HomeMy WebLinkAbout437065 R3 CONSULTING GROUP - CONTRACT - RFP - P1131 HAZARDOUS MATERIALS STUDYPROFESSIONAL SERVICES AGREEMENT THIS AGREEMENT made and entered into the day and year set forth below, by and between THE CITY OF FORT COLLINS, COLORADO, a Municipal Corporation, hereinafter referred to as the "City" and R3 Consulting Group, Inc., hereinafter referred to as "Professional". WITNESSETH: In consideration of the mutual covenants and obligations herein expressed, it is agreed by and between the parties hereto as follows: 1. Scope of Services. The Professional agrees to provide services in accordance with the scope of services attached hereto as Exhibit "A", consisting of seven (7) pages, and incorporated herein by this reference. 2. Contract Period. This Agreement shall commence within five (5) days of signing and shall continue in full force and effect until December 15, 2008, unless sooner terminated as herein provided. Final report must be delivered to the City of Fort Collins by October 15, 2008, 3. Early Termination by City. Notwithstanding the time periods contained herein, the City may terminate this Agreement at any time without cause by providing written notice of termination to the Professional. Such notice shall be delivered at least fifteen (15) days prior to the termination date contained in said notice unless otherwise agreed in writing by the parties. All notices provided under this Agreement shall be effective when mailed, postage prepaid and sent to the following addresses: Professional: City: With Copy to: R3 Consulting Group, Inc. City of Fort Collins City of Fort Collins, Purchasing Attn: William Schoen Attn: Susie Gordon PO Box 580 4811 Chippendale Drive, Suite 708 PO Box 580 Fort Collins, CO 80522 Sacramento, CA 95841 Fort Collins, CO In the event of any such early termination by the City, the Professional shall be paid for services rendered prior to the date of termination, subject only to the satisfactory performance of the Professional's obligations underthis Agreement. Such payment shall be the Professional's sole right and remedy for such termination. Standard Professional Services Agreement- rev07/08 • Air quality; • Public safety; • Landfill and groundwater protection; and • Natural habit conservation. The Comparative Options Matrix will also include various other criteria to provide the decision makers with an effective means for comparing and evaluating options. Those additional criteria may include: • Target Materials • Summary pros and cons; • Reference Jurisdictions; • Cost; • Diversion Potential; • Impact on existing haulers; • Impact on residents; • Implementation issues; and • Administrative issues. Task 2.3 Stakeholder Meetings If requested by the City, R3 Staff will also be available to meet with the residential haulers, County and/or other stakeholders to discuss the project objectives, data needs, answer questions, etc. We have assumed that any such meeting(s) will be scheduled on the day of the Task 2.1 Kick -Off Meeting or the following day and that the City will schedule any such meeting(s) it deems appropriate. Task 2 Deliverables: • Kick -Off Meeting Agenda; • Preliminary Draft Comparative Options Matrix. Task 3 Review Current Policies, Practices, and Programs Our approach to this engagement is designed not to recreate the wheel, but effectively build upon the good work that has already been completed by the City and the R3 Project Team for other jurisdictions. The first step in doing so is to have a full understanding of the City's current policies (e.g., E-Waste Ordinance), practices and programs, and review relevant analysis and reports that have been developed. Obtaining that understanding will start with our review of relevant documents that have been provided in advance of the Task 2 Kick -Off Meeting. We have reviewed a number of those documents as part of the preparation of this proposal and will review all other available documents that are provided. Information gathered from those documents will be used to help prepare the preliminary Draft List of Options for discussion as part of Task 2.2 above. Additional review and analysis will be conducted following the Kick -Off Meeting as part of this task. Standard Professional Services Agreement- rev07/08 10 Task 3.1 Review Existing Data and Practices 3.1.1 Review Ordinances / Evaluate Opportunities to Improve Diversion The City's existing hazardous materials management policies, practices and programs will be reviewed and evaluated to determine opportunities to improve the management of hazardous materials in the City. This review will be coordinated with our broader consideration of options conducted as part of Task 5. As part of our review of the City's ordinances we will reference ordinances from other jurisdictions which we drafted or are familiar with that have been designed to support effective residential hazardous material management. This will include, but not necessarily be limited to ordinances in support of Extended Producer Responsibility and U-waste management. 