REQUEST FOR PROPOSAL
P1111 Air Conditioning Tune -Up and Quality Installation Program
Written proposals six (6) will be received at the City of Fort Collins Purchasing Division 215
North Mason St 2nd floor Fort Collins Colorado 80524 Proposals will be received before
3 00 p m (our clock) March 7 2008 Proposal No P1111 If delivered they are to be sent to
215 North Mason Street 2nd Floor Fort Collins Colorado 80524 If mailed the address is P O
Box 580 Fort Collins 80522 0580
Questions concerning the scope of the project should be directed to Project Manager Doug
Swartz (970) 221 6719
Questions regarding proposals submittal or process should be directed to Opal F Dick CPPO
Senior Buyer (970) 221-6778
A copy of the Proposal may be obtained as follows
Download the Proposal/Bid from the BuySpeed Webpage
httos //secure2 fcgov com/bso/login isD
Come by Purchasing at 215 North Mason St 2nd floor Fort Collins and request
a copy of the Bid
The City of Fort Collins is subject to public information laws which permit access to most
records and documents Proprietary information in your response must be clearly identified and
will be protected to the extent legally permissible Proposals may not be marked Proprietary in
their entirety Information considered proprietary is limited to material treated as confidential in
the normal conduct of business trade secrets discount information and individual product or
service pricing Summary price information may not be designated as proprietary as such
information may be carried forward into other public documents All provisions of any contract
resulting from this request for proposal will be public information
Sales Prohibited/Conflict of Interest No officer employee or member of City Council shall have
a financial interest in the sale to the City of any real or personal property equipment material
supplies or services where such officer or employee exercises directly or indirectly any decision
making authority concerning such sale or any supervisory authority over the services to be
rendered This rule also applies to subcontracts with the City Soliciting or accepting any gift
gratuity favor entertainment kickback or any items of monetary value from any person who has
or is seeking to do business with the City of Fort Collins is prohibited
Collusive or sham proposals Any proposal deemed to be collusive or a sham proposal will be
rejected and reported to authorities as such Your authorized signature of this proposal assures
that such proposal is genuine and is not a collusive or sham proposal
The City of Fort Collins reserves the right to reject any and all proposals and to waive any
irregularities or informalities
Since ly
James B OreilillPPO FNIGP
Directo g & Risk Management
where renewal Is a way of life
Appendix A Fort Collins Residential Budding Permit History, 1977 to
2007
The graph below shows residential penrnt activity for new residential construction for the past 31
years
City of Fort Collins Budding Permits,1977-2007
e
rn
e
J
n n m m m m eo rn a m m ci o 0 0 0
rn m rn m m — m m a m — m o 0 0
�- � � N N 0 N N
■ Single Family Units ❑ Multi Family Units
r /11
111
1
III
�
IIIIIIIIIIIIIIIIIIIIIIIIIIIIIII.
�
I
I
I1,1
I
I
I�
2/9/00
Appendix B AC Market Research
Platte River Power Authority is Utilities wholesale power provider In 2004 2005 and 2006
Platte River conducted market research among residential customers living in the three
Northern Colorado cities that represent most of its load (Longmont Loveland Fort Collins) The
2006 data summarized below should be a fairly accurate representation of the AC market in
Fort Collins)
Question
Response
n
p
+
01 Cooling equipment used
Central air conditioning
412
65 5%
460
Window unit air conditioning
412
131%
33%
Evaporative cooling
412
9 2%
2 8%
Ceiling fans
412
48 5%
4 8%
Portable fans
412
38 6%
4 70/0
Whole houserattic fan
412
18 2%
3 7%
Other (windows shades)
412
7 3%
2 50/
Q2 Year central AC installed
2006
265
9 1 %
3 5%
2005
265
9 8%
3 6%
2000 to 2004
265
43 8%
6 0%
1995 to 1999
265 z
23 4%
5 1%
1990 to 1994
265
7 2%
3 1 %
1989 or earlier
265
6 8%
3 0%
Q3 Central AC replacement
Yes
269
71%
31%
No
269
86 6%
4 1 %
Don t know
269
6 3%
2 9%
04 No AC but plan to install
Yes
130
8 5%
4 8%
No
130
91 5%
4 8%
Q5 Type of home
Mobile homettrailer
410
2 7%
1 6%
House
410
73 9%
4 3%
Condominium
410
5 9%
2 3%
Townhouse
410
59%
2 3%
Duplex
410
4 6%
2 0%
Apartment
410
71%
25%
Q6 Year home built
2006
403
2 0%
1 4%
2005
403
2 5%
1 5%
2000 to 2004
403
18 1 %
3 8%
1995 to 1999
403
16 6%
3 6%
1990 to 1994
403
9 4%
2 8%
1980 to 1989
403
13 4%
3 3%
1970 to 1979
403
21 1 %
4 0%
1960 to 1969
403
7 7%
2 6%
1950 to 1959
403
4 2%
2 0%
1940 to 1949
403
1 5%
1 2%
1939 or earlier
403
3 50/
1 8%
Q1 The probability of using central AC in the 2004 and 2005 surveys was 56% and 60%
respectively
Q4 The numbers refer to the percentage of those currently without central AC This suggests
that the market for installing first-time AC systems in existing homes is close to saturation
2/9/00
Appendix C Electric Rates
Fixed costs are not reflected in the numbers presented here Charges include all surcharges
and taxes
• Wholesale electric rates
— Peak coincident demand = $12 05 per kW
— Energy = $0 0170/kWh
