__.. __. .._- FTA Submittal -PMP Update .__..... .__. _. ._.._. _ 1.A.6 14 .. ___ Mon 8/11/OS - Mon 8f11/08 Q days ® 8/11 28 FTA Review &Comments ... .._.__ /0.. Fn 9/5/OS 19 tlay_.s ' ....... .... ......... .... Task Rolled Up Task External Tasks t Project: MASONBRTWBS081108 Progress Rolled Up Milestone O Project Summary Date: Mon 8/11108 Milestone ® Rolled Up Progress Group By Summary Summary Split Deadline , City of Fort Collins 30 PMP Final FTA Submittal 31 ',, RAMP & Agency Coordination 32 �'. Real Estate Acquisition Management Plan (RAMP) 33 Consultant Draft RAMP 34 City Review 35 !! Revisions 36 Initial FTA Submittal - RAMP 37 FTA Review & Comments 38 Final Revisions -- 39 Final FTA Submittal - - -- - 40 Property Acquisition 41 Title Commitments 42 Review Commitments 43 Form Approval 44 License to Enter Procurement 45 Final Legal Description Deadline 46 Pre -Condemnation Property Ownership 47 i Council Condemnation Authorization 48 Bid Process 49 Submit NO) Letter 50 Appraisal - 51 —' Railroad 52 Phases 53 RR 54 Phase 11 55 , Phase III 56 Final - Mason Corridor MAX BRT Project Schedule August l 1.2008 iBS Start 1.A.B.16 Mon 918108 Thu 10/16/08 1.A.B.17 Thu 10/16/08 Thu 10/16/08 1.A.0 Tue 516108 Wed 6/30110 - 1.A.C.1 Tue 516108 Thu 10116108 1.A.CA.1 Tue 5i6108 Fri 71,125108 1.A.0 1.2 ;Mon 7128/O8 Fri 811108 1.A.0 1.3 Mon W4108 Fri 8008 1.A.C.1.4 Mon 8/11/08 Mon 8111108 1.A.C.1.5 Tue 8/1208 Fd 9/5.'08 1.A.C.1.6 Mon 918108 Thu 10116108 1.A.C.1.7 Thu 10/16/08 Thu 10/16/08 1-AC.2 Fri 811108 Wed 6130110 1.A.C.2A Fri 8/1108 Thu 8/28108 1.A.C.2.2 Fn 8/8/08 Thu 914108 1.A.C.2.3 Fri 8/1!08 Thu 8/14108 1.A.C.2.4 Wed 8113r08 Tue 9.123108 1.A.C.2.5 Mon 61/09 Mon 6i1/09 1.A.C.2.6 Tue 62,09 Mon 6!29/09 1.A.C.2.7 Tue 6116/09 Mon 8/10/09 1.A.C.2.8 - Wed 8113108 Tue 9123/08 - 1.A.C.2.9 Tue 8/11,109 Mor, 8124,109 1.A.C2.10 Thu 8/7/08 Mon 2/15MO 1.A.C.2.10.1 Thu 8/7/08 Wed 10/15/08 1.A.C.2.10.2 Thu 8.0108 Wed 10115/08 1.A.C.210.3 Thu 10116,108 Thu 11/27/08 LA.C.2.10.4 Tue 8/25!09 Mon 1111/10 1.A.C.2.10.5 Tue 10/20/09 Mon ZVI0 1.A.C.2.10.5 Tue 10/27+D9 Mon 2i15/10 0 days : ..... . 10/16 _ 561 days? NB days? � ..-......._.-__.-_......:'. 59 days?: l_. 5 days? ... ..._ .....__ 5 days? l day? ! ..-_ .._ ._..... 19 days?: Q 29 days?' 0 days? 10116 498 days? 20 days? a 20 days?; ......-. _. _....,..... 10 days? I 30 days 0 days _... -... 6/1 20 days?' ......_...--_....® ._..... 40 days? - 30 days? . -.. _ ... _ ...... . 10 days? - tt 398 days?', 50 days? 50 days? 31 days? 100 days?..... ........... _. 80 days? 80 days? _.L. .._....... _.. -. I Task ! Rolled Up Task External Tasks Project: MASONBRTWBS081108 I Progress Rolled Up Milestone G Project Summary Date: Mon 8111/08 Milestone Rolled Up Progress ® Group By Summary Summary Split 11111 1 1111111111, Deadline - City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID ;Task Name WBS Start ! Finish ! Duration ;-- 2008_ _ rri 1226f08 Fri 1220108 _2.009..__,_,-.__. - _`Q2 Q3 _,-_-- G -days Pt _-Q4 p1 .12/26 5a FMv o , oe ...._. ... _. 80 days? 59 Negotiation 9 on 10 MMoi 1 00 y t- 60 I First Offer I A.0 2.13.3 Tue 77110/09 ' 329 70 _...-...- 1- ... .. ..__... 80 days? Y 1 61 Final Offer I.A.C.2.I a.2 Tue 12i8109 Mon 3/29110 80 tlays? 62 i Condemnation 1.AC.2.14 Tue 4l20/10 Wed 6/30/10 ,.... _.._ _-. _..._-__...._-_-_._... . 51 days? [ " 1 63 L� Petition Filing Date 1.A.C.2.14.1 Tue 4/20it0 Tue 4i20110 0 days' I, 64 Court Date tA.C.2.14.2 Wed 4121/10 Tue 6/75110 ___......__;.._.... ..... _._..__-.. _... 40 days? : - 65 Posession Date 1.A.C.2.14.3 Wed 6130/10 Wed 6/30110 0 days Closing 1.A.C.2.15 Tue 1110i09 Mon 6i21110 160 days?� 67 BNSF Railway S.A.C.3 Mon 612/08 Fri 7131109 305 days? 68 ! Confirm ROW Square Footage Desired 1.A.C.3.1 Tue 7/1108 Thu 7/31108 23 days? ! 69 4 City Obtains Certified Appraisal of ROW Area LA.C.3.2 Thu 817108 Wed 10/15/08 50 days? Hire Railroad Negotiator 9 , , t.A.0.3.3 Fri 8,8,08 Fri 8,129108 ....-. _.... _.__. _....--...... _.-. 16 days ' 71 1 City Finalizes Draft Request Letter to BNSF 1.A.C.3.4 Mon 612'08 Thu 1225/08 149 days? r 72 Legal Negotiations 9 9 o1 t.A.C.3.5 Mon 12/Z OS v/ Fri 3(1„ G9 - - - - 55 days?- j 73 : Final Offer 1.A.C.3.6 Mon 3M6/09 Tue 3/31109 12 days? 74 Final Agreement Signature Routing 1.A.G3.7 Wed 4/1109 Wed 4/29/09 21 days?' - 75 --: Final Land Transfer &Payment 1.A.C.3.8 Fri 5/1/09 Fri 7/3 i109 66 days? ! ! 76 - -: New Mercer Ditch 1.A.C.4 Mon t 1i3108 Fr, 2/26/10 - 345 days? _ 77 Sherwood Lateral Ditch 1.A.C.5 Mon 11/3,'08 Fri 226/10 345 days? 76 Emigh Lateral Ditch 1.A.C.6 Mon 11/3/08 Tue 1/26110 322 days? " 79 _— Larimer County No. 2 1.A.C.7 Mon 11/3108 Fri 2/26/10 345 days? 80 CSU 1.A.C.8 Mon tt/3.r08 Fri 2/26170 --- � --� 345 days?�!---. ...Hymm 81 Park-n-Rides �! Pion tt/3r08 Fri Z/26/10 345 days? 82 Preliminary Design ry 9 1.A.D Tue 5/6/08 Mon 1112/09 -------""" --^- - 390 days? ' 83 Preliminary Engineering (PE) Plans - 30% 1.A.DA Tue 5 6'08 Fri 5/30i08 19 days?' (i` 84 Supplemental Data Collection PF 1.A.D.2 Mon 612108 Fri 10/31i08 110 days? - - - - Task ";� Rolled Up Task .- External Tasks ?- - Project MASONBRTWBS081108 Progress Rolled Up Milestone Project Summary Date: Mon 8/11/08 Milestone ♦ Rolled Up Progress ® Group By Summary Summary Split ..,:............. Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August ll, 2008 ID Task Name WBS i Start Finish Duration 2008 2009 _ 85_ Utilities Coordination & PE Plan D/B RFP Develo ment `�"-- 1.A.D.3 Fn 8/1/08 -- -- Q�-02 _ Q3 i P Mon t112/0S 327 days? L 86 Supplemental Data Collection - — -- ., PP 1.A.D.3.t Fri 811/06 Fri 2/13109 141 days? 87 Survey 1.A.D.3.1.1 Mon 9/1108 Fri 2/13/09 120 days? 88 Existing Drainage System Configuration 1A.D.3.7.2 Fri 8/1/08 Fri 70137i08 66 days?,- 89 Soil Borings 1.A.D.3.1.3 Mon 9/1108 Fri 10/3lfG8 45 days?: 90 PothAling 1.A.D.3.1.4 Mon 9/7108 Fri 10/31/08 45 days? 91 Utilities/1TSfrraffic Signal Coordination 1.A.D.3.2 Mon 9/1108 Mon 1112109 306 days? _. - 92 I Identification 1.A.D.3.2.1 Wed 10/1/08 Fri 10/31/08 23 days? l - -- 93 Relocations 1.A.D-3.2.2 Mon I113/08 Toe 3/3 VG9 107 days? I 94 i Wet Utilities (WaterlSanitary Sewerl.Stormwater) 1.A.D.3.2.3 Mon 12/1108 Thu 4/30i09 109 days? r - ...... 95 Dry Utilities (ITSiCommunic tions�..GastElectric) 1.A.D.3.2.4 Thu ti1109 Fri 5/29/09 107 days? 96 Primary Electric Trunk Line 1,A.D.3.2.5 Mon 1113/08 Fri 5/29iG9 150 days?' 97 Floodplain Management 1.A.D.3.2.5 Mon 1113/08 Fri 5/29@9 150 days? —§F8 PUC Submittal - Mason/Howes 1.A.D.3.2.7 Mon 11/3/08 Thu 4/30/09 129 days - - - �99 Signal Priority System Implementation Planning 1.A.D.3.2.8 Mon 911108 Mon 11/2/09 306 days? I 100 I PE Plan DIB RFP Development 1.A.D.3.3 Mon 1113/08 Mon 1112(09 260 days? 101 Final D/B Package RFP Plans t.A.D.3.3.1 Mon 11/3/08 Fri 5129109 150 days?' 102 DIB Package RFP Development-t.A.D.3.3.2 Thu 111/09 Fri 10/30/09 217 days? 9 y i ® 1 103 Final DIB RFP Package 1.A.D.3.3.3 Mont 1/2709 Mon 1 V2109 0 days .. .... 104 Finance 1.A.E Tue 516/08 Thu 4130109 257 days? li 105 Finance Management Plan (FMP) tAE.t Tue 516108 Fri 10/171O8 179 days? 706 Draft FMP t.A.E.1.1 Tue 516/08 Thu 914108 88 days? j- (_ 107 Initial FTA Submittal 1.A.E.1.2 Fri 9/5108 Fri 9/5108 0 days? ;. 95 - i- 108 ! FTA Review & Comments 1.A.E.1.3 Mon 9/8108 Fn 9/26108 15 days? - - - - - -- - t09 '., Final Revisions 1.A.E.1.4 Mon 9129/08 Thu 10/16/08 14 days? 110 BNSF Appraisal Update 1.A.E.t5 Thu 10/16/08 Fri 10/17/08 2days? --- - -" - "117 - Final FTA Submittal -- 1.A.E.1-6 Fri 10/17/08 Fri 10/17/08 0 days? I ® 10117 112 Secure State Funds (CDOT) - 1.A.E.2 Tue 5J6i08 Tue 9/30108 106 days? --- - ----- -- ---- Task Project: MASONBRTWBS081108 Progress . Date: Mon 8fl1/08 Milestone Summary Rolled Up Task External Tasks Project Summary a;Zi� Group By Summary Deadline ;( Mason Corridor MAX BRT Project Schedule August11,2008 ID ;Task Name � WBS Start Finish Duration � 2008 2009 113� I City Identify Re -Purchasing Agreement 1.A.E.3 Mon 911/08 Thu 10/30/08 Q7 Q2 Q3 Q4 07 - Q2 Q3 Q4 44 days? .. 114 Secure Local Funds 1.A.E.4 --1.A.E.5 Fri 10/31/08 Fri 10/31/08 _.__.� .__.__ ..._...-...__-.... 0 days Ii 10/31 115 Secure Federal Funds (FTA Small Starts PCGA) Thu 4/30/09 Thu 4130109 0 days? I : 4/30 116 Final Design 9 1.6 Mon 12l1/OB Fri 9/30/11 ------------ If-'------------. 740 days?--177J Final Design 1.BA Mon 311110 Wed 8/31/11 393 days? ' 118 Mason\Howes Street Two -Way Conversion 1.B.A.7 Mon 3/1/10 Wed 8/31/11 393 days? - 119 BRT (GuidewaykStations\Stops\Lots\STC) 1.B.A2 Mon 311110 Wed 8131111 393 days? 120_. Value Engineering 1.B.A.2.7 Mon 3!7/70 Wed 8/31/17 393 days?. 121 Typical Section 1.B.A2.2 Mon 3/1/10 Wed $131/11 393 days? 122 Pavement Thickness(Geotechnical) - _ 1.B.A.2.2.1 Mon 3/1/10 Wed 8131/11 393 days? -- --- - -- - -- - - ----- - --- - ....-. 123 Guideway - 1.B.A.2.2.2 Mon 3/1110 Wed 8131/11 393 days?' 124 Station Platforms 1.B.A.2.2.3 Mon 3/1/10 Wed 8131/11 ;........... _. .:........ _ ............._.---------- .. 393 days?; 125 Park-n-Ride Lots 1.B,A.2.2.4 Mon 3/1/10 Wed 8/31/11 393 days? 126 ; South Transit Center 1.B.A.2.2.5 Mon 3/1/10 Wed 8/31/11 .. _.-.._....-.. 393 days? ._.......... _ ; � - - 127 Mason Trail t.B.A.2.2.6 Mon 311/10 Wed 8131/11 393 days?'� 128 ? Demolition and Removals 1.B.A.2.3 Mon 3/7l10 Wed 8/31/71 393 days? 129 PSCO Building Demolition 1.B.A.2.3.1 Mon 3/1/10 Wed 8/31/11 393 days?: 130 Miscellaneous Removals t.B.A.2.3.2 Mon 3/1/10 Wed 8131111 393 days?'- 731 Horizontal Alignment -- --- -----� ----- —i - ---_- t.B.A2.4 Mon 311/10 Wed 8/31/11 393 days? ! 132 Guideway Control Line Alignment\Layout - - 1.B.A.2.4.1 Mon 3/1110 Wed 8131/11 393 days?- 133 Mason Trail 1.B.A.2.4.2 Mon 3/1110 Wed 8/31/11 393 days? l; 134 Crossing Alignments - 1.B.A.2.4.3 Mon 311/10 Wed 8/31/11 393 days?: 135 South Transit Centerr 1.B.A.2.4.4 Mon 311/10 Wed 8/31/11 393 days?' Vertical Profiles � t.6.0.2.5 Mon 3/1/10 Wed 8/31/11 393 days?- 137 Guideway Control Line Profile 1.B.A.2.5.1 Mon 311/10 Wed 8/31111 393 days? 138 Curb &Gutter profiles- 1 B.A.2.5.2 Mon 3/1/10 Wed 8131/11 393 days? 139 ! Mason Trail - - - _ - _ - - 1.B.A.25.3 Mon 3/1110 Wed 8/31/11 393 days? 140 Intersection Details 1.B.A.2.5.4 Mon 3/1/10 Wed 8131/11 - �....._. .......: _. ... _.._----------------- 393 days? Task (,; '. Rolled Up Task 0 External Tasks Project: MASONBRTWBS081108 Progress ® Rolled Up Milestone O - Project Summary' Date: Mon 8/11/08 Milestone . Rolled Up Progress Group By Summary Summary Split .. •. Deadline - City of Fort Collins Mason Corridor MAX BRT Project Schedule August11,2008 ID !Task Name WBS Start Finish j Duration2008 2009 141 . Park-n-Ritle Lots O2 O3 O4 . Q7, _._. 1.B.A.2.5.5 Mon 3111/10 __L__ Wed 8131111 t...Qt Q2 Q3 _Q4 393 days? ; 142 South Transit Center 1.B.A.2.5.6 Mon 3/1/10 Wed 8131/11 393 days? 143 Facilities Layout - _ - 1.B.A2.6 Mon 311110 Wed 8131111 393 days? 144 Stations &Stops _ ._.. 1.B.A.2.6.7 Mon 3/1 /70 Wed 8/31/11 393 day_.. _....... ... _._. .... _.__.... _....... _...._ s� 145 ,. Park-n-Ride Lots 1.B.A.2.6.2 Mon 3/1/10 Wed 8131/11 393 days? 146 Maintenance Facility 1.B.A.2.6.3 Mon 3/1/10 Wed 8/31/11 393 days? 147 _...__.; South Transit Center 1.B.A.2.6.4 Mon 311/10 Wed 8/31/11 393 days? 148 ! Signing g & Striping 1.B.A2.7 Mon 3/1/10 Wed 813'1/11 393 days?!.__.._.-. _....�..............__...__ ----- 149 BRT Guideway 1.B.A.2.7.1 Mon 3/1110 Wed 8/31111 393 days? 1_b_0_ 157 Stations 1.B.A.2.7.2 Mon 3/1/70 Wed 8/31111 393 days2'. Stops 1.B.A.2.7.3 Mon 311/10 Wed 8131111 393 days? 152 Park-n-Ride Lots 1.8.A.2.7.4 Mon 3/1110 Wed 8/37l11 393 days? 153 South Transit Center 1.B.A.2.7.5 Mon 3/1110 Wed 8131111 393 days? Drainage 1.B.A2.8 Mon 3/1/10 Wed 8131/11 393 days? 554 155 Fixed Guideway 1.B.A.2.8.1 Mon 3/1110 Wed 8/31/11 393 days? 156 i Basin layout ', 1.B.A.2.8.1.1 Mon 3/1110 Wed 8131/17 393 days? 157 Inlet Spacing 1.B.A.2.8.1.2 Mon 311/10 Wed 8/31/11 393 days? 158 Trunk Line Profile 1.B.A.2.8.1.3 Mon 311/10 Wed 8/31/11 393 days? ;. Lateral Profiles 1.B.A.2.8 t 4 Mon 311/10 _... Wed 8/31111_ , 393 days?. 160 Inlet &Manhole Elevations 13.A2.8.1.5 Mon 3/1/70 Wed 8/31/11 393 days? j 161 Details 1.B.A28 1 6 Mon 3/1110 Wed 8131/11 393 days? 1 162 StationsiStopslLotslSTG 1.13.A.2.8.2 Mon 3/1l10 . Wed 8/31111 393 days?! 16 _—_ Site Drainage PlaMLayout t.B.A.2.8.2.1 Mon 3/1110 Wed 8/31/11 393 days? 164 � Profiles . . . . 1BA28.2.2 Mon 3/1/10 Wed 8131/11 393 days? ---........ _..___.... _... ._ ... y - - - a . 165 I Inlet & Manhole Elevations 1.B.A.2.8.2.3 Mon 311110 Wed 8/31/11 393 days? 166 Details 1.B.A.2.8 2.4 Mon 3/1l70--� Wed 8/31%1{--- 393 days? j 167 ! South Transit Center 1.B.A2.8 2 5 Mon 311/10 Wed 8131111 393 days? 1 8 Mercer DitchlMail Creek Crossings 1.B.A.2 8 3 Mon 3(1/10 Wed 8/37/11 - 393 days?' Task Rolled Up Task External Tasks f7l _ Project: MASONBRTWBS081108 Progress ® Rolled Up Milestone Project Summary VaMMMMEW Date: Mon 8/11/08 Milestone . Rolled Up Progress ® Group By Summary Summary Split .,...... .,,.. Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID I Task Name WBS Start Finish Duration I__ 2008 j., 2009 - _L_ _..i_Qt_,._.Q2 Q3 1 04_ 01T02 Q3 �_04 169 Stom water Management & Erosion Control t.B.A.2.8.4 Mon 3/1/10 Wed 8/31111 393 days? ! " 170 Drainage Report (ENTIRE PROJECT) 1.B.A.2.8.5 Mon 3/7/10 Wed 8/31/11 393 days?', 171 Traffic Signals 1.B.A2.9 Mon 311/10 Wed 8/31111 393 days? 172 " Guideway Street Crossings 1.B.A.2.9.1 Mon 3/7/10 Wed 8/31/11 _..._. ....:..... _. __.... _. 393 days? ........ 173 Industry Track Crossing 1.B.A.2.9.2 Mon 311/10 Wed 8/31111 393 days? 174 Park-n-Ride Lots 1B.A.2.9.3 Mon 3/1/10 Wed 8/31111 393 days?: 175 " • South Transit Center 1.B.A.2.9.4 Mon 3/1110 Wed 8/31/11 393 days?'. 176 Fixed Guideway Communication Intfrastructure 1.6.A2.10 Mon 3/1/10 Wed 8131/11 ..___..:......_... 393 days? . ........... _... 177 Ensure Transit Bandwidth Priority Usage 1.B.A.2.10.1 Mon 311/10 Wed 8131/11 393 days? �. 178 Investigate Partnerships With Other Departments 1.B.A.2.10.2 Mon 311/10 Wed 8/31/11 393 days?! 179 Investigate Partnerships With Other Agencies 1.B.A.2.10.3 Mon 311/10 Wed 8131/11 393 days?' 180� Fiber Optic Connectivity 1.B.A.2.10.4 Mon 3/1110 Wed 8/31111 393 days? 181 ! Connecting to Existing City Data Network 1.B.A.2.10.4.1 Mon 311/10 Wed 8131/11 393 days? 182 Selecting Appropriate Fiber Optic Cable - 1.B.A2.10.4.2 Mon 311/10 Wed 8/31/11 ..... _.___.._.__........... _.__... 393 days? 183 New Guideway Installation 1.B.A2.10.4.3 Mon 3/1/10 Wed 8/31111 393 days?', ......i 184 Conduits B.A2.10.4.3.1 Mon 3/1/10 Wed 8/37/11 ___ _ __...:........... ......._._. _ _ 393 days? 185 is Junction Points B.A.2.10.4.3.2 Mon 3/1/10 Wed 8131111 393 days? 1 186 , Termination B.A.2.10.4.3.3 Mon 3/1/10 Wed 8/31/11 393 days? 187 Testing BA.2.10A 34 - "-Mon3/Vi0 Wed 8/31/11— 393 days?1 188 I Existing Roadway Installation 1. B. A. 2-16.4.4 Mon 3!1/10 Wed 8131/11 393 days? 189 !. Borings B.A.2.16AA 1 Mon 3N/10.. " Wed 8/31/11 393 days?: 190 Traffic Fiber Versus New Fiber Plant B.A.2.10.4.4.2 Mon 3/t/10 " Wed 8/31/11 393 days? 191 1 Connectivity - STC to Transfort 1.13.A.2.10.5 Mon 31110 Wed 8 IMI 393 days? 192 Cost\Benefit Analysis 1.B.A.2.10.5.1 Mon 3/1/10 Wed 8l31/11 393 days? 193 Partnerships Analysis '.. 1.B.A.2.10.5.2 Mon 3/1/10 Wed 8/31111 393 days? 194 : New Utilities Power System -South West Anne 1.13X..10.5.3 ---� Mon 3/110 Wed 8/31/11-- 393 days?'• t95 •: Wireless Infrastructure 1.B.A.2.10 6 " Mon 311f10 Wed 8/3111-1 393 days? 196 Analyze ProtocollTechnology to Use 1.B.A2.10.6A Mon 3/1/1e " Wed 8/31A1 393 days? Task 0 Rolled Up Task External Tasks `I Project: MASONBRTWBS08M1M108 Pro Progress goep R Milestone C^ t Mil d U Rolled / Project Summary PI q' Date: Mon 8/11/08 Milestone ♦ Rolled Up Progress ® Group By Summary Summary Split Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID Task Name WBS Start Finish Duration 2008 2009 197 _— EVDO -, B.A.2.10.6.1.1 Mon 3/1/10 Wed 8/31/11 Q4 : Q1 Q3 Q4 393 days? 198 802.11 B.A.2.10.6.1.2 Mon 311/10 Wed 8/31111 393 days? 199 WIMAX B.A.2.10.6A.3 Mon 3/1110 Wed 8/31111 393 days? i 200 _ Public Safe Safety B.A.2.70.6.1.4 Mon 3/t/10 Wed 8/31/17 !_...........___"...___. .. ......_._.._._.... 393 days? _ i 201 Analyze Security Encription to Use 1.B.A.2.10.6.2 Mon 311/10 Wed 8/31/11 393 days? 202 Current Encription Methods B.A.2.10.6.2.1 Mon 3P1/10 Wed 8/31/11 393 days? - - - - - _203 Newly Adopted at Build Out B.A.2.10.6.2.2 Mon 311/10 Wed 8/31/11 393 days? 204 Connect to Existing City Data Network B.A.2.10.6.2.3 Mon 3/1/10 Wed 8/31/11 393 days - - - - - - - " 205 Investigate Public Wireless Possibility B.A.2.10.6.2.4 Mon 3/l/10 Wed 8/31/11 393 days?''., 2206 Communication Equipment - - - 1.B.A.2.10-7 Mon 311/10 Wed 8131/11 393 days? 207 ! Cisco Switches . 1.B.A.2.10.7.1 Mon 3/1110 Wed 8131111 393 days? 208 . POE _. - 'B.A.2.10.7.1.1 -Mon a/1/10 Wed B/31/11 _........ :.___....... _.. _.. _..... _... 393 days?', 209 Standard B.A.2.10.7.1.2 Mon 3/1/10 Wed 8/31111 393 days? 210^ Conduit Cabling Ground Vault to Platforms 1.B.A.2.10.8 Mon 3/1110 Wed 8/31/11 393 days? 211 Platforms Communications Infrastructure 1.B.A.2.11 Mon 3/1/10 Wed 8131111 393 days? 212 Environmental Enclosure 1.B.A.2.11.1 Mon 3/1110 Wed 8/31N1 393 days? _ 213 _ Communication Equipment 1.B.A.2.11.1.1 Mon 3/1110 Wed 8131/11 393 days? 214 Transfort Schedule Information 1.B.A.2.17.1.2 Mon 3/1/10 Wed 8/31/11 393 days?. 215 Ticket Vending Equipment 1.B.A.2.11.1.3 Mon 3/1/10 Wed 8131111 393 days? 216 Electrical Needs Analysis 1.B.A.2.11.1.4 Mon 311110 Wed 8131/11 393 days?'. - - - - — ...... _ ..... 217 Conduits From Connectivity Vault 1.B"A.2.11.1.5 Mon 3/1110 Wed 8/31111 393 days? 218 ! Conduits - Individual Platform Components....... tB.A2.t 1.1.6 Mon 3/1/10 Wed 8/31/11 _ _ - ` , ........ -.....-... . .. 393 days? "." 219 _.... _: Sound Equipment 1.B.A.2.11.1.7 Mon 3/1110 Wed 8/31/11 393 days?'. not 220 ' Video Security Equipment 1.B.A.2.11.1.8 Mon 3/1110 Wed 8131111 393 days? .!......._ ---"....... 221 Connectivity to City Data Network 1.BA2.11.2 Mon 3/1/10 Wed 8/31111 393 days? 222 Cisco Switch 1.B.A.2.11.2.1 Mon 311/10 Wed 8131/11 ._....__.. _.; _. _......__....... _...... .. 393 days?! 223 Fiber Optic Terminal Modules 1.B.A.2.112.2 Mon 3/l/10 Wed 8/31/11 393 days? 224 Sound and Paging System 1.B.A.2.11.3 Mon 3/1110 Wed 8131111 393 days? Task � � Rolled Up Task � _ _ External Tasks Project: MASONBRTWBS081108 Progress Rolled Up Milestone Project Summary Date: Mon 8/11/08 Milestone ♦ Rolled Up Progress Group By Summary Summary Split ..... Deadline _ City of Fort Collins REVIEW AND ASSESSMENT Professional firms will be evaluated on the following criteria. These criteria will be the basis for review of the written proposals and interview session. The rating scale shall be from 1 to 5, with 1 being a poor rating, 3 being an average rating, and 5 being an outstanding rating. WEIGHTING FACTOR QUALIFICATION STANDARD 2.0 Scope of Proposal Does the proposal show an understanding of the project objective, methodology to be used and results that are desired from the project? 2.0 Assigned Personnel Do the persons who will be working on the project have the necessary skills? Are sufficient people of the requisite skills assigned to the project? 1.0 Availability Can the work be completed in the necessary time? Can the target start and completion dates be met? Are other qualified personnel available to assist in meeting the project schedule if required? Is the project team available to attend meetings as required by the Scope of Work? 1.0 Motivation Is the firm interested and are they capable of doing the work in the required time frame? 2.0 Cost and Do the proposed cost and work hours compare Work Hours favorably with the project Manager's estimate? Are the work hours presented reasonable for the effort required in each project task or phase? 2.0 Firm Capability Does the firm have the support capabilities the assigned personnel require? Has the firm done previous projects of this type and scope? 9 Mason Corridor MAX BRT Project Schedule August 11, 2008 ID Task Name WBS Start Fmieh n.�r,,,., onno —� zm i Auto Announcement System 1.B.A.2.11.3.2 —� 227 Platform Amplifier 1.B.A.2.11.3.3 22$ Video Security System CB.A.2.11.4 229 IF Cameras 7.B.A.2.11.4.1 230 Analog Cameras With Encoders 1.B.A.2.11.4.2 231 Mini-DVR 1.B.A.2.11.4.3 232 Wayside Signs 1.B.A.2.11.5 233 LED Panels 1.B.A.2.11.5.1 234 LCD Panels 1.B.A.2.11.5.2 235 Investigate Revenue Generation Through Adve ! 1.B.A.2.11.5.3 23fi Investigate Corporate Sponsorship -: 1.B.A.2.11.5.4 237 GPS Based Clock System 1.B.A2.11.5.5 238 Primary B.A.2.11.5.5.1 239 Secondary B.A.2.11.5.5.2 240 Fare Collection 1.B.A.2.11.6 24~ Ticket Vending Machines 1.BA.2.11.6.1 242 Ticket Validation Machines 1.BA.2.11.6.2 243 Change Machines l.B.A.2.11.6.3 Structures Soil Boring Logs Retaining Wail Layouts Troutman Underpass Sviallow Bridge Replacement Larimer County No. 2 Enclosure Sherwood Lateral Box Culvert Extension Spring Creek Box Culvert Extension Lighting Task Project: MASONBRTWBS081108 Progress Date: Mon 8/11/08 Milestone Summary 1.B.A2.12 1.B.A.2.12.1 1.B.A.2.12.2 1.B.A.2.12.3 1.B.A.2.12.4 1.B.A.2.12.5 1.B.A.2.12.6 1.B.A.2.12.7 1.B.A2.13 Mon 3/1l10 Wed 8/31111 393 days?'. Mon 3/1/10 Wed 8/31111 393 days? Mon 311110 Wed 8/31/11 393 days? Mon 3/1l10 Wed 8/31/11 393 days? Mon 3/1/10 Wed 8/31/11 393 days? Mon 311110 Wed 8/31/11 393 days? Mon 311/14 Wed 8/31/11 393 days? Mon 3/1/10 Wed 8/31/11 393 days?' Mon 311/10 Wed 8/31/11 393 days?; Mon 3/1110 Wed 8/31/11 393 days? Mon 3/1/10 Wed 8/31/11 393 days?: Mon 311/10 Wed 8131111 393 days?' Mon 3/1l10 Wed 8l31/17 ._.... _...:_............_. 393 days? _._...__.... Mon 3f1/10 Wed 8/31/11 393 days? Mon 311/10 Wed 8/31111 393 days? '.. Mon 311/10 Wed 8131111 393 days?' Mon 3/1/10 Wed 8/31/11 393 days?'', - - ------ - Mon 3/1/10 Wed 8/31111 393 days?! Mon 311110 Wed 8131/11 393 days?': Mon 3/1/70 Wed 8/31/11 393 days? Mon 3/1110 Wed 8/31/11 393 days? Mon 3/1/10 Wed 8/31/11 393 days? Mon 3/1/10 Wed 8131/11 393 days?......'........__..._ .................. _............ Mon 311/10 Wed 8131/11 393 days?; Mon 3/1/10 Wed 8131/11 393 days? Mon 311/10 Wed 8131/11 393 days?' Mon 311110 Wed 8/31/11 393 days? . Rolled Up Task (` Rolled Up Milestone v Rolled Up Progress Split City of Fort Collins External Tasks Project Summary Group By Summary Deadline Guideway _ Stations\Stops\Lots Landscaping Guideway Stations\Stops\Lots Operations Equipment ITS Passenger Information Systems Fare Vending Machines Shelters STC Building Plans Maintenance Facility Upgrades Site & Building Upgrade Plan Construction Documents 60 % Design Review 90% Design Review Final Construction Documents Construction Mason\Howes Street Two -Way Conversion BRT (Guideway�Stations\StopslLots) Building Demolition\Relocation Utility Relocation Miscellaneous Demolition & Clearing Erosion Control Drainage Pipe & Inlets Deep Utilities (Water\Sanitary Sewer) Earthwork Structures (Retaining Wails) Task Project: MASONBRTWBS081108 Progress Date: Mon 8111/08 Milestone Summary Mason Corridor MAX BRT Project Schedule August ll, 2008 WBS Start 1.B.A.2.73.2 Mon 3!1/70 Wed 8/31/11 393 days?'. - -- 1.B.A2.14 Mon 3/1/10 Wed 8/31111 393 days? 1.B.A.2.14.1 Mon 311110 Wed 8131/11 393 days? - - - - - -- - - - --- 1.B.A.2.14.2 Mon 3/1/10 Wed 8/31/11 393 days?I, 1.B.A.2.15 Mon 311110 Wed 8131111 393 days?..'-. ..... ". _.:.__.... _., _..... .._..__... _. _.__ 1.B.A.2.15.1 Mon 3/1110 Wed 8/31/11 393 days? 1"B.A.2.15.2 Mon 3/1110 Wed 8/31111 393 days?:* t.B.A.2.15.3 Mon 311/10 Wed 8131111 . 393 days? t.B.A.2.15.4 Mon 3/1/70 Wed 8/31/11 393 days?i- 1"B.A.2.15.5 Mon 3/1/10 Wed 8/31111 393 days? 1.6.A2.16 Mon 3!1110 Wed 8/31111 393 days? 1.B.A.2.16.1 Mon 3/1/10 Wed 8/31111 393 days? . 1.B.A2.17 Mon 311/10 Wed 8l31111 393 days? 1.B.A.2.17.1 Mon 3/l/10 Wed 8/31/11 393 days?'; 1.B.A.2.17.2 Mon 3/1110 Wed 8/31111 393 days?! 1.13.A.2.17.3 Mon 3/1/10 Thu 3110111 269 days? 1.6.6 Mon 3/1/10 Wed 8/31111 .....__........._._."...._._.._..j 393 days?! L6.8.1 Mon 3/1/10 Wed 8/31111 393 days? 1-B.B.2 Mon 311/10 Wed 8131111 393 days?' - - --- '- "-- --" ---- ----- -� 1.B.B.2.1 Mon 3/1110 Wed 8131/11 393 days?:; 1.B.B.2.2 Mon 3/1/10 Wed 8/31111 ............:"....__._..__ ........... ...... _.. 393 days? 1.B.B.2.3 Mon 311/10 Wed 8/31111 393 days?'; 1.13.8.2.4 Mon 311/10 Wed 8/31/11 393 days?j l.B.B.2.5 Mon 3/1110 Wed 8/31/11 393 days?; 1.6.6.2.E Mon 3/7110 Wed 8/31/11 393 days?'. --- 1.6.8.2.7 Mon 3/1110 Wed 8/31/11 393 days? -' 1.8.6.2.8 Mon 3/1/10 Wed 8/31/17 393 days? Rolled Up Task E Rolled Up Milestone O Rolled Up Progress Split City of Fort Collins External Tasks Ij Project Summary Group By Summary Deadline Mason Corridor MAX BRT - Project Schedule August 11, 2008 ID .Task Name WBS Start Finish Duration - _ 2008 2009 281 Shallow Utilities (ITS\Communication\Gas\Electric) Foundations (Signal &Lighting) Conduit Crossings (Irrigation & Communication) Curb &Gutter Fixed Guideway) ( Y) 1.B.B.2.9 1.B.B.2.10 l.B.B.2.11 - 7.6.6.2.12 Monn 3/1/10 Mon 3l1I10 Mon 3/1/10 Mon 3/1/10 Wed 8/31/11 Wed 8/31/11 Wed 8/31111 Wed 8f31/11 _ Qt 02 ! Q3__ Q4I Q1 Q2__ 03 Q4 393 days? ._.""_. _........_...:, 393 days? 393 days? '. _...__......._..._.. _................. ....... _... 393 days? j I 282 283 ..284. _ Curb & Gutter (Stations) Paving (Fixed Guiedway) 1.B.B.2.13 t.B.B.2.14 Mon 311/10 Mon 3/1/10 Wed 8131111 Wed 8131111 393 days? 393 days? 286 287 Station Platforms Paving (Stations) 1.B.B.2.15 1.B.B216 Mon 311110 Mon 3/1/10 Wed 8131111 Wed 8/31l11 393 days? 393 days?---"""""-"----� 288 289 Sidewalk (Stations & Street Crossings) Landscaping & Irrigation Signing &Striping Traffic Signal Equipment - Lighting Poles &Luminaires 1.B.B.2.17 1 -6.6.2.18 1.B.B.2.19 1.B.B.2.20 1.8.8.2.21 Mon 311110 Mon 3/1/10 Mon 3/1110 Mon 311/10 Mon 3/1110 Wed 8/31/11 Wed 8!31f11 Wed 8/31Ill Wed 8/31/11 Wed 8/31/11 393 days? 393 days? - 393 days?', 393 days?- 393 days? 290 291 292 293 294 Passenger Information Systems 7.6.6.2.22 Mon 3/1/10 Wed 8/31/11 393 days?'; 295 �i -----' Fare Vending Machines 1.B.6.2.23 Mon 3/1/10 Wed 8131111 393 days? 296 Shelters South Transit Center 1.B.B.2.24 t.B.6.3 Mon 3/1110 Mon 3/1/10 Wed 8/31/11 Wed 8/31/11 _..... . .........___........ _.. .__... 393 days? I" 393 days?,'. 297 j 298 Maintenance Facility Upgrades Vehicle Ac wsnion - -- --"-- -- � �--- 9 1.6.6.4 _;----1211106-- I 1.B.0 Mon 3/1/10 Mon Wed 8/31f11 Fri 9/30/11 393 days?'- _; 740 days? 299 I 300 Procurement Inspection (Pre -Revenue) 1.B.C.1 1.B.C.2 Mon 1211/08 Mon 113/11 Fri 12/31/10 Thu 3/31111 545 days? 64 days?' - 301 302 Testing 8 Startup Hire Trainer - Hire Drivers Train Drivers � 1.B.C.3 � 1.B.C.3.1 1.B.C.3.2 1.B.C.3.3 Mon 10/4/10 Mon 10/4110 Tue 3!1 /11 Fri 7/1111 Fri 9/30/1 t Mon 1014/10 Thu 6130/11 Wed 8/31/11 260 days?'.- 0 days 88 days? 44 days? 303 304 305 306 � . .._".. Test Buses on Guideway Hire Dispatch "_-- _ __ O erations .. P Task ......._. 1.B.C.3.4 _ 1.B.C.3.5 1.B.D i Rolled Up Task Thu 9/1/11 Fri 9/30111 Mon 3/1110 y .""... _. _. _... .___..._....__. Fri 9/30H 1 22 da sv - - - Fri 9/30/11 Oda s ...._— _....... Wed 8/31/11 393 days?!". ___ . . External Tasks 307 308 Project: MASONBRTWBS081108 Progress Rolled Up Milestone �,� Project Summary Date: Mon 8/11/08 Milestone ® Rolled Up Progress Group By Summary Summary Split Deadline City of Fort Collins 309 MasonlHowes Two -Way Street Conversion 310 Equipment Procurement 311 Installation 312 Street Conversion - 313 BRT (Guideway,StationslStopslLots) 314 i Procurement 315 ITS Equipment 316 Passenger Information Systems 317 Traffic Signals 318 Fare Vending Machines 319 Shelters 320 Fuel 321J Inspection 322 Passenger Information Systems 3323 Traffic Signals 324 _'. Fare Vending Machines 325 Shelters 32326 t Testing _ 32�7 ', Traffic Signal Systems 328 Fare Vending Equipment 329 ITS Equipment 330 AVLiGPS 337 Passenger Information Systems 332 ! ITS Data Cabinet Mobile Video Security System DVR Cameras Task Project: MASONBRTWBS081108 Progress Date: Mon 8/11/08 Milestone Summary Mason Corridor MAX BRT Project Schedule August t t, 2008 WBS Start I Finish Duration 200- _ 2009 - L - _..__i_Q1 i_Q2 Q3 Q7_._Q2 Q3_ 1.B.D.1 Mon 3/1/10 Wed 8/31111 — - _.Q4 393 days? 1.B.D.1.1 Mon 311/10 Wed 8131/11 393 days? --- - ' - -- --- - - 1.B.D.1.2 Mon 3/1110 Wed 8131111 393 days? t.B.D.1.3 - Mon 3!1/10 Wed 8/31/17 393 days? j 1.5.0.2 Mon 3/1110 Wed W31/11 393 days? 1.B.D.2.1 Mon 3/1l10 Wed 8/31111 :.__...__.... . _..__....... _._.. _.. 393 days? _...... 1.B.D.2.1.1 Mon 311/10 Wed 8/31111 393 days? - 1.B.D.2.12 Mon 311110 __...... ...__...... - 393 days? - 1.B.D.2.1.3 Mon 3/1110 Wed 8/31111 393 days? 1.8.D.2.1.4 Mon 3/1/10 Wed 8/31/11 393 days?: - - 1.B.D.2.1.5 Mon 311110 Wed 8/31/11 393 days?! 1.B.D.2.1.6 Mon 311I10 Wed 8131/11 393 days?! 1.B.D.2.2 Mon W1/10 Wed 8/31111 393 days? - 1.8.D.2.2.1 Mon 3/1/10 Wed 8l31/17 ....... _._.....:.. _. ___. _.. _... 393 days. ........_ 1.B.D.2.2.2 Mon 3/1110 Wed 8131/11 393 days?' t.B.D.2.2.3 Mon 3/1/10 Wed 8/31/11 L...__.__.......:.........___..__.._.__.. 393 days?! 1.B.D.2.2.4 Mon 3/1/10 Wed 8/31/11 393 days? 1.B.D.2.3 Mon 311/10 Wed 8/31/11 393 days?: - - - 1.B.D.2.3.1 Mon 3/1110 Wed 8131/11 393 days? ! 1.B.D.2.3.2 Mon 3/1/10 Wed 8131/11 393 days? 1.B.D.2.3.3 Mon 3/1110 Wed 8/31/11 393 days? 1.B.D.2.3.4 Mon 3/1/10 Wed 8/31/11 393 days? I - 1.B.D.2.3.5 Mon 3/1110 Wed 8131/11 393 days? `. 1.B.D.3 Mon 3/1/10 Wed 8131/11 393 days?' 1.B.D.3.1 Mon 3/1/10 Wed 8131/11 393 days? 1.B.D.3.2 Mon 311/10 Wed 8/31/11 - --_.........:...—...... _..... ....... 393 days? '. 1.B.D.3.2.1 Mon 3/1/10 Wed 8/31/11 393 days?, i.B.D.3.2.2 Mon 3/1/10 Wed 8131/11 393 days?' - - - Rolled Up Task External Tasks Rolled Up Milestone Project Summary Rolled Up Progress Group By Summary Split Deadline- City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID (Task Name WBS Start Finish Duration 2008 I 9nno 338 I Automatic Announcement System 1.B.D.3.3 Mon 3/1110 Wed 8131/11 339 1 Audio Announcement 1.B.D.3.3.1 Mon 311/10 Wed 8/31/11 340 J' Visual Display 1.13.0.3.3.2 Mon 3/1/10 Wed 8/31/11 341 Fare Collection System 1.B.D.3.4 Mon 3/1110 Wed 8/31/11 342—� On Board Server 1.B.D.3.5 Mon 3/1/10 Wed 8131/11 i 343 CPS Input 1.B.D.3.5.1 Mon 3/1110 Wed 8/31/11 344 Discrete Inputs 1.B.D.3.5.2 Mon 3/1110 Wed 8/31/11 345 Driver Console Integration 1.B.D.3.5.3 Mon 3/1/10 Wed 8/31111 346 Headway Signs Integration 1.B.D.3.5.4 Mon 3/1/10 Wed 8/31/11 347 Fare Collection System Integration 1.B.D.3.5.5 Mon 3/1/10 Wed 8/31111 348 i Automatic Announcement Integration 1.B.D.3.5.6 Mon 3/1l10 Wed 8/31/11 349 Rear Camera Integration 1.B.D.3.5.7 Mon 3/1/10 Wed 8/31111 350 Dispatch 1.B.D.3.6 Mon 3/1110 Wed 8131/11 351 -- ITS Software for Dispatchers 1.B.D.3.6.1 Mon 3/1110 Wed 8/31111 352 i Large Screeens 1.B.D.3.6.2 Mon 3/1110 Wed 8/31/11 353 Automatic Vehicle Location System 1.B.D.3.6.3 Mon 3/1/10 Wed 8/31/11 354 ! Route Schedule Adherence - 1.B.D.3.6.4 Mon 3/1/10 Wed 8/31/11 355 Mobile Video Security 1.B.D.3.6.5 Mon 3/1/10 Wed 8/31111 35>� Platform Videc Security �� �7.B.D.3.6.6 Mon 3/1/10 Wed 8/31/11 357 Sout1hTransit Center Video Secudty 1 1.B.D.3.6.7 Mon 3/l/10 Wed 8/31/11 358 Communications 1.B.E Mon 311110 Fri 9130/11 Shan=.tl Data Website 1.B.E.1 Mon 3/1/10 Fri 9130/11 _35 360 ( Public Website 1.B.E.2 Mon 3/1/10 Fri 9/30/11 361 Community Outreach 1.B.E.3 Mon 311110 Fri 9/30/11 362 Media - � 1.B.E.4 Mon 311/10 Fri 9/30l11 363 Government I 1.B.E.5 Mon 3/1/10 Fri 9/30111 364 Public Art 1.6.E.6 Mon 3/1/10 Fri 9/30l11 Task Project: MASONBRTWBS081108 I Progress Date: Mon 8111/08 Milestone Summary Rolled Up Task Rolled Up Milestone O ® Rolled Up Progress Split .„1 City of Fort Collins 393 days? ._.......__ __.__, 393 days? 393 days?i I 393days? I 393 days? __...__.............. 393 days? 393days?I 393 days? 393 days?! _...__......_. _..1 393 days?; 393 days? 393 days? 393 days? 393 days? 393days,;- 393 daW' 393 (Jays? .......__ ...._..__..-.. 393 days?',, 393 da .— ys?� ...------- 415 days? l 415 days? 415 days?I 415 days? 415 days? 415 days?' 415 days? External Tasks Project Summary " Group By Summary Deadline Mason Corridor MAX BRT Project Schedule August 11, 2008 ID Task Name I WBS Start Finisuration 2009 365 _—___ ___.._.._ Public Meetings I 1.B.E.7 Mon 3/1PI0 _____2008 Ot O2 Q3 '_ Q4 Qt_Q2 O3 Q4_. Fri 9/30/11 4 �5 -days -'- 366 Public s & Hearin s 1.B.E.8 Mon 311/10 Fr9/30/11 - 415 days- 367 Public Participation Record - 1.B.E.9 Mon 31V10 Fri 9/30/11 415 days? 368 Public Involvement ActivityTimeline tB.E.10 Mon 3/t/70 ...