Change Order Form
PROJECT TITLE: 2008 Street Maintenance Program
PROJECT NUMBER: 320200-(Concrete Project - Bid #6046)
CONTRACTOR: ,.Vogel Concrete (PO #8851920)
CHANGE ORDER NUMBER: 2
1: Reason for change. 2. Description of
3. Change in contract cost. 4. Change jrl
1.&2. See attached invoice for details
3. The contract cost will increase by $28,204.20
4. There is no change in contract time.
ORIGINAL CONTRACT COST
$1,383,689.52
TOTAL APPROVED CHANGE ORDERS
$12,841.19
TOTAL PENDING CHANGE ORDERS
$0.00
TOTAL THIS CHANGE ORDER
$28,204.20
TOTAL % OF THIS CHANGE ORDER
2.04%
TOTAL C.O. % OF ORIGINAL CONTRACT
2.97%
ADJUSTED CONTRACT COST
$1,424,734.91
ACCEPTED BY
REVIEWED BY'.
SUBMITTED Bti
(Project Manager - Engineering)
DATE: `I - L-I -0 9
APPROVED BY: DATE:
(Purchasing Agent over $60,000)
cc: Contractor
Purchasing
Project File
Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605
Change Order No.: 2
Date: 7/3/2008
1. Reason For Change:
a. Additional concrete repairs on Remington (Prospect to Parker)
2. Description Of Change:
a. Additional concrete removal between Prospect & Parker, west side of Remington
due to grade
adjustments
3. Change In Contract Amount:
Item
Qty
Unit
Unit Cost
Total Cost
a. 304.01 Aggregate Base Course
10
TON
$ 27.60
$
276.00
403.01 Temporary Patching
42
TON
$ 189.15
$
7,969,50
608.01 Remove Concrete
78
SF
$ 1.60
$
124.02
608.03 Remove & Replace Apron
46
SF
$ 7.10
$
326.60
608.08 Vertical Curb & Gutter - No Sidewalk - Remove & Replace
95
LF
$ 26A7
$
2,514.65
608.11 Hollywood Curb, Gutter & 6" Sidewalk - Remove & Replace
291
LF
$ 35.64
$
10,371.24
608.17 Flatworl( 4" - Remove & Replace
271
SF
$ 5.18
$
1,401.97
608.18 Flatwork &'- Remove & Replace
484
SF
$ 5.95
$
2,879.80
608.19 Replace Flatwork - V Additional Depth
269
SF
$ 0.68
$
182.92
630.04 Type I / It Barricade Without Light
250
EA
$ 0.63
$
157.50
630.17 Flagging
100
HR
$ 20.00
$
2,000.00
TOTAL CHANGE IN CONTRACT AMOUNT
TOTAL
$
28,204.20
4. Change In Contract Time
a. There is no change in contract time.
TOTAL CHANGE IN CONTRACT TIME
0 Days