Loading...
HomeMy WebLinkAboutCHANGE ORDER - BID - 6062f City of Farf Collins Engineering Department Change Order Form PROJECT TITLE: Horsetooth-Ziegler Roundabout & Ziegler Rd. Improvements PROJECT NUMBER: 30523286.E (Bid No. 6082 CONTRACTOR: Naranjo Civil Contractor O No: 88514244 CHANGE ORDER NUMBER: 1 1. Reason for change. 2. Description of change. 3. Change in contract cost. 4. Change in contract time. 1.&2. See attached invoice for details 3. The contract cost will increase by $319.40 4. There will be no change in contract time. ORIGINAL CONTRACT COST TOTAL APPROVED CHANGE ORDERS TOTAL PENDING CHANGE ORDERS TOTAL THIS CHANGE ORDER TOTAL % OF THIS CHANGE ORDER TOTAL C.O. % ORIGINAL CONTRACT ADJUSTED CONTRACT COST ACCEPTED BY: REVIEWED BY: (Engineer) 0.05% 0.05% $694,103.00 $0.00 $0.00 $319A0 $694,422.40 /s-0e SUBMITTED BY: A( �/� , �SN� DATE: eltzgoO /' (Project Manager) y APPROVED BY: \ -,h ")")"ALL11,A11 DATE: 4-16-09 �j (Department Head) APPROVED BY: DATE: (Purchasing Agent over $30,000) cc: Contractor Purchasing Project File Engineering Department • 231 North College Avenue • P.O. Box 530 • Port Collins, CO 80522-0580 • (970) 221-6605 Horsetooth-Ziegler Roundabout and Ziegler Road Improvements Change Order No. t - Mouth City of Fort Collins Bid No. 6082 Contractao Patent, Civil Constn:ctors DESCRIPTION: 1. Reason for Change: A Quantity Achushearas 2. Description of Change: Ou final Contract This Chan eOrder Revised Comact AmOont Item It.. Description Quantity Unit Unit price Total Quantity Unit Price Total Quantity Unit Price Total 20205 iRemavx Nirc Fmcc 80 LF S 230 S to<09 280.0D S 230 S 644OD 3600g $ 2.30 S 826.00 2,2" IMillgs1.111rve B I —in Place- DSve',vafor Warren Prc n 1210 SY $ 4.80 S 5.60809 2.32.00 S 4.80 S 111360` 97800 5 4.80 $ 4,6a4,40 21004 Relocate FieeHd.nt 1 Eq S 110000 S L10000 :.DO $ 1.100,0 S 1100M 200 51.100.00 S 2.20000 506-01 Type U 8ma0 Ri Ra a/BMOino and 6- Tosoil 1 EA S 63400 S 63409 1.00 S 634.00 $ 63400 2.00 6 634.90 $ 1288O0 505-02 10'4118'7e'U Sorted Ri Ra WBecid, and 6'To soil 2 FA S 52600 S 104800 ��.DD)_ S 524.00 S l524.00) 1,00 S 52,1.00 $ 524.00 50S-03 5x5k18'P a"i &inetl Ri ga n/Betldin end G"To it 1 EA S 41200 S 41200 1.00 S 5'2.00 $ 112.00 2,00 S 112,00 S 824 CD 603-01 15"RCP Chat 111 33 LF 5 4900 S 1617.00 17.00 S 4900 5 J833.091 1600 $ 49.OD S T84C0 Total from Original Contract 5 10,803.11 1 Total lncreaselDoerease 5 319.40 Total After Change Order S 11,422.40 3. Change in Contract Cost $ 319AO 4. Charge in Contract Time: None