3.1.2 Evaluate Metrics and Measurements R3 Project staff will evaluate the accuracy and effectiveness of the City's metrics and measurements for hazardous materials in the community. As appropriate, we will also review and comment on the County's HHW metrics and measurements, with specific attention to the tracking and reporting data for the County's Hazardous Waste Program that can be used for diagnostic benchmarking in support of hazardous materials management program improvements. Task 3.2 Document "Best Practices" R3 Project staff will identify and document Best Practices as they relate to the management of household hazardous waste. The R3 Project Team has worked with numerous jurisdictions that have implemented a wide range of HHW, E-waste, U-waste and EPR policies, practices, and programs. Those policies, practices and programs will be documented, along with others thatwe are aware of or that are identified as part of our project specific research, and will be included in the evaluation of options conducted in Task 5. Task 3.3 Summarize Emerging Issues R3 Project staff will summarize emerging issues of specific hazardous waste materials disposal i management (e.g., compact fluorescent light bulbs, electronic waste, mercury thermometers, etc.). Task 3.4 Evaluate Impacts of Emerging Hazardous Waste Needs on Trash Collection Services Certain options available to the City for the management of HHW and/or sub streams including E- waste and U-waste involve curbside collection of these materials either as part of existing curbside recyclables and/or bulky waste collection programs or through dedicated HHW, E-waste and/or U- waste collection programs. For this task we will evaluate the potential opportunities and impacts of such options as part of existing licensed hauler programs / requirements or through separate dedicated programs. Task 3 Deliverables: • Documentation and evaluation of the City's existing HHW data and practices; • Documentation of Best Practice options to be included in the Task 5 analysis; • Summary of emerging issues of specific hazardous materials/disposal management and evaluation of their impacts on trash collection services. Standard Professional Services Agreement- rev07/08 11 Task 4 Data Collection and Analysis Task 4.1 Establish Local Data R3 will use information from the City, local private trash haulers, and other public agencies (e.g., Larimer County and State) to establish local data on the amount and types of hazardous materials and hazardous waste that are being handled in Fort Collins. This data will be used as part of quantifying the impacts in Task 4.2. For purposes of characterizing and quantifying hazardous waste from commercial and industrial generators we propose to use City commercial and industrial tonnage data and the results of the Larimer County 2006 Waste Composition Study that includes the percentage of the Electronics and Hazardous Material in the commercial waste stream. Task 4.2 Evaluate Impacts Project staff will evaluate impacts to air quality, neighborhood safety, landfill and groundwater protection and natural habitat conservation that are related to hazardous waste. Task 4.3 Apply Concepts from Industrial Ecology R3 Project Staff will consider applying concepts from Industrial Ecology (i.e., Materials Flows Analysis) to pull data together in context of achieving community goals and optimizing efficiencies. Task 4 Deliverables: • Estimate the amount and types of household hazardous waste and CESQG hazardous waste that are being handled in Fort Collins; and • Evaluate impacts to airquality, neighborhood safety, landfill and groundwaterprotection and natural habitat conservation that are related to hazardous waste. Task 5 Research and Evaluate Options Task 5.1 Define Options The preliminary Draft List of Options developed as part of Task 2 will be expanded based on the work conducted in Task 3, Task 5.2, and this task resulting in a Final List of Options that will be evaluated in Task 5.3. The list of options will include, but not necessarily be limited to the following and will include an evaluation of benefits and cost of implementation: • Null alternative (no changes to existing system); • Changes and/or additions to regulations affecting hazardous materials/waste management; • New initiatives that could be implemented by the City to achieve exemplary levels of public safety from the risks of hazardous waste being released to the local environment. Our review of Extended Producer Responsibility will include City options