— --- - . . .. ............. Fri 9l30/11 415 days?I i Task Rolled Up Task External Tasks Project: MASONBRTWBS081108 Progress Rolled Up Milestone Project Summary Date: Mon 8/11/08 Milestone ® Rolled Up Progress Group By Summary Summary Split .. Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11. 2008 ID Task Name WBS Start Finish �2010 2011 j Corridor MBT Project - I Qt 2QQ3 4 QtMason Q2 Q31 u— /Oili 2 Planning &Preliminary Design 1.A Tue 5/6/08 Wed 6130/10 l- - -------- - ----- - -' .------"- 3 Environmental Assessment 1.A.A Tue 5/6108 Fri 8/29/08 f 4 Final Document Revisions 1.A.A.1 Tue 5/6108 Fri 5/30/08 ---"----------- --------- 5 Final Review 1.A.A.2 Mon 6/2/08 Mon 6/16108 6 Public Comment Period 1.A.A.3 Mon 6116108 Wed 7130108 --------"""""---""-_.--'; "--"- 7 EA Public Meeting 1.A.A.4 Wed 7/9108 Wed 719/08 8 Compile Comments t.A.A.S Fri B/1 /08 Tue 8/5/OS ------------"""--... .! 9 Final Revisions 1.A.A.6 Tue 8/5/08 Fri 8/8/08 10 FTA Submittal - FinalAPProval 1.A.A.7 Mon 8/11/08 Fri 8/151O8 f - - 11 Route for Signatures 1.A.A.8 Mon 8/18108 Fri 8/29/08 i 12 FONSI - Fri 8/29/08 1.A.A.9 Fri 8/29/08 :_..__......___ _......_.._._.._ _. _..__.. _._...' ' - - 13 Project Management Plan (PMP) 1.A6 Tue 5/61O8 Thu 10/16/08 14 Project Initiation Meeting f 9 1.A.B.t Tue 5/6/08 Tue 5/6/08 ----- 15 Research PMP Content 1.A.B.2 Wed 5/7/08 Thu 5/22108 16 Team Meeting - Identify Sub-Teams\Scoping Discussion 1.A.8.3 Fri 5/23/08 Fri 5/23lO8 - - "" - ' - 17 Collect Existing PMP Information 1.A.B.4 Mon 5/26/08 Fri 6/20l08 I 18 EMT Meeting Draft Charter 9' 1.A.6.5 Mon 6/23/08 Mon 6/23/08 __.._........ _...... _. _...._... _.. _....._J - 19 Collect Additional Existing PMP Information _.- ..._. , 1.A.8 6 Tue 6724/08 .__ Mon 7p/OS 20 Draft Base WBS- ------ 1.A67 Tue 6/24/08"----Mon 7/7108 - ""-----""-.---...'.. ' 21 Sub -Team Meetings - WBS & Task Assistance 1.A.8.8 Fri 7/111O8 Fn 7/11/08 22 Complete ChapteASubection Work Tasks -- - - 1.A.B.9 Mon 7/14/08 - Fri 7/25/08 -- - ..-.-.._. _............... ... ._= 23 Compile & Publish Dmft PMP Update -- - - 1.A.6.10 Mon 7/28/08 Thu 7131/08 24 Review Draft PMPU date P I 1.A.8.11 Fri 8fl/08 � Mon 8/4/08 --"- ------""------"---- 25 Draft Review Sub -Team Meetings - 1.A.6.72 Mon 8/4/08 Mon 8/4/08 26 Final Revisions -PMPU date P 1 A.B 13 Tue 8/5108 " -_ Fr,B/8108 -------------"----"-- 27 FTA Submittal -PMPU-1/0 P 1.A.6 14 Mon 8117l08 Mon 8/1l8 28 ___...__. __...-__....____ FTA Review &Comments r .__ _.. t. A.6.15 Tue 8/12/08 Fr, 9/5/08 ..... _...... ...... _... _......: - - - , Task Rolletl Up Task External Tasks ----_--- Project MASONBRTWBS081108 Progress Rolled Up Milestone Project Summary Date: Mon 8/11/08 Milestone O Rolled Up Progress Group By Summary Summary Split Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID Task Name WSS Start Finish 2010 2011 Q1 02 63 04�_Q2 Q3___Q4j__01 —_- __ ._._ ____ 1..._ .-.___._ _ 29 PMP Final Revisions &Schedule Cost Loading 1.A.8.16 Mon 918108 Thu 10/16/08 30 PMP Final FTA Submittal 1.A.B.17 Thu 10/16/08 Thu 10/16/08 - 31 RAMP & Agency Coordination 1.A.0 Tue 516/08 Wed 6/30110 32 Real Estate Acquisition Management Plan (RAMP) 1.A.C.1 Tue 6/6108 Thu 10/16l08 1 33 34 35 Consultant Draft RAMP City Review Revisions. 1.A.C.1.1 Tue 516/08 1.A.C.1.2 Mon 7/28/08 Fri 7125108 Fri 8/1/08 _.........------ _ .--.._.. ... .. _........ _. _. ... _ _.._. .... 36 37 Initial FTA Submittal -RAMP FTA Review &Comments 1.A.C.1.3 Mon 8/4108 1.A.C.1.4 Mon 8/11/08 1.A.C.L5 Tue 8/12/08 Fri 818/08 Mon 8/11/08 Fri 9/5/08 ..............__._--.....:___....-....---...... - _.:..:... j. 38 Final Revisions tA.C.1.6 Mon 9/8l08 Thu 10/16/08 ------------------- ---.___...--- ...--- 39 Final FTA Submittal 1.A.C.1.7 Thu 10/76/08 Thu 70/16/08 40 Property Acquisition 1....___.-.-_--------------__-------.....- AC.2 Fri 8/1 /08 Wed 6/30/10 .__..__....1 41 Title Commitments 1.A.C.2.1 Fri 8/1/08 Thu 8128/08 42 Review Commitments 1.A.C.2.2 Fri 818108 Thu 914108 43 Form Approval 1.A.C.2.3 Fri 8/1/08 Thu 8114/08 44 License to Enter Procurement 1.A.C.2.4 Wed 8113108 Tue 9/23/08 ---.._----_.-...._..._...... _. _..........__.. -------- 45 Final Legal Description Deadline 1.A.C.2.5 Mon 6/1109 Mon 611/09 46 Pre -Condemnation Property Ownership 1.A.C.2.6 Tue 6/2/09 Mon 6/29/09 ---------- ----------------- - _ .._ .......... _ ..' 47 Council Condemnation Authorization 1.A,C 2 7 Tue 6/16/09 Mon 8110/09 48 Bid Process "--- - - -__ i -_ i.A.0 2 8 Wed 8/13/08- __.. Tue 9123i08 _ .....-- ....-__--_......_.__.. ; 49 Submit NO[ letter 1.A.C.2.9 Tue 8111/09 Mon 8124109 50 Appraisal 1.A.C.2.10 Thu 8/7108 Mon 2/15/10 ___.-._.............._.__...--....... _. EW 51 Railroad 1.A.C.2.10.1 Thu 8/7/08 Wed 10/15/08 52 Phase I 1.A.C.2.10.2 Thu 817108 Wed 10/15/08 ...._--_..._._...__.-....__-__.......................j 53 RR 1.A.C.2.10.3 Thu 10/16/08 Thu 11127/08 54 . ._.._..___.__ Phase II _.. 1 A.C.2.10.4 Tue 8/25/09 -..___. - Mon ii11/10 - -------- --------- --_----- -----..—.. - '.. 55 Phase III -- -" " - ----. - - ___._._-_.__.___!__._..-- 1.A.C.2.10.5 Tue 10/20/09 Mon 2l8/10 56 Final 1.A.C.2.10.6 Tue 10/27/09 Mon 2/15/10 --------------_.......-.-...______-....-._........ _.... Task..; = j Rolled Up Task,., ..... External Tasks Project: MASONBRTWBS081108 Progress I � Rolled U Milestones P � t'�`T`' Project Summary .;�� Date: Mon 8/11108 Milestone ® Rolled Up Progress Group By Summary Summary Split Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID (Task Name WBS Start Finish 2010 _ 2011 01.. O2 ! Q3 Q4 Of IQ3yQ4 Of 57 Submit BNSF Offer Letter 1.AC.2.71 Fri 12%26%08 Fri 12/26/08 58 FMV - __. __T_.---_._.. tA.C.212 ue 11/3/09- Mon 2/22/70 ..-.._...._ - 59 Negotiation t.AC.2.13 Tue 11t0/09 Mon 3/29/-7--0- 60 First Offer _..__ 1AC2.131""-Tue 11/10/09 Mon 3/1/10::�—� -------- _.".._- ."_.""_.........- .... ---� 61 Final Offer tA.C.2.13.2 Tue 12/8/09 Mon 3/29/10 62 Condemnation 1AC.2.74 Tue 4/20/10 Wed 6/30/10 -:....._------------------ ....---------------- _...." - 63 Petition Filing Date 1.A.C.2.14.1 Tue 4/20/10 Tue 4120110 *,4/20 64 Court Date 1.A.C.2.14.2 Wed 4121110 Tue 6115110 --"" "-�" - --""- - -"." ""--"""-"----- -� 65 Posession Date 1.A.C.214.3 Wed 6/30/10 Wed 6/30/10 6130 66 Closing t.A.C.2.15 Tue 11/10/09 Mon 6/2l/10 ------------ ----"""------ -"-""""---"- "-- ' 67 BNSF Railway -- 1.AC.3 Mon 6/2/08 Fri 7/31109 68 Confirm ROW Square Footage Desired- 1.A.C.3.1 Tue 7/1108 Thu 7/31/08 ---- ----"-----------------"---"' " 69 City Obtains Certified Appraisal of ROW Area 1.A.C.3.2 Thu 8/7108 Wed 10/15/08 - 70 Hire Railroad Negotiator 1.A.C.3.3 Fri 8/8/08 Fri 8/29108 --"---"-- "- --- ---- "---- -- ------------ - - 71 City Finalizes Draft Request Letter to BNSF 1.A.C.3.4 Mon 6/2/08 Thu 12/25/OS 72 Legal Negotiations ', 1.A.C.3.5 Mon 12/29%08 Fri 3/13J09 � 73 Final Offer 1.A.C.3.6 Mon 3/16,09 Tue 3/31/0974 . Final Agreement Signature Routing 1.A.C.3.7 Wed 4/1/09 Wed 4/29/09 75 Final Land Transfer & Pa ment Y ----� 1.A.0 3 8 Fri 5lV09 " Fri MV69 - 76 New Mercer Ditch .... __. _"_.. 1.A.0 4 Mon 11/3/08 Fri 2/26/10 _ - _......__.... ..... _... _.__. .__.... ".... ': 1 77 Sherwood Lateral Ditch - 1.A.C.5 Mon 11068 Fri 2/26/10 ::-- 78 Emi hLateral Ditch 9 ._ - 1.A.C.6 Mon 11/3108 Tue 1/26110 "..-- .... _..__..._... ..__.... _...__...._ _......; 79 Larimer County No. 2 1.A.C.7 Mon 11/3/08 Fri, ::: 1.A.C.B Mon 1713/08 Fri 2/26/10 :? 87 Park-n-Rides 1.A.C.9 Mon 11/3/08 Fri 2/26/1082 Preliminary Design 1.A0 Tue 5/6106 Mon 1112109 83 Preliminary Engineering (PE) Plans - 30% 1.A.D.1 Tue 5i6/08 Fri 5/30/08 84 Supplemental Data Collection tA.D.2 Mon 6!2/08 Fri 10/31/08 ....-_-_...-..------ .""_...__ ...... _...:_...... .. _... _: Task Rolled Up Task External Tasks — Project: MASONBRTWBS081108 _ Progress Rolled Up Milestone 0 Project Summary Date: Mon 8/11/08 Milestone Rolled Up Progress Group By Summary Summary Split Deadline; ; City of Fort Collins Mason Corridor MAX BRT Project Schedule August l 1, 2008 ID Task Name I WBS Start Finish 2010 _ 2011 ! 85 Utilities Coordination S PE Plan D/B RFP Development 1.A.D.3 Fri 8f1/08 _ _ Mon 1112109 Qt Q2 I 03 Q4 01 .__Q2 01 86 Supplemental Data Collection PP -. 1.A.D.3A Fri 8/1/08 Fri Z13109 -__..._-_.--....-_-.......___.. ! - - ------------ 87 Survey 1.A.D.3.1.1 Mon 9/1108 Fri 2/73/09 88 Existing Drainage System Configuration 1.A.D.3.1.2 Fri 8/1/O8 Fri 10131/O8 89 Soil Borings 1.A.D.3.1.3 Mon 9/1/08 Fri 10/31/08 90 Potholing__-... 1.A.D.3.1.4 Mon 9/tlOB Fri 10/31/08 _.... _...._..-_- _....__...__. __.............' - - 91 Utilities/ITSfTraffic Signal Coordination 1.A.D.3.2 Mon 911108 Mon 1112109 I. 92 Identification 1.A.D.3.2.1 Wed 10/1108 Fri 10/31/08 i - ' '.. 93 Relocations 1.A.D.3.2.2 Mon 11/3108 Tue 3/31/09 94 Wet Utilities (Water\Sanitary Sewer\Stonnwater) - 1.A.D.3.2.3 Mon 12/1/08 Thu 4/30/09- 95 Dry Utilities (ITS\Communications\Gas\Electric) 1.A.D.3.2.4 Thu 1/1109 Fri 96 Primary Electric Trunk Line - 1.A.D.3.2.5 Mon 11/3/08 Fri 5/29/09 r_------- .___....- • - ......- 97 Floodplain Management 1.A.D.3.2,6 Mon 1113/08 Fri 5/29109 98 PUC Submittal -Mason/Howes 1.A.D.3.2.7 Mon 11f3/08 Thu 4/30/09 ... _.....___... _. _. _.._.. _.. _......... +. - ---- -.--- . 99 Signal Priority System Implementation Planning 1.A.D.3.Z8 Mon 911109 Mon 11/2109 - 100 PE Plan D/8 RFP Development 1.A.D.3.3 Mon 11/3/08 Mon 11/2/09 101 Final D/B Package RFP Plans 1.A.D.3.3.1 Mon 11/3/08 Fri 5/29/09 102 D/B Package RFP Development 1.A.D.3.3.2 Thu 1/1 /09 Fri 10/30/09 - 103 Final D/B RFP Package � � 1.A.D.3.3.3 Mon 1112/09 Mon 11/2109 12 104 Finance - � .._ 1 AE Tue 5/6/08 Thu 4/30109 -............... _... _. .. _. .1, 105 Finance Management Plan (FMP) - - ..t. - 1 AEA Tue 5/6/08 Fri 10/17/08 106 _... _. ..-.-__._._ Draft FMP � -- 1.A.E.1.1 Tue 5161O8 Thu 9/4108 ...._... .. ........_ .-_.... _- ...._.- - - - 707 Initial FTA Submittal 1.A.E.1.2 Fri 9/5l08 Fri 9/5/08 108 .. FTA Review 8 Comments 1.A.E.1.3 Mon 9!8l08 Fri 9/26/O8 _.___.-..._..___... .................... _........ -, - 109 Final Revisions I 1A-E.t.4 Mon 9/29/08 Thu 10/16/08 110 BNSF Appraisal Update t.A.E.1.5 Thu 10/16/08 Fri 10/17/08 171 Final FTA Submittal - � 1.A.E.1.6 Fri 10/17/O8 Fri 10/17108 112 Secure State Funds CDO7- I ( ) 1.A.E.2 Tue 5/6/08 Tue ------- ----- Task (: `. .; i(j Rolled Up Task I External Tasks Project: MASONBRTWProgress BS081108 � Rolled Up Milestone Project Summary Date: Mon 8/11/08 Milestone ® Rolled Up Progress Group By Summary Summary Split Deadline - City of Fort Collins Reference evaluation (Top Ranked Firm) The project Manager will check references using the following criteria. The evaluation rankings will be labeled Satisfactory/Unsatisfactory. QUALIFICATION STANDARD Overall Performance Would you hire this Professional again? Did they show the skills required by this project? Timetable Was the original Scope of Work completed within the specified time? Were interim deadlines met in a timely manner? Completeness Was the Professional responsive to client needs; did the Professional anticipate problems? Were problems solved quickly and effectively? Budget Was the original Scope of Work completed within the project budget? Job Knowledge a) If a study, did it meet the Scope of Work? b) If Professional administered a construction contract, was the project functional upon completion and did it operate properly? Were problems corrected quickly and effectively? 10 Mason Corridor MAX BRT Project Schedule August 11, 2008 Name 114 Secure Local Funds 1.A.E.4 Fri 10i31108 Fri 10131108 115 Secure Federal Funds (FTA Small Starts PCGA) 1.A.E.5 Thu 4/30/09 Thu 4/30109 116 Final Design 8 Construction 1.B Mon 1231108 Fri 9130111 117 Final Design 1.B.A Mon 311110 Wed 8131111 118 Mason\Howes Street Two -Way Conversion 1.B.A.1 Mon 3/l/10 Wed 8/31111 119 BRT(Guideway�StationsiStopslLotsISTC) 1.B.A2 Mon 311110 Wed 8131111 120 Value Engineering 1.B.A.2.1 Mon 3/l/10 Wed 8131111 j 121 Typical Section S.B.A.2.2 Mon 311110 Wed 8/31/11 122 Pavement Thickness (Geotechnicap 1.B.A.2.2.1 Mon 3/1/10 Wed 8/31il1 123 Guideway 1.B.A.2.2.2 Mon 3/1/10 Wed 8131111 124 Station Platforms _ 1.B.A.2.2.3 Mon 3/1110 Wed 6/31/11 j 125 Park-n-Ride Lots t.B.A.2.2.4 Mon 3/1/10 Wed 8/31111 126 South Transit Center 1.B.A.2.2.5 Mon 3/1110 Wed 8/31111 127 Mason Trail 1.B.A.2.2.6 Mon 311110 Wed 8131111 128 Demolition and Removals 1.B.A.2.3 Mon 311/10 Wed 8131111 1 1 129 PSCO Building Demolition 1.BA.2.3.1 Mon 311110 Wed 8131/11 j 130 Miscellaneous Removals 1.B.A.2.3.2 Mon 3/1/10 Wed 8131/11 131 Horizontal Alignment 1.B.A.2.4 Mon 311110 Wed 8/31/11 ' 132 Guideway Control Line AlignmenhLayout 1.B.A.2.4.1 Mon 311110 Wed 8131/11 133 Mason Trail 1.B.A.2.4.2 Mon 3/1110 Wed 8131/11 134 Crossing Alignments 1.B.A.2.4.3 Mon 311/10 Wed 8131/11 135 South Transit Centerr 1.B.A.2.4.4 Mon 311/10 Wed 8/31Ill 136 Vertical Profiles 1.BA2.5 Mon 311110 Wed 8131111 137 Guideway Control Line Profile 1.B.A.2.5.1 Mon 311110 Wed 8/31/11 138 Curb & Gutter Profiles - - 1.B.A.2.5.2 Mon 311/10 Wed 8/31/11 j 139 Mason Trail - 1.B.A.2-5.3 Mon 3/l/10 Wed 8/31/11 140 Intersection Details 1.B.A.2.5.4 Mon 3/1/10 Wed 8131111 Task { Rolled Up Task External Tasks Project: NIASONBRTWBS081108 Progress Rolled Up Milestone C` Project Summary Data: Mon 8/111O11 Milestone ♦ Rolled Up Progress ® Group By Summary ^ ' Summary Split .. Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August l 1, 2008 I 142 South Transit Center '. 1.B.A.2.5.6 Mon 3/1l10 i Wed 8/31111 ---"--- 14"s Facilities Layout 1.B.A.2.6 Mon 311110 Wed 8131/11 144 Stations & Stops 1.B.A.2.6.1 Mon 3/1110 Wed 8/31/111- r 145 Park-n-Ride lots 1.B.A.2.6.2 Mon 311/10 Wed 8/31/11I 146 j Maintenance Facility tY 1.B.A.2.6.3 Mon 3/1110 Wed 8131111 147 South Transit Center 1.B.A.2.6.4 Mon 311/10 _ - " `------a Wed 8/31/11 148 Signing & Striping 1.B.A.2.7 Mon 311110 r Wed 8131111 - . --- -- " 149 BRT Guideway 1.B.A.2.7.1 Mon 3/1110 Wed 8131111 156 " Stations ._... _ 1.13.A.2.7.2 Mon 311110 t a .. :�:-..:... ".....:...... Wed 8131111 151 -- Stops - - - tB.A.2.7.3 Mon 3/l/10 Wed 8131111 - 152 Park-n-Ride Lots 1.8.A.2.7.4 - Mon 3/1110 Wed Bl31(11i! 153 South Transit Center 1.B.A.2.7.5 Mon 311/10 Wed 8131/11 154 Drainage 1.B.A.2.8 Mon 3/1/10 Wed 8131/11 155 Fixed Guideway 1.B.A.2.8.1 Mon 3/1110 Wed 8/31111 156 Basin Layout tB.A.2.8.1.1 Mon 311/10 Wed 8/31/71 '� z----""" 757 Inlet Spacing I.B.A.2.8.1.2 Mon 311/10 Wed 8131/11 :: 158 Trunk Line Profile 1.B.A.2.8.1.3 Man 3/1/10 - - --- '-"-"-- Wed 8/31111 .-" ',, 159 Lateral Profiles 1.B.A2.8.1.4 Mon 3/1110 Wed 8/31111 160 Inlet & Manhole Elevations 1.B.A.2.8.1.5 Mon 311/10 .: Wed 8/31/11 161 Details , 1.B.A.2-8.1.6 Mon 3/1110 Wed 8/31111 :3 162 StationsiStopslLots\STC 1.B.A.2.8.2 Mon 311110 Wed 8131111 ---- 163 Site Drainage PlantLayout 1.B.A.2.8.2.1 Mon 311/10 Wed 8/31/11 i- 164 Profiles t.B.A.2.8.2.2 Mon 311/10 Wed 8/31/11 165 Inlet & Manhole Elevations 1.B.A.2.8.2.3 Mon 3/1110 Wed 8/31/11 166 Details - - 1.13.A.2.8.2.4 Mon 311/10 Wed 167 South Transit Center 1.B.A.2.8.2.5 Mon 311110 Wed 8/31/11 - 168 Mercer Ditch\Mail Creek Crossings 1.B.A.2.8.3 Mon 311/10 ..: Wed 8/31/11 Task— Rolled Up Task`"—, ' ;� External Tasks Project: MASONBRTWBS081108 Progress Rolled Up Milestone Project Summary Date: Mon 8/11108 Milestone ♦ Rolled Up Progress ® Group By Summary Summary Split ... , Deadline ; r City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID Task Name WBS Start Finish 2p10 2011 Stormwater Management &Erosion Control 7.B.A.2.8.4 Mon 3/1l70 _ Wed 8/31/11 170 Drainage Report (ENTIRE PROJECT) 1.B.A.2.8.5 Mon 3/1/10 E Wed 8/31/11- 171 Traffic Signals 1.B.A.2.9 Mon 311/10 Wed 8/31/11 i 172 Guideway Street Crossings 1,B.A.2.9.1 Mon 311/10 Wed 8/31/17."-- 173 Industry Track Crossing t.B.A.2.9.2 Mon 3/1110 Wed 8/31/11 174 Park-n-Ride Lots 1.S.A.2.93 Mon 311110 Wed 8/31/11r _.....'---.._ 175 South Transit Center" .9.4 Mon 3!1/10 Wed 8r3ll11 176 Fixed Guideway Communication Intfrastructure y 1.BA2.10 Mon 3/1/10 Wed 8/31N1 177 Ensure Transit Bandwidth Priority Usage 1.B.A.2.10.1 Mon 3/1110 Wed 8/31/11 178 Investigate Partnerships With Other Departments 1.B.A270.2 Mon 311/10 Wed 8/31/17 179 Investigate Partnerships With Other Agencies 1.B.A.2.10.3 Mon 311/10 Wed 8/31/11 _: ..., 180 Fiber Optic Connectivity 1-BA2.10.4 Mon 3/1/10 Wed B131/11t a-- - ' 181 Connecting to Existing City Data Network 1.B.A.2.10.4.1 Mon 311110 Wed 8/31111 ! 782 Selecting Appropriate Fiber Optic Cable 1.B.A.2.10.4.2 Mon 3/1/10 Wed 8131/11 1- 183 New Guideway Installation 1.BA2.10.4.3 Mon 311110 Wed 8131111 184 ontluits B.A.2.10.43.1 Mon 311/10 - Wed 8/31111 I .. _...- 185 Junction Points B.A.2.10.4.3.2 Mon 311110 j Wed 8/31/11 187 Ter �— —_.: 18E Testingtination B.A.2.10.4.3.4 Mon 3/1/10 Wed 8/31/11 1 188 Existing Roadway Installation 1.B.A2.10.4.4 Mon 311110 .i Wed 8/31111 189 s Borin g B .A.2.10.4.4.1 Mon 311/70 Wed 8/31/11 ..",j '.. Traffic Fiber Versus New Fiber Plant B A.2.10,4,4.2 Mon 3/1/10 Wed 8l31/71_-, i190 191 Connectivity - STC to Transfort t B.A.2.10.5 Mon 311/10 Wed 8131111 192 COSN3enefit Analysis 1.B.A.2.10.5.1 Mon 3/1110 Wed 8/31/11 T- 193 Partnerships Analysis'. 1.B.A.2.10.5.2 Mon 3/1110 Wed 8/31111 194 New Utilities Power System - South West Annex 1.B.A.2.10.5.3 Mon 3/1flo Wed 8131111, 195 Wireless Infrastructure 1.B.A2.10.6 Mon 311110 Wed 8/31111 196 Analyze ProtocoRTechnology to Use 1.BA2.10.6.1 Mon 311110 ;.__...... _.....--_....-- ... _...... Wed 8131111 Task � � Rolled U Task P �� External Tasks I <, Project: MASONBRTWBS081108 Progress Rolled Up Milestone O Project Summary Date: Mon 8111/08 I Milestone Rolled Up Progress ® Group By Summary Summary Split Deadline - City of Fort Collins Name 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 EVDO 802.11 WIMAX Public Safety Analyze Security Encription to Use Current Encription Methods Newly Adopted at Build Out Connect to Existing City Data Network Investigate Public Wireless Possibility Communication Equipment Cisco Switches POE Standard Conduit Cabling Ground Vault to Platforms Platforms Communications Infrastructure Environmental Enclosure Communication Equipment Transfort Schedule Information Ticket Vending Equipment Electrical Needs Analysis Conduits From Connectivity Vault Conduits - Individual Platform Components Sound Equipment Video Security Equipment Connectivity to City Data Network Cisco Switch Fiber Optic Terminal Modules Sound and Paging System Mason Corridor MAX BRT Project Schedule August 11, 20D8 WBS Start Finish _ ' — ,I-G B A.2.10,6-A.1 Mon 3%1110--- Wed 8l31/17 B.A.2.10.6.1.2 Mon 3A/10 Wed 8/31111 B.A.2.10.6.1.3 Mon 3/1/10 Wed 8131/11 '. B.A.2.10.6.1.4 Mon 311/10 Wed 8131/11 t.B.A2.10.6.2 Mon 311110 Wed 8131/11 j BA.2.10.6.2.1 Mon 311/10 Wed 8/31/11 r B.A.2.10.6.2.2 Mon 311110 Wed 8/31/17 j j B.A.2.10.6.2.3 Mon 3/1/10 Wed 8131/11 B.A.2.10.6.2.4 Mon 3/1/10 Wed 8/31111 1.B.A.2.40.7 Mon 3/1110 Wed 8131111 1.BA2.10.7.1 Mon 311110 Wed 8/31111 B.A.2.10.7.1.1 Mon 311110 Wed 8/31111 ' - B.A.2.10.7.t2 Mon 311MO Wed 8/31/11 1.B.A.2.10.8 Mon 311/10 Wed 8/31111 '. 1.B.A.2.11 Mon 311/10 Wed 8131/11 1.B.A.2.11.1 Mon 311110 Wed 8t31111 1.B.A.2.11.1.1 Mon 311/10 Wed 8131111 1.B.A.2.11.1.2 Mon 3/1/10 Wed 8/31111 1.B.A.2.11.1.3 - Mon 3/1110 Wed 8/31M1 1.B.A.2.11.1.4 Mon 311/10 Wed 8/31/11 1.B.A.2.11.1.5 Mon 311/10 Wed 8/31/11 '. 1.B.A.2.11.1.6 Mon 3/1110 Wed 8/31/11 t.B.A.2.11A.7 Mon 3/1110 Wed 8/31/11. 1.B.A211.1.8 Mon 3/11/10 Wed &31111 1.S.A2.11.2 Mon 311110 Wed 8/31111 ! 1 1.13A.2.11.2.1 Mon 311/10 Wed 8/31/11 1.B.A.2.11.2.2 Mon 3/1/10 Wed 8131111 1.B.A2.11.3 Mon 3/1/10 Wed 8/31/11 Task Rolled Up Task External Tasks Project: MASONBRTWBS081108 Progress Rolled Up Milestone ^ Project Summary Date: Mon 8/11/08 Milestone . Rolled Up Progress i Group By Summary WNWOMMIP Summary Split Deadline ! " City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID (Task Name WBS Start Finish 2n1D in-,i 226 Auto Announcement System 1.B.A.2.11.3.2 - Mon 3/1110 Wed 8131111 227 Platform Amplifier : 1.B.A.2A 1.3.3 Mon 311/10 Wed 8131/111 228 Video Security System 1.BA2.11.4 Mon 311/10 Wed 8131111 I 229 IP Cameras 1-B.A.2.11.4.1 Mon 3/1/10 Wed 8131111 230 Analog Cameras With Encoders 1.B.A.2.11.4.2 Mon 311110 Wed 8131111 j 231 Mini-DVR 1.B.A.2.11.4.3 Mon 3/1110 Wed 82111 232 Wayside Signs 1.B.A2.11.5 Mon 311/10 Wed 8131111 1 233 LED Panels 1.BA.2.11.5.1 Mon 3/l/10 Wed 8/31/11 234 LCD Panels 1.B.A.2.11.5.2 Mon 3/1/10 Wed 8/31/11 235 Investigate Revenue Generation Through Advei 1.B.A.2.11.5.3 Mon 3/1110 Wed 8/31/11 236 Investigate Corporate Sponsorship - 'I.B.A.2.11.5.4 Mon 311110 Wed 8/31/11 ' 237 GPS Based Clock System 1.B.A.2.11.5.5 Mon 311110 Wed 8131t11 238 Primary B.A.2.11.5.5.1 Mon 311110 Wed 8f31/11 239 Secondary B.A.2.11.5.5.2 Mon 3/l/10 Wed 8/31/11 240 Fare Collection 1.B.A.2.11.6 Mon 3/1110 Wed 8131/11 r 241 Ticket Vending Machines I.B.A.211.6.1 Mon 3/1110 Wed 8/31/11 242 Ticket Validation Machines - - 1.B.A.2.11.6.2 Mon 311/10 Wed 8131/11 243 Change Machines - ,' tB.A.2.11.6.3 Mon 3/l/10 Wed 8/31/11 244 Structures _ - 1.BA2.12 Mon 311110 Wed 8131111 245 Soil Bodng Logs j. 1.B.A.2.12.1 Mon 3/1/10 Wed 8131111 246 Retaining Wall Layouts 1.B.A.212.2 Mon 311/10 Wed 8/31/11 247 Troutman Underpass 1.8.A.2.12.3 Mon 311/10 Wed 8/31111 248 Swallow Bridge Replacement 1.B.A.2.12.4 Mon 311110 Wed 8131111 249 Larimer County No. 2 Enclosure 1.B.A.2.12.5 Mon 3/1/10 Wed 8/31111 250 Sherwood Lateral Box Culvert Extension 1.B.A.2.12.6 Mon 311/10 Wed 8/31/11 ':- 251 Spring Creek Box Culvert Extension 1.B.A.2.12.7 Mon 3/1/10 Wed 8/31111 252 Lighting 1.B.A2.13 Mon 3/1/10 Wed 8/31111 1 Task Rolled Up Task External Tasks F Project: MASONBRTWBS081108 Progress Rolled Up Milestone ^ Project Summary Date: Mon 8/11108 Milestone ® Rolled Up Progress ® Group By Summary Summary Split Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11. 2008 I. 10 Task Name WBS Start Finish 1010 2011 I—- --AV _Ju___ _Q2 1 253 Q1 Q3 , I _94 Of Q2 Q3 Q_4_; Q1 Wed 8131111 I.B.A.2.13.1 Mon 311110 254 Stabons\StopskLots 1.B.A.2.13.2 Mon 3/1 /10 Wed 8/31111 255 Landscaping I.B.A.2.14 Mon 311/10 Wed 8/31111 256 Guideway I.B.A.2.14-1 Mon 3/1110 Wed 8131/11 257 StabonsNStops\Lots I.B.A.2.14.2 Mon 3/1/10 Wed 8131f1I 13 258 Operations Equipment I.B.A.2.15 Mon 3/1110 Wed 8l31111 259 ITS I.B.A.2-15.1 Mon 3/1110 Wed 8131111 260 Passenger Information Systems I.B.A.2.15.2 Mon 311/10 Wed 8131111 ...... 261 Fare Vending Machines I.B.A.2.15.3 Mon 3/1110 Wed 8131/11 262 Shelters 1.B.A2.15.4 Mon 311/10 Wed 8/31111 . . ........ 263 STC Building Plans 1.13.A.2.15.5 Mon 3/1/10 .......... Wed 8/31111 ZIA Maintenance Facility Upgrades 1.BA2.16 Mon 311110 Wed 8131111 ;1 265 Site & Building Upgrade Plan I.B,A.2.16.1 Mon 311/10 Wed 8/31/11 266 Construction Documents I.B.A2.17 Mon 3/1110 Wed 8131111 267 60% Design Review 1.B.A.2-17.1 Mon 3,11110 Wed 8Y31111 268 90% Design Review 16.A2-17.2 Mon 3/1/10 269 Final Construction Documents I.S.A.2.17.3 Mon 3/1110 .... Thu 3110111 a ...----------- 270 Construction 1.6.6 Mon 311110 Wed 8/31111 ...... 1W 271 Mason\Howes Street Two -Way Conversion I-B-8.1 Mon 311/10 Wed 8/31111' ........... ......... .. 272 BRT (Guide%,aykStations\Stops\Lots) I.8.6.2 Mon 311110 Wed 8131111 1 273 Building DemolitiomRelocation I.S.B.2-1 Mon 3/1/10 i Wed 8/31111 I 274 Utility Relocation 1.S.B.2.2 Mon 311110 Wed wo 11 7I 275 Miscellaneous Demolition & Clearing 1.8.6.2.3 Mon 311110 Wed 8/31/11 E-=- 276 Erosion Control 1.B.B.2.4 Mon 3/1/10 ...... Wed 8/31/11 277 Drainage Pipe & Inlets I.B.B.2.5 Mon 3/1110 Wed 8131111 278 Deep Utilities (WaterkSanitary Sewer) 1-B.B.2-6 Mon 3/1/10 Wed 8/31/11 279 Earthwork 1.B3.2.7 Mon 311/10 Wed 8131111; 280 Structures (Retaining Walls) 1.B.B.2.8 Mon 311110 Wed 8131 /11, Task Rolled Up Task External Tasks Project: MASONBRTWBS081108 Progress Rolled Up Milestone Project Summary Date: Mon Bit 1108 Milestone ♦ Rolled Up Progress Group By Summary Summary split Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID ,Task Name WBS ; Start1 Finish 2010 ! 9m1 !—1 282 Foundations (Signal & Lighting) 1.B.B2.10 Mon 3/1110 Wed 8/31/11;- - "". 283 Conduit Crossings (Irrigation & Communication) 1.B.B.2.11 Mon 3/1110 Wed 8/31/11 284 Curb &Gutter (Fixed Guideway) - 1.B.S.2.12 Mon 3/1110 Wed 8131111 " 285 Curb & Gutter (Stations) 1.B.8.2.13 Mon 311/10 Wed 8/31/11 286 Paving (Fixed GuiedwaY) 1.B.B.2.14 Mon 311110 Wed a/31/11 287 Station Platforms 1.8.8.2.15 Mon 3/1110 Wed 8/31111 288 Paving (Stations) 1.B.B.2.16 Mon 311110 Wed 8/31111' i --� 289 Sidewalk (Stations & Street Crossings) 1.8.62.17 Mon 3/1l10 Wed 8/31/11 , 290 Landscaping &Irrigation _ 1.B.B.2.18 Mon 3/1110 Wed 8131/11- 291 Signing & Striping 1.B.B.2.19 Mon 3/1110 Wed 8/31/11 292 Traffic Signal Equipment 1.B.B.2.20 Mon 311110 Wed 8/31/11 293 Lighting Poles & Luminaires tB.B.2.21 Mon 3/1/10 Wed 8/31111; i 294 Passenger Information Systems 1.8.6.2.22 Mon 311/10 -- ... :! '.. ...... Wed 8/31/11 295 Fare Vending Machines 1.B.B.2.23 Mon 3/1110 Wed 8131111 296 Shelters 1.6.8.2.24 Mon 3/1l10 r Wed 8/31/11 297 South Transit Center 1.B.B.3 Mon 311/10 Wed 8131111 298 Maintenance FacilityUP9rades 7.B.B.4 Mon 3J1/10 Wed 8r31l11 -- 299 Vehicle Acquisition 1.B.0 Mon 1211/08 Fri 9130/11 " 300 Procurement 1,B.C.1 Mon 12i1/G8 Fri 12/31710 301 Inspection (Pre -Revenue) 1.B.C.2 Mon 1!3/11 _. Thu 3131/11 :;:::: _«. 302 Testing &Startup 1.B.C.3 Mon 1014110 .. ..... .. _..-..... Fri 9130111 - If 303 Hire Trainer i.B.C.3.1 Mon 10.-4r10 Mon 1014 10 j ♦ t0i4 304 Hire Drivers tB.C.3.2 Tue 311;11 Thu 6r30111 - 305 Train Drivers 1.B.C.3.3 Fri 711;11 Wed 8.131111 0 306 Test Buses on Guideway 1.B.C.3.4 Thu 9/1,11 - - ; Fn 9l30l11 ! El 307 - Hire Dispatch 1.B.C.3.5 Fri 9/30l11 Fn 9130/11i . 9130 308 _ Operations 1.B.D Mon 311/10 Wed 8131/11 i Task Rolled Up Task T. M I External Tasks MASONBRTWBS081108 P Progress Roiled U P Milestone U Project Summary Date: Mon 8111108 Milestone ♦ Rolled Up Progress ® Group By Summary Summary Split ............ Deadline City of Fort Collins Mason Corridor MAX BRT Project Schedule August 11, 2008 ID (Task Name WBS Start Finish 9010 310 Equipment Procurement - 1.B.D.1.1 Mon 3/1110 Wed 8/31111 i 311 Installation - 1.B.D.1.2 Mon 3/1/10 Wed 8131/11 312 Street Conversion 1.B.D.1.3 Mon 311110 Wed 8/31/11 j 313 BRT (GuidewaylStationslStops4Lots) 1.B.D.2 Mon 311110 Wed a/31/11 314 Procurement 1.B.O.2.1 Mon 3/1110 Wed 8/31111 315 ITS Equipment 1.B.D.2.1.1 Mon 3/1110 Wed 8/31111 316 Passenger Information Systems 1.&D.2.12 Mon 3/1110 Wed 8131111 1 317 Traffic Signals 7.6.0.2.1.3 Mon 3/1l10 Wed 8131/11 318 Fare Vending Machines t.B.D.2.1.4 Mon 311110 Wed 8131111 319 Shelters 1.B.D.2.1.5 Mon 311110 Wed 8/31/11 320 Fuel - 1.B.D.2.1.6 Mon 3/1/10 Wed 8131/11 321 Inspection 1.B.D.2.2 Mon 311110 Wed &31111 322 Passenger Information Systems 1.13.13.2.2.1 Mon 3/1/10 Wed 8/31/11 323 Traffic Signals 1.B.D.2.2.2 Mon 3/1110 Wed 8131/11 324 Fare Vending Machines I.B.D.2.2.3 Mon 3l1/10 Wed 8131111 325 Shelters 1.B.D.2.2.4 Mon 311110 Wed 8/31111 ! 326 Testing 1.B.D.2.3 Mon 311110 Wed 81'31111 327 Traffic Signal Systems 1.B.D.2.3.1 Mon 3/1110 Wed 8131/11 328 Fare Vending Equipment 1.B.D.2.3.2 Mon 311/10 Wed B/31/11 I 329 ITS Equipment 1.6.0.2.3.3 Mon 3/1/10 Wed &31/11 330 AVL\GPS 1.S.0.2.3.4 Mon 311110 Wed 8/31111 331 Passenger Information Systems 1.B.D.2.3.5 Mon 3/1110 Wed &31/11 332 ITS 1.B.D.3 Mon 3/1/10 Wed 8131111 IF ' 333 Data Cabinet 1.B.D.3.1 Mon 3/1/10 Wed 8/31/11 334 Mobile Video Security System 1.B.D.3.2 Mon 3/1110 Wed 8131/11 335 DVR 1.B.D.3.2.1 Mon 3/1/10 Wed 8/31111 336 - Cameras - 1.13.D.3.22 Mon 3/1110 Wed 8/31/11 Task Rolled Up Task External Tasks Project: MASONBRTWBS081108 Progress Rolled Up Milestone O Project Summary i Date: Mon 8111108 Milestone ♦ Rolled Up Progress Group By Summary Summary Split Deadline City of Fort Collins Mason Comdor MAX BRT Project Schedule August 11, 2008 337 1.B.D.323 Mon 3/V10 338 Automatic Announcement System 1.B.D.3.3 Mon 311110 339 Audio Announcement 1.13.13.3.3.1 Mon 3/1110 340 Visual Display 1.B.D.3.3.2 Mon 3/1110 341 Fare Collection System 1.B.D.3.4 Mon 3/1110 342 On Board Server 1.B.D.3.5 Mon 3/t/10 343 GPS Input 1.B.D.3.5.1 Mon 311/10 344 Discrete Inputs 1.S.D.3A2 Mon 311/10 345 Driver Console Integration 1.B.D.3.5.3 Mon 311110 346 Headway Signs Integration 1.B.D.3.5.4 Mon 3/1!10 347 Fare Collection System Integration 1.8.0.3.5.5 Mon 311/10 348 Automatic Announcement Integration 1.B.D.3.5.6 Mon 311110 349 Rear Camera Integration S.B.D.3.5.7 Mon 3/1/10 350 Dispatch 1.B.D.3.6 Mon 311110 351 ITS Software for Dispatchers 1.B.D.3.6.1 Mon 3/1110 352 Large Screeens 1.B.D.3.6.2 Mon 3/1/10 353 Automatic Vehicle Location System 1.B.D.3.6.3 Mon 3/1110 354 Route Schedule Adherence - 1.B.D.3.6.4 Mon 311110 355 Mobile Video Security 1.B.D.3.6.5 Mon 3/1l10 356 Platform Video Security 1.B.D.3.6.6 Mon 3/1/10 357 South Transit Center Video Security 1.B.D.3.6.7 Mon 3/1110 358 Communications 1.B.E Mon 311/10 359 Shared Data Website 1.S.E.1 Mon 311110 360 Public Website 1.B.E.2 Mon 3/1/10 361 Community Outreach 1.B.E.3 Mon 3/1110 362 Media - 1.6.E.4 Mon 3/U1ti 363 Government 1.B.E.5 Mon 3/1i10 364 Public Art 1.13.E.6 Mon 3/1 il0 Task Project: MASONBRTWBS081108 Progress Date: Mon 8/11108 Milestone Summary Finish 2010 2011 Rolled Up Task Rolled Up Milestone 0 ♦ Rolled Up Progress Split .,,.,.��•. •.•„�..� City of Fort Collins External Tasks Project Summary `'"'ems"="'�" Group By Summary Deadline Task Name 366 367 368 Public Meetings & Hearings Public ParticipaEcn Record Public Involvement Activity Timeline Task Project: MASONBRTWBS081108 Progress Date: Mon 8/11/OS Milestone Summary Mason Corridor MAX BRT Project Schedule August 11, 2008 4SS Start Finish t-.B.E7 Mon 33!1il0 Fri 9130i1? 1.B.E.8 Mon 31L10 Fr 9130/11 1.B.E.9 Mon 311,10 Fri 930/11 1.8. E.10 Mon 311110 Fri 91;30111 Rolled Up Task Rolled Up Milestone O Rolled Up Progress Split City of Fort Collins External Tasks ( _� Project Summary Group By Summary Deadline - PROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City' and , [insert either a corporation, a partnership or an individual,doing business as , hereinafter referred to as "Professional". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of ( ) pages, and incorporated herein by this reference. 2. The Work Schedule. [Optional] The services to be performed pursuant to this Agreement shall be performed in accordance with the Work Schedule attached hereto as Exhibit "B", consisting of ( ) pages, and incorporated herein by this reference. 3. Contract Period. This Agreement shall commence 200 and shall continue in full force and effect until 200 , unless sooner terminated as herein provided. In addition, at the option of the City, the Agreement may be extended for additional one year periods not to exceed four (4) additional one year periods. Renewals and pricing changes shall be negotiated by and agreed to by both parties. The Denver Boulder Greeley CPIU published by the Colorado State Planning and Budget Office will be used as a guide. . Written notice of renewal shall be provided to the Professional and mailed no later than ninety (90) days prior to contract end. 4. