Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1107 GEOTECHNICAL TESTING SERVICE (8)EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND CTL THOMPSON DATED: March 26, 2003 Work Order Number: CTL-WRF-2008-20 Purchase Order Number: Project Title: Mulberry Intermediate Replacement Project Demolition Geotechnical Services Commencement Date: October 30, 2008 Completion Date: January 15, 2009 Maximum Fee: (time and reimbursable direct costs) $4,190.00 Project Description: Geotechnical Services for the MIRP Demolition Phase Scope of Services: See attached Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms) the Services Agreement shall control. CC: Purchasing Service Provider CTL Thompson: By:& Date: City of Fort Collins: J Submitted By: 4.✓''/� Project Manager Date: lc% 2 Approved By: Water Resources & Trt Services Manager Date:1 of / c Approved Utilities Executive Director �I�M�G(Q'./f�YPa►Ad0"� It�/1$t7i"0 O October 17, 2008 City of Fort Collins Waste Water Treatment Plant 3036 Environmental Drive Fort Collins, Colorado 80525 Attention: Mr. Link Mueller Subject: Fee Estimate for Construction Observation and Materials Testing Services Mulberry Water Reclamation Facility Improvements, Phase 1 900 E. Mulberry Street Fort Collins, Colorado Proposal No. FC-08-0624 At your request, CTLIThompson, Inc. is pleased to provide this fee estimate for construction observation and materials testing services for the Mulberry Water Reclamation Facility (MWRF) Improvements, Phase I project located at 900 E. Mulberry Street in Fort Collins, Colorado. We appreciate your time this afternoon to discuss the scope of the project. We anticipate that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms of our professional services agreement with the City of Fort Collins dated April 9, 2008 and are presented below: Construction Observation and Materials Testing Excavation Observation and Earthwork: Compaction testing will be required for backfill of demolished and/or abandoned structures. We anticipate 3 proctors will be necessary for this project. Based on our discussions with you and Mr. Stan Javernick with Hydro Construction, we anticipate approximately 25 site visits for observation and density testing will be necessary. We have also included consultation time for our project engineers and geologists to support the project team during construction. Field Technician Standard Proctors Atterberg Limits Gradations Engineering Consultation 25 days x 2 hrs/day x $55/hr $2,750.00 3 tests x $80/ea $240.00 3 tests x $60/ea $180.00 6 tests x $70/ea $420.00 8 hours x $75/hr $600.00 Subtotal $4,190.00 361 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 Our total estimated fee for Construction Observation and Materials Testing services is $4,190.00. It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOM ON, IN Heather Grubb Staff Engineer cc via email: Imueller@fcgov.com CITY OF FORT COLIJNS MINRF IMPROVEMENTS, PHASE CTL I T PROJECT NO. FC 08-0624 Reviewed By Eric D. Bernhardt, PE Manager of Field Services 2