Loading...
HomeMy WebLinkAboutPrebid - BID - 6099 DRAKE ZIEGLER IMPROVEMENT PHASE III (2)DRAKE/ZIEGLER IMPROVEMENT PROJECT PHASE 3 PRE -BID CONFERENCE APRIL 17, 2008 100PM 281 N College Ave Conference Room A City of Fort Collins Engineering Dept Street Oversizmg Program INTRODUCTIONS ► Purchasing ► John Stephen — Purchasing Agent — (970) 221-6777 ► Traffic ► Syl Mireless — Traffic Engineer Tech — (970) 221- 6815 ► Utilibes ► D A Black - Environmental Specialist — (970) 224 6063 ► Engineering ► Helen Mlgchelbnnk — City Engineer — (970) 221-6605 • Street Ovemizing Program P. Matt Baker Program Manager — (970) 224-6108 ► Mark Laken Project Engineer— (970) 222-3546 ►Craig Farver Senior Construction Inspector (970) 222-0854 1 HIGHLIGHTS FROM SPECIFICATIONS 202 02 Remove 60x50 Existing Secondary Drainage Structure (Foothills Channel) er uryrnd �� � 10 HIGHLIGHTS FROM SPECIFICATIONS ► 203-01 Seeded Roadway Fill — Strip and Haul - 6" Depth — Roadway P. 203-02 Borrow Suitable Fill (CIP) ► 203-03 Muck Excavation ► 203-04 Potholing ► " 203-05 Import Topsoil (Screened) — 3" Depth — Parkways YM1k ► 2Q3-06 Borrow ABC (Class 5 or 6) — CIP ►,,, 20J-07 Splash Block Shaping HIGHLIGHTS FROM SPECIFICATIONS 206 01 Structure Excavations 11 HIGHLIGHTS FROM SPECIFICATIONS ► 206-02 Borrow Structural Backfill Material (R-Value>25) @ Wingwalls ► 206-03 Structure Backfill Flowfill @ Box Culvert ► 206-04 Filter Material (1 1/2' Washed Rock) ► 206-05 Structure Haul and Dispose (On -Site) ► 206-06 Structure Muck Excavtion ► 206-07 Dewatering HIGHLILGHTS FROM SPECIFICATIONS ► 208-01 Erosion Control — per plan — contractor obtains SWMP from State ► 208-02 Sod Retention Blanket w/Seed @ Box Culverts 12 HIGHLIGHTS FROM SPECIFICATIONS ► 210-01 Adjust Manhole Ring/Cover ► 210-02 Adjust Valve Box HIGHLIGHTS FROM SPECIFICATIONS ► 304-01 Aggregate Base Course — (Class 5 or 6) — 6" Depth — (CIP) 13 HIGHLIGHTS FROM SPECIFICATIONS ► 306-01 Sidewalk Preparation HIGHLIGHTS FROM SPECIFICATIONS ► 307-01 Flyash Subgrade Stabilization — (12%) 14 HIGHLIGHTS FROM SPECIFICATIONS ► 403-01 Hot Bituminous Pavement — Grading S — 2 5" Depth — (PG 64-28) ► 403-02 Hot Bituminous Pavement — Gradmg SG — 4" Depth — (PG 58-28) HIGHLIGHTS FROM SPECIFICATIONS ► 412-01 Enhanced Concrete Crosswalk —10" — Tile Red w/Stamped Border 15 HIGHLIGHTS FROM SPECIFICATIONS ► 506-01 SINSIN18" Type L Rip -Rap — 6" Topsoil (CIP Per Detail) ► 506-02 21'X61'X18" Type L Rip -Rap — 6" Topsoil — (CIP Per Detail) ► 506-03 8 X8'X18" Type Rip=Rap — 6" Topsoil — (CIP Per Detail) ► 506-04 6%6'X18" Type L Rip -Rap — 6" Topsoil — (CIP Per Detail) "'0 t "► 506-05 11'MN18" Type L Rip -Rap — 6" Topsoil — (CIP Per Detail) 3 ► 506-06 130'X30'X2' Type M Rip -Rap — 6" Topsoil — (CIP Per Detail) w HIGHLIGHTS FROM SPECIFICATIONS 60101 20x7x113 Box Culvert — (CIP) W/Wmgwalls/Parapet Walls/Toe Walls/Railing/Brick Fascia R Y '10 iGyq t\ Ky 4S �k s 9 /�lli III W HIGHLIGHTS FROM SPECIFICATIONS ►601-02 4'x8' Precast Box Culvert — with CIP Wingwalls Toe Walls HIGHLIGHTS FROM SPECIFICATIONS ► 603-01 18" Class III RCP ► 603-02 21" Class III RCP ► 603-03 30" Class III RCP ► 603-04 36" Class III RCP P. 603-05 42" Class III RCP P. 603-06 54" Class III RCP 17 HIGHLIGHTS FROM SPECIFICATIONS ► 603-07 21" Class III RCP FES P. 603-08 30" Class III RCP FES P. 603-09 36" Class III RCP FES P. 603-10 42" Class III RCP FES HIGHLIGHTS FROM SPECIFICATIONS ► 603-11 Pond 269 Inlet Box w/Water Quality Structure — Ties into 4 X8' Precast Box ► 603-12 Modified Junction Box #3 & Headwall @ Ends of 54" RCP Pipes 91 HIGHLIGHTS FROM SPECIFICATIONS P. 603-13 Concrete Encasement on 30" PVC Sanitary Sewer @ 54" RCP Crossing