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of 11 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 EXHIBIT E BNSF RAILWAY COORDINATION LOG Event Date Discussion Action FHU emailed project September 28, FHU informed BNSF that project FHU follow up; FHU to status to BNSF 2006 is now in position to receive keep BNSF informed of Manager Public funding; identified that every project progress Projects (MPP) effort will be made to keep the alignment outside BNSF right- of-way; requested meeting when BNSF MPP is in Denver FHU meeting with November 8, 2006 FHU informed BNSF that City MPP provided comments BNSF MPP at Council will meet November 21, and questions; requested Globeville Yard, 2006 to decide on funding the that alignment be outside Denver, CO 30% design effort; reviewed BNSF ROW as much as aerial concept alignment from possible; maintain 25' clear previous effort and requested distance from center -line of BNSF input regarding design track; asked about the when inside BNSF right-of-way status of replacing pavement around tracks downtown with concrete; asked for refined alignment to be emailed to MPP for circulation within BNSF FHU discussions December 2006 City would like to meet with FHU to pursue setting with City regarding BNSF to discuss the project and meeting between BNSF BNSF coordination their concerns and City FHU multiple phone January 2006 FHU requested meeting with MPP indicated others conversations with BNSF to discuss project within BNSF would need to BNSF MPP be included; MPP needs to coordination internally; FHU to continue to follow u FHU phone February 7, 2007 FHU/BNSF discussed FHU to produce memo conversation with refinement of alignment addressing BNSF BNSF MPP elements and information concerns regarding safety; needed by MPP to share refine alignment to pull internally prior to meeting with stations outside right -of - the City way and alignment out where possible FHU generated draft February 14, 2007 Memo outlines project FHU forwarded draft memo BNSF project memo background, funding, project to the City for review and for City review elements, traffic control/safety, comment and worked improvements of interest to through revisions of the BNSF and the City's request for draft additional coordination with the BNSF Exhibit E Mason Corridor MAX Bus Rapid Transit Project Management Plan August11 2008 Event Date Discussion Action FHU received all March 2007 City staff is comfortable with FHU to prepare final memo City comments to memo with refined alignment on BNSF project memo aerials to send to BNSF for and revised final circulation and review draft FHU emailed BNSF March 28, 2007 FHU email identifies FHU to follow up with Project Memo and attachments and following BNSF regarding receipt of refined alignment to BNSF review, requested a transmittal and any BNSF MPP meeting to discuss the memo immediate and design. Email also informed comments/questions BNSF of Agency Scoping Meeting to be held April 12, 2007 and extended invitation to BNSF. FHU email follow-up April 5, 2007 FHU email offered breakdown of FHU to continue to follow to BNSF project costs and some of the up with BNSF important project elements as a follow up to the BNSF Project Memo and to provide more detail for their consideration BNSF email April 5, 2007 BNSF Fort Worth sent email to FHU to prepare for phone response to FHU FHU indicating that BNSF would conversation contact FHU in the next week to discuss the subject at hand City email setting April 16, 2007 Meeting will be at the City FHU to prepare documents meeting among City offices on April 30, 2007 at 2:30 for City Staff to help Staff and FHU to for a brief discussion in discussion regarding BNSF prepare for preparation for meeting with position discussions with BNSF BNSF FHU email follow up April 20, 2007 FHU sent email indicating FHU to continue to follow to BNSF project plans are progressing up with BNSF and that the City and FHU are meeting on April 30, 2007; requested any project input prior to April 30 to share with City Staff BNSF email from April 20, 2007 BNSF DPP indicated that MPP FHU to await details of BNSF Director will be setting up a conference conference call and Public Projects call with FHU to discuss the compile documents (DPP) to FHU BNSF Project Memo and attached refined design Exhibit E Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 Event Date Discussion Action FHU Conference April 23, 2007 BNSF stated their position as FHU to forward this Call with BNSF DPP follows: information on to the City and MPP Senate Bill 07-219 has been and research the status of introduced which would limit the Senate Bill 07-219 liability of railroads that make their property available for (` Note: Senate Bill 07-219 commuter or light rail. BNSF to take effect July 1, 2007 would like to take some time to unless opposed) better understand that bill and await its conclusion. Therefore, BNSF defers comment on this project until such time as Senate Bill 07-219 has reached its conclusion. FHU Meeting with April 30, 2007 Discussion of possible City FHU to continue to discuss City Staff participation in indemnification the issue with BNSF and of BNSF Railway for BRT; to be follow the progress of SB discussed further following July 07-219 1, 2007 conclusion of Senate Bill 07-219; City would like to meet with BNSF after July 1, 2007 FHU Phone June 19, 2007 FHU indicated to BNSF that BNSF indicates they have Conversation with FTA was asking for a log no official position on the BNSF MPP showing BNSF coordination; project pending the FHU was preparing it. passing of SB 07-219 and how the City will address the indemnification issue FHU web search of July 2, 2007 FHU researched the status of FHU notified the City of the status of SB 07-219 SB 07-219; the bill passed passing of SB 07-219 and initiated discussion of next steps with BNSF FHU phone August 30, 2007 FHU provided status of multiple BNSF defers comment on conversation with projects to BNSF; indicated to the project until the City BNSF re: passing of BNSF that SB 07-219 had identifies how they will SB 07-219 passed address the indemnification issue FHU phone November 1, 2007 FHU indicated to BNSF that the BNSF still defers comment conversation with City was addressing the issue of on the project until the City BNSF MPP re: indemnification after which the identifies how they will status of multiple City would be in contact with the address the projects BNSF indemnification issue FHU emailed and January 25, 2008 Memo indicated latest update on BNSF indicated they would hand delivered the project: FTA notification in need more detail on this BNSF Project Status December 2007; possible information in order to Memo to BNSF MPP scenarios for City use of BNSF discuss the project; still ROW; ways in which City can concerned about the address the indemnification indemnification issue Exhibit E Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 __ Event Date Discussion Action FHU coordinated April 2, 2008 No additional information was FHU generated a with Staubach given other than what is conservative timeline flow (BNSF Real Estate available on the BNSF website chart for property purchase Services Rep) vs. property license regarding process agreement and timeline of property urchase FHU forwarded April 16, 2008 FHU indicated the BNSF is City determining how to BNSF ROW awaiting more detail regarding address the Coordination Flow the indemnification before indemnification issue with Chart to City via offering further comment on the their insurance email for review project FHU emailed BNSF April 30, 2008 Memo indicated City is BNSF indicated they would Project Status Memo addressing the insurance issue; need more detail on this to BNSF MPP would like to pursue a purchase information in order to of the property; and asked if discuss the project; still there are others at BNSF that concerned about the need to be involved indemnification FHU generated a May 30, 2008 City indicated they would review City reviewing the offer draft offer letter to the flowchart and offer letter and letter BNSF for purchase determine what they could move of the BNSF forward with regarding an offer property for the project; this was NOT sent to the BNSF; it was sent to the City for review and consideration FHU phone July 15, 2008 BNSF asked of the status of City to finalize information conversation with Mason BRT; FHU indicated City regarding indemnification BNSF MPP re: is working on indemnification and finalize review of offer status of multiple issue and offer letter letter for transmittal to projects BNSF Exhibit E termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: Professional: City: With Copy to: City of Fort Collins, Purchasing PO Box 580 Fort Collins, CO 80522 In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination, subject only to the satisfactory performance of the Professional's obligations under this Agreement. Such payment shall be the Professional's sole right and remedy for such termination. 5. Design, Project Indemnity and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City, its officers and employees in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City; and for the City's costs and reasonable attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance in the amount of $500,000 combined single limits and errors and omissions insurance in the amount of $ 6. Compensation. [Use this paragraph or Option 1 below.] In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional a fixed fee in the amount of ($ ) plus reimbursable direct costs. All such fees and 12 costs shall not exceed ($ ). Monthly partial payments based upon the Professional's billings and itemized statements are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's actual reimbursable expenses. [Optional] Insert Subcontractor ClauseFinal payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings, and other services rendered by the Professional shall become the sole property of the City. 6. Compensation. [Option 1] In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis according to the following schedule: Hourly billing rates: Reimbursable direct costs: with maximum compensation (for both Professional's time and reimbursable direct costs) not to exceed ($ ). Monthly partial payments based upon the Professional's billings and itemized statements of reimbursable direct costs are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's reimbursable direct costs. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings and other services rendered by the Professional shall become the sole property of the City. 7. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 13 8. Project Drawings. [Optional]Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival, prepared on stable mylar base material using a non -fading process to provide for long storage and high quality reproduction. "CD" disc of the as -built drawings shall also be submitted to the owner in and AutoCAD version no older then the established city standard. 9. Monthly Report. Commencing thirty (30) days after the date of execution of this Agreement and every thirty (30) days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Scope of Services, Work Schedule, and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 10. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible for withholding any portion of Professional's compensation hereunder for the payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 11. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 12. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 14 13. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 14. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 15. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 16. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. 17. Prohibition Against Employing Illegal Aliens. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Professional represents and agrees that: a. As of the date of this Agreement: 1. Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 15 A4. The RAMP is complete and an electronic copy is being provided. Additional ROW - related services will required of the PM and included in the future design/construction contracting processes. 05. Has the consultant been hired for the Burlington Northern Santa Fe (BNSF) negotiations? If so, who is it? If not, will there be one hired or is it part of this scope? A5. Yes - we have our railroad consultants hired. Mr. Lonny Blaydes is under contract for BNSF negotiations. Q6. Can the Construction Quality Assurance services be included in this contract or will they be let out separately? A6. The Construction Quality Assurance services will be contracted out separately in the future. 07. Has the delivery method for construction been decided upon? What involvement will the Project Management Team have in the development of the design process procurement documents? AT The Project Management Plan (PMP) was prepared on the basis of a design -build delivery method. This is the current method selected by the City of Fort Collins; however, if necessary, this decision can be reevaluated as the project progresses. The Project Management Team would have direct involvement in the development of this method as well as the procurement process. Q8. Will the Project Management Team have any involvement in the development of the Risk Management Plan? A8. Yes 09. Will the Project Management Team have any involvement in the development of the Quality Assurance Procedures, Schedule procedures, etc.? A9. Yes 010. Will the Project Management Team have any involvement in the procurement of vehicles or will that be the City's responsibility? A10. The City will take the lead on the vehicle procurement process. The Project Management Team will need to be familiar with the vehicle requirements as it relates to the various design elements of the project as well as scheduling concerns. 011. What role will the Project Management Team play in public relations since the City has an internal team for public relations identified? A11. Overall involvement in events/outreach opportunities will be required. Q12. Is there a ballpark budget identified for this contract? Would funding for this contract come from the overall project budget? 2. Professional will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the "e-Verify Program") or the Department Program (the "Department Program"), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. C. Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre -employment screening of job applicants while this Agreement is being performed. d. If Professional obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Professional shall: 1. Notify such subcontractor and the City within three days that Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the "Department") made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. I. If Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Professional shall be liable for actual and consequential 16 damages to the City arising out of Professional's violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. 18. Special Provisions. [Optional] Special provisions or conditions relating to the services to be performed pursuant to this Agreement are set forth in Exhibit " ", consisting of ( ) pages, attached hereto and incorporated herein by this reference. 17 THE CITY OF FORT COLLINS, COLORADO By: James B. O'Neill II, CPPO, FNIGP Director of Purchasing & Risk Management DATE: ATTEST: City Clerk APPROVED AS TO FORM: Assistant City Attorney [Insert Professional's name] or [Insert Partnership Name] or [Insert individual's name] or Doing business as [insert name of business] M Title: CORPORATE PRESIDENT OR VICE PRESIDENT Date: ATTEST: (Corporate Seal) Corporate Secretary 18 EXHIBIT" " INSURANCE REQUIREMENTS The Professional will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Professional shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: "The insurance evidenced by this Certificate will not be cancelled or materially altered, except after ten (10) days written notice has been received by the City of Fort Collins." In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Professional, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Professional under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Professional's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability. The Professional shall maintain during the life of this Agreement for all of the Professional's employees engaged in work performed under this agreement: 1) Workers' Compensation insurance with statutory limits as required by Colorado law. 2) Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. B. Commercial General & Vehicle Liability. The Professional shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $500,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Professional shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. 19 City of Fc Mason Cc MAX Bus z� ` a V5 A SERVICE August11, ]IOLT &' No Text City of Fort Collins Mason Corridor MAX Bus Rapid Transit Project Project Management Plan C Htyc f m f� _' August 11, 2008 No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan TABLE OF CONTENTS Paqe TABLEOF ACRONYMS-------------------------------------------------------------------------------------------- I PREFACE--------------------------------------------------------------------------------------------------------- ii PROJECT DESCRIPTION-----------------------------------------------------------------------------------------III 1.0 PROJECT OVERVIEW ---------------------------------------------------------------------------------- 1.1 1.1 Project Background ----------------------------------------------------------------------------- 1-1 1.2 Stakeholders -------------------------------------------------------------------------------------- 1-2 1.3 Project Summary -------------------------------------------------------------------- -----------1-2 1.4 Delivery Strategy -------------------------------------------------------------------------------- 1-5 2.0 ORGANIZATION AND STAFFING ------------------------------------------------------------------- 2-1 2.1 Position within Owner Organization--------------------------------------------------------2-1 2.2 Project Organization ---------------------------------------------------------------------------- 2-1 2.3 Key Personnel Job Functions ---------------------------------------------------------------- 2-3 2.4 Other Participants ------------------------------------------------------------------------------- 2-3 2.5 Agency Involvement ---------------------------------------------------------------------------- 2-4 2.6 Project Partner Staffing Assistance --------------------------------------------------------- 2-6 2.7 Consultant/Contractor Services -------------------------------------------------------------- 2-6 2.8 Training Plan-------------------------------------------------------------------------------------2-6 3.0 PROJECT MANAGEMENT AND CONTROLS---------------------------------------------------3-1 3.1 Work Breakdown Structure-------------------------------------------------------------------3-1 3.2 Schedule Control--------------------------------------------------------------------------------3-2 3.3 Cost Control--------------------------------------------------------------------------------------3-5 3.4 Configuration Management ------------------------------------------------------------------- 3-7 3.5 Project Accounting------------------------------------------------------------------------------3-8 3.6 Records Management -------------------------------------------------------------------------- 3-8 3.7 Estimating-----------------------------------------------------------------------------------------3-8 3.8 Change Order Control -------------------------------------------------------------------------- 3-9 3.9 Internal Reporting-------------------------------------------------------------------------------3-9 4.0 PLANNING AND PRELIMINARY DESIGN PHASE MANAGEMENT ---------------------- 4-1 4.1 Planning Studies --------------------------------------------------------------------------------- 4-1 4.2 Site Investigations ------------------------------------------------------------------------------- 4-1 4.3 Environmental Clearance---------------------------------------------------------------------4-2 4.4 Agency Agreements----------------------------------------------------------------------------4-2 4.5 Permits --------------------------------------------------------------------------------------------- 4-4 4.6 Financing ------------------------------------------------------------------------------------------ 4-5 4.7 Acquisition Plan Overview--------------------------------------------------------------------4-6 4.8 Acquisition Program Approach --------------------------------------------------------------- 4-7 4.9 Acquisition and Relocation Process--------------------------------------------------------4-8 4.10 Acquisition Program Controls----------------------------------------------------------------4-9 4.11 Utilities Management --------------------------------------------------------------------------- 4-9 4.12 Intelligent Transportation Systems (ITS)------------------------------------------------4-10 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (8 TABLE OF CONTENTS (Continued) 5.0 FINAL DESIGN PHASE MANAGEMENT 7.0 8.0 9.0 Paqe 5.1 Roles and Responsibilities -------------------------------------------------------------------- 5-1 5.2 Design Criteria----------------------------------------------------------------------------------5-3 5.3 Design Scope/Status--------------------------------------------------------------------------5-4 5.4 Design Submissions/Review ---------------------------------------------------------- ------- 5-4 5.5 Value Engineering/Constructability Reviews --------------------------------------------- 5-4 5.6 Quality Assurance/Quality Control----------------------------------------------------------5-4 5.7 Procurement Packages ------------------------------------------------------------------------ 5-5 CONSTRUCTION PHASE MANAGEMENT ------------------------------------------------------- 6.1 6.1 Organization--------------------------------------------------------------------------------------6-1 6.2 Pre -Construction Conferences --------------------------------------------------------------- 6-1 6.3 Quality Assurance/Quality Control----------------------------------------------------------6-1 6.4 Safety ----------------------------------------------------------------------------------------------- 6-1 6.5 Owner -Controlled Insurance Program ------------------------------------------- =--------- 6-2 6.6 Schedule Control -------------------------------------------------------------------------------- 6-2 6.7 Contractor Payments --------------------------------------------------------------------------- 6-2 6'.8 Record Documentation------------------------------------------------------------------------6-2 6.9 Field Inspection ---------------------------------------------------------------------------------- 6-3 6.10 Third Party Construction ----------------------------------------------------------------------- 6-3 6.11 Change Order Management ------------------------------------------------------------------ 6-3 6.12 Disputes & Claims ------------------------------------------------------------------------------- 6-3 6.13 System Testing & Startup---------------------------------------------------------------------6-3 CLOSEOUT PHASE MANAGEMENT--------------------------------------------------------------7-1 7.1 Operational Testing and Start Up 7.2 Operator Training --------------------- 7.3 Vehicle Maintenance Program---- 7.4 Contract Closeout -------------------- QUALITY MANAGEMENT------------------ 7-1 7-2 7-2 7-3 8-1 8.1 General-------------------------------------------------------------------------------------------8-1 8.2 FTA QA/QC Guidelines ------------------------------------------------------------------------ 8-1 8.3 Management Responsibility ------------------------------------------------------------------ 8-2 8.4 Documented Quality System ------------------------------------------------- ---------------- 8-2 8.5 Design Control-----------------------------------------------------------------------------------8-2 8.6 Document Control ----------------------------------------------------------------------------- --8-2 8.7 Purchasing----------------------------------------------------------------------------------------8-2 8.8 Product Identification ------------------------------------------------------------------------ ---8-2 8.9 Process Control------------------------------------------------------------------------- -------- 8-3 8.10 Inspection and Testing ------------------------------------------------------------------------- 8-3 8.11 Non -Conformance - Corrective Action----------------------------------------------------8-3 8.12 Quality Records/Quality Audits--------------------------------------------------------------8-4 RISK MANAGEMENT, SAFETY AND SECURITY----------------------------------------------9-1 9.1 Risk Management------------------------------------------------------------------------------9-1 9.2 Safety and Security Management Plan(SSMP) ----------------------------------------- 9-1 Al2. The City is not releasing the ballpark budget given the federal processes/protocols but, yes, it would come from the overall project budget. Q13. Will the design team develop the Intelligent Transport System (ITS) program and Project Management Team just oversee these efforts? At 3. Yes. The Project Management Team will be expected to integrate the ITS into the overall project and project schedule. Q14. What role will the Project Management Team play in the actual testing and initiation of service. At 4. Oversight & Coordination Q15. 1 understand the roles and responsibilities of City staff in the PMP, but how do you see that functioning in reality? Meaning that City Staff already have daily responsibilities and this will just add to their already busy schedules. A15. It will be challenging and that is why we need to secure a strong, experienced Project Management Team. This is a top -priority project for the City of Fort Collins and resources are being directed to see it successfully completed. Q16. Is there a required DBE or SBE usage? At 6. The City encourages participation of all firms and the usage of DBE and SBE firms as sub -consultants or prime consultants. However, there is not a set goal for participation. Q17. What type of communication by the Project Management Team is expected? At 7. The Project Management Team will have a variety of reporting requirements including daily, weekly, monthly and quarterly communications with various individual, committees and outside agencies. There is an established monthly reporting requirement for FTA that would be a responsibility of the Project Management Plan. The Project Management Team would report directly to Mark Jackson, Transportation Group Director for the City of Fort Collins. Q18. How much design has been completed on the project and who completed it? Is that preliminary design consultant eligible for final design? A18. Thirty percent (30%) design has been completed by Felsburg Holt Ullevig (FHU) and, yes, FHU is eligible for the final design contract.. Q19. What type of records management has been established for the project and what are the future expectations? A19. Currently, the City has been using an internal system of data management. However, the City is looking at a share point system and the FTA has requested the use of Primevera for tracking the project. Q20. Are you planning to use version P3 or P6 of the Primavera Software? Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 __ TABLE OF CONTENTS (Continued) Pace 10.0 PROCUREMENT AND CONTRACT ADMINISTRATION ------------------------------------ 10-1 10.1 Design Services-------------------------------------------------------------------------------10-1 10.2 Design Contract Administration ------------------------------------------------------------ 10-1 10.3 Construction-----------------------------------------------------------------------------------10-1 10.4 Construction Contract Administration----------------------------------------------------10-1 10.5 Vehicle Acquisition ---------------------------------------------------------------------------- 10-1 11.0 COMMUNICATONS ------------------------------------------------------------------------------------ 11-1 11.1 Vision and Strategy --------------------------------------------------------------------------- 11-1 11.2 Project Team-----------------------------------------------------------------------------------11-1 11.3 Public Information Activities----------------------------------------------------------------11-2 11.4 Community Engagement Activities-------------------------------------------------------11-2 11.5 Media --------------------------------------------------------------------------------------------- 11-2 11.6 Government ------------------------------------------------------------------------------------- 11-3 11.7 Public Art----------------------------------------------------------------------------------------11-3 11.8 Public Meetings and Public Hearings----------------------------------------------------11-4 11.9 Public Participation Record-----------------------------------------------------------------11-4 11.10 Communications and Public Involvement Activity Timeline------------------------11-4 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11 2008 (a LIST OF FIGURES Page FigurePD-1 Project Area Map.................................................................................................. iv Figure 1-1 Project Summary Schedule................................................................................1-3 Figure 2-1 MAX BRT Project Delivery Organization Chart ........................ .......................... 2-2 LIST OF TABLES Table 1-1 Project Budget, Year of Expenditure (Millions of Dollars) ....... ............................... 1-4 Table 4-1 Sources of Capital Funds, Year of Expenditure Dollars (Millions)..........................4-6 Table5-1 Design Criteria ............................................... ......................................................... 5-3 EXHIBITS Exhibit A Project Charter Exhibit B Project Organization Chart Exhibit C �EA Executive Summary Exhibit D Project Schedule/Work Breakdown Structure Exhibit E BNSF Railway Coordination Log Mason Corridor MAX Bus Rapid Transit Project Management Plan TABLE OF ACRONYMS ADA Americans with Disabilities Act AASHTO American Association of State Highway and Transportation Officials BNSF Burlington Northern Santa Fe Railway BRT Bus Rapid Transit CDOT Colorado Department of Transportation CBD Central Business District CIVIC Construction Management Consultant CMAQ Congestion Mitigation Air Quality CO Change Order CPM Consultant Project Manager CSU Colorado State University CSURF Colorado State University Research Foundation DBE Disadvantaged Business Enterprise DCCT Design Consultant -Contractor Team DDA Downtown Development Authority EA Environmental Assessment EEO Equal Employment Opportunity EMT Executive Management Team FMP Finance Management Plan FONSI Finding of No Significant Impact FRA Federal Railroad Administration FTA Federal Transit Administration M Million MAX Mason Express BRT MPO Metropolitan Planning Organization NEPA National Environmental Policy Act NFR North Front Range NRRC Natural Resources Research Center OPCC Opinion of Probable Construction Cost PE/EA Preliminary Engineering/Environmental Assessment PM Program Manager PMP Project Management Plan PRM Public Relations Manager QA/QC Quality Assurance/Quality Control RAMP Real Estate (or ROW) Acquisition Management Plan ROD Record of Decision ROW Right of Way RTP Regional Transportation Plan STIP Statewide Transportation Improvement Program TIP Transportation Improvement Program WBS Work Breakdown Structure Pagel Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (a PREFACE A Project Management Plan (PMP) is required by the Federal Transit Administration (FTA) for certain "Small Starts" funded projects. This PMP was prepared in conformance with FTA's Project and Construction Management Guidelines: 2003 Update, and in conjunction with the requirements identified in Section 49 USC 5327 and 49 CFR 633 Project Management Oversight. Modifications to the PMP are undertaken in response to comments received from FTA and as required during the life of the project. Apart from meeting the obligations of FTA, the PMP update process has aided the Mason Corridor MAX Bus Rapid Transit (MAX BRT) project team in identifying the task requirements for successful project implementation, the resources needed and the communications necessary to complete the tasks. The PMP also serves as a tool to communicate the project purpose as well as the roles, responsibilities and authorities assigned to each member of the project team. This organizational plan is also validated in the project Charter, attached as Exhibit A. The Charter memorializes the commitment of the City of Fort Collins Executive Management Team to successful implementation of the MAX BRT project. The City of Fort Collins is also committed to maintaining the PMP, thus ensuring that it is updated to reflect significant changes in the project organization, administrative policies and procedures, contracting conditions, budget, scope and schedule, as well as other significant matters affecting management of the MAX BRT project. Page ii Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11 ,2008 (8 PROJECT DESCRIPTION The MAX BRT project is a $74.2M bus rapid transit project in the City of Fort Collins, Colorado. The primary components for the project are a five mile, primarily fixed guideway for the BRT, seven park-n-ride lots, eight BRT stations with pedestrian and bicycle access, eight BRT curb- side stops, a transit center at the southern and northern termini and off-line upgrades to an existing transit maintenance facility to provide MAX service. As shown in Figure PD-1, the MAX BRT project is a proposed north -south BRT system in the central core of the City of Fort Collins, Colorado. The MAX BRT is located just west of and parallel to College Avenue (US 287), one of the busiest arterials within the City and the entire North Front Range region. The project corridor extends from Cherry Street on the north, to approximately % mile south of Harmony Road with a total length of five miles. The BRT System is proposed within an exclusive guideway for 3.6 miles, with the remaining 1.4 miles intermixed with street traffic on portions of McClelland Drive and Mason Street. Along the entire length of the corridor, the BRT runs parallel to existing Burlington Northern and Santa Fe (BNSF) Railway tracks. At varying locations, the BRT system is proposed within a combination of properties owned by the BNSF, the City of Fort Collins, Colorado State University (CSU), and private land owners. The project has completed Preliminary Engineering (PE) and the Environmental Assessment (EA). The City of Fort Collins anticipates a finding on the EA by September 2008. Negotiations with the BNSF are currently on -going. Right-of-way acquisition will occur in 2009 and 2010, with a design build process to complete construction in 2010 and 2011. The MAX BRT service would begin operation later in 2011. PROJECT GOALS The following goals have been identified for the project: ► Address traffic congestion along the parallel College Avenue corridor ► Improve transit ridership along the corridor ► Address a lack of transit facilities in the corridor ► Promote economic growth opportunities ► Support local and regional land use plans ► Address safety concerns ► Address inadequate inter -modal activity Page iii Mason Corridor MAX Bus Rapid Transit Project Management Plan Aggust 11, 2008 Figure PD-1 Project Area Map /�� i0,96'Yllm � 11A1 4 Fl- l Il CVINE`DR_--t_._—_........ �L LAPORTE AVE P;.�\ m i ♦ _, I ? f ♦ \`_ i._.•-.._ VJ MOUNTAIN AYtl qU < 6 ♦E•f, W MULBERRY ST,J, \OF ULBERRY ST WLAUREL STI§�3_ Project LOCahOnJ it _ �L ee, m n- WPROSPECT RD ,�� EPROSPECTP. I � I I Fort Collins LL P L,I --- ',. W DRAKE RD x E DRAKE RD m. oM P o; o, r _L Pft-w z'i �wl 'oi _ wl E I10RSETOOTH RD z `A J p,,,o V1I a Z l0 W 1�� _ Legend MAX BRT ". MAX Station MAX Stop '_i Transit Center P Park & Ride of pt m N i W HARMONY Ej'S�IARtAONY RD_. Pt� 1 �� 0 2.5 s _. II —�� f� 1, Miles ;,Ecotu�ry Ro D 36 City of Fort Collins FMaintenance Facility]—, it I d Page iv Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (0 1.0 PROJECT OVERVIEW 1.1 Project Background The City of Fort Collins has been actively working on the Mason Corridor project since the late - 1990's when the original idea for the concept was envisioned by citizens working on transit, pedestrian and cyclist elements of the Fort Collins long-range Transportation Master Plan. The concept of a preferred transportation corridor to serve the demand for north -south movement in the central City area began in 1996 as a city-wide effort to identify needed transportation improvements. The idea of the MAX BRT emerged from that endeavor and in response to the existing and projected congestion along College Avenue. Additionally, the project was proposed in response to the lack of a direct, continuous, and safe route for people choosing to use alternate modes of travel to the automobile. In addition to offering an option to the congestion on College Avenue, the MAX BRT project is intended to enhance opportunities for transit riders, bicyclists and pedestrians along its length; to encourage development of compact, transit -related land uses; and to support adopted community economic and environmental sustainability goals for the future. Since that time, the Fort Collins City Council has approved the City's comprehensive land -use City Plan and the Transportation Master Plan (original plans approved in 1997 and updated in 2004) as well as the Mason Street Transportation Corridor Master Plan (2000). Each of these adopted plans supports and recommends the proposed MAX BRT system improvements. Over the years, numerous updates and action items have been approved by the City Council as well as regional and state agencies, confirming the support for the MAX BRT project. The MAX BRT project is included in the North Front Range Metropolitan Planning Organization's Regional Transportation Plan, Unified Planning Work Program, Transportation Improvement Program, as well as in the Colorado Department of Transportation (CDOT) Statewide Transportation Improvement Program. These formal, public decision -making actions, as well as on -going updates and dialogue with key City Executive -level staff, have provided the previous project authorization for implementing the MAX BRT project. The City of Fort Collins considers the MAX BRT project to be the number one priority public works project for all departments at the City. Page 1-1 Mason Corridor MAX Bus Rapid Transit Project Management Plan _August 11, 2008 __ ___ 1.2 Stakeholders The stakeholders for the MAX BRT project include a wide variety of active interests. The primary stakeholder is the City of Fort Collins' organization, including staff from almost every City department/division, Executive Management, and the City Council. The City organization includes Transfort, the local public transit operator. Other stakeholders include: ► Burlington Northern Santa Fe Railway (BNSF) BNSF is the primary property owner along the corridor, and provides freight rail service along the existing corridor track. ► North Front Range Metropolitan NFRMPO is the planning organization Planning Organization (NFRMPO) responsible for oversight of transportation planning in northern Colorado. ► Larimer County The City of Fort Collins is located in Larimer County, Colorado. ► Colorado State University (CSU) CSU is a primary property owner along the corridor, the location for three of the BRT stations/stops, and a primary source for MAX BRT transit ridership. ► Downtown Development Authority (DDA) 1.3 Project Summary Project Scope A consortium of business owners from the Fort Collins central business district. The MAX BRT project is a five mile, primarily fixed guideway for the BRT with seven park-n-ride lots, eight BRT stations with pedestrian and bicycle access, eight BRT curb -side stops, a transit center at the southern and northern termini and off-line upgrades to an existing transit maintenance facility to provide MAX BRT service. As shown in Figure PD-1, the MAX BRT project is a proposed north -south BRT system in the central core of the City of Fort Collins. The MAX BRT is located just west of and parallel to College Avenue (US 287), one of the busiest arterials within the City and the entire North Front Range region. The project corridor extends from Cherry Street on the north, to approximately'/ mile south of Harmony Road with a total length of five miles. The BRT System is proposed with an exclusive guideway for 3.6 miles, with the remaining 1.4 miles intermixed with street traffic on portions of McClellan Drive and Mason Street. The MAX BRT system includes high -quality design treatments for vehicles, permanent architecturally -inviting stations and transit centers, easy to use park-n-rides, and sophisticated Advanced Traffic Management Systems (ATMS)/Intelligent Transportation Systems (ITS) technologies to maintain efficient and effective operations and information. Page 1.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (V The primary components of the project can be summarized as follows: ► Mason/Howes Two -Way Street Conversion ► BRT Fixed Guideway ► BRT Stations and Curb -Side Stops ► BRT Park-n-Ride Lots ► BRT Vehicles ► South Transit Center ► Maintenance Facility Upgrades Project Schedule Environmental clearance for the project is expected in August, 2008. The critical path item for the remainder of 2008 is the on -going negotiations with the BNSF Railway in order to execute an agreement by April, 2009. The City desires to enter into a Construction Grant Agreement with FTA in April, 2009. Right-of-way acquisition will occur in 2009 and 2010, with a design build process to complete construction in 2010 and 2011. The MAX BRT service would begin operation in the 41h Quarter, 2011. The Project Summary Schedule is depicted in Figure 1-1. Figure 1-1 Project Summary Schedule EA/FONSI^ Q RFP I PROJECT MANAGEMENT i RAMP FLEET/OPERATIONS Now DESIGN/GUILD , BEGIN OPERATION LEGEND _.. _...... = RR Negotiation Consultant Hired = Critical Path A - ARRIVE i004 - UESIGN&CONSTNUC'TION - 2011 Page 1-3 Mason Corridor MAX Bus Rapid Transit Project Management Plan Au ug st11 2008 Project Budget The total capital cost of the MAX BRT project is estimated at $74.19 million in Year of Expend iture/201 0 dollars ($69.39 million in 2007 dollars). To clarify previous concerns from FTA staff, this cost estimate does not include any costs associated with the Mason bicycle/pedestrian trail elements of the corridor, the Troutman Parkway bicycle/pedestrian grade -separation, nor does it include any transit service operating outside of the MAX BRT corridor. The following discussion about capital requirements is based on the completed Preliminary Engineering work to the 30 percent level (July 2007). This cost estimate information will be refined at each design review level. Detailed financial information is also provided in the 2007 8 2008 Finance Management Plan updates (the 2008 updated Finance Management Plan will be submitted to FTA on September 5, 2008 as requested). The schedule for implementation of the MAX BRT will be confirmed in the Development Agreement\Construction Grant Agreement between the City and FTA. The costs in Table 1-1 are based upon updated cost estimates resulting from the completion of preliminary engineering in 2007 and include a 30% contingency level. Table 1-1 Project Budget, Year of Expenditure (Millions of Dollars) MAX BRT Project Cost 2008 2009 2010 Total Final Design $3.27 $6.08 $9.35 Real Estate Acquisition, Permitting $32.21 $26.95 $59.16 & Construction Rolling Stock $5.68 $5.68 Total Cost $8.95 $38.29 $26.95 $74.19 19 Page 1.4 A20. That decision will be made with the FTA, the City, and the Project Management Team. Q21. Who would be responsible for the state and federal permitting requirements prior to construction? A21. Responsibility for coordination and assurance of completion would that of the Project Management Team with the help of City Staff and the future design team. Q22. Have any construction phasing decisions been made as of yet? A22. No. Q23. Is there any thought to extending the submittal date? A23. The date is not being extended. 024. Is there any concern over funding the project? A24. The City will be financing the project and will have the ability to proceed with the complete project. OTHER ITEMS NOW POSTED ON THE WEB SITE: Pre -Proposal Attendance Record RAMP Plan Federal Requirements Please contact James B. O'Neill, II, CPPO, FNIGP at (970) 221-6779 with any questions regarding this addendum. RECEIPT OF THIS ADDENDUM MUST BE ACKNOWLEDGED BY A WRITTEN STATEMENT ENCLOSED WITH THE BID/QUOTE STATING THAT THIS ADDENDUM HAS BEEN RECEIVED. Mason Corridor MAX Bus Rapid Transit Project Management Plan 1.4 Delivery Strategy As detailed in Chapter 2, the City Transportation Director and Program Manager will be responsible for consultants and contractors that have been or will be hired as well as all City staff assignments necessary to complete the project. The City has developed a recommended delivery strategy to complete the following primary components of the project: ► Mason/Howes Two -Way Street Conversion ► BRT Fixed Guideway ► BRT Stations and Stops ► BRT Park-n-Ride Lots ► BRT Vehicles ► South Transit Center ► Maintenance Facility Upgrades Currently, the public comment period for the EA has concluded. A Finding of No Significant Impact (FONSI) is anticipated by September 2008. Final design, agency coordination, right-of- way acquisition and construction are to be completed after the FONSI and are detailed in later sections of this Project Management Plan. The City of Fort Collins will implement the project through five service delivery packages: First, the City has submitted and will execute a Real Estate Acquisition Management Plan (RAMP). In conjunction with execution of the RAMP, the City has retained a consultant to facilitate negotiations with the BNSF for a purchase agreement. Details of the ongoing railroad negotiation process are provided in Section 2.5 of this PMP. The City will also issue a RFP and hire a consultant to assist in execution of the RAMP in its entirety. Second, the City will issue an RFP and contract with a consultant to provide project management services. The Consultant Project Manager (CPM) will maintain an office at the City of Fort Collins to provide day-to-day management of all project control measures as well as Real Estate Acquisition, Vehicle Acquisition, Final Design\Construction, Operations, Public Involvement and initiation of BRT service operations. A complete description of project organization and staffing is provided in Chapter 2. Third, the City will issue an RFP and contract with a Design Consultant -Contractor Team (DCCT) to complete a design/build process for the following project components: ► Mason/Howes Two -Way Street Conversion ► BRT Fixed Guideway ► BRT Stations and Stops ► BRT Park-n-Ride Lots ► South Transit Center ► Maintenance Facility Upgrades Page 1.5 Mason Corridor MAX Bus Rapid Transit Project Management Plan Fourth, the City of Fort Collins/Transfort will procure the BRT vehicles. Procurement of transit vehicles will be completed in accordance with the City's standard procurement process for Transfort. The City/Transfort anticipates "piggybacking" on another transit agency's contract to procure the vehicles to save both time and money. Fifth, the City of Fort Collins will either assign City staff or issue an RFP and contract with a consultant to provide Construction Quality Assurance services under the direction of the CPM. While this delivery strategy does call for a single construction package for the bulk of the project components, the City has an interest in retaining some flexibility in controlling the phasing and scope of three of the design/build components: First, the Mason/Howes Two -Way Street Conversion must be completed as an early phase of the construction process. The City has met with business interests in the project area and they agree that public understanding and acceptance of this operational change prior to implementation of MAX BRT operations will lead to overall project success. Consequently, the scope of services for the DCCT will reflect this project phasing requirement. Second, the City may enter into an agreement with a private partner for development of the South Transit Center. The scope of services for the DCCT will include a provision wherein the City would limit the scope of services to only transit -related facilities at this site and disclose that a possible third party may be involved in the site development process. Third, Transfort may seek additional funds from other sources to complete more extensive and comprehensive improvements to the existing maintenance facility beyond those required to support MAX BRT services included herein. Consequently, the City may consider qualifications requirements in the RFP to address this potential service need. However, these services are not part of the project to be delivered under this PMP. Deliverables The following project deliverables are anticipated to implement the project components: RAMP & Railroad Negotiations RAMP Consultants Project Management Consultant Project Manager (CPM) Mason/Howes Two -Way Street Conversion BRT Fixed Guideway BRT Stations and Stops Design Consultant — Contractor Team BRT Park-n-Ride Lots Design\Build Package South Transit Center Maintenance Facility Upgrades BRT Vehicles Standard City/Transfort Fleet Order Contract by Cit 's Purchasing Dept. Construction QA Services TBD (City Staff or Consultant) Page 1.6 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11 2008 2.0 ORGANIZATION AND STAFFING 2.1 Position within Owner Organization The MAX BRT project is being managed by the Transportation Planning Department in the City of Fort Collins with additional technical and administrative support from other City departments. The Consultant Project Manager (CPM) will be a full-time consultant' whose only responsibilities are to the MAX BRT project. All City staff with project responsibilities will maintain other duties and responsibilities on behalf of the City. The City Project Team includes representatives from almost every City department/division, including Transportation Planning, Transfort, Engineering, Traffic Operations, Advance Planning, Current Planning, Real Estate Services, Utilities, Parks, Natural Resources, Poudre Fire Authority/Emergency Services, City Managers Office, Finance, Public Information Office, etc. 2.2 Project Organization Per the description provided in FTA's Construction Project Management Handbook, the MAX BRT project is considered a small to mid -size capital project, meaning that it does not require full-time staff in every function, and this type of project lends itself well to a matrix form of project organization. The City Project Team is organized as a matrix; staff reports to the Project Management through the project chain of command to receive direction on project work assignments (what work has to be done) and to their functional supervisors for direction on their technical performance (how their work is done). A project delivery organization chart is provided in Figure 2-1. The Executive Management Team (EMT) provides project oversight and reports to the City Council as necessary in conjunction with project progress. The EMT is comprised of the City Manager, Service Area Directors, City Engineer, City Attorney and Staff General Managers. The Project Director and Project Manager will meet monthly with the Transportation Group Director and the Planning, Development & Transportation Director and quarterly with the EMT to report project progress and receive guidance from the executive leadership of the City to implement the project. In addition to the EMT, the City project staff is organized in "sub -teams' according to the major work efforts for the project: ► Finance ► Real Estate Acquisition ► Agency Coordination ► Design and Construction ► Vehicles and Operations ► Public Relations ' Project management services will be provided by a consultant (or consulting firm) due to the extensive responsibilities for this role. These include management of all project control measures as well as Real Estate Acquisition, Vehicle Acquisition, Final Design\Construction, Operations, Public Involvement and initiation of BRT service operations. Page 2.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan At this time, MAX BRT project team members will not all be co -located into a single project office due to the existing close proximity of the City staff offices and the frequent, on -going interaction of most of the project team members. During the construction phase of the project, the City may opt to co -locate all or some of the City staff and contractors into one location for the duration of construction. Figure 2-1 MAX BRT Project Delivery Organization Chart Page 2.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan 2.3 Key Personnel Job Functions In addition to the EMT, project organization includes the following key personnel job functions. Planning, Development, & Transportation Director Jeff Scheick serves as the City's Director of Planning, Development & Transportation and he is responsible for executive level oversight of the MAX BRT project, including the MAX BRT Project Team. Mr. Scheick will provide leadership to the Project Team, serve as a liaison to all City Department Directors whose staffs are involved with the MAX BRT project, and serve as a member of the Executive Management Team, Transportation Group Director Mark Jackson serves as the Transportation Group Director, which is comparable to a Public Works Director role, for the City of Fort Collins. Mr. Jackson will be responsible for direct oversight of the MAX BRT Project Management Team, including the Project Manager/Management Team (consultants). Mr. Jackson will assure effective collaboration and resources are available throughout the various Transportation departments involved with delivering the MAX BRT project, and serve as the liaison to the Executive Management Team. Program Manager Kathleen Bracke serves as the Program Manager (PM) for oversight of the development of the MAX BRT project, including the Preliminary Design and Environmental Assessment phases as well as providing guidance for future phases of the project. Ms. Bracke is responsible for project leadership and direction, including administration of schedules and budgets, coordinating with other agencies on management and policy issues, representing the City at public outreach activities for the project, coordinating with the Project Manager, and serving as the liaison to the Transportation Group Director and Planning, Development, & Transportation Director. Project Manager The Project Manager is responsible for all project control measures and the full implementation of the MAX BRT project, including Real Estate Acquisition, Vehicle Acquisition and Operations, Design and Construction, Public Relations and initiation of BRT service operations. The Project Manager is responsible for direct management and operation of the project, including compliance with schedules and budgets, coordinating with other agencies on management and technical issues, establishing and coordinating public outreach activities for the project, managing project consultants, compiling & distributing project technical and financial reports per City, State, and Federal requirements, and directing all activities for successful completion of the project. The Program and Project Managers shall have full authority to engage City Staff and the consultants/contractors as needed to successfully complete the project according to the scope, budget and schedule for the project, identified herein and as amended. 2.4 Other Participants A complete project staff organization chart is included in Exhibit B. All project sub -teams include representation from the appropriate City departments as well as the Project Management Team and the design consultants/contractors. In addition, sub -teams will include representatives from project stakeholders such as FTA, CDOT, CSU, DDA, and other agencies as appropriate. Page 2.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 ___ (a 2.5 Agency Involvement Several federal, state, and local agencies are involved in developing the MAX BRT project, including the agencies listed below: 1. Federal Transit Administration (FTA) - FTA is an agency of the U.S. Department of Transportation. FTA has the responsibility for granting and overseeing the expenditure of federal funds for mass transit projects. The City is seeking project approval and funding assistance from FTA's new Small Starts program for the MAX BRT project. 2. Federal Railroad Administration (FRA) FRA is an agency of the U.S. Department of Transportation. FRA has the responsibility for administering operations and infrastructure of the country's rail carriers. 3. Colorado Public Utilities Commission (PUC) The project involves modification of several at -grade crossings of the BNSF tracks. The PUC, a state entity, must approve any changed/new/upgraded railroad crossings, including pedestrian and vehicle crossings. The City must obtain permits from the PUC for new or modified railroad crossings. 4. Colorado Department of Transportation (CDOT) CDOT is a department in the state government that is responsible for coordinating the state roads and highways in Colorado, as well as administers state transit funding. The MAX BRT project runs parallel to and helps enhance mobility along US287/College Avenue. In addition, CDOT is a project partner with the City for the state -funded elements of the MAX BRT project — particularly the Downtown to CSU segment of the MAX BRT service as well as the new South Transit Center. The MAX BRT project is included in the Statewide Transportation Improvement Program (STIP). 5. North Front Range Transportation Metropolitan Planning Organization (NFR MPO) The NFR MPO is an association of local governments formed in 1987 to address transportation and air quality planning issues in Colorado's North Front Range. NFR MPO membership consists of one representative from each of twelve local governments and two state agencies. The NFR MPO is assisted by a Technical Advisory Committee, and a Transit Advisory Group, which are composed of staff from each of the member entities. The NFR MPO is responsible for preparing a long-range Regional Transportation Plan (RTP) every three years. This document contains a financially constrained plan that looks at all federal and state resources expected to be received over the next 20 years, and lists projects that could be completed using the anticipated funding. The NFR MPO also prepares annually a Transportation Improvement Program (TIP). This document contains a six -year program of projects, with a three-year action component. The Mason Corridor project is included in both the RTP and TIP. Page 2.4 Mason Corridor MAX Bus Rapid Transit Project Management Plan Other Participants (a] 1. Burlington Northern Santa Fe Railway (BNSF) The BNSF is a key participant in the project, since the MAX BRT parallels its tracks and the improvements will be built largely on BNSF property. The BNSF participated in developing the Master Plan and reviewing the preliminary design concepts as part of the initial PE and EA phases of the MAX BRT project. The City is currently working with the BNSF to develop an agreement to formally establish terms and conditions under which the City will be able to develop the MAX BRT within the BNSF right-of-way. 2. Colorado State University (CSU) CSU is the largest single landholder abutting the MAX BRT corridor, and students, staff, and faculty at the University comprise a significant proportion of current riders on the Transfort system. For these reasons, CSU administration has been actively involved in the development of the MAX BRT project from the beginning, and the City will continue to involve CSU throughout the project. The MAX BRT project is an integral element of the University's Master Plans for both the Main Campus and the South Campus/Veterinarian Teaching Hospital to ensure compatibility and cohesion with land use and planned transportation improvements. Corridor features to serve the CSU campus include three transit stations (at the Natural Resources Research Center/South Campus, at Prospect Road, and at University Avenue) and a downtown MAX BRT stop at Laurel Street. 3. Colorado State University Research Foundation (CSURF) CSURF is a private, not -for -profit Colorado corporation established to aid and assist CSU and two other universities governed by the State Board of Agriculture in their research and educational efforts. CSURF's functions include land acquisition, development and management. CSURF owns more than 200 acres south of the CSU Main campus, the east edge of which borders the MAX BRT corridor, including land on which a six -building campus (Natural Resources Research Center, or NRRC) of federal natural resource agencies has been constructed. The NRRC will be a significant employment center, with over 5,000 employees on - site, located directly adjacent to the MAX BRT corridor. A MAX BRT station is planned to jointly serve the NRRC, as well as the world -renown CSU Veterinary Teaching Hospital and the University shopping mall. CSURF representatives have been actively involved with the development of the MAX BRT project, particularly during the PE/EA phases. 4. Downtown Development Authority (DDA) The DDA is appointed by the City Council and serves as the primary planning and development advisor for downtown Fort Collins. The DDA is quasi -autonomous, has certain powers and duties granted to it by Colorado Statute, has authority to levy a property tax up to 5 mills for its operations, and has the ability to issue tax increment bonds to provide public services within its boundaries. The Downtown segment of the MAX BRT project is within the DDA district; the DDA has been involved with the development of the MAX BRT project and has committed substantial funding to the project. Page 2.5 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 5. Ditch Companies Several irrigation ditches cross the Corridor, which require the City to coordinate with the ditch companies to obtain Agreements for constructing bridges and/or crossings, and use of any needed right-of-way for building the MAX BRT project. 6. Land and Business Owners The MAX BRT project represents a new neighbor for many land and business owners along its route. Several land and business owners served as Lead Team members and participated in developing the Mason Street Transportation Corridor Master Plan and are continuing to be involved throughout the on -going design development for the MAX BRT project. The project also requires acquisition or temporary construction easements from individual owners. The City will continue to involve land and business owners throughout the development of the MAX BRT project. 2.6 Project Partner Staffing Assistance No additional project partners have been identified for this project beyond the previously mentioned agencies at this time. All work will be completed by City forces and outside consultants and contractors. 2.7 Consultant/Contractor Services In addition to the experienced in-house staff, the City acknowledges the need to establish contractual relationships with qualified consultants and contractors to successfully implement the MAX BRT project. The City Project Director and Project Manager will oversee the consultants and contractors that participate in the project. From final design to project implementation, outside consultants will be solicited to perform in the following capacities: 1. Railroad Negotiations Consultant 2 RAMP Consultant 3. Project Management Consultant 4. Design Consultant — Contractor (Design/Build) Team 5. Quality Assurance Consultant (To Be Determined) At this time, no additional consultants are anticipated to be utilized. However, as the project progresses, the project needs may be reevaluated and the current plan modified. In addition to the consultants listed above, the successful completion of the MAX BRT project will require awarding contracts for vehicle acquisition and construction. The project delivery strategy is detailed in Section 1.4. 2.8 Training Plan The City will be developing a Training Plan for all aspects of the project from design through construction and for operations of the new BRT service. This Training Plan will be developed jointly by the City and the consultants/contractors during the Final Design phase and continually updated and applied throughout the life of the project. Page 2.6 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 3.0 PROJECT MANAGEMENT AND CONTROLS 3.1 Work Breakdown Structure All project information will be integrated through the use of a Work Breakdown Structure (WBS). The WBS will provide a systematic framework for defining and organizing the entire project into manageable elements in terms of scope, schedule and budget. The WBS is explained in the following text and graphically depicted in the Exhibit D. The WBS for the MAX BRT Project provides a common language to be used by all project members so that information is shared in an orderly, organized fashion at each level of the project implementation process. The WBS will allow for orderly collection and retrieval of project information. The WBS for the project is composed of 6 levels as described below: Level One represents the total capital project. At this summary level, information from all lower levels can be combined and used to track the progress and cost of the entire project. This would be a single alpha or numeric code common to all tasks at all levels of the project (i.e. 1). Level Two defines the major phases of the project. Items at this level are identified as a single alpha -code in the second position of the WBS code structure. 