• Residential energy retail rate (applicable to almost all residential customers) Average
blended energy -based charges = $0 0691 per kWh
• Small commercial retail rate (applicable to commercial customers with average demand less
than 50 kW) average blended energy based charges = $0 0626 per kWh
2/9/00
PROFESSIONAL SERVICES AGREEMENT
THIS AGREEMENT made and entered into the day and year set forth below by and
between THE CITY OF FORT COLLINS COLORADO a Municipal Corporation hereinafter
referred to as the City and [insert either a corporation a partnership or an
individual doing business as
WITNESSETH
hereinafter referred to as Professional
In consideration of the mutual covenants and obligations herein expressed it is agreed
by and between the parties hereto as follows
1 Scope of Services The Professional agrees to provide services in accordance
with the scope of services attached hereto as Exhibit A consisting of ( ) pages
and incorporated herein by this reference
2 The Work Schedule [Optional] The services to be performed pursuant to this
Agreement shall be performed in accordance with the Work Schedule attached hereto as
Exhibit B consisting of ( ) pages and incorporated herein by this reference
3 Contract Period This Agreement shall commence 200 and shall
continue in full force and effect until 200 unless sooner terminated as herein
provided In addition at the option of the City the Agreement may be extended for additional
one year periods not to exceed four (4) additional one year periods Renewals and pricing
changes shall be negotiated by and agreed to by both parties The Denver Boulder Greeley
CPIU published by the Colorado State Planning and Budget Office will be used as a guide
Written notice of renewal shall be provided to the Service Provider and mailed no later than
ninety (90) days prior to contract end
4 Early Termination by City Notwithstanding the time periods contained herein
the City may terminate this Agreement at any time without cause by providing written notice of
termination to the Professional Such notice shall be delivered at least fifteen (15) days prior to
2/9/00
the termination date contained in said notice unless otherwise agreed in writing by the parties
All notices provided under this Agreement shall be effective when mailed postage prepaid and
sent to the following addresses
Professional
City
With Copy to
City of Fort Collins Purchasing
PO Box 580
Fort Collins CO 80522
In the event of any such early termination by the City the Professional shall be paid for services
rendered prior to the date of termination subject only to the satisfactory performance of the
Professionals obligations under this Agreement Such payment shall be the Professionals sole
right and remedy for such termination
5 Design, Proiect Indemnity and Insurance Responsibility The Professional shall
be responsible for the professional quality technical accuracy timely completion and the
coordination of all services rendered by the Professional including but not limited to designs
plans reports specifications and drawings and shall without additional compensation
promptly remedy and correct any errors omissions or other deficiencies The Professional
shall indemnify save and hold harmless the City its officers and employees in accordance with
Colorado law from all damages whatsoever claimed by third parties against the City and for the
City s costs and reasonable attorneys fees arising directly or indirectly out of the Professionals
negligent performance of any of the services furnished under this Agreement The Professional
shall maintain commercial general liability insurance in the amount of $500 000 combined single
limits and errors and omissions insurance in the amount of $
6 Compensation [Use this paragraph or Option 1 below ] In consideration of
the services to be performed pursuant to this Agreement the City agrees to pay Professional a
fixed fee in the amount of ($ ) plus reimbursable direct costs All such fees and
costs shall not exceed ($ ) Monthly partial payments based upon the Professionals
2/9/00
billings and itemized statements are permissible The amounts of all such partial payments
shall be based upon the Professionals City verified progress in completing the services to be
performed pursuant hereto and upon the Citys approval of the Professionals actual
reimbursable expenses [Optional] Insert Subcontractor ClauseFinal payment shall be made
following acceptance of the work by the City Upon final payment all designs plans reports
specifications drawings and other services rendered by the Professional shall become the sole
property of the City
6 Compensation [Option 1] In consideration of the services to be performed
pursuant to this Agreement the City agrees to pay Professional on a time and reimbursable
direct cost basis according to the following schedule
Hourly billing rates
Reimbursable direct costs
with maximum compensation (for both Professionals time and reimbursable direct costs) not to
exceed ($ ) Monthly partial payments based upon the Professionals billings and
itemized statements of reimbursable direct costs are permissible The amounts of all such
partial payments shall be based upon the Professionals City venfied progress in completing the
