Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 6034 CONCRETE STREET MAINTENANCE PROJECTCity of Fort Collins Engineering Department ,a Change Order Form PROJECT TITLE: 2008 Street Maintenance Program PROJECT NUMBER: 320200-(Concrete Project - Bid #6046) CONTRACTOR: ,.Vogel Concrete (PO #8851920) CHANGE ORDER NUMBER: 2 1: Reason for change. 2. Description of 3. Change in contract cost. 4. Change jrl 1.&2. See attached invoice for details 3. The contract cost will increase by $28,204.20 4. There is no change in contract time. ORIGINAL CONTRACT COST $1,383,689.52 TOTAL APPROVED CHANGE ORDERS $12,841.19 TOTAL PENDING CHANGE ORDERS $0.00 TOTAL THIS CHANGE ORDER $28,204.20 TOTAL % OF THIS CHANGE ORDER 2.04% TOTAL C.O. % OF ORIGINAL CONTRACT 2.97% ADJUSTED CONTRACT COST $1,424,734.91 ACCEPTED BY REVIEWED BY'. SUBMITTED Bti (Project Manager - Engineering) DATE: `I - L-I -0 9 APPROVED BY: DATE: (Purchasing Agent over $60,000) cc: Contractor Purchasing Project File Engineering Department • 281 North College Avenue • P.O. Box 580 • Fort Collins, CO 80522-0580 • (970) 221-6605 Change Order No.: 2 Date: 7/3/2008 1. Reason For Change: a. Additional concrete repairs on Remington (Prospect to Parker) 2. Description Of Change: a. Additional concrete removal between Prospect & Parker, west side of Remington due to grade adjustments 3. Change In Contract Amount: Item Qty Unit Unit Cost Total Cost a. 304.01 Aggregate Base Course 10 TON $ 27.60 $ 276.00 403.01 Temporary Patching 42 TON $ 189.15 $ 7,969,50 608.01 Remove Concrete 78 SF $ 1.60 $ 124.02 608.03 Remove & Replace Apron 46 SF $ 7.10 $ 326.60 608.08 Vertical Curb & Gutter - No Sidewalk - Remove & Replace 95 LF $ 26A7 $ 2,514.65 608.11 Hollywood Curb, Gutter & 6" Sidewalk - Remove & Replace 291 LF $ 35.64 $ 10,371.24 608.17 Flatworl( 4" - Remove & Replace 271 SF $ 5.18 $ 1,401.97 608.18 Flatwork &'- Remove & Replace 484 SF $ 5.95 $ 2,879.80 608.19 Replace Flatwork - V Additional Depth 269 SF $ 0.68 $ 182.92 630.04 Type I / It Barricade Without Light 250 EA $ 0.63 $ 157.50 630.17 Flagging 100 HR $ 20.00 $ 2,000.00 TOTAL CHANGE IN CONTRACT AMOUNT TOTAL $ 28,204.20 4. Change In Contract Time a. There is no change in contract time. TOTAL CHANGE IN CONTRACT TIME 0 Days