1.A Planning and Preliminary Design 1.13 Final Design and Construction Level Three identifies the major project delivery packages. Items at this level are identified as a single alpha -code in the third position of the WBS code structure. These items represent the major summary schedule milestones in the process of project completion (similar to the items presented in Figure 1-1, Project Summary Schedule): 1.A.A Environmental Assessment 1.A.B Project Management Plan (PMP) I .A.C. RAMP & Agency Coordination 1.A.D. Preliminary Design 1.A.E. Finance 1.13.A Design\Build Package 1.B.B Vehicle Acquisition 1.B.0 Operations 1.13.D Communications (Public Relations) Level Four divides each package into the task groups associated with each package. Items at this level are identified as a single digit -code in the fourth position of the WBS code structure. For example, Vehicle Acquisition is divided into the following task groups: 1.B.C.1 Procurement 1.B.C.2 Inspection 1.B.C.3 Testing & Startup Level Five of the WBS contains the activities or tasks that together create the previously described task groups, packages and major phases of the project. Items at this level are Page 3.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan (a identified by a one or two digit -code in the fifth and sixth positions of the WBS code structure For example, Vehicle Acquisition — Testing & Startup has the following tasks: 1.B.B.3.1 Hire Drivers 1.13.6.3.2 Train Drivers 1.B.B.3.3 Test Buses on Guideway Level Six of the WBS contains the sub -tasks that together create the previously described tasks, groups, packages and major phases of the project. Items at this level are identified by a one or two digit -code in the sixth position of the WBS code structure. For example, Vehicle Acquisition — Testing & Startup has the following tasks: 1.B.C.3.1.1 Advertisement 1.B.C.3.1.2 Interviews & Selection 3.2 Schedule Control Schedule control is the process of recording and updating progress, evaluating actual progress with the baseline schedule, identification of high priority activities, as well as planning and implementation of corrective actions. The Baseline Schedule for the MAX BRT project was developed during the PE phase and is the foundation for the Project Master Schedule. The Project Master Schedule encompasses all components and work efforts of the project and is a compilation of numerous sub -projects, sub -schedules and milestones into a single critical path network. The Consultant Project Manager (CPM) will maintain the Project Master Schedule during the design and construction phases of the project. All proposed changes that may affect the Project Master Schedule are subject to analysis and recommendation by the CPM. Schedule status reports will be prepared by the CPM and submitted to the Program Manager, Transportation Director and EMT. Executive project milestones have been established and require approval of the EMT prior to official modification of these milestones. The executive project milestones established to date are identified in Figure 1-1. Upon approval of executive milestone changes by the EMT, a new baseline schedule will be adopted and become the basis of analysis for progress evaluation. This section of the Project Management Plan describes the processes and procedures necessary to meet project objectives by the utilization of sound methods of monitoring, reporting and schedule control. Scheduling System The City of Fort Collins Microsoft Project scheduling software tools. The CPM will be tasked with transferring the Microsoft Project WBS included herein to Primavera Project Planner (P3). This software meets the specific control -level requirements of the project, and provides the capabilities necessary to control, monitor and report schedule progress of the work. All scheduling prepared by consultants and contractors to complete the project will be done in P3 unless use of a compatible software is previously approved by the CPM. In an effort to ensure smooth coordination during schedule preparation and updating, the construction contract specifications will provide contractors with detailed requirements for Page 3.2 City ®� Financial Services Purchasing Division 215 N. Mason St. 2itl Floor F6rt COMIns PO Box 580 Fort Collins, CO 80522 970.221.6775 ��._ P u rrcha 970.221.6707 y g fcgov.comlpurchasing REQUEST FOR PROPOSAL P1144 Mason Corridor Project Management Services Written proposals, eight (8) will be received at the City of Fort Collins' Purchasing Division, 215 North Mason St., 2nd floor, Fort Collins, Colorado 80524. Proposals will be received before 3:00 p.m. (our clock), September 5, 2008. Proposal No. P1144. If delivered, they are to be sent to 215 North Mason Street, 2nd Floor, Fort Collins, Colorado 80524. If mailed, the address is P.O. Box 580, Fort Collins, 80522-0580. A Pre -Proposal conference will be held at 215 N Mason St., 2nd floor, Fort Collins, Colorado conference room 2A, on August 28, 2008 at 1:30 p.m. Attendance at this pre -proposal meeting is highly advised. The City of Fort Collins is soliciting proposals from qualified consultants for project management services to implement the Mason Corridor Bus Rapid Transit project. The use of these services will be to assist City staff and direct the management of the overall project design\engineering, public outreach, right-of-way acquisition, coordination with the BNSF railroad, Colorado State University, and other major stakeholders as well as to manage the construction and oversight of the initial phases of operation for the Mason Corridor/MAX BRT system. Questions concerning the scope of the project should be directed to Project Manager Kathleen Bracke, Transportation Planning and Special Projects Director (970) 224-6140, or kbrackeafcgov.com. Questions regarding proposals submittal or process should be directed to James B. O'Neill II, CPPO, FNIGP (970) 221-6779, or joneill@cgov.com. A copy of the Proposal may be obtained as follows: 1. Download the Proposal/Bid from the BuySpeed Webpage, www.fcqov.coin/eprocurement 2. Come by Purchasing at 215 North Mason St., 2"d floor, Fort Collins, and request a copy of the Bid. The City of Fort Collins is subject to public information laws, which permit access to most records and documents. Proprietary information in your response must be clearly identified and will be protected to the extent legally permissible. Proposals may not be marked 'Proprietary' in their entirety. Information considered proprietary is limited to material treated as confidential in the normal conduct of business, trade secrets, discount information, and individual product or service pricing. Summary price information may not be designated as proprietary as such information may be carried forward into other public documents. All provisions of any contract resulting from this request for proposal will be public information. Sales Prohibited/Conflict of Interest: No officer, employee, or member of City Council, shall have a financial interest in the sale to the City of any real or personal property, equipment, material, supplies or services where such officer or employee exercises directly or indirectly any decision - making authority concerning such sale or any supervisory authority over the services to be ;r�c�srei� Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 (a Critical Path Method (CPM) schedule preparation. These specifications will ensure compatibility with the WBS in addition to delineating the information needed to maintain project control. The Baseline Schedule is the foundation of the MAX BRT project and is the means by which past performance, current progress and future projections are monitored. The existing Baseline Schedule was presented to the EMT by the Program Manager in June 2008, and the current version has been revised & updated per direction from the EMT members, City Staff and previous meetings with FTA representatives. The Baseline Schedule is the basis for establishment of major milestones and the project completion date. The Baseline Schedule is used as a target for progress evaluation and schedule control. As previously mentioned, Executive Milestones, within the Baseline Schedule, have been developed as primary interim indicators, to the project team, of slippage and possible project delays. Executive Milestones can only be officially changed after approval by the Transportation Group Director, the Planning, Development & Transportation Director, and the EMT. Executive Milestone changes are initiated by the Program Manager and CPM. The Program Manager and CPM will evaluate the need for changes based upon a recommendation by the Design Consultant - Contractor Team (DCCT) or the CA Construction Management Consultant. The Program Manager and CPM will present the recommended Executive Milestone change(s) to the Transportation Group Director and to the Planning, Development, & Transportation Director for review & approval. Prior to the submission of a recommendation to change Executive Milestones, alternatives must be investigated and evaluated to achieve the most cost effective and timely solution. The following are the Executive Milestones that require the Transportation Group Director's, Planning, Development & Transportation Director's and/or EMT's approval to modify and their current status: Executive Milestone Preliminary Design Environmental Assessment BNSF RR Agency Coordination RAMP Vehicle Acquisition Final Design & Construction Begin Service Operations Status 100% Complete FONSI anticipated 3rd Quarter 2008 - 95% Complete On -going through 1st Quarter 2009-40% Complete 3rd Quarter 2008 through 2"d Quarter 2010 — 5% Complete 4`" Quarter 2008 through 3rd Quarter 2011 — 0% Complete 4th Quarter 2008 through 3rd Quarter 2011 — 0% Complete Begin 4`" Quarter 2011 The Baseline Schedule is represented in two levels of schedule detail: Level One — Project Summary Schedule (Figure 1-1) - The Level One schedule is the highest level of schedule in bar -chart format and contains only the most important summary information. The Project Summary Schedule contains major design, construction, system integration, testing and startup, vehicle acquisition, procurement and revenue operation milestones as well as programmatic events. Level Two — Project Master Schedule Exhibit D — This Exhibit D provides a recent example of the type of schedule being used for the project. The most up-to-date schedule can be obtained from the Program Manager or CPM. Page 3.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (a The Project Master Schedule encompasses all elements and phases of the project into a single critical -path network. It integrates and encapsulates all other schedules, reflects all program elements, and includes all known or anticipated ties, constraints between project elements, and major milestones. The Project Master Schedule includes sub -schedules for work performed by City staff, design and project management consultants, outside agencies, vendors and construction contractors. The CPM will maintain the Project Master Schedule during the design phase and the CMC will assume the responsibility once they have been hired and join the project team. The Project Master Schedule will be updated at least once a month or as frequently as necessary due to project activity. Other Schedules Prime consultants and contractors will prepare, maintain and update monthly a detailed Critical Path Method (CPM) cost -loaded contract schedule (hereinafter "CPM Schedule"), The CPM Schedule will permit the orderly planning, organization, and execution of the work, and shall include sufficient detail to accurately depict all the work required by the contract. Prime consultant and contractor schedules shall permit efficient incorporation in the Project Master Schedule. The following additional schedules will be prepared and maintained as the project progresses. ► Administrative Support Schedule ► Consultant Schedules ► Construction Schedules ► Construction/Contractor Interface Schedule Schedule Progress Monitoring and Reporting Schedule monitoring will be performed to ensure that the project team meets the design and construction requirements, budget and schedule. The Master Project Schedule will be updated at least once a month or as frequently as necessary due to project activity. The monitoring process will consist of the following two major elements: Schedule Updates — Schedule updates and evaluations will be conducted on two levels. The first level consists of monitoring project sub -team schedules by the appropriate task manager. Task managers, managing consultants and contractors will be required to submit a baseline schedule for approval. The baseline schedule must outline the consultant or contractor plan to perform the work specified in the contract documents. The baseline schedule will be reviewed by the appropriate task manager and evaluated for compliance with the contract documents. Each CPM Schedule shall represent a practical plan to complete the work within the required time(s) for completion, as defined in the contract documents. A schedule found to be impractical due to non-conformance with the contract documents or any other reason shall be revised and resubmitted. Once the baseline schedule has been approved, the schedule will be forwarded to the Consultant Project Manager and/or the CIA CIVIC. The approved baseline sub -schedule then becomes an integral part of the Project Master Schedule. The second level of schedule updates and evaluation examines the Project Master Schedule. The Project Master Schedule will be maintained by incorporating approved, updated sub - schedules. The Baseline Schedule for the project has been established and can only be Page 3.4 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 modified upon the approval of the Transportation Group Director, the Planning, Development, & Transportation Director and the EMT in accordance with the procedure stated herein. The individual task managers will provide a monthly schedule update to the Consultant Project Manager and/or the CA CIVIC for review. Failure of a consultant or contractor to submit a schedule update will result in a recommendation from the Consultant Project Manager to withhold payment until the consultant or contractor becomes compliant with the contract documents. A critical element of the schedule control process is the tracking of actual performance against the Baseline Schedule. Reports will be identified and used by the Consultant Project Manager. The evaluation of current progress to the Baseline Schedule allows for detection of any adverse trends and changes in activity constraint in the major work areas which may delay the project or increase cost. Upon completion of the baseline schedule for the construction phase of the project, schedule -to - complete reports will be prepared and submitted to the FTA for review. The schedule -to - complete reports will be generated every quarter and be coordinated with cost -to -complete reports. In the event that sub -schedule updates are found to be inconsistent with the performance time stated in the contract documents, the consultant or contractor will be required to identify the reasons for the deviations. Additionally, the consultant or contractor will be required to prepare and submit a corrective action plan. The corrective action plan will be reviewed and upon acceptance, be incorporated into the Project Master Schedule. Sub -Team Technical Meetings — These will be conducted routinely during the Final Design and Construction phases. The meetings will involve all members of the Design and Construction Sub -Team as well as meetings with the Operations, Public Involvement, RAMP and Agency Coordination Sub -Teams . The meetings provide a forum for project staff to discuss and inform each other of the progress of their respective activities relevant to the project. Generally, activities discussed cover those that are ongoing or will be performed in the next quarter. Action items are identified and monitored to ensure completion. 3.3 Cost Control Cost Control is the system that provides a mechanism for managing project budgets, cost estimates, expenditures and cost trends. Controlling capital costs in addition to quarterly budgeting and tracking of expenditures for non -capital items is also very important in maintaining an up to date project cost status. Cost Tracking The Current Working Estimate (CWE) is a continuously maintained forecast of the project cost at completion. The CWE will be utilized as the primary cost management tool within an on -going cost control process. The CWE is continuously updated to give the Consultant Project Manager, Program Manager, Transportation Group Director, and Planning, Development & Transportation Director as well as the EMT a forecast of the project's financial status. The CWE will be the basis for all project cost estimates that are issued. Page 3.5 Mason Corridor MAX Bus Rapid Transit Project Management Plan C The Baseline Cost Estimate (BCE) is a project management tool that is used to compare actual and anticipated costs to the initial target costs of the project. The current BCE is based on the project Opinion of Probable Construction Cost (OPCC) from the Preliminary Engineering Plans. A Value Engineering Study will be conducted as part of the continued pursuit of improving project cost effectiveness. This BCE will not be modified without the approval of the City Manager/City Council. The CWE will be utilized as a cost management tool within an on -going cost control process that involves three basic steps: Step One entails forecasting cost -at -completion by continuously updating the CWE. During design, the Consultant Project Manager will be responsible for organizing cost distributions contained in the consultant or contractor cost loaded CPM. The QA Construction Management Consultant will assume these responsibilities during the construction phase of the project. Step Two involves the detailed comparison of the CWE to the BCE, the identification of variances (positive and negative), and the description of the contributing cause of the variances. On a monthly basis, this information will be reported by the Consultant Project Manager to the Project Director and summarized in a standard report format for appropriate distribution. Step Three involves the evaluation of variances and development of corrective actions required to bring the CWE in conformance with the BCE. These corrective actions are proposed by the representative team members and are summarized by the Consultant Project Manager for joint analysis by the appropriate team members. Certain changes developed during this analysis may be subject to the project's change control procedure. Cost Performance Evaluation Schedule and cost elements are combined to form a base that is used in Cost Performance Evaluation. This measures actual performance against planned performance to not only create a snapshot of the current status, but also provide insight as to the cost -at -completion and the final completion date. Requirements of consultant and construction contracts specify that a cost -loaded CPM will be submitted and maintained throughout the project. The comparison of actual performance to plan is a critical and recurring step in the control process. Actual performance must be compared to planned performance on a task -by -task basis. The effectiveness of the cost control system is a direct function of the level of detail established and the frequency, accuracy and realistic approach of reviews. The earned value concept will be utilized to determine whether the project is over or under budget, as well as ahead or behind schedule. Earned value is a measure of the value of work actually performed to date. Earned value is equal to the percent complete of a task multiplied by the budget for the same task. The evaluation of budget in terms of percent complete is conducted by comparing the budgeted work cost to actual work cost. The method of determining the percentage complete will be calculated by dividing the scheduled value by the value that has been completed to date. Page 3.6 Mason Corridor MAX Bus Rapid Transit Project Management Plan 3.4 Configuration Management C The monitoring and documentation of significant changes to the project configuration is the systematic control process known as Configuration Management. The objective of configuration management is to ensure that the overall configuration of the project is baselined at a pre- determined point in the project development process and, thereafter, is not changed without a systematic review to assess the impact of the proposed change on all other aspects of the project. If a configuration change requires modification to an existing contract, change order policies and procedures will be followed. Project Configuration A description of the project configuration is provided in Chapter 1. The baseline scope and costs for the project were developed during the PE phase and will be refined during the design review process. Modifications made during completion of the Final Design/Build phase will be processed in accordance with the configuration management system herein. To ensure that the interfaces between all project sub -teams (real estate acquisition, design, construction, vehicles, operations, etc.) are properly integrated, all project related plans and specifications are subject to review and concurrence by the Consultant Project Manager (CPM) prior to solicitation of bids or proposals for construction, installation or acquisition. Project Configuration Changes This section outlines the general procedures and methods for identifying, analyzing, approving and processing proposed configuration changes. Changes may affect the project design, funding and agency agreements, as well as the environmental documents. Formal recognition of the previously stated changes must be followed by an appropriate schedule and cost impact analysis. The CPM will recommend the appropriateness of the modification for configuration management review. The CPM will also establish a course of action and personnel assignments required for the submission of the change request. Configuration Change Control Procedures Changes that are in conflict with the project design criteria and that affect the design documents will be processed and evaluated by the EMT, which is comprised of City executive and senior management staff. The standard procedure for changes to the baseline scope is as follows: 1. CPM recommends change to the Program Manager, the Transportation Group Director, as well as the Planning Development & Transportation Director, and are reported to the EMT. 2. EMT recommends to City Manager/City Council. 3. City Manager/City Council authorizes and signs change. Configuration Changes During Design The following steps will be taken to address changes during Final Design: 1. Identification by the CPM of a need to alter the baseline documents. 2. Preparation and presentation of a change request to the Program Manager, the Transportation Group Director, as well as the Planning, Development & Transportation Director, and are reported to the EMT. 3. Review and approval of the change request by the EMT. Page 3.7 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 Configuration Changes During Construction Configuration changes during construction will be managed by the CPM following procedures documented in the City's Capital Projects Procedures Manual. 3.5 Project Accounting The financial accounting system for the project is managed by the Financial Coordinator for the City's Transportation Planning department, with participation from Transfort staff and the City's Finance department staff. The City uses the J.D. Edwards system for municipal governments. The accounting system allows individual project tracking and reporting to meet City, State, and Federal requirements. Transfort's Financial Coordinator will be responsible for entering all of the project's financial data into FTA's database. The Financial Coordinators from Transportation Planning and Transfort recently attended FTA's financial training course in Denver and are aware of the FTA financial reporting/tracking requirements and procedures. 3.6 Records Management The City currently controls project documents and maintains the record -keeping system with a well -established system which includes procedures for labeling, storing, cataloging and distributing documents, records, drawings, reports, and other written and electronic materials. The City will prepare a Quality Assurance Plan (QAP) for the MAX BRT project for FTA approval. The QAP will include a project -specific plan for document control and records management. Control of drawings and specifications will be primarily the responsibility of the Design Consultant — Contractor Team (DCCT), under the direction of the CPM. Internal procedures must be addressed in the DCCT Quality Control Plan for the project, which must be submitted to and approved by the CPM. Documents related to procurement are retained in the City Purchasing Department records. Real estate documents are retained in the City Real Estate Services Department records. Any legal documents and/or documents requiring City Council approval are retained by the City Clerk's Office. At the completion of the MAX BRT project, consultant and contractor records will be turned over to the CPM as required in the contracts. These records, along with the City generated records, will be retained in accordance with a records retention schedule, which, at minimum, shall comply with applicable laws and City, State, and Federal/FTA requirements. 3.7 Estimating Estimates are prepared by determining construction packages, units of measurement, construction quantities and unit costs. The construction quantities are calculated from the construction plans, and the units are standard units for that particular item generally used in the industry. The unit costs are estimated from Colorado Department of Transportation (CDOT) bid tabulation data, Means Construction Cost Data, City cost data, consultation and input from local contractors, the DCCT and the CPM. The current Opinion of Probable Construction Cost (OPCC) is based on the existing PE plans. The construction unit costs used in the current OPCC were developed by the consultant design Page 3-8 Mason Corridor MAX Bus Rapid Transit Project Management Plan -- August 11, 2008 team that prepared the PE plans. The unit costs that were used for the current OPCC are based on input from the consultant design team using CDOT and City data. Consultation and input from other sources as noted above will be included in determining the appropriate unit costs for the Final Design/Build phase. The unit costs applied for this project reflect the adjustments that are appropriate due to magnitude of quantity and relative complexity of construction. The current OPCC is based on a single construction package as well as a vehicle acquisition package, and include all of the primary project components identified in Sections 1.3, 1.4 and 1.5 of this PMP. An annual cost estimate increase of approximately 3.25% was applied to establish the construction year (2010) cost estimate. The OPCC will be updated to reflect changes and increased level of detail during the Final Design\Build process. At the 60%, 90% and final completion milestones of the Design/Build phase, all package construction units will be assessed or remeasured and the applied unit costs will be reassessed as well to develop an updated OPCC at each of these Final Design/Build milestones. The DCCT will prepare and submit to the CPM, Project Opinion of Probable Construction Cost estimates at the 60%, 90% and final design\build completion milestones. An independent review of the OPCC will occur at each design level. These estimates will also be reviewed by the Program Manager, Transportation Group Director, Planning, Development & Transportation Director, and EMT, as well as other appropriate project staff at each submission, with comments forwarded to the CPM. Also, assistance from the DCCT will be obtained, whenever necessary, while reviewing the OPCC. The DCCT revises the OPCC based on the comments received from the Project Manager, Project Director and EMT, and updates the same before proceeding further in the Final Design/Build process. 3.8 Change Order Control Policies and procedures for change order control are provided in Section 6.11 of this Project Management Plan. 3.9 Internal Reporting For a project of this magnitude, the City requires monthly reports, status reports, and exception reports as identified in the Capital Projects Procedures Manual. The CPM is responsible for developing the content of the reports and distributing them to the proper recipients, as agreed upon between the CPM, Program Manager and the DCCT. In addition, periodic conference call meetings are held between City and FTA staff, and the CPM will submit monthly and annual reports as required by the Federal Transit Administration's New Starts/Small Starts program. We anticipate monthly reporting will begin in November, 2008. For the Final Design/Build phase, analysis and internal reporting of budget and schedule information will be the responsibility of the CPM. Work progress, budget and schedule information will be captured and monitored using project and construction management software. Deviations from established budgets and schedules will be highlighted in the reports. Detailed monthly reports will be presented to the MAX BRT Program Manager, Transportation Group Director, and Planning, Development & Transportation Director, and summary reports will be presented on a quarterly basis to the Executive Management Team. Page 3.9 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 Whenever the CPM detects a potential budget or schedule problem, the CPM is required to simultaneously notify the Program Manager, Transportation Director, and the Manager in charge of the issue. The CPM is then required to convene a scope/budget/schedule resolution meeting. Minutes of this meeting are to be distributed to all meeting participants and must include a list of action items and a resolution summary. Page 3.10 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 4.0 PLANNING AND PRELIMINARY DESIGN PHASE MANAGEMENT The City of Fort Collins has worked extensively over the last several years to thoroughly identify and evaluate the short- and long-term transportation needs of the community as well as to identify a comprehensive set of improvements to address those needs. The City's focus on the central core area of the community, the area that will be served by the MAX BRT project, has been the subject of numerous functional studies to define and document our residents transportation requirements as well as the alternatives analysis process used to evaluate the feasibility of potential solutions. Extensive site selection analysis and technical investigations have been conducted to explore the various opportunities and constraints for providing north/south mobility to, from, and through this core area of the City. The findings from all of the studies confirm that the proposed MAX BRT improvements are the most effective and sustainable transportation choice for the Fort Collins' community — both in the short-term as well as for future generations. 4.1 Planning Studies The City of Fort Collins has been actively working on the Mason Corridor project since the late - 1990's when the original idea for the concept was envisioned by citizens working on transit and pedestrian/cyclist elements of the Fort Collins long-range Transportation Master Plan. In accordance with the Federal Transit Administration's Small Starts program guidelines, the City of Fort Collins completed the Alternative Analysis phase for this project corridor in 2000, and the City Council approved the Locally Preferred Alternative for the MAX BRT system improvements in October, 2001. Over the years, numerous updates and action items have been approved by the City Council as well as regional and state agencies, confirming the support for the MAX BRT project. The Mason Corridor is included in the North Front Range Metropolitan Planning Organization Regional Transportation Plan, Unified Planning Work Program, Transportation Improvement Program, as well as in the Colorado Department of Transportation (CDOT) Statewide Transportation Improvement Program. These formal, public decision -making actions, as well as on -going updates and dialogue with key City Executive -level staff, have provided the project authorization for implementing the MAX BRT project. 