for: • New regulatory options to address identified issues at the local level; and • New EPR related collection/drop-off programs. Standard Professional Services Agreement- rev07/08 12 Task 5.2 Identify Additional Alternatives R3 Project Team staff will draw upon our collective knowledge and experience, which we will supplement with additional research to identify additional alternatives to those identified in Task 5.1, with respect to improving residential hazardous materials management. Those alternatives will be included in the Final List of Options that are evaluated in Task 5.3. Additional alternatives to be considered may include, but are not limited to the following: • Technology innovations in the hazardous materials manufacturing industry, such as product stewardship initiatives, and in the waste collection and treatment industry, including but not limited to route planning software, and materials tracking software; • Regulation of hazardous materials manufacturers, waste generators, or collectors; • Regulations on the operation of hazardous waste collection and transport vehicles; • Improvements in source reduction programs that reduce the quantity of hazardous materials consumed, and the quantity of hazardous materials generated; and • Establishment of local environmental fee by City government to pay for hazardous waste management programs. Task 5.3 Evaluate Impacts of Each Option Each option defined in Task 5.1, along with additional alternatives identified in Task 5.2 will be evaluated for its benefits and costs of implementation. This analysis will be presented in the form of the Comparative Options Matrix along with supporting analyses and reference documentation as appropriate. Task 5.4 Present Options to City Council R3 will present the Comparative Options Matrix to City Council as part of a work session. It is hoped that this will provide the City Council with information about alternatives, and City Council will provide direction on which options are suitable for consideration as part of an Action Plan and inclusion in the Final Report (Task 6) Task 5 Deliverable: • Presentation of Comparative Options Matrix to City Council along with supporting analyses and reference documentation, as appropriate; and • Recommendations on which option(s) would be most feasible and/or effective forthe Cityto implement. Task 6 Meetings & Reports Task 6.1 Meetings R3 understands that the City's goal is to do much of the work for this project on-line and via conference call, to minimize travel time for consultants. Our project work scope and budget provides for our Task 2 Kick -Off Meeting, one (1) City Council presentation to present initial program options. To the extent that there is budget remaining, R3 will also be available to present our Final Report to Council. Standard Professional Services Agreement- rev07/08 13 Project staff will be available throughout the engagement via teleconferencing. We anticipate providing the City with electronic copies of various project related documents and drafts of project deliverables during the course of the engagement which will be reviewed and discussed with City staff on an ongoing basis throughout the course of the engagement. Task 6.2 Reports R3 will prepare a Draft Report of the analyses of the various options considered which includes: • Executive Summary; • Data analysis; • Pros / cons of each option selected for analysis; • A graphical representation of how each selected option addresses the issues of concern (i.e., air quality, public safety, landfill and groundwater protection and natural habitat conservation); • A specific action plan to implement the selected options as directed by City Council. We will then revise the Draft Report and issue a Final Report based on comments received from the City. Three (3) hard copies and an electronic copy of both the Draft and Final Report will be provided. Task 6 Deliverables: • One(1) Project Kick -Off Meeting (Task 2); • One (1) Meeting with City Council to present the Initial Program Options ; • Three (3) hard copies of Draft and Final Reports; and • One (1) electronic copy of Draft and Final Reports. • One (1) Meeting with City Council to present the Final Report, if budget is available. Standard Professional Services Agreement- rev07/08 14 EXHIBIT B INSURANCE REQUIREMENTS 1. The Professional will provide, from insurance companies acceptable to the City, the insurance coverage designated hereinafter and pay all costs. Before commencing work under this bid, the Professional shall furnish the City with certificates of insurance showing the type, amount, class of operations covered, effective dates and date of expiration of policies, and containing substantially the following statement: "The insurance evidenced by this Certificate will not be cancelled or materially altered, except after ten (10) days written notice has been received by the City of Fort Collins." In case of the breach of any provision of the Insurance Requirements, the City, at its option, may take out and maintain, at the expense of the Professional, such insurance as the City may deem proper and may deduct the cost of such insurance from any monies which may be due or become due the Professional under this Agreement. The City, its officers, agents and employees shall be named as additional insureds on the Professional's general liability and automobile liability insurance policies for any claims arising out of work performed under this Agreement. 