Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRESPONSE - BID - 6102 PLUMBING SERVICES ANNUAL 2008No Text
6.0 Bid Schedule: Bid # 6102, Plumbing Services
Bidder must be prepared, if requested, to produce proof of personnel qualifications and to provide
an inventory of bidder -owned equipment which would be used in performing City work.
6.1 Direct Labor Rates
Journeyman: Regular rate $ . oC9 Overtime rate $ Ue3. OLD
Apprentice: Regular rate $ E3 , oc'Zg Overtime rate $ 9 D, eX
6.2 Materials Markup
The maximum materials markup the City will pay is 10% for materials costing less than $1,000 and
8% for materials costing more than $1,000.
Enter your bid material markup rates: Material costing less than $1,000 IB
Material costing more than $1,000
Material cost information must be included with any billing statement
6.3 Trip Charge
Amount of trip charge, per paragraph 4, above. $ d— .
7.0 Method of Award
Award will be based on the lowest total cost for the work listed below and on the bidder meeting the
requirements of the attached Services Agreement.
Calculate the costs for the work listed below using Bid Schedule pricing. Work to be done during
normal work hours except as noted.
1. 16 hours x $ S . OcC) (Journeyman rate, regular hours) $ Z 3J • 0L
2. 12 hours x $ 32, .oa (Apprentice rate, regular hours) $ 38y. Z�
3. 5 hours x $ 1.P3, CDC) (Journeyman rate, overtime hours) $ 16 • o'c�
4. 4 hours x $ q DI C0 (Apprentice rate, overtime hours) $ ) Lob � C7C
5. Materials: $800 x a 8 % (material markup) $ $ LPY , 0C)
Total $ 2 t,o S ( • �
Signature: °�
'_`r �� i /
Title:
Print Name
tk)) \koVVi
Wr, V". -
�eol.-e-v..
Company Nam
rd
r a u n iOfi
Date: 2
�J
Street: 1SSl.p
tl 1 l,.QvS OC-� GY.r-�-�--
Phone#: 9Zo-LI VLi- DiC®LI
City/State/Zi
�tllr�s,
Fax #:
qZo `l8y_oeL