4.2 Site Investigations The City and the Preliminary Engineering (PE) consultant team have conducted extensive site investigations along the MAX BRT alignment as part of the PE and Environmental Assessment (EA) phase of the project. Additional data collection relative to survey, utility potholing and soil borings is necessary to supplement existing data based on the outcomes of the PE design phase, and this data collection is currently being initiated by the City. City surveyors have documented the corridor and station areas and have worked closely with the MAX BRT project team, including the City's Real Estate Services and Natural Resources staff, to thoroughly investigate and record all findings. Page 4.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (V This extensive field information identified existing utilities, drainages/waterways, property boundaries, topography constraints/opportunities, significant resources (natural and man- made), and other important information to thoroughly consider the ramifications of design of the MAX BRT transportation -related improvements. 4.3 Environmental Clearance During the initial planning & conceptual design phases of this project, FTA determined that the appropriate environmental action for the MAX BRT project is an EA in accordance with the National Environmental Policy Act (NEPA) process specifications. The purpose of an EA is to determine if certain aspects of the proposed project have the potential for significant adverse social, economic, or environmental impact. The EA process facilitates identification of alternatives and measures which might mitigate adverse environmental impacts. The City has developed the EA for the MAX BRT project in collaboration with the conceptual design and PE phases of the project to best facilitate design modifications that are compatible and supportive of the NEPA objectives to avoid and/or mitigate any adverse impacts to the environment. It is important that the City comply with federal and state environmental requirements before proceeding to real estate acquisition and final design/build for the MAX BRT project. Based on these important environmental requirements, the City and the Mason Team are continuing to actively work on completion of the EA; the EA was released by FTA for public review on June 16, 2008 and a Public Hearing was held on July 9, 2008. The EA Executive Summary is included as Exhibit D of this PMP. The public comment period concluded on July 30, 2008. The City anticipates receiving a signed FONSI in the Third Quarter of 2008. With the completion of the FONSI, the City is ready to begin the Real Estate Acquisition Phase and Final Design/Build phases in accordance with FTA direction. 4.4 Agency Agreements The City of Fort Collins will be the lead Agency responsible for acquiring the necessary agency agreements for the MAX BRT project. The following are agreements that are being established or will be established by the City for the MAX BRT project. Burlington Northern & Santa Fe Railway Company (BNSF) An agreement must be established between the City and BNSF for permanent use and construction of the MAX BRT guideway within the BNSF right-of-way. The BNSF has worked with the City throughout the development of the Mason Corridor Master Plan, Alternatives Analysis report, as well as the PE and EA work for the project. The City established a license agreement for the recently constructed Mason Trail bicycle/pedestrian facility that parallels the future MAX BRT alignment. The City intends to use elements of the license agreement as elements of the draft request letter to the BNSF for the MAX BRT project. Exhibit E is a summary of BNSF coordination activities completed to date. Page 4.2 rendered. This rule also applies to subcontracts with the City. Soliciting or accepting any gift, gratuity favor, entertainment, kickback or any items of monetary value from any person who has or is seeking to do business with the City of Fort Collins is prohibited. Collusive or sham proposals: Any proposal deemed to be collusive or a sham proposal will be rejected and reported to authorities as such. Your authorized signature of this proposal assures that such proposal is genuine and is not a collusive or sham proposal. The City of Fort Collins reserves the right to reject any and all proposals and to waive any irregularities or informalities. Sincerely, James B. O'Neill II, CPPO, FNIGP Director of Purchasing & Risk Management where renewal is a way of lift Mason Corridor MAX Bus Rapid Transit Project Management Plan c The BNSF has agreed to continue meeting and working with the City to negotiate the agreement for the MAX BRT project. The City has continued periodic conversation with the BNSF to inform them of the project status and continue to express interest in using a portion of the BNSF right-of-way for the MAX BRT corridor. At this time, the City is pursuing the outright purchase of the necessary BNSF property. The current PE plans reflect safety measures and design elements resulting from early conversations with the BNSF representatives. The City of Fort Collins has established a draft plan to address indemnification issues and limitations on liability for use of railroad right-of-way for public transit on this project that is similar to the Mason Trail License Agreement. The City intends to continue through a course of negotiations with the BNSF based on the previously discussed project philosophy of mutually beneficial safety improvement measures along the corridor and proper, appropriate compensation for the purchase of BNSF property. In preparing the following action plan, the City has included only the measures that will be undertaken as necessary in order to expedite the process according to the schedule requirements of this project. The following is a summary of the steps to needed execute this agreement, which must be executed before the Construction Grant Agreement (CGA) may be executed. Since the cost of the anticipated property acquisition will be in excess of $250,000, the City has undertaken the task of completing a certified appraisal and review appraisal of the railroad right-of-way property. This certified appraisal is expected to be completed in October, 2008, and the review appraisal is expected to be completed in November, 2008. The certified appraisal will provide an increased level of validation for the property cost element of the updated Finance Management Plan to be delivered to FTA in September, 2008. As such, the FMP will immediately be updated to reflect the appraisal results. 2. The City has drafted a letter to BNSF requesting purchase of right-of-way from the BNSF for the project. The offer terms will include a reasonable purchase offer that reflects the results of the City certified appraisal, review appraisal, and FTA concurrence of the appraised value. The request letter will also address indemnification considerations as well as safety considerations of benefit to both parties. These include the Mason/Howes Two -Way Street Conversion, proposed grade -separated crossings for pedestrians and bikes as well as replacement of railroad crossing material at all downtown street crossings. Finally, the letter will also include as a condition of the purchase offer a schedule for entering into such an agreement in order for the City to enter into the Construction Grant Agreement (CGA)with FTA, currently anticipated in April, 2009. The City will reconcile the final terms for indemnification and the final draft offer amount as well all other terms of the offer letter for delivery to BNSF in December, 2008. 3. To facilitate the negotiation process, the City will contract the services of an outside consultant with experience in property acquisition negotiations with BNSF. The City will engage the services of this outside consultant in conjunction with final preparation of the final draft offer letter to BNSF. The City expects to have the negotiation consultant under contract in August, 2008. 4. The City recognizes that BNSF will conduct an independent appraisal of the property, which is expected to be completed by the end of January, 2009. Page 4.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan (0 5. The City anticipates entering into negotiations with BNSF for final terms of the acquisition agreement by January, 2009. The first preference of the City is to continue negotiations with the BNSF based on the purchase request and the recognized safety improvements of the project that are mutually beneficial to both parties. If, through the course of this process it becomes apparent that the timeline or terms for negotiations will not meet the project requirements, the City will entertain the option to pursue a license agreement with BNSF in lieu of purchase. FTA requirements of such a license agreement will be set out in a letter from FTA to the City. 6. The intent of this proposed action plan is to provide an adequate period of time for negotiations to progress between the City and BNSF from August, 2008 to March, 2009 to accomplish execution of the agreement before anticipated execution of the CGA in April, 2009. This must include preparation of the draft agreement language, final reviews, and document routing for signatures. 7. Final land transfer documentation and payment would occur in up to a three month period immediately thereafter (with the schedule being subject to BNSF approval). The timeline for these activities is reflected in the overall project schedule included as an Exhibit D to the PMP. Public Utility Commission (PUC) The City must obtain permits from the PUC for any new or modified railroad crossings. The only permits identified at this time relate to the interconnection of the MAX BRT traffic signals to the BNSF bungalows where the MAX BRT crosses major arterials. Additionally, the PUC has indicated that a formal public review process may be required for approval of the Mason/Howes Two -Way Street Conversion. Colorado State University (CSU) & Colorado State University Research Foundation CSURF Because the MAX BRT alignment crosses the CSU campus, the City will establish an agreement with CSU/CSURF regarding use of campus streets, parking areas, and walkways for the MAX BRT improvements. This agreement will also address compensation for lost parking spaces and maintenance of the MAX BRT facilities. CSU/CSURF representatives continue to be actively involved in the project and are instrumental in developing all aspects of the MAX BRT project to best serve the schools Main and South campuses. Ditch Companies The City must establish agreements with existing ditch companies (Larimer County No. 2 Canal, Sherwood Lateral, Emigh Ditch, and the New Mercer Ditch) to obtain their concurrence for crossings, enclosures or right-of-way encroachment or use. 4.5 Permits City staff and the project team have designed the project to avoid and/or minimize environmental and other land/utility impacts to the extent practicable. However, the City realizes that several common federal, state, and/or local permits will be required for the project. Page 4.4 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11 2008 4.6 Financing Details of project financing can be found in the City of Fort Collins MAX BRT Finance Management Plan (July 24, 2007). Per FTA direction, the City will submit an updated FMP by September 5, 2008 to reflect any project changes since 2007.The City is seeking capital funding for the project from several sources. Non-federal sponsors will provide 20 percent of capital funds for the project; the City is seeking the remaining 80 percent from FTA's new Small Starts transit funding program. Capital funding sources are described below and shown in Table 4-1, below. 1. Non -Federal Sources It is important to note that the City of Fort Collins has already funded significant local monies for the Mason Corridor from local Building Community Choices capital improvements funds. This funding has been used to develop the Master Plan vision for the Mason Corridor, as well as the Alternative Analysis report for the FTA New Starts/Small Starts program application process, and to complete the PE phase of the project to the 30 percent level as requested by FTA. The City is also using this existing local funding to develop the EA document for the MAX BRT project. A portion of this local funding has also been used to purchase the land for the future South Transit Center for the MAX BRT service. In addition, these local funds have been leveraged with funds from the Colorado Department of Transportation and Great Outdoors Colorado, to construct the new Mason bicycle/pedestrian trail — however, we are not including the funds spent on the bicycle/pedestrian trail as part of this PMP or Small Starts application to FTA; all of the costs provided in this PMP report are solely related to the BRT functions of the Mason Corridor project. This information is simply included as background information to demonstrate the City's long-standing financial commitment to the Mason Corridor. The financial information included in this updated PMP report demonstrates that the local matching dollars needed for the MAX BRT project will be provided by the City as well as by committed funding from the Fort Collins' Downtown Development Authority. The City will fund the completion of the MAX BRT utilizing one of two options: 1. The City will identify a short-term re -purchasing agreement within it's internal investment portfolio that will not fall beneath the outstanding balance of the project. 2. The City will fund a flexible repurchasing agreement with a third party financial institution that will not fall below the outstanding balance of the project. The City intends to supplement these existing local funds with state capital transit funding approved by the Colorado Transportation Commission from Senate Bill 97-1 (SB-1) specifically for the MAX BRT project. The combination of the local (City & DDA) and state funding provides the necessary 20% non- federal share of funding for the MAX BRT project. 2. Federal Government Sources To supplement local sources, the City is seeking funding from the Federal Transit Administration's new Small Starts transit program to implement the MAX BRT project, which is the subject of this PMP as part of the City's formal request to FTA to enter "Project Development". Page 4.5 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 Table 4-1 Sources of Capital Funds, Year of Expenditure Dollars (Millions) Funding Sources Funding Amount Funding Share FTA Small Starts $59.35 80% State SB-1 Transit Funds $ 8.56 11.5% Local Funds (City& DDA $ 6.28 8.5% Total $74.19 100% The State S13-1 and local funds are committed to the MAX BRT project, thereby confirming the full 20% local funding requirement. Funding sources for operations will remain unchanged from current funding sources, and will consist of fares and fees, City General funds, and FTA formula funding. The operating ratio (proportion of total operating and maintenance costs covered by fare revenues) will increase from 45.3% in 2007 to 53.2% when the new MAX BRT system opens in late 2011. 4.7 Acquisition Plan Overview The Real Estate Acquisition Management Plan (RAMP) outlines the policies and procedures that the City must adopt in order to comply with federal and state requirement for right-of-way- appraisal/appraisal review, land acquisition, relocation and property management activities for all construction activities for the MAX BRT project. The RAMP must demonstrate that the City has done sufficient planning to show that it has technical capacity and capability to successfully implement the project. The City project will utilize federal funds requiring that all land acquisitions and relocations be in compliance with policies and procedures that conform to the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 as amended and 49 CFR Part 24 implementing regulations (collectively "the Uniform Act"), and FTA Circular 5010.1 C and applicable implementation guidelines. These policies and procedures also incorporate compliance requirements of state statutes and guidelines. The RAMP is identified as a requirement in the PMP. The RAMP's intent is to: ► Provide an overview of the acquisition process ► Define roles for the City, project personnel, consultants, or sub -consultants involved in title reports, appraisals and appraisal review, acquisition, condemnation and/or relocation services, property management services, and environmental assessment services; ► Outline acquisition strategies and decision -making processes; ► Identify coordination requirements and processes; ► Define task and assign responsibility for those tasks; ► Establish project controls and monitor the acquisition schedule, costs, and quality controls, and ► Monitor progress for completion and adherence to laws, regulations, and procedures. The RAMP discusses the following policies and procedures that the City proposed to utilize in order to comply with federal and state requirements. RE 'El Page 4.6 Mason Corridor MAX Bus Rapid Transit Project Management Plan_ _August 11,.2008 __ ► Federal and state legislation that controls public acquisition and relocation activities and regulations that control public acquisition. ► City real estate process and procedures. ► Acquisition, relocation and property management policies and procedures that have consolidated and integrated federal laws and regulations and provide the basic parameters for the RAMP's development and operation. The intent of these sections of the PMP is to provide a general overview and understanding of the RAMP that has been developed specifically for the MAX BRT project. In order to obtain a more comprehensive understanding of the real estate acquisition process, refer to the RAMP (submitted accompanying the PMP). The project real estate needs are comprised of partial acquisitions, permanent easements and construction easements. There are approximately 41 properties adjacent to the project that will be affected through acquisitions. Property owners include the BNSF Railway Company, City of Fort Collins, Colorado State University/Colorado State University Research Foundation, and miscellaneous private business owners. The Preliminary ROW plans identify 14 fee takings, and all are partial takings. The PE plans identify 49 permanent easements and 54 temporary easements. The most significant real estate impact of the project involves the BNSF since the bulk of the MAX BRT project improvements will be located within existing BNSF right-of-way. The status of the agency agreement process with the BNSF that will be the basis for the real estate acquisition process in this case is summarized in Section 4.4. 4.8 Acquisition Program Approach The City may acquire real property in several different ways depending on project or program needs and the interest or desires of property owners. It is possible that more than one method or mode of acquisition may be used on a single project. Acquisition methods are listed below and a brief description of these methods can be found in the RAMP. ► Negotiated Settlement based on Approved Valuation ► Administrative Settlement ► Possession and Use Agreement ► Leasing ► Acquisition by Exchange ► Donation/Dedication ► Mediation or Arbitration ► Advanced Acquisition ► Condemnation ► Voluntary Transactions Page 4.7 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 gym. __( 4.9 Acquisition and Relocation Process The current EA and Project design do not identify any acquisitions that would result in displacements. If during the final design process the City identifies any land acquisition that would result in displacement, the City would update the RAMP to identify the affected property owners and tenants. A displaced person is any person who moves from the real property or moves his or her personal property from the real property. All relocation activities will be in compliance with the Uniform Act and its implementing regulations. The timely delivery of right-of-way will be critical to successful implementation of the Project. The City's real estate procedures and project -specific procedures are being developed to allow for adequate and realistic projections of real estate availability. Complex or unusual acquisition and relocation parcels will be identified early, to allow adequate time for an accelerated real estate process delivery. All land acquisition and relocations will be implemented in compliance with the Uniform Relocation and Real Property Acquisition Policies Act of 1970 as amended, 49 CRF Part 24 implementing regulations and applicable state laws. Rights of Entry will be obtained from property owners to access parcels to perform the following activities: soil borings, utility investigation, surveying, real estate appraisal, or other data. Right - of -Entry documents give the City the right to enter the owner's property or remaining lands. The City will restore any disturbed property to a safe and sanitary condition after it has used the property for the necessary task. The RAMP Project Manager will be responsible for tracking and monitoring the ROW schedule. A parcel -by -parcel schedule will be developed as the right-of-way engineering plans for the project progress. Design changes will be tracked and monitored for impact to the right-of-way schedule. Development of the right-of-way schedule will include evaluation of specific tasks required and the expected durations. The City intends to utilize right of way consultants to conduct property acquisition negotiations. The City's criteria for selecting a right-of-way consultant will include requirements to ensure sufficient experience with the Uniform Act to successfully implement the project. The City, through its consultants, shall make all reasonable efforts to contact owners or owners' representatives and discuss its offer to purchase property. This will include explaining the basis for the Offer of Just Compensation and its acquisition policies and procedures, including payment of incidental expenses in accordance with 49 CRF Section 24.106. Owners shall be given reasonable opportunity to consider offers, present materials they believe are relevant to determining property value, and suggest modifications in the proposed terms and conditions of the purchase. All negotiations will be in accordance with 49 CFR Sections 24.101 and 24.102. The person acting as negotiator will maintain adequate records of negotiations on a parcel basis with sufficient detail to demonstrate compliance with the Federal laws and to show good faith negotiations. These records shall be retained for at least three years from the date of acceptance of the final voucher for the project but may generally follow the requirements of the State or City. The records are to be typed or written in ink and completed within a reasonable time after each contact with the property owner. The information for each contact should include, but is not limited to, the date and place of contact, parties of interest contacted, offers made (dollar Page 4.8 Mason Corridor MAX Bus Rapid Transit Project Management Plan .-Aug 2008 amounts), counteroffers, reasons settlement could not be reached or any other pertinent data. The records shall be signed and dated by negotiators. If negotiations with the owner are not successful, the RAMP Manager, in consultation with the CPM, Program Manager, and City Attorney's office, will approve proceeding to condemnation. 4.10 Acquisition Program Controls The Real Estate Consultant will develop controls for the acquisition program. They will coordinate information provided by the project team members and provide regular updates on schedule, budget, acquisition and contract status as appropriate. Specific aspects of the acquisition program controls are addressed below. Progress and Schedule Reports Monthly progress reports will be prepared by the Real Estate Consultant to present the status of the acquisition program and provide measures of progress. CPM will gather progress reports from the Real Estate Consultant and submit to the Program Manager, Project Management Team, and EMT with an overall monthly summary report. The current Real Estate Consultant, with input from the CPM & Director and City Staff, will prepare a schedule for the acquisition program as a whole (included in the RAMP). The Real Estate Consultant will track progress against that schedule and, relative to the Project Baseline Schedule, develop a schedule for each individual acquisition. The Real Estate Consultant will also be responsible for developing and maintaining a schedule of property acquisitions based on the needs of the various parcels. It will identify projected dates for various stages of the acquisition process that will be updated as necessary. The updated real estate schedule will be submitted to the CPM each month. Schedule updates will be provided at least monthly or as significant milestones are achieved. MAX BRT project summary monthly reports to the FTA will contain a section summarizing the status of the real estate acquisition program. 4.11 Utilities Management These are formal written agreements between the City and public or private utilities that may or may not involve reimbursement or exchange of funds. All Contracts for the project will be maintained on file by the City of Fort Collins. The City recognizes that utility coordination, design, relocation and new construction requirements for the project are critical steps for schedule adherence and successful project implementation. The CPM will take the PE plans and begin coordination with each of the affected utilities to determine impacts, relocation requirements, permit requirements, agency clearance requirements, new utility construction requirements and cost agreements. This utilities coordination process will include the following services: ► Floodplain Management ► Water ► Sanitary Sewer Page 4.9 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 (V ► Electric ► Telephone and Fiber Optic ► Gas ► Ditch Companies Existing utility information has been obtained from the local public and private utility companies along the MAX BRT alignment. The City of Fort Collins provided water, stormwater, and sanitary sewer data as well as traffic communication fiber-optic cable data for city -owned facilities; the City of Fort Collins Light & Power provided the electric facility information. Telephone, CATV, water, and fiber-optic data were obtained from local private companies. These data were used to compile a base map of utility data for the MAX BRT alignment. Utility data was referenced to existing surveyed data of manholes, switch cabinets, transformers, etc. to prepare a composite database of existing utility data to the extent possible during the PE design phase. It is anticipated that a formal utility location process will occur for each public and private utility during the initial stages of the Final Design/Build phase of the project. There are a few utility coordination issues that will require extra efforts during this phase: ► In the northwest corner of the existing Horsetooth Road/McClelland Drive intersection, there are two electric/fiber-optic utility vaults that will need to be adjusted (lowered approximately 6 inches) or moved. ► An existing bank of six electric transmission conduits parallel the MAX BRT alignment between Drake Road and Lake Street. This bank of conduits may need to be moved. ► Several utility vaults/switch cabinets exist at the approximate northwest corner of the Jack Christianson running track on the CSU campus (south of University Street). These facilities will require relocation. Other utility adjustments will likely be necessary, i.e., the relocation of fire hydrants, etc. to facilitate the construction of the MAX BRT. A preliminary summary of these adjustments are included in the PE construction plans and will be confirmed early in the Final Design/Build phase. Additionally, coordination will occur with the New Mercer Ditch Company and the Larimer County No. 2 Canal Company relative to the proposed modifications to their irrigation facilities. 4.12 Intelligent Transportation Systems (ITS) The Transfort Senior Network Specialist and the City's Management Information Systems (MIS) Department Director and the Traffic Operations Engineer are currently evaluating all of the ITS elements required for the successful construction and operation of the MAX BRT system. ITS devices will be used to provide communication capability between the central Transfort office and the MAX BRT Station and Stops, for conveying information to the system users, for security purposes, for traffic signal priority across the major east/west arterial cross -streets and for directing patrons to the MAX BRT Stations and Stops. A summary of the basic ITS communication and operational devices will be focused at the following static locations and on the MAX BRT buses as noted: Page 4.10 Mason Corridor MAX Bus Rapid Transit Project Management Plan (0 South Transit Center ► Data/telecom room ► Video security system ► Digital signage ► Television and phone systems ► Sound and paging systems ► GPS-based clock system ► Fare collection system ► Advanced Traveler Information System ► 2-way radio communication Stations and Stops ► Fare collection system ► Video security system ► Sound system ► Advanced Traveler Information System ► Wayfinding signing ► Public telephone Maintenance Center ► Video security system ► Dispatch software and devices ► Fare collection system Vehicles ► 2-Way radio communication ► Mobile video security system ► Automatic announcement system ► Fare collection system integration ► Automatic Vehicle Location / GPS systems ► Traffic signal priority devices Connectivity to the City's fiber-optic communication system will be provided to facilitate communication between the central office, the maintenance center, the South Transit Center, and Stations and Stops. Connectivity to the existing Transit Centers will be enabled as well since they have existing connection the City Data Network. Page 4.11 No Text REQUEST FOR PROPOSAL P1144 — Mason Corridor Project Management Services Purpose The City of Fort Collins is soliciting proposals from qualified individual(s) and/or firms for project management services to implement the Mason Corridor/MAX Bus Rapid Transit (BRT) project. The use of these services will be to assist City staff and direct the management of the overall project design\engineering, public outreach, right-of-way acquisition, coordination with the BNSF railroad, Colorado State University, and other major stakeholders as well as to manage the construction and oversight of the initial phases of operation for the Mason Corridor/MAX BRT system. Implementation of the Mason Corridor BRT project, also referred to as "Mason Express or MAX", will be guided by the following documents and resources: 1. Environmental Assessment, including the Finding of No Significant Impact (FONSI) approved by the Federal Transit Administration (FTA) — August 2008; 2. Project Management Plan — August 2008; 3. Real Estate Acquisition Management Plan — August 2008; 4. Finance Management Plan — July 2007 & update 2008; 5. Preliminary Engineering documents July 2007; 6. Federal Transit Administration Small Starts program requirements & reports — 2007; 7. Colorado Department of Transportation State Transit Funding Program Senate Bill (SB) 97-1 program requirements - 2006-08; 8. City of Fort Collins Capital Projects Procedure Manual - 2005. Il. Scope of Services The services will generally consist of overall project management of the Mason Corridor/MAX Bus Rapid Transit (BRT) project as described in the Project Management Plan (2008), including completion of final planning stages; assistance with solicitation and selection of engineering design consultants; oversight of engineering design efforts through final design; oversight of the development of the extensive Intelligent Transportation Systems (ITS) communication network, assistance with solicitation and selection of construction contractors; construction contract administration; oversight of land acquisition efforts; project scheduling and task management; financial oversight and budget management; project reporting to various governmental agencies including the City of Fort Collins, Federal Transit Administration, Colorado Department of Transportation, coordination and collaboration with local businesses/property owners, community stakeholders, local organizations and authorities including Colorado State University, Downtown Development Authority, and the Burlington Northern Santa Fe Railway Company (BNSF); oversight of project close-out activities, start-up and initial phases of operation. Mason Corridor MAX Bus Rapid Transit Project Management Plan _August11 2008 (0 5.0 FINAL DESIGN PHASE MANAGEMENT The Final Design phase of the MAX BRT project will be conducted in accordance with the City's Capital Project Procedures Manual, the Larimer County Urban Area Street Standards (LCUASS), and the requirements of FTA's Small Starts program, including the recommendations from the FTA's Construction Management Handbook (2006) for Final Design. Practices are designed to address compliance with schedules and budgets, and to meet design requirements and project specifications. The culmination of the Final Design phase will be the development of a construction build package and updated assessment of the final capital costs and construction schedule. The final plans and specifications will include plans and profiles, sections, schedules, and detailed specifications. The final plans will also include detailed rights-of-way/easements needed to accommodate the project and descriptions of work required by third parties and coordination efforts thereof. 