2. Insurance coverages shall be as follows: A. Workers' Compensation & Employer's Liability, The Professional shall maintain during the life of this Agreement for all of the Professional's employees engaged in work performed under this agreement: 1) Workers' Compensation insurance with statutory limits as required by Colorado law. 2) Employer's Liability insurance with limits of $100,000 per accident, $500,000 disease aggregate, and $100,000 disease each employee. Commercial General & Vehicle Liability. The Professional shall maintain during the life of this Agreement such commercial general liability and automobile liability insurance as will provide coverage for damage claims of personal injury, including accidental death, as well as for claims for property damage, which may arise directly or indirectly from the performance of work under this Agreement. Coverage for property damage shall be on a "broad form" basis. The amount of insurance for each coverage, Commercial General and Vehicle, shall not be less than $500,000 combined single limits for bodily injury and property damage. In the event any work is performed by a subcontractor, the Professional shall be responsible for any liability directly or indirectly arising out of the work performed under this Agreement by a subcontractor, which liability is not covered by the subcontractor's insurance. Standard Professional Services Agreement- rev07/08 15 EXHIBIT C Billing Rates and Charges July 2008 — December 2008 Technical Services Principal $155 per hour Project Manager $155 per hour Consultant $155 per hour Senior Manager $145 per hour Manager $135 per hour Senior Associate $125 per hour Associate II $100 per hour Associate 1 $75 per hour Administrative Support $60 per hour Reimbursable Costs Consultants/Subcontractors cost Lodging and meals cost Travel — Private or company car $0.585 per mile, or as adjusted by the IRS Travel — Other cost Delivery and other expenses cost Payments Unless otherwise agreed in writing, fees will be billed monthly at the first of each month for the preceding month and will be payable within 30 days of the date of the invoice. Standard Professional Services Agreement- rev07/08 16 Section 4 Proposed Budget R3 proposes to perform our Work Scope as set forth in the Budget attached proposal for a not -to -exceed amount of $49,950. Table 1 below shows a break down of staff, hours and costs by task. Task' '. Schoon nitn 'Erwin Arco Doolevy Admin n Sanborn Cost Hears Print at Princi al M(r Sr Assoc $ 155.00 S 155.00 $ 135.00 125.00 60.00 1 S 125.00 1 Document Request/Review 4 2 5 930 6 2 Kick-Ofl Meeting 10 16 $ 4.960 32 3s Rovlow Oliy'E Q1ur0nt Policlas �. 3.1 Review Existing Data and Practices 8 4 12 $ 3,360 _24 _ 3.2 Documont'Oast Practices' 6 4 0__20 24 $ 8.440 64 3.3 Summarize Emerging issues 4 4 4 6 4 S 3,280 2.4 3.4 Evaluate HHW Impacts on Trash Collection Services 4 2 0 $ 1,930 14 A hDglo'Colioohpn alU f}nalysls , P 4.1 Establish A00cfato Data 4 16 S 2.620 20 4.2 Quantity Impacts 16 t6 $ 4,460 32 4.3 Apply Concepts of Industrial Ecology 4 S 620 4 6z Raseacrj and'Eveluala Oplipng 5.1 Define Options 4 4 12 8 $ 3.660 20 5.2 Identify Additional Allumatives 4 4 0 12 $ 3,660 20 5.3 Evaluate Impacts of Fact) Oplion 4 2 t0 4 S 2,640 20 6i Meolmgs & Roports, . .,.6. 6.1 Meetings 2, $ 1,650 10 6,2 RepoAaF, ' „24 Draft 16 2s 6 $ 3.150 Final Report 6 2 2 $ 1,670 12 Totnl Hours 112 30 22 110 a 52 342 Total Cost $ 17,360 S 5,890 $ 2,970 S 13.750 $ 480 $ 6.500 $46,050 Expenses= $ 3,000 TOTAL BUDGET= $49,950 Standard Professional Services Agreement- rev07/08 17 4. Design Project Indemnity and Insurance Responsibility. The Professional shall be responsible for the professional quality, technical accuracy, timely completion and the coordination of all services rendered by the Professional, including but not limited to designs, plans, reports, specifications, and drawings and shall, without additional compensation, promptly remedy and correct any errors, omissions, or other deficiencies. The Professional shall indemnify, save and hold harmless the City, its officers and employees in accordance with Colorado law, from all damages whatsoever claimed by third parties against the City; and for the City's costs and reasonable attorneys fees, arising directly or indirectly out of the Professional's negligent performance of any of the services furnished under this Agreement. The Professional shall maintain commercial general liability insurance Exhibit "B" in the amount of $500,000 combined single limits and errors and omissions insurance in the amount of $1,000,000. 