services to be performed pursuant hereto and upon the City approval of the Professionals
reimbursable direct costs Final payment shall be made following acceptance of the work by the
City Upon final payment all designs plans reports specifications drawings and other
services rendered by the Professional shall become the sole property of the City
7 City Representative The City will designate prior to commencement of work its
protect representative who shall make within the scope of his or her authority all necessary and
proper decisions with reference to the protect All requests for contract interpretations change
orders and other clarification or instruction shall be directed to the City Representative
8 Proiect Drawings [Optional]Upon conclusion of the protect and before final
2/9/00
payment the Professional shall provide the City with reproducible drawings of the project
containing accurate information on the project as constructed Drawings shall be of archival
prepared on stable mylar base material using a non fading process to provide for long storage
and high quality reproduction CD disc of the as built drawings shall also be submitted to the
owner in and AutoCAD version no older then the established city standard
9 Monthly Report Commencing thirty (30) days after the date of execution of this
Agreement and every thirty (30) days thereafter Professional is required to provide the City
Representative with a written report of the status of the work with respect to the Scope of
Services Work Schedule and other material information Failure to provide any required
monthly report may at the option of the City suspend the processing of any partial payment
request
10 Independent Contractor The services to be performed by Professional are those
of an independent contractor and not of an employee of the City of Fort Collins The City shall
not be responsible for withholding any portion of Professional s compensation hereunder for the
payment of FICA Workers Compensation other taxes or benefits or for any other purpose
11 Personal Services It is understood that the City enters into this Agreement
based on the special abilities of the Professional and that this Agreement shall be considered as
an agreement for personal services Accordingly the Professional shall neither assign any
responsibilities nor delegate any duties ansing under this Agreement without the prior written
consent of the City
12 Acceptance Not Waiver The Citys approval of drawings designs plans
specifications reports and incidental work or materials furnished hereunder shall not in anyway
relieve the Professional of responsibility for the quality or technical accuracy of the work The
City approval or acceptance of or payment for any of the services shall not be construed to
operate as a waiver of any rights or benefits provided to the City under this Agreement
13 Default Each and every term and condition hereof shall be deemed to be a
2/9/00
material element of this Agreement In the event either party should fad or refuse to perform
according to the terms of this agreement such party may be declared in default
14 Remedies In the event a party has been declared in default such defaulting
party shall be allowed a period of ten (10) days within which to cure said default In the event
the default remains uncorrected the party declaring default may elect to (a) terminate the
Agreement and seek damages (b) treat the Agreement as continuing and require specific
performance or (c) avail himself of any other remedy at law or equity If the non defaulting
party commences legal or equitable actions against the defaulting party the defaulting party
shall be liable to the non defaulting party for the non defaulting party s reasonable attorney fees
and costs incurred because of the default
15 Bindina Effect This writing together with the exhibits hereto constitutes the
entire agreement between the parties and shall be binding upon said parties their officers
employees agents and assigns and shall inure to the benefit of the respective survivors heirs
personal representatives successors and assigns of said parties
16 Law/Severabilrtv The laws of the State of Colorado shall govern the
construction interpretation execution and enforcement of this Agreement In the event any
provision of this Agreement shall be held invalid or unenforceable by any court of competent
jurisdiction such holding shall not invalidate or render unenforceable any other provision of this
Agreement
17 Prohibition Against Employing Illegal Aliens This paragraph shall apply to all
Contractors whose performance of work under this Agreement does not involve the delivery of a
specific end product other than reports that are merely incidental to the performance of said
work Pursuant to Section S 17 5-101 C R S et seq Contractor represents and agrees that
a As of the date of this Agreement
and
2/9/00
1 Contractor does not knowingly employ or contract with an illegal alien
2 Contractor has participated or attempted to participate in the basic pilot
employment verification program created in Public Law 208 104th Congress as
amended and expanded in Public Law 156 108th Congress as amended
administered by the United States Department of Homeland Security (the Basic