5.1 Roles and Responsibilities The design of the construction plans can be divided into four main design disciplines for the project: 1. Civil Engineering Design — BRT guideway, pavement, drainage, structure, traffic signals, railroad crossing equipment, floodplain impact mitigation; and signing & striping 2. Station/Maintenance Facility Design — Station platforms, aesthetic features, wayfinding signing, South Transit Station, information systems, urban design elements, shelters, ADA accessibility, lighting and landscaping 3. Utility Design — Confirmation of all existing public and private utilities, identification of conflicts, development of modification/adjustment alternatives, and design of new facilities 4. Communication/ITS Network Development — Information conveyance to the public, integrated fiber-optic communications, AVL, transit signal priority, security systems, and system dispatch. The CPM will be responsible for oversight of all of the design aspects of the project. The CPM will oversee the selected DCCT and City staff relative to the preparation, coordination, facilitation and completion of the construction documents. Specific tasks can be summarized as follows: ► Management of the Final Engineering activities ► Review of engineering studies, reports, drawings, and other design documents ► Review and approval of project schedules ► Participation in project progress meetings ► Monitor safety and environmental compliance ► Review and approval of Final Engineering progress reports and opinions of probable construction costs Page 5.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (8 ► Review and approval of supplemental agreements ► Management of MAX BRT construction The DCCT will be responsible for the preparation of the final engineering plans, specifications and estimates following City of Fort Collins and FTA guidelines. Specific duties will include: Guideway Design ► Design of horizontal and vertical layout including toe -of -slope calculations ► Retaining wall and Larimer County No. 2 enclosure ► Stormsewer facilities ► Floodplain impact mitigation ► Coordination with utility and ditch companies ► Erosion control and water quality management Station/Stop Design ► Design of the South Transit Center • Design of building structure including adequate public facilities • Design of drainage, parking, lighting and other civil design elements • Building and site amenities including artwork and wayfinding • Urban design elements such as water fountains, trash receptacles, benches, shelters, information kiosks, etc. ► Design of station platform/roof structure ► Station wayfinding and signing design ► ADA facility compliance including access ramp, handrailing and tactile warning devices ► Approach beacon design ► Urban design features such as trash receptacles or bench design ► Lighting design ► Landscaping design ► Design of the Maintenance Center • Vehicle lifts • Tool storage areas • Restrooms/employee showers • Tire replacement • Dispatch/Operations area enlargement Page 5.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan C= Utility Design ► Confirmation of all existing public and private utility horizontal locations and vertical depths ► Identification of utility conflicts relative to MAX BRT design ► Coordination with both public and private utility companies ► Development of modification/adjustment alternatives ► Design of new utilities Communication/ITS Design ► Coordination with City departments relative to the implementation of information technology devices at stations/stops ► Design of fiber-optic wiring diagrams/routing data ► Coordination with traffic signal system vendor relative to transit vehicle priority software revisions and other operating parameters 5.2 Design Criteria Table 5-1 summarizes the civil design elements of the BRT Guideway and Stations. These criteria are in general compliance with the LCUASS. Table 5-1 Design Criteria Design Element I Criteria GUIDEWAY Design Speed 40 mph Stopping Sight Distance 305 ft Minimum Centerline Radius 700 ft Maximum Centerline Grade 5% Minimum Flowline Grade 0.5% Maximum Grade at Intersection 4.0% for 200 ft Minimum K Value Crest 44 Minimum K Value(Sag) 64 Number of Lanes 2 1 each direction — no center median Lane Width 11.5 ft—each lane Cross -Sloe 0.2 ft/ft west to east, no crown Pavement Section 11.5" Curb & Gutter Vertical Height = 6 inches, 15 inches at Stations/Stops Intersection Curb Return Radii 25 ft at face -of -curb Total Guideway Width 23 ft (face -of -curb to face -of -curb) 24 ft (back -of -curb to back -of -curb) Widened where s ace is available - STATIONS Platform Length 60 ft cr to cr Platform Width 14 ft face -of -curb to face -of -curb Platform Hei ht 15 inches match bus floor hei ht Bus Lane Width 15 ft face -of -curb to face -of -curb Page 5.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11 ,2008 5.3 Design Scope/Status The DCCT will provide technical and professional engineering service, including preparation of plans, specifications and cost estimates to be used by the City for construction of the facilities and systems for the MAX BRT project. The DCCT will hold regular design status meetings (throughout the final design phase) and other status meetings with technical staff from the City and other stakeholders as necessary. Design progress, as well as all relevant design issues will be reviewed during these technical update meetings. For all status meetings, the DCCT will prepare draft minutes of the meeting, draft an action item log of all issues that arise and require further action, and draft an agenda for the next meeting to be forwarded to the CPM for review. After review and approval from the CPM, the DCCT will forward the agenda, meeting minutes and action item log to all participants. The action item log will clearly reflect all actions required and taken as well as any information pertinent to such actions. 5.4 Design Submissions/Review The current PE plans have been prepared to an approximate 30% level. It is planned to have the selected DCCT submit design plans, project specifications and cost estimates to the City and FTA for formal review at the 60%, 90% and 100% design levels. The plans and specifications will be submitted for a review period that will culminate with review meetings where plan/specification reviewers will be invited to attend to provide written and verbal comments in a more formalized review and discussion setting. At the 60% design level, it may still be necessary to discuss design issues that could affect other design disciplines, i.e., could a utility issue affect a retaining wall location? At the 90% design level, final design details and specification content would be reviewed for consistency; minor design changes would be expected at this review level. The 100% review level would be used to assure that previous design and specification comments have been addressed and that the project plans and specifications reflect the construction phase of the project. 5.5 Value Engineering/Constructability Reviews The City's preferred method of project delivery, a design/build process creates a design/construction partnership between the design team and the project contractor. This method of project delivery creates an on -going Value Engineering/constructability review process in which the consultant, contractor and City are equal partners to the creation of the final construction documents. This process will ensure the successful completion of the construction documents by engaging the designers, constructors, and inspectors throughout the design process. As such, no separate value engineering process is anticipated for this project. 5.6 Quality Assurance/Quality Control The DCCT will submit all design plans and documents in accordance with the City of Fort Collins Capital Projects Procedures Manual. The DCCT is responsible for conducting regular reviews to ensure adherence to City standards. In addition, the City's staff and the CPM will perform informal, unannounced quality assurance audits of the design plans and the internal operations of the DCCT. Page 5.4 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 5.7 Procurement Packages The City of Fort Collins Purchasing Division will be responsible for management of the procurement package advertisement and consultant selection process. The procurement package will include the PE plan and project specifications, the appropriate City contracting documents, DBE and EEO compliance forms, contractor instructions and soils or hazardous materials reports that are available. The City's Purchasing Division uses several methods to advertise the project and to allow for consultant/contractor viewing or purchase of the contract documents. These methods include: ► Advertisement of the project in local newspapers and the Denver Business Journal ► Providing an area at the Purchasing Division for contractors to review the documents ► Providing an opportunity to review and/or purchase the contract documents on-line through several on-line services The City may opt to use an RFQ process to short-list the DCCT candidates prior to the RFP process for the design/build package. For the RFP, prospective consultants/contractors will be given ample opportunity to review the advertised plans and specifications before bid opening. A pre -bid meeting will be held with prospective consultants/contractors at the approximate mid -point of the advertisement review period. Negotiations will then begin with the DCCT whose bid provides the best overall value to the City. Page 5.5 No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan . August 11, 2008 V 6.0 CONSTRUCTION PHASE MANAGEMENT Day-to-day management of the construction phase quality assurance of the MAX BRT project may be provided by a full-time Construction Management Consultant (CMC) or City Staff. Exact details of management roles and responsibilities will be determined by the CPM and City Staff during the RFQ and RFP phases of the DCCT selection process. Quality Assurance for the project will be completed in accordance with adopted and proven City and FTA practices & policies to safely and successfully complete the project. 6.1 Organization As noted in Chapter 2, the City may hire a full-time Construction Management Consultant (CMC) to provide full-time quality assurance management of the final design and construction of the MAX BRT project. City staff will also be involved or may be solely responsible for these services. It is anticipated that the consultant (if hired) will be responsible for: ► Day-to-day quality assurance during final design ► Day-to-day quality assurance during construction activities 6.2 Pre -Construction Conferences The CMC will be responsible for scheduling and conducting a pre -construction conference. The CMC will conduct the meeting following guidelines of the Pre -construction Conference Checklist in the City's Capital Projects Procedures Manual, Section 5.6. All City construction staff, the contractor and sub -consultants will be required to attend this meeting. 6.3 Quality Assurance/Quality Control The Contractors will complete all work in accordance with the plans and specifications, the City of Fort Collins Capital Projects Procedures Manual (revised January, 2005), and the LCUASS. 6.4 Safety Contractors are responsible for initiating, supervising, observing and complying with all safety precautions and programs in connection with the work performed in accordance with all applicable federal, state and local laws, regulations, ordinances and railroad safety . requirements. Railroad Safety The successful contractor will be required to comply with BNSF Standard Railroad Requirements, which are made part of the specification package of the project and require Contractor signature. These specifications identify (generally) the following for the contractor: 1. Required insurance, indemnification and assignment of liability 2. Railroad flagging (protocol and process for requesting flagging from BNSF) 3. Contractor safety training - mandatory 4. Clearance distances from the track that are to be maintained 5. Compliance with Local, State and Federal Laws 6. Contractor development and enforcement of a Safety Action Plan during construction Page 6.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan (a 7. Protection of railway facilities during construction 8. Requirements with regard to equipment, excavation, hazardous waste, substances, materials reporting, and personal injury reporting These requirements are provided to the consultants/contractors as part of the plan and specification RFP package so only those that can comply with these requirements will bid on the project. The terms are not negotiable. 6.5 Owner -Controlled Insurance Program The City of Fort Collins has evaluated the possibility of using an Owner Controlled Insurance Program (OCIP) as a cost effective way to limit risk to the City. As a result of this evaluation, it has been determined that the MAX BRT project does not meet the criteria for implementation of this program. Consequently, an OCIP will not be used for this project. 6.6 Schedule Control Schedule Control activities for the MAX BRT project are explained in Section 3.2 of this Project Management Plan 6.7 Contractor Payments Contractor payments will be processed on a monthly basis. These payments will be based on completed work and on percent payments on non -unit specific pay items. The City of Fort Collins has an Application and Certificate for Payment form which must be completed by the selected contractor and submitted with other documentation with their monthly invoices. The City will make every effort to secure payment to the contractor within 30 days of receipt of the monthly invoice. A 10% retainage will be held from each contractor payment until 50% of the work is complete (5% thereafter) to assure project completion to the satisfaction of the City. 6.8 Record Documentation The City of Fort Collins will require that the selected DCCT provide record documents of the constructed project. This information shall be provided in an electronic format and will include all construction changes and modifications to the contract construction plans. This information typically includes: ► Final MAX BRT horizontal alignment ► Final profile grade lines ► Final locations of all drainage structures including rim and invert elevations ► Final locations of all retaining walls including horizontal alignment changes and top -of - wall elevations ► Final locations of all traffic signalization equipment ► BRT Station/Stop platform locations and elevations ► Final locations of all new, moved or modified utilities, including manhole rim and invert elevations ► All other record documentation as requested by the CPM Page 6.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan : August 11, 2008 6.9 Field Inspection The CMC will be responsible for quality assurance. The DCCT will be responsible for the daily observation of construction activities and documentation thereof of constructed facilities, material types, and pay quantities. The City will provide competent, experienced staff that will ensure that contract work is constructed in accordance with the plans and specifications. Procedures outlined in the City's Capital Projects Procedures Manual, Section 5. B., will be followed. 6.10 Third Party Construction The City of Fort Collins anticipates that certain construction elements will be constructed by third parties; these efforts will be on a limited basis. An example of a third party construction element would be the modification, relocation or new construction of a private utility. 6.11 Change Order Management The City of Fort Collins will follow the City procedures outlined in Section 8.C. of the Capital Projects Procedures Manual for the processing of project change orders. 6.12 Disputes & Claims The City of Fort Collins will follow the City procedures provided in the Engineers Joint Contract Documents Committee General Conditions 1910-8 (1990 Edition) with City of Fort Collins Modifications (REV 9/99) for the settlement of any contract disputes or claims that arise throughout the construction of the MAX BRT project. 6.13 System Testing & Startup The basic "system" included in the MAX BRT project relates to the operation of the BRT vehicle priority system of crossing the major east/west arterial cross -streets. This system will include detection devices that will permit the BRT vehicles to obtain priority for crossing of these streets. The PE plans include the installation of in -ground vehicle loop detection to provide acknowledgment of approaching buses to the local intersection traffic signal controller. Proposed traffic signal installations will be interconnected both to nearby signalized intersections as well as to the BNSF bungalows. The system testing will include two basic parts: 1. Electrical Testing — this process will follow a normal testing procedure that informs the traveling public of the upcoming activation and use of a new traffic signal. The procedure will include several days of "flashing" operation whereas the east/west arterial cross - streets will flash in the yellow color as included in any normal traffic signal. The north/south exclusive BRT alignment will flash in the "stop' (white) bar mode. Page 6.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan c 2. Priority Testing — There will be a pre -revenue testing period of the priority bus operation system before the MAX BRT system is placed on-line for customer use. This process would include the traveling of BRT vehicles along the BRT system as they would during normal passenger operation. This period of testing not only allows bus drivers an opportunity to become familiar with the BRT system, but allows time for City staff to make modifications to the minimum/maximum allowable priority times to not only assure that BRT vehicles have sufficient time to cross each arterial, but to also assure that these priority periods are not so long that normal east/west traffic flow is hindered. Page 6.4 General Project Description The Mason Corridor/MAX BRT Project is a north -south Bus Rapid Transit system, in the central area of Fort Collins. The project corridor extends from Cherry Street on the North, to approximately 1/4 mile south of Harmony Road, with a total length of approximately five miles. The BRT system will be located within an exclusive guideway for the length of 3.6 miles with the remaining 1.4 miles intermixed with street traffic on portions of McClelland Drive and Mason Street. Along the entire length of the corridor the BRT system runs parallel to the existing Burlington Northern Santa Fe (BNSF) railroad tracks. At varying locations, the BRT system will be located within a combination of property owned by the BNSF, City of Fort Collins', Colorado State University, and private land owners. The Mason Corridor/MAX BRT project includes a dedicated guideway from the proposed South Transit Center, approximately 1/4 mile south of Harmony Road, north to the existing Downtown Transit Center. The guideway includes one new transit center, seven Park-N-Ride lots, eight stations, eight curb -side stops, expansion of the existing Transfort maintenance facility, and the development of an extensive Intelligent Transportation Systems communication network. Beginning at the South Transit Center, an exclusive BRT guideway will connect north to University Avenue. Between University and the existing Downtown Transit Center, BRT operation will join vehicular traffic on Mason Street. The Mason Corridor/MAX BRT project includes the following improvements: • New South Transit Center including a Park-N-Ride lot • Bus -only guideway between the South Transit Center and University Avenue • Two-way conversion of N. Mason Street and Howes Street • Shared Park-N-Ride lot at Troutman Parkway • Shared Park-N-Ride lot at Horsetooth Road • Shared Park-N-Ride lot at Swallow Road • Shared Park-N-Ride lot at Drake Road • Shared Park-N-Ride lot at University Mall • Park-N-Ride lot at the existing Downtown Transit Center • Downtown BRT stops at these street intersections: Laurel, Mulberry, Olive, and Mountain • Modifications to the Downtown Transit Center to accommodate BRT vehicles • Expansion of existing Transfort maintenance facility on Portner Road • Extensive Intelligent Transportation Systems (ITS) communication system development. The Mason Corridor/MAX BRT system will use low -floor, rubber -tire, 60' articulated transit vehicles. The BRT vehicles would be clearly differentiated from conventional buses and the stations/stops will be designed to emulate light rail stations. The Mason Corridor/MAX BRT project is funded through several sources. The non- federal sources include the CDOT State Transit Funding Program Senate Bill (SB) 97-1 Transit Funds, the Downtown Development Authority (DDA), and local funding from the City of Fort Collins. The primary Federal funding for the Mason Corridor/MAX BRT Project is Section 5309 New Starts/Small Starts Funds. IS Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11 ,2008 _ (8 7.0 CLOSEOUT PHASE MANAGEMENT The closeout plan will consist of the requirements to provide a coordinated transition from construction to operation. This will include the roles and responsibilities of various agencies and offices. The Closeout Phase for the MAX BRT project will be determined by the CPM, CMC and City Staff during the RFQ/RFP process for the selection of the DCCT. Closeout of the project will be completed in accordance with adopted and proven City and FTA practices & policies. 7.1 Operational Testing and Start Up The City will develop a testing program to ensure the project systems and materials comply with design standards and will be ready to perform properly upon completion. The objectives, methodology, control systems, milestones, and staff responsibilities to verify completion and readiness of the MAX BRT for full operations will be developed during the RFQ/RFP process for selection of the DCCT and finalized during the Final Design/Build phase. MaintenancgMepair Facilities Maintenance and repair activities for the MAX BRT will occur at Transfort's existing facility located at the northeast corner of Trilby Road and Fortner Road. General improvements to the maintenance facility have been identified in the EA. Specifics will be refined during the Final Design/Build phase of the project. Once these improvements are identified, appropriate operational testing and start-up activities for the maintenance facility will be defined in this section. Vehicle and Fixed -Guideway Vehicle and system testing will consist of running full service for a period prior to opening day. This period is referred to as the pre -revenue testing period. Tests will be conducted without passengers to determine if the vehicles operate properly and have adequate clearance from fixed objects and each other and that all equipment on the guideway operates properly. Traffic Signal Systems City staff will evaluate operation of new signals and integration with the adjacent signals (including the BNSF) along the corridor. Detectors will be placed in the new pavement to detect an approaching BRT vehicle and modify the signal phasing to accommodate bus travel with minimal delay to either the bus or arterial street traffic. During the RFQ\RFP process for selection of the DCCT, a decision will be made about using preemption or priority type signal operation. Each traffic signal will be tested by City staff as part of their standard installation testing process. In addition, the system will be tested during the pre -revenue testing period when the BRT line is fully operational but not carrying passengers to ensure that the entire MAX BRT operating system is functioning properly and that it is a cohesive part of the City's overall traffic signal operating system. Page 7.1 Mason Corridor MAX Bus Rapid Transit f . Project Management Plan August 11, 2008 Coordination with the Public Utilities Commission will be required to ensure that signals integrated with the adjacent BNSF railway are operational and ready for testing during the pre -revenue testing period. Intelligent Transportation Systems AV L/GPS/Announcement Each of the new buses will be equipped with AVL, GPS and an announcement system. This equipment will be installed at the factory and inspected as each BRT vehicle arrives. Testing of the equipment will occur during the pre -revenue testing period. Video Video surveillance cameras installed at the station platforms will be tested as part of the installation process as well as during the pre -revenue testing period. Fare Collection Systems A final decision will be made during Final Design regarding the selected fare collection technology. It is anticipated that off -board fare collection systems will be provided at each of the MAX BRT stops. Each machine will be tested after installation and during the pre -revenue testing period. Emergency Response Systems Operator and staff training will include emergency response and recovery in accordance with the City of Fort Collins Safety and Health Program Manual (August 31, 2006). This training will occur prior to the pre -revenue testing period, during operator training. Program Administration Administration of the pre -revenue test program will be overseen by Transfort in conjunction with traffic operations staff of Fort Collins. 7.2 Operator Training Vehicle operators will be trained in accordance with the latest TransforUDial-A-Ride Operator Training Manual. The most recent version was completed July 1, 2008, and includes training on radio procedures, railroad crossings, fare collection, pre -trip inspections, defensive driving, driving maneuvers, and customer treatment. A driver trainer will be hired and trained one year prior to MAX BRT revenue operation. A dispatcher will be hired and trained six months prior to revenue operation and drivers will be hired 10 weeks prior to revenue operation. It is anticipated that experienced drivers from other Transfort routes will have the first opportunity at MAX BRT driver positions. 7.3 Vehicle Maintenance Program See the Transfort Vehicle Fleet Management Plan for the Operating Maintenance and Heavy Vehicle Maintenance Programs. Page 7.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 7.4 Contract Closeout Contract closeout will be the responsibility of the MAX BRT CPM and Contract Administrator. The CPM will be responsible for oversight and assistance required in evaluation of issues relevant to completion of all construction work and satisfaction of all contractual obligations. The CPM will: ► Tabulate contract work that is either incomplete or requires remedial action for final acceptance ► Collect and organize records of material testing, inspection, certifications ► Assist with resolution of change orders ► Establish dates of substantial completion and final completion ► Participate in assessing liquidated damages, back charges or similar adjustment to the final contract value ► Review and approve final progress payment with required documentation ► Enforce manufacturers warranties ► Ensure as -built drawings are created and properly stored Page 7.3 No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan 8.0 QUALITY MANAGEMENT 8.1 General (a The CPM is responsible for overseeing the in-house design quality assurance system for the MAX BRT project. The project delivery method assures that City staff, design consultants and the contractor are continuously involved in delivering a quality product as the project progresses through Final Design/Construction. This is imperative since the City wants to assure FTA , and all project funding partners, that their capital funds are spent wisely. The City has prepared procedures in the Capital Projects Procurements Manual that will be followed for design changes, including sign -off and documentation, design reviews, and verification against the project scope and conducted by qualified personnel. In the future phases of the project, constructability reviews will be conducted to make sure the project includes the application of sound construction principles consistent with operating and maintenance requirements and accepted engineering practices for safe, efficient, and economic construction. 8.2 FTA QA/QC Guidelines The City has reviewed FTA's Quality Assurance and Quality Control Guidelines technical report and the City of Fort Collins commits its organization to providing the highest quality product for the MAX BRT project. The City wants to assure its design and construction success so that the use of the BRT system is also successful. Controls necessary for preserving the integrity of quality -related activities and the required documentation of the results are identified in the FTA guidelines and categorized in the following areas: ► Management Responsibility ► Documented Quality System ► Design Control ► Purchasing ► Product ID and Traceability ► Process Control ► Inspection and Testing ► Inspection, Measuring and Test Equipment ► Inspection and Test Status ► Nonconformance ► Corrective Action ► Quality Records ► Quality Audits ► Training Page 8.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 8.3 Management Responsibility City management at its highest levels commits to the purchase of quality products and materials, and the inspection and testing of constructed facilities. The City Project Charter confirms the City management commitment to the MAX BRT project. 8.4 Documented Quality System The City of Fort Collins developed the Capital Projects Procurements Manual to summarize standards for the construction of capital projects within the City. This document provides guidance on design, construction and project close-out relative to material requirements, construction practices, and material testing procedures for capital improvement projects. 8.5 Design Control The MAX BRT system will be completed by the DCCT in coordination with the CPM and City Engineering Department. The CPM and City Engineer will establish an organizational structure that assigns quality assurance responsibilities to certain City staff for certain design elements. A Design Review/QA program will be implemented to assure that specific design criteria are met for individual design elements while organization of processes that allow for cross -element reviews will be developed. An internal design verification procedure will be developed by the DCCT that would provide independent checks of design calculations, specifications, drawings and contract documents. 