Loading...
HomeMy WebLinkAboutCORRESPONDENCE - BID - 6090 THREE PHASE LARGE OUTDOOR 115KV POWER TRANSFORMERS (3)Jennie Beck Fwd City of Fort Collins Maintenance Warranty Addendum (Re PO# 8854470 WES# W026565& W02658B)ge 1 From Bob HOVER To tbeck@fcgov corn Date 7/30/2008 10 30 21 AM Subject Fwd City of Fort Collins Maintenance Warranty Addendum (Re PO# 8854470 WES# W026565& W026566) Please fax back to Kelly Thanks' Bob Hover Electric System Design Manager Fort Collins Utilities P O Box 580 Fort Collins Colorado 80521 (970)221 6725 bhover@fcgov corn >>> <Kelly Smith@Waukesha spx com> 7/30/2008 9 49 AM >>> Hi Jim Can you please sign the attached Maintenance Warranty Addendum and return it to us as soon as you get a chance'? Thank you' Have a great day' Kelly A Smith Waukesha Electric Systems 400 S Prairie Ave Waukesha WI 53186 1 800 835 2732 direct 262 513 5410 fax 262 521 0198 Kelly Smith(a)Waukesha spx com Forwarded by Kelly Smith/Waukesha/SPX on 07/30/2008 10 42 AM yi _� L `Y 1 Opal Dick Re Req Transformer Page 1 From Bob HOVER To Opal Dick Date 7/24/2008 5 07 12 PM Subject Re Req Transformer a.. The req was given to Shannon last Wednesday was already approved by Brian and Steve and Shannon entered it into the system Waukesha has been calling and wondering why we have not issued the P O yet They had agreed to hold their price until the appropriation approval on July 15 Would you please have someone approve it and send it to them by tomorrow if at all possible because their project engineer is leaving on vacation and needs to enter it into their system to get production going Shannon says the P O that she entered has been waiting in the system for approval because Terry is gone Can we get the P O approved and issued tomorrow and a mailed/faxed to them? Thanks for your help' Bob Hover Electric System Design Manager Fort Collins Utilities P O Box 580 Fort Collins Colorado 80521 (970) 221 6725 bhover@fcgov com cc Shannon Gallegos Steve Catanach