Pilot Program ) in order to confirm the employment eligibility of all newly hired
employees
b Contractor shall not knowingly employ or contract with an illegal alien to perform
work under this Agreement or knowingly enter into a contract with a subcontractor that
knowingly employs or contracts with an illegal alien to perform work under this
Agreement
c Contractor shall continue to apply to participate in the Basic Pilot Program and
shall in writing verify same every three (3) calendar months thereafter until Contractor is
accepted or the public contract for services has been completed whichever is earlier
The requirements of this section shall not be required or effective if the Basic Pilot
Program is discontinued
d Contractor is prohibited from using Basic Pilot Program procedures to undertake
pre employment screening of job applicants while this Agreement is being performed
e If Contractor obtains actual knowledge that a subcontractor performing work
under this Agreement knowingly employs or contracts with an illegal alien Contractor
shall
1 Notify such subcontractor and the City within three days that Contractor
has actual knowledge that the subcontractor is employing or contracting with an
illegal alien and
2 Terminate the subcontract with the subcontractor if within three days of
receiving the notice required pursuant to this section the subcontractor does not
cease employing or contracting with the illegal alien except that Contractor shall
2/9/00
not terminate the contract with the subcontractor if during such three days the
subcontractor provides information to establish that the subcontractor has not
knowingly employed or contracted with an illegal alien
f Contractor shall comply with any reasonable request by the Colorado
Department of Labor and Employment (the Department ) made in the course of an
investigation that the Department undertakes or is undertaking pursuant to the authority
established in Subsection 8-17 5 102 (5) C R S
g If Contractor violates any provision of this Agreement pertaining to the duties
imposed by Subsection 8 17 5 102 C R S the City may terminate this Agreement If this
Agreement is so terminated Contractor shall be liable for actual and consequential
damages to the City arising out of Contractors violation of Subsection 8-17 5-102
CRS
h The City will notify the Office of the Secretary of State if Contractor violates this
provision of this Agreement and the City terminates the Agreement for such breach
18 Special Provisions [Optional] Special provisions or conditions relating to the
services to be performed pursuant to this Agreement are set forth in Exhibit consisting
Of ( ) pages attached hereto and incorporated herein by this reference
2/9/00
P1111 Air Conditioning Tune -Up and Quality Installation Program
Summary
Fort Collins Utilities (Utilities) a municipal electric utility is seeking an experienced Service
Provider (SP) to deliver a turnkey program that will deliver air conditioner peak electrical
demand reductions and energy use savings in both the residential and small commercial
sectors
This solicitation will result in a one-year contract that has the potential to be annually renewed
for up to five years
Background
Fort Collins Colorado is located near the northern end of the Front Range region of Colorado
The city has a population of about 130 000 It has grown rapidly over the last three decades
though the pace of building has markedly slowed down in recent years About 600 new housing
units were added in 2007 See budding permit data in Appendix A Most homes are heated with
natural gas
Fort Collins has a relatively mild climate logging an average of 6368 HDD and 479 CDD
Design dry bulb temperatures are 4 OF for heating (99%) and 89 OF for cooling (1 %) with a
mean coincident summer wet -bulb temperature of 62 OF Summertime high temperatures are
typically in the high 70s to high 80s with two to three weeks topping 90 OF There are large
dwmal temperature swings There have been several unusually hot summers since 2001
Until the early 1990s residential air conditioning (AC) market penetration in Fort Collins was
minimal That has dramatically changed however with market penetration growing very rapidly
since that time In 2006 about two-thirds of residential customers had central AC Most
residential AC is provided by central units with a much smaller penetration of window AC units
See additional AC market research data summarized in Appendix 8 Almost all new single-
family homes have central AC installed at time of sale The rapid growth in residential AC has
been a significant factor in overall electrical load growth and the shift of peak electrical demand
from winter to summer Fort Collins summer electric peak demand is approximately 300
megawatts
A new home performance study (www fcgov com/conservation/pdf/newhome-eval pdf)
evaluated design construction and performance of homes built in the mid- to late-1990s
Among other things it documented
• Oversized heating equipment and vastly oversized air conditioning equipment
• That equipment was installed but rarely tested with a significant subset operating outside
manufacturer specifications and
• That equipment was typically coupled with inadequately designed or installed distribution
