Loading...
HomeMy WebLinkAboutWORK ORDER - BID - 5844 STREETSCAPE MAINTENANCE (2)07/30/2008 10 52 9705687635 07/30/2006 WED 11 0B rAR PAGE 01/01 ®0a1/001 Work Order Number Pw chase Order Numbel Project 1 itle Commencement Date FXHIBIT "A WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN Tic CITY OF FORT COLLINS AND kmb 'y 5nA Dated 5 ul lug 4t ceh t rnd Sidewalk etntnechon f�� PtvtsDCct Road 7/30206S Completion Date 8182008 Maximum ree (time & ren»bursabie dnect costs) g7 153 SK Project Descnlptlon Sulpe in nrclulc dl ivolk neee„ uy to SU(,cLNSI11IIy Mnni c exwluw ui igauen rcgi We and ICI utdtielrpL III di4turbLd ire iv rtung,ideii ilk to Intl colmeauon fd 1>mspeU 12oad 14 Spi mg (i eck 1 nut Scope of Services Sit ulnultctf one (1) p tge(e) of uvspe fnr dUad, I ci inx and r ilt.� lot the (. uy t cin rem rontraU bid ii nh Kmbj � Stx1 to apply Inr tlus woi k Acceptance (11 Put, I. D opmcnt User Service Providei agrees to perform the sevrces Identified above and on the attached feima In accordance with the tams and eonditinne contained herein and in the Services Agreement between the panties in the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached Pomrs) the Services Agreement shall conhril Scrvlcc Provider By t� L Date t �30 1Q CC Purchasing The attached forma consisting of nnc (1) page(a) ire hereby accepted and incorporated herein by thls refeence, and Notice in Proceed is hereby given uty of Fort Collins Director of Purchasing and Risk Management If over $30 000 Landscape Quote Date Estimate # 7/23/2008 7133 I Name / Address I ATTN Jason Stutzman City Of Ft Collins Accounting Depatment P O BOX 580 Fort Collins CO 80522 0580 PO No Terms Due Date Project Net 20 8/12/2008 Prospect & Timberline Description Qty Cost Total Soil preparation and fine grading 1 100 0 14 15400 Compost/Topsoil per cubic yard placed 5 deep 3 6180 18540 Bluegrass sod installed 1 000 030 30000 Soil preparation and fine grading 2 400 0 14 33600 Compost/topsoil 5 deep 8 6180 49440 Tall FESCUE sod installed 2 400 036 86400 LABOR CHARGES FOR THE CITY OF FORT 6 3605 21630 COLLINS for pinning sod & pins PVC PIPE CL200 BE 1 860 107143 92143 Labor charges for irrigation operations per hour 20 3605 72100 Trucking & Hauling Charge 2 61 80 12360 RB 5004 ROTOR AP/AC W/SAM 30 2800 84000 RB SWING ELL BARB * 3/4 60 023 1380 RB SWING PIPE 1/2X100 100 0 18 1800 SCH 40 PVC TEE 1 * 1 * 1/2 sLIP 30 163867 4916 SCH 40 PVC 90 ELBOW 1*1/2 S*F 4 129 5 16 RB I PE -PLASTIC VALVE 2 4745 9490 Irrigation Parts miscellaneous 1 15000 15000 LABOR CHARGES FOR THE CITY OF FORT 25 3605 90125 COLLINS Equipment Charge Hourly trencher small 4 5150 20600 Mobilization charges 1 65945 65945 Thank you for your business Sales Tax (6 7%) $0 00 Total $7 253 85 Signature