Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 8851129 OLD TOWN SQUARE IRRIGATIONCHANGE ORDER NO. ft1 PROJECT Tll'LE: Old Town Square Plaza Irrigation CONTRACTOR: Green Plan, In.c PROJECT NUMBER: PURCHASE ORDER NO 8SG1129 " DESCRIPTION: Phase 1 Installation of Stage Pavillion hanging pot chip system. 1. Reason for change: Change in requested materials and extension of drip system Plumbing 2. Description of Change: See attached thawing. 3. Change in Contract Cost: $350.00 4. Change in Contract Time: 2 ORIGINAL CONTRACT COST - $84,205.00 TOTAL APPROVED CHANGE ORDER $5,691.00 TOTAL PENDING CHANGE_ ORDER $0.00 TOTAL THIS CHANGE ORDER $350.00 TOTAL % OF ORIGINAL CONTRACT, THIS C.O. 0,42% TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S 7.18% ADJUSTED CONTRACT COST _ $90,246.00 (Assuming all change orders approved) ACCEPTED BY: _ 1" DATE _ f Contractor's Represents ive DATE: ACCEPTED BY: Project Manager REVIEWED BY, DATE: Title: ( APPROVED BY: DATE: Title: APPROVED BY: DATE: Purchasing Agent over $$30,000 cc: Contractor Architect Project File Engineer Purchasing SIDE VIE4i 3.AS(ETS 4aNG FROM ROUND TUBES ON ROOF PAVILION ROOF ARCH �/� COPPER PIPE. )4 1- COPPER TEE. 34', CCC Y./ Mk — RAN BIRD XBT-2C—PC EMITTER SPLIT DISTRIBUTION TUBING L — APPLY BUG CAP i0 ENDS CLAMP, ATTACH TO STEEL FRAME SAME AS ROPE TIE PLATE HANGING POT COPPER 90 DEGREE ELS, CxC— EXISING ROPE TIE PLATE ATTACHED TO POSTS W/ SCREV.S HOLDING PLATE, ATTACH SAME AS POPE TIE PLATE, SAME COLOR AS PAVIUON K COPPER PIPE, PAVILION BASE POSTS DRILL HOLE IN PAVER K COPPER PIPE, 31, FROM CONTROL VALVE ASSEMBLY PVC SLEEVE, I h' BACK UEVI NOTE: 1. MALE THREADS MUST BE PLASTIC AT TRANSITION FROM PLASTIC PIPE TO COPPER, PIPE NEAR CONTROL VALVE. 2. UUNOERGROUNO L VERTICAL PIPE TO BE V K COPPER, HORIZONTAL PIPE ON ROOF TO BE Y' COPPER. 3. PIPE CLAMPS FOR COPPER TUBIP!G i0 BE SPACED 6' f.1A%MMUN. 3' 7bo Green Plant h7c. Professional tandscape Services April 4, 2008 Mr. Matt Robenalt 045 Compton Street 13)oomfield, Coloiado 80020-7634 Phone: 303.938.8230 fax: 303.9.38.81.37 Downtown Dovelnpnrent;±r,tlra; its 19 Old Town Square, Suite 230 Port Collins, Colorado 80524 Olcl Town Square Phase I mxl Phase II Change Order 42 The Green Plan; Inc. proposes the following change for Phase I,: Installation of pavilion hanging pot drip system. Stub copper to the top. The City will extend to flue planters. Total Materials and Labor: Original Rid Amount: Change Order #I -Net Change: Revised Contract Amount: Change Order #2-Net Amount: Revised Contract Amount: Please sign and date below to indiccde accepted: Accepted: Rttyrnoncl Ty e��ions Manager The Green Plena, Inc. Date: 6/0 $ 350.00 S 84,205.00 $ 5,691.00 S 89,896:00 $ 350.00 $90,246.00 Matt R lalt, Prorger Downtown DevelopmentAuthor•ith as Agent for Old Town Square Date: 1-1. I -1- 0CJ