Loading...
HomeMy WebLinkAbout109888 - PURCHASE ORDER - 8854512Date: 08/04/08 City of Fort Collins 6 Page Number: 1 City of Fort Collins Purchase Order Number: 8854512 Delivery Date: 08/01/08 Buyer: DICK,OPAL Purchase Order number must appear on invoices, packing lists, labels, bills of lading, and all correspondence. Note: Line Qty/Units Description Extended Price 1 8" & 10" SANITARY SEWER MAIN CURED IN PLACE PIPE Total order is rVQjhalid over $5000 unless signed by James B. O'Neill II, CPPO City of Fort Collins Purchasing, PO Box 580, Fort Collins, CO 80522-0580 220,000.00 $220,000.00 City of Fort Collins Accounting Department PO Box 580 Fort Collins, CO 80522-0580 EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS AND Insituform Technologies Inc. DATED: July 1, 2008 Work Order Number: Purchase Order Number: Project Title: City of Fort Collins P-763 Cured In Place Pipe Sanitary Sewers Commencement Date: Aucust 18 2008 Completion Date: September26,2008 Maximum Fee: (time and reimbursable direct costs): $220,000,00 Project Description: Cured in Place Pipe 400 blk. Clover Ln. 8" 244' —1100 Blk. Cherry St. 8" 413'-1000 Blk Cherry St. 8" 430' — 400 Blk. N. Shewood St. 8" 490' — 200 Blk. W. Oak St. 8" 227' — 900 Blk. Rocky Rd. 8" 164' — 500 Blk. S. Shields St. 8" 292' — 600 Blk. Remington St. 8" 628' — 200 Blk. E. Laurel St. 8" 43' —1600 Blk. Buckeye St. 8" 412' —1900 Blk. Leicester St. 8" 642' — 500 Blk. Dartmouth Tr. 8" 397' — 2900 Blk. Eagle Dr.B" 367' — 2800 Blk. Tulane 10" 597' — 2600 Blk, Tulane 10" 303' Scope of Services: Insitutube 0.21 nominal wall thickness, based on 400,000 PSI Modulus Certificate of Insurance as indicated in Contract Mobilization and demobilization All work to be done following Insituform Safety Policies and Practices in addition to the requirements of OSHA, A copy of the Safety Policy will be available upon request. Pipeline cleaning of debris as defined by NASCO; other cleaning service provided at an additional cost when all site conditions are known. Preliminary video inspection to document existing pipe condition prior to reconstruction Mainline Bypass during CIIP installation Insitutube pipe installed complete including curing and finishing As -built video inspection and video tape Proper Traffic Control for the work site as provided by the City of Fort Collins Traffic Operations Superintendent Coordination and notification with project manager, residents, homeowners association, water districts, including letters and flyers prior to installation Coordination with appropriate water district to operate fire hydrants during installation Daily Fax notification to Project Manager of work to be completed on that day Project pre -construct meeting with Project Manager Standard one year Warranty All service connections will be reopened internally using the Insitucutter (service connections will be left sealed only upon written direction from the Owner, and in such event, Owner will indemnify and hold contractor harmless from all backup claims arising there from.) Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. The attached forms consisting of Exhibits _, consisting of _ (_) pages are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Professional: H.Douglas Thomas,VP-Global Procurement/ Date: July 16, 2008 Operations Support City of Fort Collins Submitted By: G7/ u rd Date: Approved by: �/ Water Engin ring & Fi Date: �/3/0 S Approved by: l _ O'Pz U Y (-,a P- Director of ;teasing & Risk Management Date: (if over $30,000.) _7 ) % �