Loading...
HomeMy WebLinkAboutWORK ORDER - RFP - P1107 GEOTECHNICAL TESTING SERVICEEXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN THE CITY OF FORT COLLINS and / ) CTL Thompson, Inc. DATED: June 9, 2008 Work Order Number: 15-41082028-08 Project Title: US 287/South College Bikelanes Project Commencement Date: June 16, 2008 Completion Date: October 16, 2008 Maximum Fee: (time and reimbursable direct costs): not to exceed $ 5,850.00 Project Description: Constriction Observation & Materials Testing. Scope of Services: Construction observation and materials testing on the US 287/8. College Bikelanes between Harmony Rd, and Carpenter Rd. Per Proposal No. FC 08-0351 R. Service Provider agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Services Agreement between the parties. In the event of a conflict between or ambiguity in the terms of the Services Agreement and this work order (including the attached forms), the Services Agreement shall control. Service �PProviderce///A'n/ X��" Date: June 9, 2008 Approved By:_ Purchasing Agent over $60,000 The attached forms consisting of three (3) pages are hereby accepted and incorporated herein by this reference, and Notice to Proceed is hereby given, City of Fort Collins By. Date: June 9, 2008 May 29, 2008 Revised June 2, 2008 City of Fort Collins Engineering Department 281 N. College Avenue P.O. Box 580 Fort Collins, Colorado 80522-0580 Attention: Mr. Kyle Lambrecht, PE Project Manager Subject: Fee Estimate for Construction Observation and Materials Testing Services US 287/South College Avenue Bike Lanes US 287 Between Harmony Road and Carpenter Road Fort Collins, Colorado Proposal No. FC 08-0351 R At your request, CTLIThompson, Inc. is pleased to provide this revised fee estimate for Construction Observation and Materials Testing services for the US 287/South College Avenue Bike Lanes project located on US 287 between Harmony Road and Carpenter Road in Fort Collins, Colorado. We understand testing should be performed in accordance with CDOT standards and specifications. We have revised our initial fee estimate to increase our estimated number of site visits and laboratory tests based on a better understanding about the project scope. We appreciate your time to discuss the scope of your project over the phone. We also reviewed a portion of the construction drawings and project specifications for our use in preparation of our estimate. We understand this project includes construction of approximately 600 lineal feet of concrete bike path, a driveway for Pioneer Sand and Gravel, and two retaining walls. We anticipate that the city will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms and conditions of our professional services agreement with the City of Fort Collins and are presented below. Earthwork: Compaction testing will be required for bike path subgrade and retaining wall backfill. We estimate two site visits for the bike path subgrade and eight site visits for the retaining walls fora total of 10 site visits. Engineering Technician Standard Proctor Atterberg Limits Gradation 10 days x 3 hrs/day x $55/hr $1,650,00 6 tests x $80/ea $480.00 6 tests x $60/ea $360.00 6 tests x $60/ea $360.00 Subtotal: $2,850.00 351 Linden Street I Suite 140 1 Fort Collins, Colorado 80524 Telephone: 970-206-9455 Fax: 970-206-9441 Concrete Testing: Concrete testing will be required for the bike path, ramp, and retaining walls. We estimate 15 concrete tests consisting of 5 cylinders each will be necessary. Concrete Cylinders 15 tests x $160/test $2,400.00 Extra Concrete Cylinders 15 cylinders x $9/cylinder $135.00 Subtotal: $2,535.00 Asphalt Testing: Asphalt testing will be required for the drive access for Pioneer Sand and Gravel. We estimate one visit will be necessary. Senior Engineering Technician 1 day x 4 hrs/day x $55/hr $220.00 Lab Density (Rice) 1 tests x $85 /ea $85.00 AC Content/Gradation 1 tests x $160/ea $160.00 Subtotal: $465.00 TOTAL ESTIMATED FEE: $5,850.00 It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner, contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL ( THOMPSON, INC. N W, AdAW Eric D. Bernhardt, PE Manager of Field Services CITY OF FORT COLLINS US 267/SOUTH COLLEGE AVENUE SIRE LANES CTL I T PROPOSAL NO. FC-0"351 R