systems in homes designed and built with little attention to managing heating and cooling
loads
• These practices led to many unhappy homeowners and significant impacts on the electric
system
2/9/00
THE CITY OF FORT COLLINS COLORADO
By
James B O Neill II CPPO FNIGP
Director of Purchasing & Risk Management
DATE
ATTEST
City Clerk
APPROVED AS TO FORM
Assistant City Attorney
[Insert Professionals name] or
[Insert Partnership Name] or
[Insert individuals name] or
Doing business as [insert name of business]
Title
CORPORATE PRESIDENT OR VICE PRESIDENT
Date
ATTEST
(Corporate Seal)
Corporate Secretary
2/9/00
EXHIBIT B
INSURANCE REQUIREMENTS
1 The Service Provider will provide from insurance companies acceptable to the City the
insurance coverage designated hereinafter and pay all costs Before commencing work under
this bid the Service Provider shall furnish the City with certificates of insurance showing the
type amount class of operations covered effective dates and date of expiration of policies and
containing substantially the following statement
The insurance evidenced by this Certificate will not be cancelled or materially altered
except after ten (10) days written notice has been received by the City of Fort Collins
In case of the breach of any provision of the Insurance Requirements the City at its option
may take out and maintain at the expense of the Service Provider such insurance as the City
may deem proper and may deduct the cost of such insurance from any monies which may be
due or become due the Service Provider under this Agreement The City its officers agents
and employees shall be named as additional insureds on the Service Provider's general liability
and automobile liability insurance policies for any claims ansmg out of work performed under
this Agreement
Insurance coverages shall be as follows
A Workers Compensation & Employer's Liability The Service Provider shall
maintain during the life of this Agreement for all of the Service Provider's employees
engaged in work performed under this agreement
Workers Compensation insurance with statutory limits as required by
Colorado law
Employers Liability insurance with limits of $100 000 per accident
$500 000 disease aggregate and $100 000 disease each employee
B Commercial General & Vehicle Liability The Service Provider shall maintain
during the life of this Agreement such commercial general liability and automobile liability
insurance as will provide coverage for damage claims of personal injury including
accidental death as well as for claims for property damage which may arise directly or
indirectly from the performance of work under this Agreement Coverage for property
damage shall be on a broad form basis The amount of insurance for each coverage
Commercial General and Vehicle shall not be less than $500 000 combined single limits
for bodily injury and property damage
In the event any work is performed by a subcontractor the Service Provider shall be
responsible for any liability directly or indirectly ansing out of the work performed under
this Agreement by a subcontractor which liability is not covered by the subcontractor's
insurance
2/9/00
In part these observations reflect that builders and contractors used to installing forced -air
heating systems were coming up the learning curve as they began to routinely install AC An
updated new home study is currently in process Preliminary data suggests that significant AC
related improvements have been made in recently built homes but that there are still many
opportunities for improved performance
No refrigerant charge data has been collected for Fort Collins residential AC systems No
systematic performance data has been collected for small commercial rooftop units
Utilities is working to meet energy savings and demand -reduction goals in the Electric Energy
Supply Policy adopted in 2003 (www fcaov com/electnc/enerov policy php) AC is an important
target particularly for summer peak demand reduction Utilities intends to pursue these AC
related opportunities through a'whole-house approach that includes several components
• Education for consumers builders trades
• Incentives for cooling load reduction
• Quality design and installation of new or replacement AC systems
• Tune-up of existing AC systems
• AC load control
This Request for Proposals (RFP) addresses quality installation AC tune up and related
opportunities in both the residential and small commercial sectors
Additional information relevant to this solicitation includes the following
• Home performance City of Fort Collins is known for its advocacy and support for improved
home performance It has promoted a whole house building science -based approach
toward both new home construction and improvements to existing homes This has been
done via energy codes training for the building industry education for consumers and other
housing market stakeholders development of a builder's guide for energy -efficient design
and construction and sponsorship of Home Performance with ENERGY STAR® Efforts
continue to improve home performance across the board with the multiple goals of
improved comfort better indoor air quality enhanced durability and energy savings
Messages focus on installed performance
