HomeMy WebLinkAboutCHANGE ORDER - BID - 8851129 OLD TOWN SQUARE IRRIGATIONCHANGE ORDER NO. ft1
PROJECT Tll'LE: Old Town Square Plaza Irrigation
CONTRACTOR: Green Plan, In.c
PROJECT NUMBER:
PURCHASE ORDER NO 8SG1129 "
DESCRIPTION:
Phase 1 Installation of Stage Pavillion hanging pot chip
system.
1. Reason for change: Change in requested materials and extension of drip system Plumbing
2. Description of Change: See attached thawing.
3. Change in Contract Cost: $350.00
4. Change in Contract Time: 2
ORIGINAL CONTRACT COST -
$84,205.00
TOTAL APPROVED CHANGE ORDER
$5,691.00
TOTAL PENDING CHANGE_ ORDER
$0.00
TOTAL THIS CHANGE ORDER
$350.00
TOTAL % OF ORIGINAL CONTRACT, THIS C.O.
0,42%
TOTAL % OF ORIGINAL CONTRACT, ALL C.O.'S
7.18%
ADJUSTED CONTRACT COST
_ $90,246.00
(Assuming all change orders approved)
ACCEPTED BY: _ 1"
DATE _ f
Contractor's Represents ive
DATE:
ACCEPTED BY:
Project Manager
REVIEWED BY,
DATE:
Title:
(
APPROVED BY:
DATE:
Title:
APPROVED BY:
DATE:
Purchasing Agent over $$30,000
cc: Contractor Architect
Project File Engineer
Purchasing
SIDE VIE4i
3.AS(ETS 4aNG FROM
ROUND TUBES ON ROOF
PAVILION ROOF ARCH �/�
COPPER PIPE. )4 1-
COPPER TEE. 34', CCC Y./ Mk —
RAN BIRD XBT-2C—PC EMITTER
SPLIT DISTRIBUTION TUBING L —
APPLY BUG CAP i0 ENDS
CLAMP, ATTACH TO STEEL FRAME
SAME AS ROPE TIE PLATE
HANGING POT
COPPER 90 DEGREE ELS, CxC—
EXISING ROPE TIE PLATE
ATTACHED TO POSTS W/ SCREV.S
HOLDING PLATE, ATTACH SAME AS
POPE TIE PLATE, SAME COLOR AS
PAVIUON
K COPPER PIPE,
PAVILION BASE POSTS
DRILL HOLE IN PAVER
K COPPER PIPE, 31, FROM
CONTROL VALVE ASSEMBLY
PVC SLEEVE, I h'
BACK UEVI
NOTE:
1. MALE THREADS MUST BE PLASTIC AT TRANSITION FROM PLASTIC PIPE TO COPPER, PIPE NEAR CONTROL VALVE.
2. UUNOERGROUNO L VERTICAL PIPE TO BE V K COPPER, HORIZONTAL PIPE ON ROOF TO BE Y' COPPER.
3. PIPE CLAMPS FOR COPPER TUBIP!G i0 BE SPACED 6' f.1A%MMUN.
3'
7bo Green Plant h7c.
Professional tandscape Services
April 4, 2008
Mr. Matt Robenalt
045 Compton Street
13)oomfield, Coloiado 80020-7634
Phone: 303.938.8230
fax: 303.9.38.81.37
Downtown Dovelnpnrent;±r,tlra; its
19 Old Town Square, Suite 230
Port Collins, Colorado 80524
Olcl Town Square
Phase I mxl Phase II
Change Order 42
The Green Plan; Inc. proposes the following change for Phase I,: Installation of pavilion
hanging pot drip system. Stub copper to the top. The City will extend to flue planters.
Total Materials and Labor:
Original Rid Amount:
Change Order #I -Net Change:
Revised Contract Amount:
Change Order #2-Net Amount:
Revised Contract Amount:
Please sign and date below to indiccde accepted:
Accepted:
Rttyrnoncl
Ty e��ions Manager
The Green Plena, Inc.
Date: 6/0
$ 350.00
S 84,205.00
$ 5,691.00
S 89,896:00
$ 350.00
$90,246.00
Matt R lalt, Prorger
Downtown DevelopmentAuthor•ith
as Agent for Old Town Square
Date: 1-1. I -1- 0CJ