8.6 Document Control The CPM will prepare procedures for document control that will ensure that relevant documents are current and available for use by those people who need them. Typically, this process would include having available the PE plans for all personnel, following by each level of review documents. Outdated plan sheets or specifications would be eliminated or identified as superseded. The same personnel who review and approve design plans should remain consistent throughout the entire Final Design/Build phase. 8.7 Purchasing The City of Fort Collins will follow its standard purchasing procedures as outlined in the City of Fort Collins Purchasing Manual and FTA's Best Practices Procurement Manual. The purchasing department will identify lists of appropriate manufacturers/vendors for the purchase of products such as fare machines or the BRT vehicles. The purchasing requirements will clearly specify the expectations of the product relative to the drawings and product specifications. An inspection and testing procedure will be identified for authorized representatives to carry out to verify that the products meet the design intent and specifications of the product. The City will also define the means and methods of handling, storing and delivery of the product as well as the procedures to receive, inspect, store and maintain the procured equipment. 8.8 Product Identification The City will make every effort possible to identify products used on the project to assure that incorrect or defective items are not used. Page 8.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 8.9 Process Control The timing of construction sequences are typically left to the contractor as long as they are meeting the project intent. It will be the responsibility of the CPM and CIVIC to ensure that contractors and suppliers install and construct project components in the proper order, i.e., to make sure that earthwork is properly compacted before the placement of concrete or that utility modifications are complete before construction of above -ground facilities. 8.10 Inspection and Testing The City Engineering Department will oversee and may participate in quality assurance for the inspection and testing of all project products and materials. Chapter 23 of the LCUASS summarizes general quality assurance processes while also including details on the inspection and testing requirements for numerous construction components including: ► soil testing ► erosion control ► utility trenching (including backfilling) ► structural concrete ► structural steel ► non-structural concrete ► concrete pavement ► hot mix asphalt ► utility components such as manhole or valve box adjustments ► traffic signals ► traffic signaling and striping The LCUASS often site the Colorado Department of Transportation's Standard Specifications for Road and Bridge Construction. 8.11 Non -Conformance - Corrective Action Disposition of nonconforming work must be documented using the procedures set forth in the City of Fort Collins Capital Projects Procedures Manual. Rework or repair work must be re- inspected in accordance with documented procedures. All non-conformance items must be resolved prior to final completion of the project. The City of Fort Collins Capital Projects Procedures Manual describes procedures to assure that the cause of non -conforming work is identified and recorded, and that the corrective action needed to prevent recurrence is implemented and recorded. The City Engineering staff in coordination with the CPM/CMC will oversee the investigation of the nonconforming product or work and will take the necessary action to correct the work and prevent recurrence. City Engineering staff in coordination with the CPM/CMC will be responsible for issuing, maintaining, updating and recording disposition of nonconformance reports. Page 8.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 1l 2008 (a City Engineering staff is responsible for recording and implementing changes in procedures resulting from corrective action. The CPM, through audits of the project files, will verify that these procedures are being followed. 8.12 Quality Records/Quality Audits The CPM shall be responsible for managing the documentation of quality for purchased products, construction materials, construction methods and practices, and the inspection of constructed products. The DCCT and CPM/CMC will keep records of daily inspections of these items and will provide all record documentation to the City Engineering Department at completion of the project. An audit of the CPM and DCCT files will be conducted to closeout the project. This audit shall serve to verify that the records of constructed materials are accounted for. Special attention is required to assure that all records of deviations and deficiencies are identified, tracked, and the records of the resolutions are included in the files. A checklist of contract deliverables shall be generated by the CPM to include warranties, record drawings, operation and maintenance manuals, spatter parts lists, keys and keying schedules, certificates of compliance, and all other items deemed necessary to close-out the project. Page S-4 Mason Corridor MAX Bus Rapid Transit Project Management Plan f aTF. August 11, 2008 _ 9.0 RISK MANAGEMENT, SAFETY AND SECURITY 9.1 Risk Management The City of Fort Collins will have a Risk Management Plan completed by the end of 2008. In carrying out the MAX BRT project, it is important for the City and project partners to reduce potential liability and loss by exercising risk management. Risk management measures range from reducing known risks (e.g., through early & on -going collaboration with project partners & third parties, advance purchase of materials with volatile prices) to preparing for unknown risks with insurance coverage and project contingency budget. Risk management requires the City to identify potential risks, measure the potential for and consequences of risk elements, and controlling losses. Risk management activities for the MAX BRT project have been incorporated throughout the PE phase of the project specially targeting both design/construction risks as well as financial risks. Additional risk management -related duties will be carried out by the CPM and DCCT, including the City's Purchasing Manager and Risk Management staff, as the project moves forward through Final Design/Construction. Risk Identification & Analvsis The initial phase of risk management is critical for its foundational role in subsequent steps. The City continues to identify potential project risks and to plan for their control. Sources of risk include scope and design changes, economic/financial changes, and productivity changes. Risk Monitoring & Response After sources of risk are identified, the City will evaluate the uncertainty for, and outcome of, risk events. This helps determine controls necessary to bring the City's project risk exposure to acceptable levels by considering contingency plans, insurance, and bonding. Risk management involves strategies to control risk such as prevention (eliminate a high risk process or practice), reduction (adopt lower -risk approach), transfer (shift risk to another participant or insurance provider), and acceptance (tolerate normal or unavoidable events). The revised capital cost estimate includes a 25% contingency level for each element, as well as an additional 5% unallocated contingency line item. This contingency funding is intended to cover future and/or unforeseen costs associated with the project. In addition, the City's standard contract documents require consultants, contractors and subcontractors to carry adequate insurance coverage for their role in the project. In addition, the BNSF will require additional insurance to be carried by the contractor working within their right- of-way. 9.2 Safety and Security Management Plan (SSMP) The City and its DCCT will develop a safety program for construction and operation to protect system users, City employees, and contractors. The City's Safety and Health Program Manual and Transfort's Training Manual are reference guides. Individual contractors will be responsible for the safety of their staff and city staff and residents for their element of the project. The City will be responsible for the safety of staff and users of the system when it is operational. Page 9-1 Mason Corridor MAX Bus Rapid Transit Project Management Plan (V Management Commitment and Philosophy This section will include a signed statement issued by the recipient's management, a description of the purpose of the plan, applicability and scope and the goal of the SSMP. Integration of Safety and Security into Project Development To date, safety and security measures have been incorporated into the design of the project and will continue to be an important aspect through final design. Measures incorporated to maximize the safety and security for the public, passengers and employees include: Clearance set backs from guideway Station area lighting High visibility and open layouts Video surveillance at all platforms Grade -separated pedestrian crossings Guardrail to separate heavy rail from BRT operation Pedestrian crosswalks Real-time messaging system Emergency response personnel will participate in and review development of final design. Additional safety and security measures are expected to include: Raised platform for visually impaired Emergency phone Preparation of an emergency preparedness plan Assignment of Safety and Security Responsibilities Integration of safety and security measures into the Final Design/Construction will be the responsibility of the City of Fort Collins Emergency Response and Transfort personnel. Safety and security during construction will be the responsibility of the contractor. Safety and security when the MAX BRT is in operation, including the pre -revenue test period, will be the responsibility of Transfort. Safety and Security Analysis Per the City's Safety and Health Program Manual, the City of Fort Collins may utilize the professional skills of a safety consultant to identify hazards and vulnerabilities, categorize their severity and probability, analyze their potential impact and provide recommendations on how to resolve them by design, engineering or warning devices. Safety and Securi , Design Criteria Design codes and regulations adopted by the City of Fort Collins for building, fire, electrical and plumbing, etc. will be adhered to as a minimum design requirement. Other design requirements include: Page 9.2 Project Requirements 1. The selected consultant or consultant team will be expected to maintain a local office near the project site. 2. The selected consultant or consultant team will be required to be separate and independent from the final engineering design consultant team or design/build team. 3. The selected consultant project manager must be a registered Professional Engineer in the State of Colorado. 4. The project manager must have a minimum of 10 years of capital improvement project management experience working with or for a governmental agency, including direct experience managing federally funded capital projects such as Federal Transit Administration New Starts/Small Starts projects and/or Federal Highway Administration projects. 5. The project manager must have a minimum of 5 years of experience with right-of- way acquisition under Uniform Relocation Act requirements. 6. The project manager must have a minimum of 10 years of project delivery experience using design/build or alternative delivery models. 7. The project manager must have a minimum of 10 years of construction administration experience. 8. The project management consultant or team must have experience with complex urban retrofit projects including railroads, utilities, road and bridge construction. The consultant shall also demonstrate experience working with ditch companies and various private utility providers within public right-of-way. This may include telecommunications, fiber optics, natural gas, electric power, water, sewer, steam, condensate and chilled water utilities. 9. The project management consultant or team must have demonstrated experience managing vertical building projects and collaborating with architect teams. 10. The project manager or consultant team must have experience with project management/document management systems based on local, state, and federal practices and policies. 11. The project manager or consultant team must have experience managing multiple budget sources on multi -million dollar projects. 12. The project management team must be experienced with scheduling tools utilizing standardized method of scheduling and task assignment as used by the City, CDOT, and FTA. 13. The project management team must have experience working inside railroad rights - of -way and with railroad companies, Federal Railroad Administration, and Colorado Public Utilities Commission. Mason Corridor MAX Bus Rapid Transit Project Management Plan - - August11,2008 ADA Regulations American Association of State and Highway Transportation Officials American Public Transportation Association National Fire Protection Association American Society for Testing and Materials Federal Rail Administration Process for Ensuring Qualified Operations and Maintenance Personnel Operations and maintenance personnel will be trained in accordance with the latest TransforUDial-A-Ride Operator Training Manual. The most recent version was completed July 1, 2008, and includes training on radio procedures, railroad crossings, fare collection, pre -trip inspections, defensive driving, driving maneuvers, and customer treatment. Per Section 7.2, a driver trainer will be hired and trained one year prior to MAX BRT revenue operation. A dispatcher will be hired and trained six months prior to revenue operation and drivers will be hired 10 weeks prior to revenue operation. It is anticipated that experienced drivers from other Transfort routes will have the first opportunity at MAX BRT driver positions. Training of all personnel will include a review of the Safety and Health Program Manual and an Emergency Preparedness Plan that is to be developed by Transfort. Construction Safety and Security Contractors are responsible for initiating, supervising, observing and complying with all safety precautions and programs in connection with the work performed in accordance with all applicable federal, state and local laws, regulations, ordinances and railroad safety requirements. Page 9.3 No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (V 10.0 PROCUREMENT AND CONTRACT ADMINISTRATION The City of Fort Collins has been certified to receive FTA funding and implement FTA projects such as the proposed MAX BRT project. Procurements and contracts for the MAX BRT project will be awarded in accordance with Title 23 and 49 Code of Federal Regulations, FTA's Best Practices Procurement Manual, and with the City's existing purchasing ordinances, Purchasing Manual and Capital Projects Procurement Manual. The City's manuals were written to comply with all federal, state, and local requirements. 10.1 Design Services The City requires contract awards greater than $60,000 for consulting services, including engineering and environmental analysis, be made through competitive proposals process. Selection of architect and engineering services in conjunction with a design/build RFP is based on applicants' qualifications as a part of the best overall value determination for the City in selecting a DCCT. 10.2 Design Contract Administration For the design component of the Design/Build phase, the Contract Administrator (CA) will attend meetings with the DCCT and address any changes orders that may arise. The change order process is similar to that described for construction and is detailed in Section 3.8. The CA is responsible for all file documentation in accordance with City procurement policies. All invoices will be processed in accordance with City procedure. The CA will ensure that the DCCT has met DBE participation requirements before payment. The CA is responsible for all contractual issues and related correspondence, as well as closeout and audit, if necessary, of completed contracts and the release of any retainage. The CA is also responsible, with assistance from the City's legal department, for resolution of any contractual claims or disputes. 10.3 Construction Construction of the MAX BRT system will utilize an RFQ/RFP process to select the DCCT on a best value basis, similar to the process described in Section 10.1. 10.4 Construction Contract Administration The Construction Contract Administration for the project has not been finalized at this time, but it will be developed during the next phase of the project. 10.5 Vehicle Acquisition Procurement of transit vehicles will be completed in accordance with the City's standard procurement process for Transfort. The City/Transfort anticipates "piggybacking" on another transit agency's contract to procure the vehicles to save both time and money. Page 10.1 No Text Mason Corridor MAX Bus Rapid Transit Project Management Plan August11 2008 (a 11.0 COMMUNICATONS 11.1 Vision and Strategy Effective communications is the key ingredient to a successful project. The City of Fort Collins takes great pride in the extensive, on -going communication techniques that are employed for strategic initiatives such as the MAX BRT project. It is the overall vision of the City to brand the MAX BRT project as "Linking Community, Lifestyle, & Business". MAX is the catalyst behind Fort Collins' continuing transformation from a small city to a progressive metropolitan center, successfully channeling growth into positive community development, and a community where multiple modes of travel conveniently link vibrant activity centers within Fort Collins and the North Front Range region. From 2006 through 2007, the City Communication and Public Involvement Office created a communication strategy to "brand" the Mason Corridor project as the "Mason Express" or "MAX". Using updated materials, graphics, logos, brochures, key messages and other tools, this new communication campaign has been a huge success among multiple audiences including the Fort Collins community and surrounding North Front Range region. The City Communications and Public Involvement Office's goal is to maintain and implement the Communications Plan to generate excitement, understanding and support for the MAX BRT project through each phase of the project: design, construction and operations startup. Once MAX service begins, communication and marketing responsibilities will be absorbed by Transfort. The Communication Plan will be multi -faceted and designed to reach a variety of audiences including the general public, the business community, City of Fort Collins employees, and others. Tactics will include web -based information, public meetings and hearings as necessary, print and media advertising, newsletters, video, and media relations. The Communications Plan will remain flexible in order to respond to project needs and public interest and will be revisited on a quarterly basis. 11.2 Project Team The Communications Plan will be the responsibility of the Public Relations Manager (FIRM) who will be designated from City staff. The FIRM will lead the MAX BRT Communications Team consisting of City staff from the Communication and Public Involvement Office, Transfort, and Transportation Planning. Effective communication and internal reporting among project participants is also an essential element to successful completion of the project. The City will continue to deploy established & proven means for communicating reporting requirements and responsibilities, including archiving of formal communications, major decisions, and project changes. Page 11.1 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 (a 11.3 Public Information Activities The Communications Team has already begun implementation of the Communications Plan. Information regarding the MAX BRT service and the vision of the Corridor has been distributed through web sites, brochures, videos, local government television, public events, press releases, news stories, and presentations. The City has developed and continues to maintain a regular and electronic mailing list of parties interested in the project. These lists are used for project announcements, meeting notices, and similar purposes and include thousands of community members, neighbors, property owners, elected officials, transit users, and other groups. Future information activities will also use the MAX brand and leverage existing support and awareness of the project. The remarkable vehicles, time -sensitive operations, permanent stations, convenient park & rides, quality customer amenities, extensive community outreach efforts and marketing materials are all designed with this unique branded message in mind. 11.4 Community Engagement Activities Sharing information and gathering input & feedback from local City residents, business/property owners, and a wide variety of stakeholders continues to be one of the most important cornerstones of the MAX BRT project. This two-way information sharing process is critical to maintaining community interest and support, particularly over the long length of time this project has been active and the several years remaining before construction makes progress visible. The Mason Corridor Master Plan and subsequent work on the Alternatives Analysis report and initial phases of the PE/EA, included extensive, on -going community involvement. During these last several years (1998-2007), hundreds of community and individual meetings and public open house events have been hosted by the City. In addition, many presentations have been made by project staff to various City Boards, Commissions, community organizations, civic groups, business organizations, and City Council. Different types of meetings are held periodically during the various stages of the project to share project concepts and features as well as to gain feedback and input from the community. Meetings include working groups or committees, neighborhood or special interest groups, as well as general public open house events. These events are held in popular community meeting places and are featured in local media, including newspapers, radio broadcasts and other local media outlets. The City is committed to continuing this spirit of on -going public involvement throughout the remaining phases of the MAX BRT project life cycle. Once the MAX BRT service is operational, the City/Transfort will continue to engage the public to learn how well the service is working and identify areas for continual improvement. 11.5 Media The City uses various communication media to inform residents and technical participants about the MAX BRT project. Written products include newsletters and brochures, posters, press releases, and newspaper advertisements. Visual products include television advertisements, postings on the City website (www.fcgov.com), and CD-ROMs with downloadable information targeted to a specific audience. Audio products include radio public service announcements. Page 11.2 Mason Corridor MAX Bus Rapid Transit Project Management Plan August11,2008 The City has released the new 3-D video simulation DVD that visually shows the MAX BRT project. This is the most widely requested and informative communication tool that the City has ever developed for this project — or any other. It is very effective in providing people with quick, thorough, and entertaining information about the entire scope of the Mason Corridor project. DVDs are distributed via the updated MAX BRT brochures, shown on the City's cable television station, as well as a link to the video is on the City's project webpage. The City continues to find new and innovative means to best communicate with all of our various stakeholders and project participants using all available media outlets. 11.6 Government The MAX BRT project is an ideal candidate for FTA's new Small Starts program given the innovative and cost-effective benefits it provides, particularly in a mid -size western community. The MAX BRT is an excellent opportunity to champion the purpose and spirit of FTA's "Small Starts" program to encourage successful transit initiatives in middle America that will serve as pioneering and pragmatic role models for thousands of communities like Fort Collins around the Country. The City is actively working with United States Senators Allard and Salazar as well as United States Representative Musgrave to ensure this project moves forward through the appropriate government channels to obtain the FTA funding necessary to complete the MAX BRT project. The City recognizes that all levels of local government staff and elected officials must receive accurate and timely information to maintain consensus for and successfully complete the MAX BRT project. 11.7 Public Art Mass transit systems around the world use the power of art to transform utilitarian spaces into places that enrich the everyday lives of transit customers. The Art in Transit project highlights our commitment to provide a unique, attractive, high -quality transportation corridor that fosters community and neighborhood identity and pride. The City Vision is to incorporate are components that support goals of the MAX BRT project. The art components can include wayfinding elements, benches, railings, shelter designs, etc., in the corridor urban design. The Art in Public Places (APP) program will use the city's purchasing process to acquire artist(s) for the project. APP staff will coordinate the artists' involvement throughout the process of design to installation. Project concepts will be developed with the project team. Final designs will be approved using the city's Art in Public Places Process. t Page11.3 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11,2008 T 11.8 Public Meetings and Public Hearings Public meetings and public hearings held during the environmental clearance phase of the project were completed in accordance with the National Environmental Policy Act (NEPA); however, the overall public involvement plan exceeds NEPA requirements and will continue until operational start-up. 11.9 Public Participation Record All comments received from hearings, meetings, events, telephone calls and e-mails will be gathered and logged for document control to record public participation and inquiries. 11.10 Communications and Public Involvement Activity Timeline A Communication and Public Involvement Activity Timeline will illustrate the extent of all efforts to inform and engage the public. The timeline details all interactions that have and will occur from Planning to Operational startup. This timeline will also include all milestone events such as public hearings, meetings, community events, media briefings, advertising campaigns and outreach activities. This timeline will be maintained by the PRM and will be submitted quarterly to the CPM. Page 11.4 Mason Corridor MAX Bus Rapid Transit Project Management Plan August 11, 2008 _ EXHIBIT A DRAFT CHARTER MASON CORRIDOR MAX BUS RAPID TRANSIT PROJECT August 11, 2008 INTRODUCTION The City of Fort Collins has been actively working on the Mason Corridor project since the late - 1990's when the original idea for the concept was envisioned by citizens working on transit, pedestrian and cyclist elements of the Fort Collins long-range Transportation Master Plan. Since that time, the Fort Collins City Council has approved the City's comprehensive land -use "City Plan" and the "Transportation Master Plan" (original plans approved in 1997 and updated in 2004) as well as the "Mason Street Transportation Corridor Master Plan" (2000). Each of these adopted plans supports and recommends the proposed Mason Corridor Bus Rapid Transit (BRT) system improvements. Over the years, numerous updates and action items have been approved by the City Council as well as regional and state agencies, confirming the support for the Mason Corridor/MAX project. The Mason Corridor is included in the North Front Range Metropolitan Planning Organization's "Regional Transportation Plan", "Unified Planning Work Program", "Transportation Improvement Program", as well as in the Colorado Department of Transportation (CDOT) "Statewide Transportation Improvement Program". These formal, public decision -making actions, as well as on -going updates and dialogue with key City Executive -level staff, have provided the previous project authorization for implementing the Mason Corridor/MAX project. The City of Fort Collins considers the Mason Corridor Bus Rapid Transit Project to be the number one priority public works project for all departments at the City. PURPOSE The concept of a preferred transportation corridor to serve the demand for north -south movement in the central City area began in 1996 as a city-wide effort to identify needed transportation improvements. The idea of the MAX BRT emerged from that endeavor and in response to the existing and projected congestion along College Avenue. Additionally, the project was proposed in response to the lack of a direct, continuous, and safe route for people choosing to use alternate modes of travel to the automobile. In addition to offering an option to the congestion on College Avenue, the MAX BRT project is intended to enhance opportunities for transit riders, bicyclists and pedestrians along its length; to encourage development of compact, transit -related land uses; and to support adopted community economic and environmental sustainability goals for the future. Exhibit A Mason Corridor MAX Bus Rapid Transit Project Management Plan Through this Project Charter, the Mason Corridor/MAX BRT Executive Management Team (EMT) commits the staff and outside consultant resources necessary to implement the project as well as secure the financing for the City's share of the Mason Corridor/MAX BRT project costs. Further, the EMT, hereby authorizes the Planning, Development & Transportation Director, City Transportation Director, Program Manager and Project Manager to exercise the powers set forth by the EMT herein to implement the Mason Corridor/MAX project according to the scope, schedule and budget set forth for the project. PROJECT SCOPE The Locally Preferred Alternative for the Mason Corridor, based on the Council -adopted Master Plan and subsequent planning studies & reports, calls for the corridor's transit improvements to consist of an at -grade rubber -tired Bus Rapid Transit (BRT) fixed guideway with high -frequency transit service operations (10 minute headways) parallel to the BNSF railroad tracks (see Figure 1 - Project Area Map). As shown on Figure 1, the MAX BRT project is a proposed north -south BRT system in the central core of the City of Fort Collins. The MAX BRT is located just west of and parallel to College Avenue (US 287), one of the busiest arterials within the City and the entire North Front Range region. The project corridor extends from Cherry Street on the north, to approximately '/> mile south of Harmony Road with a total length of five miles. The BRT System is proposed within an exclusive guideway for 3.6 miles with the remaining 1.4 miles intermixed with street traffic on portions of McClelland Drive and Mason Street. The MAX BRT system includes high -quality design treatments for vehicles, permanent architecturally -inviting stations & transit centers, easy to use park-n-rides, and sophisticated Advanced Traffic Management Systems (ATMS)/Intelligent Transportation Systems (ITS) technologies to maintain efficient operations and effective passenger information systems. The intent of the Mason Corridor's innovative MAX BRT service is to offer the Fort Collins community and North Front Range region a truly new and exciting form of high -quality transit service targeting the "choice" rider and integrating into a system -wide set of existing and future transportation linkages to serve the local community as well as connect to and from the emerging regional transit system improvements to other communities throughout Northern Colorado and to the Denver & Boulder metropolitan areas. Exhibit A