Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutWORK ORDER - BID - 5911 MISCELLANEOUS CONCRETE PROJECT (2)EXHIBIT ' All
WORK ORDE1t FORM
PURSUANT TO AN AGREEMENT BETWEEN
Tl3E CITY OF FORT COLLINS
AND
ExrRESS CONCRETE
Dated 7/t5/2008
Work Order Number PP7152008
Purchase Order Number
, q 67D
,5%S
Project Title Stewart Case Yank Concrete
Commencement Date 7/15/2008
Completion Date 7131/2008
Maximum Fee (tune & reimbursable direct costs) $7,819 88
project Description loops to Andudc an wort ncce wy lu Nl"e nfully remove and mplace front �ntrana imp and
conunumon of exporad aayrcyare 6nadm5 aro'u'd artwork
Scope of Services See attached proposal Terms and rates for the City s current contract bid with
Express Concrete to apply for this work
Acceptance Park Planning& Development
User
Service provider agrees to perform the services
identified above and on the attached forms in
accordance with the terms and conditions contained
herein. and in the Services Agreement between the
parties In the event of a conflict between or
ambiguity in the terms of the Services Agreement
and this work order (including the attached forms)
the Services Agreement shall control
Service Provider
Date 0V /A lob
CC Purchasing
The attached forms (prapasal) consisting of one
11) page are hereby accepted and mcomorated
bereui by this reference, and Notice to Proceed is
hereby given.
City of Fort Collins
Date
Director of Purchasmb and Risk Management
if over $60,000
TQ tTa ?ny.a 9896ZZ9L6-L6FLZE99L6 ZZ �� SPBZ/67 i'H
Matt Day Stewart case park As
Page 1
znt �rC Ina
CONCflETE fNC.
Date 14 Jul 08
ATTN Matthew Day
i Stewart Case Park
TOTAL $611 Lot
TOTAL 1 $2 512 62�
Grand Total $7 819 88
GENERAL CONDITIONS
1 Unless othewase agreed to QUANTITIES are ESTIMATED and billings will be made from mEasured
field g antes
2 All grades are to be I i Tenth (0 1 feet) from finished subgrade Grading of subgrade to be
coordloaled with Excavating Contractor including bai it of medians
3 This proposal does not Include any excavation or regrad ng in excess of the limits of IQ
4 Th s proposal does not include winmrweathe protection uniessethervdseshein
5ThsproposaldoetinotisinnPermllsaFees Treated UContrttl Dewatenngoe ning(drost esign
stakingofgredes etc) Test ng(Solis or Concrete) Inteedsor FUWres
(excspt as noted) g
6 Th c proposal does not Phil any sawcutting or asphalt and concrete removal unless specified above
7 This proposal and the prices within are good for 38 days from receipt
6 Terms NET 30 days after lnvoleleg da within 30 days after scheduled progress sobmdtal
9 Rate rage to De neased w thin 30 days after completion of scope of work and punch list cams
10 Th a proposal to be attached or made part of any contract made or agreement reached .,is ng from
this proposal
Submitted Date 1a dui 0B
Stephan Pritchard
Express Concrete Inc
Express Cu at. In 53MDaller Rd Fob Ps GO aaG2M539 Ph g1622 1281 FA 97022408a6
Hatt Day Stewart Case Park
Page -I
CONCRIM INC
Express Concrete Inc
PO Box 273209
Ft Collins, CO 80527
Bill To
City of Ft. Collins Misc Contract
Park Planning
Attn Matthew Day
�f=
a
Date
72120oa
Invoice #
ua P h
ECI Job
Stewart Case i' rk
Client Job N
Terms
Due Date
820200Y
Item
Description
Quantity
1
Remove Concrete Flatwork
426
2
4 Flatwork
500,
3
1 Additional Flatwork
500
4
Expose Aggregate
441
6
Remove Concrete Sidewalk
257
6
6 Concrete Flatwork
380
7
Truncated Domes
12
8
Fibermesh
is,
Phone 970 225 1287
PAX 970.229 0846
Unit Price Extension
236
1 00300
287
1 43500
057
28600
586
2 584 26
236
60652
346
1 31480
4270
51240
526
7890