5. Compensation. In consideration of the services to be performed pursuant to this Agreement, the City agrees to pay Professional on a time and reimbursable direct cost basis according to the following schedule: Hourly billing rates: Reimbursable direct costs: Principal $155 HR Project Manager $155 HR Manager $135HR Senior Associate $125HR Administrative $ 60HR as billed with maximum compensation (for both Professional's time and reimbursable direct costs) not to exceed Forty Nine Thousand Nine Hundred Fifty Dollars ($49,950), according to Exhibit "C" consisting of two (2) pages and incorporated herein by this reference. Monthly partial payments based upon the Professional's billings and itemized statements of reimbursable direct costs are permissible. The amounts of all such partial payments shall be based upon the Professional's City -verified progress in completing the services to be performed pursuant hereto and upon the City's approval of the Professional's reimbursable direct costs. The parties acknowledge that Ms. Heidi Sanborn is not a party to this agreement. However, the rates listed for services to be provided by Ms. Sanborn shall be the rate paid by the City to the Professional for these services. If the Standard Professional Services Agreement- rev07/08 2 amounts charged by Ms. Sanborn exceed the rates listed in Exhibit "C" the excess amount shall not be paid or owed by the City. The limitation on increases in prices set forth in section 4 herein shall apply to all rates listed in Exhibit "C" including subcontractor rates. Final payment shall be made following acceptance of the work by the City. Upon final payment, all designs, plans, reports, specifications, drawings and other services rendered by the Professional shall become the sole property of the City. 6. City Representative. The City will designate, prior to commencement of work, its project representative who shall make, within the scope of his or her authority, all necessary and proper decisions with reference to the project. All requests for contract interpretations, change orders, and other clarification or instruction shall be directed to the City Representative. 7. Project Drawings. Upon conclusion of the project and before final payment, the Professional shall provide the City with reproducible drawings of the project containing accurate information on the project as constructed. Drawings shall be of archival, prepared on stable mylar base material using a non -fading process to provide for long storage and high quality reproduction. "CD" disc of the as -built drawings shall also be submitted to the owner in an AutoCAD version no older then the established city standard. 8. Monthly Report. Commencing thirty (30) days after the date of execution of this Agreement and every thirty (30) days thereafter, Professional is required to provide the City Representative with a written report of the status of the work with respect to the Scope of Services, Work Schedule, and other material information. Failure to provide any required monthly report may, at the option of the City, suspend the processing of any partial payment request. 9. Independent Contractor. The services to be performed by Professional are those of an independent contractor and not of an employee of the City of Fort Collins. The City shall not be responsible forwithholding any portion of Professional's compensation hereunderforthe payment of FICA, Workers' Compensation, other taxes or benefits or for any other purpose. 10. Personal Services. It is understood that the City enters into this Agreement based on the special abilities of the Professional and that this Agreement shall be considered as an Standard Professional Services Agreement- rev07/08 3 agreement for personal services. Accordingly, the Professional shall neither assign any responsibilities nor delegate any duties arising under this Agreement without the prior written consent of the City. 11. Acceptance Not Waiver. The City's approval of drawings, designs, plans, specifications, reports, and incidental work or materials furnished hereunder shall not in any way relieve the Professional of responsibility for the quality or technical accuracy of the work. The City's approval or acceptance of, or payment for, any of the services shall not be construed to operate as a waiver of any rights or benefits provided to the City under this Agreement. 