Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 6045 ASPHALT SUPPLY (2)Change Order Form Engineering Department PROJECT TITLE: Drake/Ziegler Improvements Project - Phase III PROJECT NUMBER: 30523280.6 (Bid #6099) CONTRACTOR: Lafarge Northern Inc. (PO #8853160) CHANGE ORDER NUMBER: 4 n preparing change orders show in order as separate numbered paragraphs the following: 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1.&2. See attached invoice for details 3. The contract cost will increase by $86,583.28 4. There is no change in contract time. ORIGINAL CONTRACT COST $2,025,011A4 TOTAL APPROVED CHANGE ORDERS $68,936.15 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $86,583.28 TOTAL % OF THIS CHANGE ORDER 4.28% TOTAL C.O. % OF ORIGINAL CONTRACT 7.68% ADJUSTED CONTRACT COST $2,180,530.87 �t ��� ACCEPTED BY: DATE: /(Co�trector's Repr entative) ! REVIEWED BY: DATE: SUBMITTED BY: 1z DATE: 7 Mct ngineering) APPROVED BY: DATE: a (Department Head) \ APPROVED BY: �Ki%/LIY Cir/�DNG I DATE: hod / ✓yZI (Purchasing Agent over $60,000) %OR.. cc: Accounting Purchasing Contractor Project Fife Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 CHANGE ORDER 4 Drake - Ziegler Phase 3 Improvement Project SUMMARY OF WORK " Lafarge - North America Install Sidewalk along Hewlett Packard and Avago Properties Item Quantity Unit $/Unit Total 1 Sidewalk 6" Thick 8' Wide SF 20,000 $3.52 $70,400.00 2 Winter Protection as required) SF 20,000 $0.24 $4,800.00 3 Handicap Rams in 8' walk w/ Domes 8'x6' EA 2 $2,134.17 $4,268.34 4 Ped Refuge Islands in 8' walk w/ Domes 160 SF EA 1 $3,456.94 $3,456.94 5 30" Infall Curb and Gutter Remove and Replace LF 40 $46.84 $1,873.60 6 18" Outfall Curb and Gutter Remove and Replace LF 40 $44.61 $1,784.40 TOTAL 86,683.28 REASON FOR CHANGE 1,2,3,4,5,E Additonal Quantity needed for installation of sidewalk along HP/Avago '.. WHEN POSTED Posted to Pay App #5