• Infrastructure Utilities recognizes the need to increase the capacity of the local building
industry and trades to deliver higher quality services than has been the case in the past
Utilities continues to make significant investments in this regard
• Budding code The current City residential energy code is based on the 2003 edition of the
International Energy Conservation Code A requirement of the code is that heating and
cooling equipment shall be sized based on building loads calculated in accordance with
ACCA Manual J procedures (Section M1401 3) The code also requires that duct systems
be sized in accordance with ACCA Manual D (Section M1601 1) The code places more
emphasis on tighter ductwork including a prohibition against using building cavities to
convey return air unless a duct leakage test documents a total system leakage of no more
than 25% of total system flow (Section N1112 5 3) The current code was adopted in 2004
most of its provisions were implemented in 2005 with load calculation and duct sizing
requirements being implemented in 2006
• AC tune-up Utilities has never sponsored a tune-up program in the past Xcel Energy the
large utility serving much of Colorado including electricity to areas adjacent to Fort Collins
2/9/00
implemented a small-scale residential tune up program in 2007 Xcel intends to expand the
program in 2008
• AC load control Utilities began a pilot AC load control program in 2007 Comverge Digital
Control Units were installed on approximately 40 residential systems This equipment is
controlled via a radio -frequency system that Utilities has operated for many years to control
electric water heaters Utilities intends to initiate a full fledged program in 2008 targeting an
additional 500 customers
• Customer numbers Utilities has approximately 55 000 residential customers and 5 500
small commercial customers
Program Concept
Utilities anticipates implementing a program resembling AC -tune-up programs that
have been implemented by other organizations over the past decade This section
outlines Utilities basic program concept Respondents will specify their proposed
program design in more detail (see Proposal Contents below)
• Turnkey program delivery
The SP will be responsible for most aspects of program delivery and will serve as the
liaison to the HVAC technicians working in the field
• Services
Minimum services to be provided as part of this program are
— Residential customers check and correct air flow and refrigerant charge
— Commercial customers with packaged rooftop equipment check and correct air
flow, refrigerant charge, economizer operation
Respondents are encouraged to propose additional enhanced services that could fit
well in the program delivery model and that could help to capture other opportunities
in support of Utilities demand reduction and energy saving goals
• Service Provider roles
The minimum roles of the SP include
— Recruit HVAC firms
— Tram HVAC technicians
— Verify that program clients are Fort Collins Utilities electric customers
— Oversee work done under this program provide quality assurance
— Report results of visit to customer
— Report data from each lob to Utilities
— Pay incentives to participating HVAC firms whose lobs meet program guidelines
Program sponsor roles
Utilities anticipates filling the following roles
— Provide general marketing / promotion for the program
— Review any marketing materials developed by SP or contractors that reference
program
— Make customer database available to SP for the purposes of checking eligibility
— Pay SP for documented completion of program elements
2/9/00
• Program benefits
Utilities views this program as a blend of resource acquisition and market
transformation delivering multiple benefits
— Utilities Demand reductions and energy savings toward Electric Energy Supply
Policy goals
— Customers Lower electric bill, improved comfort longer equipment life higher
expectations regarding the performance of their AC system
— Infrastructure More highly skilled infrastructure of HVAC contractors and
technicians with higher expectations and standards regarding the performance of
AC systems
Hiring Timeline
• RFP issued
• Final questions to Utilities
• Responses to questions
• Proposals due
• Proposals reviewed
• Interviews (if necessary)
• Contractor selected
• Scope of work negotiated and contract signed work begins
Proposal Contents
Feb 15
Feb 22
Feb 29
Mar 7
Mar 14
Mar 25-26
Mar 31
Apr 18
In all sections below respondents should outline the proposed core program design and
optional enhancements to capture more savings Clearly state all assumptions
All proposals must be organized in the following format to allow an orderly review and
evaluation Address all aspects of the Program Concept
1 Statement of understanding of required services
2 Program structure and processes
Describe
— Services/measures provided to customers (minimum and enhanced services)
— How the program would be delivered in the following applications
• Existing residential AC systems
• New AC systems in existing homes
° New home AC installation
° Existing small commercial AC systems
— Roles of SP, Utilities HVAC contractors and technicians
— Contractor recruitment, training equipment needs
