joXcelEnergy METERING AGREEMENT
1901 East Horsetooth Road
Fort Collura Colondo 80525
This Customer Metering Agreement ( this Agreement ) is entered Into as of the date set forth
below (the Effective Date ) by and between Xcel Energy ( Xcel Energy formerly Public Service
Company of Colorado ) a Colorado corporation ("Xcel Energy") and Xcel Energy customer
named below ( Customer )
WHEREAS Xcel Energy sells natural gas to Customer for Customer's commercial
operation and
WHEREAS Xcel measures Its supply of gas to Customer using one or more gas meters
('Xccl Energy Meters) and
WHEREAS Customer desires more detailed information with more convenient access,
concerning Customer's use of gas than is available from the Xcel Energy Meters and
WHEREAS, and electronic solid state pulse initiator (a Pulse Initiator ) when installed on a
Xcel Energy Meter and attached to Customer's energy totalizer or other measuring
equipment ( Customer Measuring Equipment) will provide the gas consumption Information
needed by Customer and
WHEREAS, Xcel Energy desires to accommodate Customers desire for greater more
convenient information concerning Customers consumption of gas while maintaining all
appropriate gas safety practices
NOW THEREFORE in consideration of the forgoing and of the mutual covenants set for the
below the parties agree as follows
1 Installation of Pulse Initiators Upon request of Customer from time to time Xcel Energy
shall install a Pulse Initiator on any or all of the Xcel Energy Meters on Customer's
premises Xcel Energy shall purchase for such purpose any Pulse Inibator designated by
Customer from time to time subject to Xcel Energy approval, not to be unreasonably
withheld
2 Payment t Xcel Enerav For each Pulse Initiator purchased and installed by Xcel Energy
for Customer Customer promptly shall () reimburse Xcel Energy for the cost of the Pulse
Initiator and (li) pay to Xcel Energy a reasonable fee for installation service Xcel
Energy s estimate of the combined charge for a Pulse Initiator and its installation as of the
Effective Date is set forth below
Installation of Customer Ecuipment For each Pulse Initiator Installed by Xcel Energy
Customer shall install (a) its own Customer Measuring Equipment and (b) a safety barrier
designed to prevent electrical surges and arcing (the Safety Barrier") between the
Customer Measuring Equipment and the Pulse Initiator, If an Isolated Input can not be
provided All Customer Measuring Equipment and the Safety Barer shall be purchased
by Customer The Safety Barrier may be any intrinsically safe Class I III Div I
applicable Grade A G hazardous location device, the particular brand of which shall be
selected by Customer but shall be subject to Xcel Energy approval not to be
unreasonably withheld An approved brand of Safety Barrier as of the date of this
Agreement is set forth below Customer shall run conduit and signal cable to the Xcel
Energy Meter If the Xcel Energy Meter is enclosed from atmosphere the conduit shall
have a sealing Y" inside the enclosed meter room to prevent gas travel through installed
conduit Customer shall not attach the Pulse Initiator to the Safety Barrier and the
Customer Measuring Equipment until such time as Xcei Energy shall have inspected and
approved the configuration and installation of the Safety Bamer provided that 0 Xcel
Energy shall fail to inspect the Safety Barrier following ten (10 ) business days notice
from Customer that the Safety Barrier is ready for inspection Xcel Energy automatically
Oct 13 200o "/ 1 A XCP FORT COLLIN)
No 0229 4
Henderson CO 80640 Fax (303)628 2855
If to Customer Customer s address and facsimile number set forth below
All notices shall be deemed delivered on the second business day following deposit in the
US mails
9 Miscellany
a This Agreement sets forth the entire understanding of the parties with respect to its
subfect matter and all prior related negotiations and agreements are merged herein
This Agreement may not be amended and no provision hereof may be waived absent
writing signed by the party against whom enforcement of the amendment or waiver is
sought
b This Agreement shall be governed by the laws of the State of Colorado
c This Agreement shall bind and inure to the benefit of the parbes and their respective
heirs successors and assigns
Effective Date
Estimated Purchase and Installation s 00 coo
Charge for Pulse Initiator $ �J Per meter
Safety Barrier Required? YES _NO
Customers Address and Fax Number for Notices
Approved Barrier,
Fax Number
Xcel Energy Customer
Xcel Energy of Colorado �z �—�t Q �✓�— C 3 �_Cii
(print name of company)
By B
Title T Uffdsignature _ p