12. Default. Each and every term and condition hereof shall be deemed to be a material element of this Agreement. In the event either party should fail or refuse to perform according to the terms of this agreement, such party may be declared in default. 13. Remedies. In the event a party has been declared in default, such defaulting party shall be allowed a period of ten (10) days within which to cure said default. In the event the default remains uncorrected, the party declaring default may elect to (a) terminate the Agreement and seek damages; (b) treat the Agreement as continuing and require specific performance; or (c) avail himself of any other remedy at law or equity. If the non -defaulting party commences legal or equitable actions against the defaulting party, the defaulting party shall be liable to the non -defaulting party for the non -defaulting party's reasonable attorney fees and costs incurred because of the default. 14. Binding Effect. This writing, together with the exhibits hereto, constitutes the entire agreement between the parties and shall be binding upon said parties, their officers, employees, agents and assigns and shall inure to the benefit of the respective survivors, heirs, personal representatives, successors and assigns of said parties. 15. Law/Severability. The laws of the State of Colorado shall govern the construction, interpretation, execution and enforcement of this Agreement. In the event any provision of this Agreement shall be held invalid or unenforceable by any court of competent jurisdiction, such holding shall not invalidate or render unenforceable any other provision of this Agreement. Standard Professional Services Agreement- rev07/08 7 16. Prohibition Against Employing Illegal Aliens. Pursuant to Section 8-17.5-101, C.R.S., et. seq., Professional represents and agrees that: a. As of the date of this Agreement: 1. Professional does not knowingly employ or contract with an illegal alien who will perform work under this Agreement; and 2. Professional will participate in either the e-Verify program created in Public Law 208, 104th Congress, as amended, and expanded in Public Law 156, 108th Congress, as amended, administered by the United States Department of Homeland Security (the "e-Verify Program") or the Department Program (the "Department Program"), an employment verification program established pursuant to Section 8-17.5-102(5)(c) C.R.S. in order to confirm the employment eligibility of all newly hired employees to perform work under this Agreement. b. Professional shall not knowingly employ or contract with an illegal alien to perform work under this Agreement or knowingly enter into a contract with a subcontractor that knowingly employs or contracts with an illegal alien to perform work under this Agreement. C. Professional is prohibited from using the e-Verify Program or Department Program procedures to undertake pre -employment screening of job applicants while this Agreement is being performed. d. If Professional obtains actual knowledge that a subcontractor performing work under this Agreement knowingly employs or contracts with an illegal alien, Professional shall: 1. Notify such subcontractor and the City within three days that Professional has actual knowledge that the subcontractor is employing or contracting with an illegal alien; and 2. Terminate the subcontract with the subcontractor if within three days of receiving the notice required pursuant to this section the subcontractor does not cease employing or contracting with the illegal alien; except that Professional shall not terminate the contract with the subcontractor if during such three days the subcontractor provides information to establish that the subcontractor has not knowingly employed or contracted with an illegal alien. e. Professional shall comply with any reasonable request by the Colorado Department of Labor and Employment (the "Department") made in the course of an investigation that the Department undertakes or is undertaking pursuant to the authority established in Subsection 8-17.5-102 (5), C.R.S. Standard Professional Services Agreement- rev07/08 5 f. If Professional violates any provision of this Agreement pertaining to the duties imposed by Subsection 8-17.5-102, C.R.S. the City may terminate this Agreement. If this Agreement is so terminated, Professional shall be liable for actual and consequential damages to the City arising out of Professional's violation of Subsection 8-17.5-102, C.R.S. g. The City will notify the Office of the Secretary of State if Professional violates this provision of this Agreement and the City terminates the Agreement for such breach. Standard Professional Services Agreement- rev07/08 