— Deliverables
— Key elements that will help this program succeed
2/9/00
3 Costs
Provide the following information on program costs
— Proposed SP compensation start-up costs and per -unit costs (itemized by
measure and in combination per unit) State clearly what is included in these
costs and what is not included
— Estimated typical customer costs(i is what the customer being served will pay), per
unit by measure and in combination
4 Peak demand reduction and energy savings
Document the basis for each of the following projections
— Cooling season savings (electric energy and demand) per measure and in
combination, per unit
— Heating season savings, if appropriate for proposed measures (electric energy
and demand natural gas) per unit
— Annual savings (electric energy and demand natural gas) per measure and in
combination per unit
5 Participation rates
Estimate participation rates and numbers for the following
— HVAC contractors
— Customers by sector and measure
6 Cost-effectiveness
Provide the following figures of merit for residential units commercial units and the
program as a whole Repeat this for two cases representing these endpoints (1)
Minimum services only (2) Complete package of proposed enhanced services
— Utility Cost of Conserved Energy ($ per kWh)
— Utility cost of avoided summer peak demand ($ per kW)
— Demand Side Management cost-effectiveness test costs ($), benefits ($) and ratio
Include results for the Total Resource Cost (TRC) Utility Cost Test (UCT) and
Participant Test
— State all assumptions for these calculations, such as discount rate, measure life
and net -to -gross ratio Utility wholesale and retail rates are provided in Appendix
C
7 Schedule
— Show a realistic timeline for start-up phases and ongoing implementation of the
program (starting at the date the contract has been executed)
— Describe any seasonal considerations for any phase of the program
8 Quality assurance processes
Describe processes that will enhance consistency in the quality of work performed in
this program and confidence in the delivered savings
9 Market transformation
Describe a multi -year process for implementing and sunsetting this program in a way
in which the market will be transformed for the long-term
2/9/00
10 Staffing
Describe each team members or subcontractors roles and responsibilities in
completing the Scope of Work
11 Qualifications
— Provide information describing staff capabilities and experience relevant to this
project
— When citing other projects describe the specific role played by the bidder
— Provide any independent evaluations of a similar program model implemented in
other locations
12 References
Provide at least five references each including name, title address phone number
and e-mail address of the clients program manager
The proposed contract between the City of Fort Collins and the successful bidder is
attached for reference purposes
2/9/00
Review and Assessment
Professional firms will be evaluated on the following criteria These criteria will be the basis for
review of the written proposals and interview session
The rating scale shall be from 1 to 5 with 1 being a poor rating 3 being an average rating and
5 being an outstanding rating
WEIGHTING
FACTOR
QUALIFICATION
STANDARD
20
Scope of Proposal
Does the proposal show an understanding of the
project objective methodology to be used and
results that are desired from the project?
20
Assigned Personnel
Do the persons who will be working on the project
have the necessary skills? Are sufficient people of
the requisite skills assigned to the project?
1 0
Availability
Can the work be completed in the necessary time?
Can the target start and completion dates be met?
Are other qualified personnel available to assist in
meeting the project schedule if required? Is the
project team available to attend meetings as
required by the Scope of Work?
1 0
Motivation
Is the firm interested and are they capable of doing
the work in the required time frame?
20
Cost and
Do the proposed cost and work hours compare
Work Hours
favorably with the project Manager's estimate? Are
the work hours presented reasonable for the effort
required in each project task or phase?
20
Firm Capability
Does the firm have the support capabilities the
assigned personnel require? Has the firm done
previous projects of this type and scope?
2/9/00
Reference evaluation (Top Ranked Firm)
The protect Manager will check references using the following criteria The evaluation rankings
will be labeled Satisfactory/Unsatisfactory
QUALIFICATION
STANDARD
Overall Performance
Would you hire this Professional again? Did
they show the skills required by this protect?
Timetable
Was the original Scope of Work completed
within the specified time? Were interim
deadlines met in a timely manner?
Completeness
Was the Professional responsive to client
needs did the Professional anticipate
problems? Were problems solved quickly and
effectively?
Budget
Was the original Scope of Work completed
within the protect budget?
Job Knowledge
a) If a study did it meet the Scope of Work?
b) If Professional administered a construction
contract was the protect functional upon
completion and did it operate properly?
Were problems corrected quickly and
effectively?
2/9/00