P. 603-14 Concrete Encasement on 21" RCP Pipe ► 603-15 4" PVC Schedule 40 Sleewng with Flowable Fill Backfill ► 603-16 Conduit Sleeving under walks for irrigation HIGHLIGHTS FROM SPECIFICATIONS ► 604-01 5' Type R Inlet ► 604-02 10' Type R Inlet P. 604-03 Double Type 16 Combo Inlet ► 604-04 5' Storm Sewer Manhole ► 604-05 Modified Concrete Sidewalk Culvert — (4'X20) 19 INTRODUCTIONS ►Design Engineers ■ J R Engineering op. Mike Brake P E ►Tim Halphoff ■ Drexel, Barrell & Co ►]im Brzostowicz P E ATTENDANCE ► Please be sure to register ► BID OPINING When MAY 812008 300PM Where 215 North Mason Street (2n" Floor) HIGHLIGHTS FROM SPECIFICATIONS ► 608-01 Concrete Sidewalk (6'j ► 608 02 Concrete Access Ramps (8'1 with truncated dome warning panels ► 608-03 Concrete Crosspan with Aprons (9 1/2") ► 608-04 Hi -Early Concrete (24hr ) ► 608 05 Flowable Fill Concrete ► 608-06 Colored Concrete Bike Path (5" Fibermesh) ► 608-07 San Diego Buff Concrete @ 20X7 Box Culvert — (6" Depth) ► 608-08 Exposed Aggregate Median Cover — San Diego Buff (4ff) HIGHLIGHTS FROM SPECIFICATIONS ► 609-01 Vertical Curb and Gutter (30') ► 609-02 Vertical Curb and Gutter (18'� Outfall 20 HIGHLIGHTS FROM SPECIFICATIONS ► 619-018" DIP CI-52 Water Main ► 619-02 6" DIP CL-52 Water Main ► 619-03 6" Gate Valve and Box ► 619-04 8"X8"X6" Swivel Tee W[M ► 619-05 Fire Hydrant Assembly ► 619-06 1" Irrigation Service & Meter Pit — Copper -Corp -Curb Stop — Per COFC Spec ► 619-07 8"X8"X3" Tapping Sleeve HIGHLIGHTS FROM SPECIFICATIONS No. 2900-01 Dryland Seeding 21 Thank You for Attending Feel free to contact Mark Laken or Craig Farver with any questions you may have 22 IMPORTANT MILESTONES ► AWARD CONTRACT May 12, 2008 ► PRE -CONSTRUCTION MEETING Mandatory meeting prior to starting of construction Date to be determined after contract is awarded ► CONSTRUCTION START DATE May 19 2008 ► SUBTANTIAL COMPLETION 90 Working Days from Construction start Date ► FINAL COMPLETION 10 working days following substantial completion SUMMARY OF WORK Drake/Ziegler Phase 3 Improvements: ► Improvements begin 100 feet east of the Drake Road/Environmental Drive intersection and continue to Horsetooth Road P. The Improvements include minor earthwork, water line installation, stormsewer installation, one cast in place 20'x7' box culvert, one precast 4'x8' box culvert, full depth asphalt roadway installation, curb and gutter installation, sidewalk installation 3 CONSTRUCTION DOCUMENTS ► Drake/Ziegler Phase 3 Specification Book and Bid Tab ► Drake/Ziegler Phase 3 Planset • Designed by ►J R Engineering ► Drexel, Barrell & Co • Sheet #'s ►1-45, 50 51, 58-63, 69-74, & Extra Informational Sheet P. Addendum with revised Bid Tab available in late April to account for the Pavement Design which is currently being prepared by CTL Thompson HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S: ► SUPERINTENDENTS The General Contractor ¢{ L employ a full time Superintendent whose sole responsibility is to monitor and coordinate all facets of the work. ► LIQUIDATED DAMAGES Substantial Comcletior 90 working days to substantially complete the on shall be defined as the completion of all instruction of the CIP Box Culvert, Storrs al Curb and Gutter, Concrete Sidewalk, ialt Pavement and any other pertinent items If the Contractor goes past the 110 working it of One Thousand Eighty Six Dollars rr day will be assessed ► FINAL ACCEPTANCE • Final acceptance must be met within 10 days after substantial completion 'j dat8d damages in the amount of Six Hundred Dollars ($600 00) per calendar day will be charged If this schedule has not been met 4 HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S' ► WARRANTY: The Contractor will be required to warranty their work for 2 years after date of final acceptance CONSTRUCTION HOURS The operation of all machinery and vehicles must take place between the hours of 7 00 A M thru 7 00 P M The Contractor may request extended hours The request must be approved by the City of Fort Collins 3 days prior to any work HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S ► CONSTRUCTION SURVEYING: ■ Provided by the Contractor ■ (Lump Sum Bid) ► TRAFFIC CONTROL: ■ Provided by the City ► GEOTECHNICAL AND MATERIAL TESTING. ■ Provided by the City It will be the Contractor's responsibility to schedule the testing 5 HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S ► PROJECT MEETINGS • Once a week at the construction trailer located on site Time to be determined ► PROGRESS AND SCHEDULE REVISIONS • Schedules shall be updated weekly The Contractor may be required to submit additional schedules depending on the progress of the project ► HAUL ROUTES • Arterial and Collector streets only Contractor will not be allowed to use residential streets to access the site with trucks hauling material HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S. ► SITE CLEAN-UP ■ The construction work and progress shall be kept and accomplished In a neat, clean and orderly fashion A HIGHLIGHTS FROM GENERAL CONDITIONS AND GENERAL REQ'S. ► Erosion Control • Contractor will obtain and manage the Storm Water Management Plan (SWMP) Permit from the Colorado Dept of Public Health and Environment ► Bi weekly inspectors and repairs for extent of construction ► Quarterlyanceinspections and maintenance of BMPs for 2 years after final accept ► On Site copy of SWMP including inspection reports • An exishng SWMP permit for the roadway earthwork will be transferred Into the awarded contrador's name • Blt e Management Practices (BMPs) will be installed and maintained per BMPs will be maintained for 2 years after final acceptance or until 70% coverage of disturbed area Is achieved • If 70% coverage of disturbed areas Is not obtained in 2 years, the SWMP will be transferred to the City of Fort Collins — Engineering Dept TRAFFIC CONTROL AND WORK AREA SAFETY ► TRAFFIC CONTROL: • The traffic control for this project will be supplied by the ■ The current closures at Environmental Drive and Horsetooth Road will remain in place until completed roadway is ready to be reopened ■ Environmental Drive and Co Rd 9 will remain open at all times to provide business access ■ The City anticipates that construction site access from Horsetooth Road will be available on June 15, 2008 ► Horsetooth/Ziegler intersections is currently under construction with roundabout installation 7 TRAFFIC CONTROL AND WORK AREA SAFETY. ► WORK AREA SAFETY: ■ The Contractor shall coordinate with the City all work area safety control devises, such as barricades and safety fence around all excavations, trenches and drop offs SITE COORDINATION WITH OTHER CONTRACTORS ► Naranjo Civil Constructors • Coordination at the Horsetooth Ziegler Roundabout Construction Project which is currently under construction and being administered by the City's Street Oversizing staff ► North Poudre Irrigation Co • Contractor will need to coordinate with the Ditch Rider of the FCRID Ditch prior to the installation of the 130' X 30' X 24" Rip -Rap and the tie in for the 4' X 8' Precast Box Culvert and upon completion of the Rip -Rap and the Box Culvert Construction City will be responsible for the permit with the North Poudre Irrigation Company E7 HIGHLIGHTS FROM SPECIFICATIONS 201-01 Clearing and Grubbing h I °✓r 5� .4 C� �bltipll l , ti