THE CITY OF FORT COLLINS, COLORADO D —g- Jo II, CPPO, FNIGP hDirector rcasinng& �Risk Management DATE: R3 Consulting Group, Inc. By: Title: - CORPORATE PRESIDENT OR VICE PRESIDENT Date: i u A E (Corporate Seal) Corporate Secretary Standard Professional Services Agreement- rev07/08 EXHIBIT A SCOPE OF SERVICES Project Objective The overall project objective is to prepare a comprehensive study that answers the following problem statement/question: "By analyzing the way hazardous materials are currently managed in Fort Collins, the City will identify the optimal systems and associated resources necessary to protect the health, welfare, and natural environment of Fort Collins citizens from hazardous waste impacts." To achieve this objective we will: 1.. Review the City's current policies and programs for protecting the local community and environment from hazardous waste pollution; 2. Supply data and analysis to assess the impacts of hazardous materials in the community; 3. Provide a list of options for making improvements to the current system in terms of hazardous waste collection and management, and for implementing source reduction measures for hazardous waste; 4. Present the initial list of program options and alternatives to City Council for discussion and direction; 5. Conduct additional analysis on the specific options as directed by City Council; and 6. Development of an action plan for the selected options. The purpose of the study is to focus on hazardous waste generated by residential sources. However, hazardous waste from conditionally exempt small quantity generators (CESQG) will also be characterized and quantified in this study, to the extent information is available. Scope of Work Task 1 Information Request Upon authorization to proceed, R3 will provide the City with a preliminary list of documents in support of the Hazardous Materials Study. Requested documents may include, but not necessarily be limited to the following, as available (Note R3 has already obtained certain of the following documents): • City Municipal Code and ordinances related to hazardous waste (e.g., E-waste Ordinance); • Larimer County 2006 Waste Composition Study; • Larimer County HHW facility data; • List of available HHW grant funding opportunities; • List of local HHW collection options (e.g., Used oil collection centers, E-waste recycling options, etc.); • Summary of methods / programs currently used to manage hazardous materials in the City; Standard Professional Services Agreement- rev07/08 9 • Summary of any specific issues or concerns that relate to hazardous materials or hazardous materials management in the City; • City metrics and measurements for hazardous materials in the community; • Relevant background reports and documents; and • Other relevant data. Task 2 Meetings Task 2.1 Kick -Off Meeting R3 Project Staff will hold a Kick -Off Meeting with City staff within two weeks of receipt of authorization to proceed. The purpose of the Kick -Off Meeting will be to review and discuss/confirm the following: • Project communication protocol and contacts; • Project objectives; • Project work scope and deliverables; • Schedule and format for deliverables; • Data availability; • Opportunities for incorporating Industrial Ecology concepts into the project deliverables; and • Additional data needs and any other key issues. • Refine project objectives / focus; particularly with respect to the extent that the City wishes to characterize and quantify issues related to commercial and industrial HW. These discussions will help ensure a successful project by clarifying the objectives and expectations of the City. In addition, a major objective of the Kick -Off Meeting is to gain a better understanding of the City's primary project objectives and the level of importance it places on various project tasks (e.g., characterizing and quantifying hazardous waste from commercial and industrial generators, applying concepts of Industrial Ecology). This will allow us to focus our efforts on those areas thatwill provide the City with the best possible work product. Task 2.2 Follow -Up Staff Meetings Immediately following the Kick -Off Meeting R3 Project Staff will hold meetings with appropriate City staff to, among other things: • Review City's current policies, practices and programs in detail (in support of Task 3 below); and • Review relevant analysis conducted to date (in support of Task 4 below) R3 will also prepare an initial Draft List of Options for consideration by the City during the Kick -Off Meeting. The options will be presented in the form of a Comparative Options Matrix that will provide a format for presenting the analysis of how each option addresses various issues of concern including: Standard Professional Services Agreement- rev07/08